DCD-PW Fee ScheduleResolution No. 116-23 FEE SCHEDULES FOR DEPARTMENTS OF COMMUNITY DEVELOPMENT AND PUBLIC WORKS Effective January 15, 2024 A. General 1. No permit shall be issued, application accepted, service provided, or appeal filed without payment of the applicable fee set forth below. 2. Time of collection of fees. a. Fees shall be collected at the times specified in the City Code or this Fee Resolution. If not specified, the minimum fee shall be collected at the time of application submittal. No application will be deemed "counter complete" until the fee due with the application has been received by the City. b. For applications that are submitted online, the applicant can pay the fees electronically or may submit another form of payment in person or via U.S. Mail. The determination of whether a permit application is "counter complete" will be deferred for four business days following submittal of the online application submittal. If payment for the fees is not received by the City by the fourth business day, then the City will reject the application. In no case will the City take any steps to process an application until such time as the fees due with the application are received in full. c. The City may bill an applicant and require payment for accrued fees at any time in the permit review process. d. The final fees will be recalculated during review, and any additional amount due shall be collected prior to the issuance of the permit, approval, denial, decision or recommendation. e. At the time an application or permit is denied or canceled, the final fee shall be determined and collected. f. Any fee in excess of the final calculated fee shall be refunded pursuant to Refunds Table 25. g. All outstanding fees shall be paid prior to scheduling or performing final inspections. 3. References to the director refer to the director of the Department of Community Development or his/her designee. 4. Some projects require more than one permit. A project may require the payment of numerous fees from the tables below. B. Building, Plumbing, and Mechanical Fee Policies 1. No temporary or final certificate of occupancy will be approved or issued for a project with any outstanding fees on any permit associated with the project. 2. Some signs require a building permit in addition to a land use (sign) permit. In these instances, the permit fees are additive. When an applicant is required to obtain a sign permit and a building permit, separate fees are required for each permit. 3. The applicant for a permit shall provide an estimated construction cost at the time of application. The amount shall be the contractor's bid price, rounded up to the next whole dollar. For work not done by a contractor, the construction cost shall include the price of materials, plus the fair market value of any donated, contributed or found materials, multiplied by two (2). Construction cost calculated on 100 square feet shall be rounded up to the next 100 square feet for any portion thereof. Page 1 of 24 4. Single family home builders who wish to reuse a plan set to construct more than one home using the same plan set may do so by utilizing a "basic plan" review process. When an applicant wishes to establish a basic plan set for reuse, the plans shall initially be reviewed upon payment of the city's standard plan review fee. Once plan review is complete and if the City finds that the plans conform to the requirements of the Building Code, the plans shall be approved as a basic plan set and marked as such for reuse. For each use of the plan, the applicant shall pay a reduced plan review fee as established in Table 3 in lieu of the full plan review fee. The use of an approved basic plan set shall have no effect on the building permit fee (only the building permit plan review fee). Plans may not be reused if the city's building code has been updated unless the plans have been re -reviewed (upon payment of the full plan review fee) and approved for conformance with the updated building code. TABLE 1: Fee Calculations. Permit fees and Plan Review fees shall be determined by using the calculations found in Table 1. Valuations shall be determined using the IBC Building Valuation Data Table (BVD) (currently the February August 2023 table as attached hereto) except as noted in the BVD Table and as otherwise set in Tables 2 and 3. Fee calculations and set fees found in Tables 2 and 3 apply to: 1. Alterations or repairs to existing buildings, based on the construction cost as determined by either the contractor's bid price or construction materials x 2. 2. Processes with a fixed fee. 3. Processes with a fixed fee plus inspection fees. 4. Valuations base on square footage calculations which are not in the BVD Table. 5. Fees as a percentage of permit fee. Total Valuation FEES (Permit Fee = 100% Plan Review Fee = 65%) $1 to $500 $36.00 $36.00 for the first $500 plus $4.00 for each additional $100, or $501 to $2,000 fraction thereof, to and including $2,000 $96.00 for the first $2,000 plus $17.00 for each additional $1,000, or $2,001 to $25,000 fraction thereof, to and including $25,000 $487.00 for the first $25,000 plus $12.00 for each additional $1,000, or $25,001 to $50,000 fraction thereof, to and including $25,000 $787.00 for the first $50,000 plus $9.00 for each additional $1,000, or $50,001 to $100,000 fraction thereof, to and including $100,000 $1,237.00 for the first $100,000 plus $7.00 for each additional $1000, $100,001 to $500,000 or fraction thereof, to and including $500,000 $4,037.00 for the first $500,000 plus $6.00 for each additional $1,000, $500,001 to $1,000,000 or fraction thereof, to and including $1,000,000 $7,037.00 for the first $1,000,000 plus $5.00 for each additional $1,000,001 and up $1,000, or fraction thereof Page 2 of 24 TABLE 2: Residential Single Family Building Permit Type Amount Unit of Measure Calculate construction Apply construction cost at $23.50 per Unfinished Basement (Group R-3) cost to Table 1 Square foot Construction cost Apply construction (contract price or Finish an existing basement cost to Table 1 materials x 2) Construction cost Conversion of an existing garage to residential Apply construction (contract price or space cost to Table 1 materials x 2) Calculate construction Apply construction cost at $13.04 per New Foundation only or under existing structure cost to Table 1 square foot Calculate construction New garage, shed, barn, or pole building (attached Apply construction cost at $64.19 per or detached) cost to Table 1 square foot Calculate construction Apply construction cost at $21.07 per New covered porch, covered deck; cost to Table 1 square foot Calculate construction Apply construction cost at $13.04 per New deck, uncovered cost to Table 1 square foot Construction cost Apply construction (contract price or Alteration or addition to deck, uncovered cost to Table 1 materials x 2) Construction cost Alteration, repair, or addition to an existing Apply construction (contract price or covered porch or covered deck cost to Table 1 materials x 2) Calculated construction cost at New freestanding roof structures and carports, Apply construction $21.07 per square other than porch or deck cost to Table 1 foot Construction cost Apply construction (contract price or Residential Interior Remodel cost to Table 1 materials x 2) Page 3 of 24 TABLE 3: Miscellaneous Permit fees: Building Permit Type Amount Unit of Measure Apply construction cost to Calculate construction cost Shoreline bulkhead walls Table 1 at $118.00 per Linear Foot Demolition $75 Each Apply construction cost to Calculate construction cost Fences over 6 feet in height Table 1 at $11.74 per Linear Foot Apply construction cost to Calculate construction cost Garages or Carports, Multiple Table 1 at $64.19 per square foot Apply construction cost to Calculate construction cost Retaining walls Table 1 at $19.67 per Linear Foot Tank: Underground or Above Ground, Apply Construction Cost Construction cost (contract Installation or Removal to Table 1 price or materials x 2) Apply Construction Cost to Calculate construction cost Roof: Hot Mop/Cold Mop (flat roof) Table 1 at $90 per 100 SQ FT Apply Construction Cost to Calculate construction cost Roof: Composition, Metal Table 1 at $70 per 100 SQ FT Apply Construction Cost to Calculate construction cost Roof: Wood Shake Table 1 at $140 per 100 SQ FT Apply Construction Cost to Calculate construction cost Roof: Concrete, Tile, Slate Table 1 at $140 per 100 SQ FT Apply Construction Cost to Calculate construction cost Roof: Torch Down Table 1 at $90 per 100 SQ FT Apply Construction Cost Construction cost (contract Residential Misc. to Table 1 price or materials x 2) Commercial Tenant Improvement and Apply Construction Cost Construction cost (contract Misc. to Table 1 price or materials x 2) Tenant Certificate of Occupancy for new business; All other C of O included in building permit fee. $75 Each Revised Certificate of Occupancy for business name change, or business ownership change, or property ownership change. $60 Each Manufactured or mobile home placed on lot or first time placement in MH park (Does not include porches, decks, or other added work covered under the IRC) $150 Each Page 4 of 24 Table 3. Miscellaneous Permit fees, continued: Building Permit Type Amount Unit of Measure Manufactured or mobile home replacement in MH park (Does not include porches, decks, or other added work covered under the IRC) $75 Each $75.00. Inspection fees at the Modular Units, Field Assembly hourly rate will apply. Reactivation fee, for permit expired for less than one year, no plan changes 50% of original permit fee Violator must obtain the required permit and pay double the permit fee, or a $75.00 minimum penalty if Work without a permit — penalty; Double the permit fee, or the permit fee is less than $75 minimum. $75.00. Apply Construction Cost to Construction cost (contract Sign (when a building permit is required) Table 1 or materials x 2) Carport or Canopy, pre-fab kit installation $100 Each Residential siding replacement: permit required when over 1000 sq. ft. or if any structural work is required (POMC Apply Construction Cost to Calculate construction cost 20.200.014) Table 1 at $70.00 per 100 Sq. ft. Apply Construction Cost to Calculate construction cost Commercial siding replacement Table 1 at $70 .00 per 100 Sq. ft. Single Family Residential plan review using a basic plan on a site specific lot $225 For each use Single Family Residential basic plan review, additional elevation(s) after the first one $225 Each additional elevation $75.00. Inspection fees at the Underground plumbing only hourly rate will apply. Apply Construction Cost to Construction cost (contract Windows or Doors Table 1 price or materials x 2) Page 5 of 24 Fire Code Permits Fire Code permit projects may be reviewed by a consultant under contract services, depending on city staff workload. Plan review fee submitted with the application may cover the consultant cost. TABLE 4: Fire Code Permit Fees: Fire Construction Amount Calculation Fire Alarm, new Construction cost Apply Table 1 (contract price or to construction materials x 2) cost Fire Alarm, minor modifications to existing Construction cost Apply Table 1 (contract price or to construction materials x 2) cost Fire Sprinkler, new or major modification Construction cost Apply Table 1 (contract price or to construction materials x 2) cost Fire Sprinkler, modifications 20 heads or fewer Construction cost Apply Table 1 (contract price or to construction materials x 2) cost Fire Suppression System, Class 1 Hood and Duct Construction cost Apply Table 1 (contract price or to construction materials x 2) cost Solar Panels: Solar energy/photovoltaic panel $235 each system roof mounted install per WAC 51-51-2300 Sec. M2302 Standpipe System Construction cost Apply Table 1 (contract price or to construction materials x 2) cost Tank: Underground or Above Ground, Installation or Construction cost Apply Table 1 Removal (contract price or to construction materials x 2) cost Fire Construction permits, other Construction cost Apply Table 1 (contract price or to construction materials x 2) cost Page 6 of 24 Table 4. Fire Code Permit Fees, continued: Fire Operational Amount Calculation High Piled Storage $75.00 An inspection fee at the hourly rate will apply when an inspection is required. Temporary Tent or Membrane Structure Permit required. No permit fee. Technology fee applies. Fire operational permits, other $75.00 An inspection fee at the hourly rate will apply when an inspection is required. Fireworks Display Permit Pass through from Kitsap County ILA Mobile Food Preparation Vehicle Technology fee applies. Page 7 of 24 Plumbing Permit Fees Plumbing permit fees shall be calculated using the commercial and residential schedules in Tables 5 and 6. TABLE 5: Commercial Plumbing Permit Fees Commercial Plumbing Fixtures Fee Per Base Fee Applied to All Plumbing Permits $23.50 Flat Fee Backflow protective device 2 inches or less $9.80 Each Backflow protective device larger than 2 inches $15.00 Each Clothes Washing Machine $9.80 Each Dish Washer $9.80 Each Drainage Pipe or Vent Pipe Repair or Alteration $9.80 Each Drinking Fountain $9.80 Each Floor Drain $9.80 Each Hose Bibbs, each $1.00 Each Industrial/Sand Oil Interceptor $9.80 Each Grease Interceptor $9.80 Each Lawn Sprinkler System with Backflow Device $9.80 Each Medical Equipment / Kidney Machine $9.80 Each Medical Gas, each additional outlet in excess of first 5 $5.00 Each Medical gas system up to 5 outlets $50.00 Each Misc. Plumbing fixtures on one trap $9.80 Each Roof Drain $9.80 Each Sewer Line Repair and/or Replace, Exterior $50.00 Each Sewer Pipe Change, Interior $9,80 Each Sink (Lavatory, Kitchen, Mop, or Bar Sink) $9.80 Each Floor Sink and /or Indirect Waste $9.80 Each Multi - Compartment Sink $9.80 Each Shampoo Sink w/interceptor $9.80 Each Toilet, Water Closet, Bidet, or Urinal $9.80 Each Tub with or without Shower, or Shower $9.80 Each Water Heater $9.80 Each Water Line Repair and/or Replace, Exterior $50.00 Each Water Pipe Change, Interior $9.80 Each Other $9.80 Each Page 8 of 24 TABLE 6: Residential and Multi -Family Plumbing Permit Fees Residential Plumbing Fixtures Fee Per Base Fee applied to all Plumbing Permits $23.50 Flat Fee Clothes Washer $7.00 Each Dishwasher $7.00 Each Floor Drain $7.00 Each Hose Bibb $1.00 Each Hot Tub $14.80 Each Lawn Sprinkler with backflow preventer $7.00 Each Sewer Line Repair and/or Replace, Exterior $50.00 Each Sewer Pipe Change, Interior $7.00 Each Sink (Lavatory, Kitchen, Mop) $7.00 Each Tub with or without shower, or shower $7.00 Each Toilet, Bidet or Urinal $7.00 Each Water Heater $7.00 Each Water Line Repair and/or Replace, Exterior $50.00 Each Water Pipe Change, Interior $7.00 Each Other $7.00 Each Mechanical Permit Fees Mechanical permit fees shall be calculated using the commercial and residential schedules in Tables 7 and 8. TABLE 7: Commercial Mechanical Permit Fees Commercial Mechanical Fixtures Fee Per Mechanical Permit Base Fee $23.50 Flat Fee Air -Handling Unit < 10,000 CFM $14.80 Each Air -Handling Unit > 10,000 CFM $18.10 Each Type 1 Hood & Duct Systems $10.65 Each Type 2 Hood & Duct Systems $10.65 Each Clothes Dryer with exhaust $10.65 Each Compressors $14.70 Each Cook stove only $10.65 Each Ducting Change without New Furnace $13.70 Each Evaporative Coolers, permanently installed $10.65 Each Fan for Bath and/or Exhaust Fan $7.25 Each Page 9 of 24 Commercial Mechanical Fixtures, continued. Fee Per Commercial Furnace & Ducting < 100,000 btu $14.80 Each Commercial Furnace & Ducting > 100,000 btu $18.20 Each Combo Gas pipe / Water Heater / Furnace $35.45 Each Fuel System Outlets in excess of the first 4 $2.00 Each Fuel Pipe System LPG, Natural Gas, OIL (first 4 outlets) $10.65 Each Miscellaneous Mechanical Equipment $10.65 Each Mechanical System Pumps (Misc.) $10.65 Each Radiant Heat Units (wall, ceiling, floor, recessed, etc.) $10.65 Each Unit Heater, Suspended or Floor Mount $14.80 Each Gas Water Heater Vent & Combustion Air Propane tank over 2000 gallons $10.65 Each $10.65 Each TABLE 8: Residential and Multi -Family Mechanical Permit Fees Residential Mechanical Fixtures Fee Per Air conditioning, separate install from furnace $14.80 Each Base Fee applied to all Mechanical Permits $23.50 Flat Fee Bath Fan and/or Exhaust Fan $7.25 Each Clothes Dryer w/exhaust $10.65 Each Cook Stove w/exhaust $10.65 Each Fireplace - Gas or Gas log inserts $12.00 Each Fireplace - Wood or Wood Stove $12.00 Each Furnace — Electric, +/- AC, Heat Pump, ducting $14.80 Each Furnace Natural Gas +/- Ducting $14.80 Each Furnace Propane +/- Ducting $14.80 Each Fuel Pipe System LPG, Natural Gas, Oil $10.00 Each Gas pipe stub -out $10.65 Each Gas Water heater, Vent and Combustion Air $10.65 Each Generator $10.65 Each Heater, Wall or Baseboard $10.65 Each Mini Split System, AC and/or Heat $14.80 Each Misc. Mechanical Equipment $10.65 Each Propane Fuel Tank Under 2000 Gallons $10.65 Each Page 10 of 24 C. Planning and Land Use Fees The planning and land use permit fees listed in the tables below shall be paid at the time an application is submitted to the city unless otherwise specified. TABLE 9: Subdivisions Short Subdivision, Preliminary $1,200 Short Subdivision, Final $700 Short Subdivision, Preliminary, or Alteration $600 Short Subdivision, Final, Vacation or Alteration $500 Preliminary Subdivision Plats 10-20 lots $2,100 plus Hearing Examiner Fee Preliminary Subdivisions Plats 21+ Lots $2,100 + $50 Per Lot plus Hearing Examiner Fee Minor Modifications to a Preliminary Plat $600 Major Modifications to a Preliminary Plat, 5- 20 lots $2,100 plus Hearing Examiner fees Major Modifications to a Preliminary Plat, 21+ lots $2,100 + $50 per lot plus Hearing Examiner fees Boundary Line Adjustment $300 Final Plat $1,100 + 50 Per Lot Final Plat, vacation or alteration $1,100 + $50 per lot plus Hearing Examiner fees Binding Site Plan, Preliminary $1,200 Binding Site Plan, Preliminary, Alteration $500 Binding Site Plan, Final $700 Binding Site Plan, Final, Alteration or Vacation $500 TABLE 10: SEPA Project Checklist Review and Threshold Determination $300 Non -Project Checklist Review and Threshold Determination $300 Environmental Impact Statement Preparation Actual Cost, See SEPA Ord. Environmental Impact Statement Review Actual Cost, See SEPA Ord. Page 11 of 24 TABLE 11: Shoreline Permits Administrative Shoreline Substantial Development Permit $600 Shoreline Substantial Development Permit $900 plus Hearing Examiner Fee Shoreline Exemption (Letter) $150 Shoreline Conditional Use Permit $1,275 plus Hearing Examiner Fee Administrative Shoreline Conditional Use Permit $600 Shoreline Variance $1,275 plus Hearing Examiner Fee Administrative Shoreline Variance $600 TABLE 12: Land Use Permits Conditional Use Permit $1,375 plus Hearing Examiner Fee Critical Areas Exemption Request $135 Critical Areas Exception $1,275 plus Hearing Examiner Fee Critical Areas Variance $1,275 plus Hearing Examiner Fee Modification to Overlay District Boundaries $1,275 plus Hearing Examiner Fee Rezone (without Comp Plan Amendment) $1,375 plus Hearing Examiner fee Temporary Use Permit $150 Temporary Use Permit Extension $150 Variance, Administrative $300 Variance $1,275 plus Hearing Examiner Fee Variance, View Protection Overlay District $1,275 plus Hearing Examiner fee TABLE 13: Other Review Request for a statement of restrictions per $75 RCW 35.21.475 Accessory Dwelling Units $75 Administrative Interpretation (POMC $75 minimum, an additional deposit Chapter 20.10) may be required if city attorney review is required, any city attorney expenses related to an application for an administrative application shall be paid by the applicant prior to issuance of a decision Page 12 of 24 Table 13. Other Review, continued: Nonconforming Use $150 Pre -Application Meeting $150 (100% is credited to a subsequent related land use application if filed within 12 months) Development Agreements $1,000 Applied to the city's costs including city attorney fees regardless of whether a development agreement is approved Comp Plan Amendment (Text) $500 Comp Plan Amendment (Map) $1 875 Land Use and Development Regulations $500 Amendment (Text) Forest Practices Application (Local $300 Approval) Pre -Submittal Design Review $150 (up to 100% credited to a subsequent related permit application if filed within 12 months) Tax Abatement Exemption Application $1,500 Zoning Verification Letter $75 Signs Permits Signs may also require a building permit. See Section B.2 and Table 3. TABLE 14: Sign Permits A -Board Sign $25 Permanent Sign $50 Master Sign Plan Permit $300 Placement of WSDOT directional sign $75 Sign Variance $300 Page 13 of 24 D. Public Works Department Fees The Public Works Department permit fees listed in the tables below shall be paid at the time an application is submitted to the city unless otherwise specified. TABLE 15: Public Works Department Permits and Fees Public Works Cost Note No more than one minor LDAP Minor Land Disturbing Activity may be issued for the same Review and Permit (disturbances property (parcel and/or of less than 1,000 square feet) $50 address) in any 365 day period. $100 base fee, plus $100 for the first acre of disturbance + $25 for (Paid at the time of application each additional acre of submittal — covers Land Disturbance above 1 Disturbing Activity plan review acre. Area to be rounded costs). Acres of disturbance Land Disturbing Activity Permit up to the next higher should be rounded up to the Plan Review acre. $100 minimum fee. nearest acre. $100 for the first acre of disturbance + $50 for each additional acre of (Paid at time of permit issuance Disturbance above 1 —covers Land Disturbing acre. Area to be rounded inspection costs). Acres of up to the next higher disturbance rounded up to the Land Disturbing Activity Permit acre. $100 minimum fee. nearest acre. $100 for the first 3,000 square feet of new and replaced hard surface to be constructed + $25 for each additional 3,000 square feet or fraction (Paid at the time of application thereof of hard surface submittal — covers hard surface Stormwater Drainage Permit Plan to be constructed. $100 and stormwater improvement Review minimum fee. plan review costs). $100 for the first 3,000 square feet of new and replaced hard surface to be constructed + $50 for each additional 3,000 square feet or fraction Stormwater Drainage Permit thereof of hard surface (Paid at time of permit issuance to be constructed. $100 — covers hard surface and Stormwater Drainage Permit minimum fee. stormwater inspection costs) Street Use Permit Application Fee $50 Tree cutting permit $50 Page 14 of 24 Table 15. Public Works Department Permits and Fees, continued Public Works Cost Note The applicant shall pay the actual fee, including city Latecomer Agreement Review attorney costs, for preparing Fee $500 Deposit the latecomer agreement For uses which do not include the physical disturbance of the ROW Permit, Tier 1 $50 right-of-way. For activities which alter the appearance, or disturb the surface or sub -surface, or allow long term use of the right -of - ROW Permit, Tier 2 $230 way. Violator must obtain the required permit and pay double the permit fee or a Double the permit fee, or $75.00 minimum penalty if the Work without a Permit — Penalty $75 minimum. permit fee is less than $75.00. TABLE 16: Street Vacations Type Cost Street Vacation Petition Fee $120 Street Vacation Appraisal Fee (Refundable Deposit) $500 Deposit, Petitioner shall pay the actual cost of the appraisal. TABLE 17: Impact Fee Deferrals (POMC 20.182.110(4)) Type Cost Application for Impact Fee Deferral $300 minimum Lien release for Impact Fee Deferral $300 minimum TABLE 18: Residential Parking Permits Type Cost Residential Parking Permit $10 Replacement Parking Permit $5 Temporary Residential Parking Permit $10 Bed and Breakfast Parking Permit $10 Page 15 of 24 Concurrency (POMC 20.180) 1. Concurrency (Capacity Reservation Certificate) applications fees shall be based on the following table. Each type of application (Transportation, Water, or Sewer) shall include payment of an application fee (A) plus any consultant fees charged to the city (B) for concurrency review as applicable. 2. The Director of Public Works shall make all determinations as to whether an application is to be reviewed by the city or to be sent to the consultant for review. 3. When consultant review is required, the applicant shall pay the actual fee incurred by the city. Any balance owed shall be paid prior to the issuance of a concurrency certificate. TABLE 19: Concurrency Review Type of Review A B Application Fee (also Review Performed by Consultant: the total review fee for A scope and fee shall be obtained from the applications reviewed Consultant after the application is received. in house by the City) Transportation $150 Either Tier 1 (limited review) or Tier 2 (full review) fixed fees listed in consultant fee schedule. For projects that do not fit the categories, the fee will be determined on PM peak hour trip generation, or as determined in a not -to -exceed task order. Water $150 The applicant shall pay the amount shown in the scope and fee provided by the City's Consultant. Sewer $150 The applicant shall pay the amount shown in the scope and fee provided by the City's Consultant. Page 16 of 24 E. Hourly Rates. A minimum of one hour shall be charged per staff member when using the hourly rates. Additional charges shall be by the quarter hour per staff member. Plan review fees shall apply to the third and any subsequent submittals when plans are revised prior to approval. The fee shall be equal to the hourly rate for all staff performing the review, or the full permit plan review fee, whichever is less. Plan review fees shall apply to revisions to plans or documents which were previously reviewed and approved. The fee shall be equal to the hourly rate for all staff performing the review, or the full permit plan review fee, whichever is less. When an inspection fee is designated in the fee tables as additional on a permit, the fee shall be equal to the hourly rate for reinspection, with a minimum of one hour. Additional charges shall be by the quarter hour per inspection. The hourly rates shall be used to calculate deductions to refunds. A Reinspection fee is charged at the hourly rate for reinspection after the same inspection fails for the second time. TABLE 20. Type Hourly Rate Notes Plan Review, Building/Fire $75 Plan Review, Planning - DCD $75 Plan Review, Engineering — Public Works $85 Administrative, Permit Center $60 Reinspection, Building/Fire $75 After two prior inspections for same work Reinspection, Public Works $75 After two prior inspections for same work Reinspection, Planning $75 After two prior inspections for same work Inspections outside of normal business Hourly rate x Minimum charge: 2 hours hours, Public Works 1.5 $75 Alternate methods and materials review, $75 Building F. Work by Outside Consultants: Building and Fire Codes. 1. The jurisdiction may send permit applications to third -party consultants for plan review. The plan review fee paid as described in Section B covers the City's consultant cost, except for the following reviews: a. Third and subsequent submittals. The applicant shall pay the actual hourly costs as listed in table 21 for all 3rd and subsequent submittals. Page 17 of 24 b. Projects with total valuation exceeding $10,000,000, or projects of a significant complexity that require outside review such as courthouses, schools, hospitals as determined by the Building Official. For projects as described in this subsection, the initial plan review fee shall be applied to the 3rd party consultant review fee. If that fee is inadequate to fully pay the actual plan review fee then the applicant shall be billed for the additional cost as described in subsection 3 below. 2. The city may provide inspections by contracted services. Permit fees cover the consultant's inspection charges except for afterhours inspection. 3. The plan review fees and afterhours inspection fees as described in Sections 1 and 2 shall be billed at the rates provided in table 21. 4. The fees charged listed in table 21 shall are based on an hourly rate must be paid in full prior to the issuance of the permit, approval, denial, decision or recommendation, final inspection, or issuance of Certificate of Occupancy, as applicable to the type of permit and when the work is performed. 5. When the hourly rate is used for consultants, the fee may be rounded to the quarter hour. TABLE 21. Building and Fire Code: Consultant Services Hourly Rates. Types listed represent the most frequently used rates. Note that a Technician's time is often included with plan review, and will be reflected when billing at an hourly rate. Type Rate Notes Plan Review, 3rd and subsequent reviews $110 / hour Subject to current contract Plan Review, revisions to approved plans $110 / hour Subject to current contract Fire Code Plan Review: Reviewer $110 / hour Subject to current contract Technician $85 / hour Subject to current contract Inspections, outside of normal business hours $120 / hour Subject to current contract G. Work by Outside Consultants: Other Services. The applicant shall be required to pay the actual cost of 3rd party review by qualified consultants under contract with the city. 1. Special Reports Review. a. When an application includes the submittal of special reports and/or plans such as habitat management plans, geotechnical reports, or traffic impact analyses requiring review beyond the capabilities of city staff, the city will obtain a fee estimate from its consultant for the scope of work, and provide that estimate to the applicant for payment to the city. The city shall authorize the consultant to proceed once the payment has been received. b. If additional special review by the consultant is required, and amended scope of work and new estimate shall be obtained by the city for payment by the applicant before the additional work by the consultant can proceed. c. If the consultant's fee total is less than the full amount paid by the applicant, the remainder shall be refunded according to section K. and Table 25 Page 18 of 24 2. Alternative Forms Review. When the applicant proposes to use an alternative form instead of the city's standard approved form, the city may request review by the city attorney of the alternative form if a legal determination is required to ensure that the language in the proposed form adequately addresses the city's interests. The cost of review shall be paid by the applicant at the attorney's hourly rate. H. Appeal Fees. Fees are collected when the appeal is filed. Any appeal statement must be filed on the deadline established in the City's code relating to the specific appeal, together with a certified check in the amount of the appeal fee. If the City Council is the decision -maker on the appeal, only the appeal fee shall be charged. If any appellant believes that the payment of the appeal fee creates a financial hardship, it shall submit a request for an appeal waiver with the appeal statement on or before the deadline established in the City's code relating to the specific appeal. This request for an appeal waiver shall describe the appellant's financial situation and why payment of the appeal fee creates a financial hardship. As an example, the appellant may provide evidence that the appellant resides in a low-income household, which would include a single person, family or unrelated persons living together, whose adjusted income is less than eighty percent of the median family income, adjusted for household size, for Kitsap County. TABLE 22: Appeal Type Appeal Body Amount Abatement Hearing Officer $100 Building Code Building Board of Appeals $450 (BBOA) Concurrency Denial Public Works Director $100 Development Agreement Same as underlying permit Depends on underlying or associated legislative permit. approval Director's Code Interpretation Superior Court Appeals and any associated fees go directly to Superior Court. Fire Authority's Decision Building Board of Appeals $450 (BBOA) Illicit Discharge Detection and City Council $450 Elimination (IDDE) Notice and Order, revocation of permit, or assessment of costs of abatement IDDE Appeal, independent City Council Consultant services, consultant services actual costs to be paid. See Section F for consultant fees. Page 19 of 24 Table 22. Appeal Fees, continued. Appeal Type Appeal Body Amount Impact Fee Amount Director $100 Reconsideration Impact Fee Amount Established Hearing Examiner $450 Upon Reconsideration by the Director Impact Fee Credit Director $100 Reconsideration Impact Fee Credit Established Hearing Examiner $450 Upon Reconsideration by the Director SEPA Appeal Same as underlying permit $450 Street Use Permit Hearing Examiner $100 Type I, Director's Decision Superior Court Appeals and any associated fees go directly to Superior Court. Type II Permit Hearing Examiner $450. Type II Permit, Deposit for a Hearing Examiner Deposit is based on fee certified transcription of hearing estimate from for appeal from Hearing transcription service. Examiner's decision After the final invoice, any remainder of the deposit shall be refunded. Any fees in excess of the deposit shall be paid by the applicant. Type II Permit, appeal of Hearing Superior Court Appeals and any Examiner's appeal decision associated fees go directly to Superior Court. Type III permit, appeal of Superior Court Appeals and any Hearing Examiner's decision associated fees go directly to Superior Court. Page 20 of 24 I. Hearing Examiner Fees. Hearing Examiner fees (excluding appeals to the Hearing Examiner) shall be the Hearing Examiner's actual costs, plus an administrative fee. Fees and deposits are required to be paid when the application is submitted. Hearing examiner fees will be secured from the deposited amount and any remainder shall be refunded to the applicant at the end of the appeal period. Hearing Examiner fees in excess of the deposit amount will be billed to the applicant. The outstanding Hearing Examiner fees shall be paid by the applicant after notification of the amount due. Subsequent permits related to the hearing examiner decision may be withheld until hearing examiner fees are paid. City projects which require Hearing Examiner services are exempt from the deposit requirement. Instead, the bill from the Hearing Examiner shall be routed to the appropriate department for payment. TABLE 23: Type Amount TYPE III Hearing, Administrative fee $250 (non-refundable) Type III Hearing, deposit $3,000 deposit Appeal fee, for appeal of Hearing Examiner decision See Table 22. Appeal Fees Appeal fee, for appeals to the Hearing Examiner See Table 22. Appeal Fees. J. Other Fees. TABLE 24: Other Fees Type Cost Electronic documents on digital storage media or devices Actual cost Photocopies, 8 % x 11 $0.15 per page Public Notice signs Actual cost + 25% Published Notice in the city's official newspaper for Notice of Application, Notice of Hearing, SEPA Notice $300 each Mailing fee for Developer's issued permit package USPS Priority Flat Rate + 25% Technology Fee, for each permit application entered in the electronic permitting system. $10 (non-refundable, unless due to city oversight ) Page 21 of 24 Table 24. Other Fees, continued. Type Cost The applicant is responsible for paying recording fees for permit -related documents required to be recorded with the Kitsap Actual cost of recording is paid County Auditor. directly to the County Auditor. $75 for each occurrence on a permitted project. (See Work Without a Permit Posted Stop Work penalty for non -permitted work) Notary Service for signatures on permit application documents, including sureties. $10 per stamp K. Refunds. The applicant may request a refund when an application or permit is cancelled or withdrawn. Refunds may also be requested when a fee is overpaid. Refund requests must be submitted using the Permit Center's refund request form. Refund requests must be made within one year of the original payment date. Refund requests must be made prior to the expiration of the permit or application. Overpayment of a fee or fees paid on a cancelled or withdrawn application shall not be credited to another fee owed on the subject application or other associated applications or permits. Refunds shall be issued as authorized by the director. Prior to release of any refund, • All fees or charges owed on the subject application or permit will be deducted. • Expended staff hours for application review, processing or inspection will be deducted. Staff hours shall be calculated at the hourly rate in Table 20. The following items shall not be eligible for refund, unless applied incorrectly: • Technology fee. • Plan review fees once the permit has been issued. • Charges for work without a permit. • Convenience fee for credit/debit card payment. • Public Notice signs if posted on the property. • Consultant fee after work has been performed. Page 22 of 24 TABLE 25: Type Amount Plan Review fees for withdrawn, Expended staff hours shall be deducted. cancelled or returned building or fire No refund shall exceed 80% of the plan review fee. permit application prior to issuing a permit: Building or Fire Permit Fees: If the permit fee was paid and the application cancelled or withdrawn prior to issuance, 100% of the permit fee may be refunded provided no staff hours have been expended for inspections or preparing the permit for issuance. Expended staff hours shall be deducted after a permit has been issued. No refund shall exceed 80% of the permit fee after a permit has been issued. Land Use Permit/Application Fees: Expended staff hours shall be deducted. No refund shall exceed 80% of the initial application fee. Plan Review fees for withdrawn, Expended staff hours shall be deducted. cancelled or returned Public Works LDAP No refund shall exceed 80% of the plan review fee. or SDP permit applications prior to issuing a permit: LDAP or SDP Permit Fees: If the permit fee was paid and the application cancelled or withdrawn prior to issuance, 100% of the permit fee may be refunded. Expended staff hours shall be deducted after a permit has been issued. No refund shall exceed 80% of the permit fee after a permit has been issued. Consultant Fees If consultant fees are less than the initial estimate, the remainder shall be refunded after the consultant work is completed. Page 23 of 24 Building Valuation Data - August 2023 Important Points • The BVD is not intended to apply to alterations or repairs to existing buildings. Because the scope of alterations or repairs to an existing building varies so greatly, the Square Foot Construction Costs table does not reflect accurate values for that purpose. However, the Square Foot Construction Costs table can be used to determine the cost of an addition that is basically a stand-alone building which happens to be attached to an existing building. In the case of such additions, the only alterations to the existing building would involve the attachment of the addition to the existing building and the openings between the addition and the existing building. • The Square Foot Construction Cost does not include the price of the land on which the building is built. The Square Foot Construction Cost takes into account everything from foundation work to the roof structure and coverings but does not include the price of the land. The cost of the land does not affect the cost of related code enforcement activities and is not included in the Square Foot Construction Cost. Square Foot Construction Costs a, b, Group (International Building Code) IA B IIA IIB IIIA 11113 IV VA VB A-1 Assembly, theaters, with stage 335.89 324.58 316.94 304.93 286.87 278.00 295.62 266.02 257.55 A-1 Assembly, theaters, without stage 307.39 296.08 288.44 276.42 258.37 249.50 267.12 237.51 229.05 A-2 Assembly, nightclubs 269.94 261.93 254.48 245.85 230.56 223.99 237.02 209.57 202.79 A-2 Assembly, restaurants, bars, banquet halls 268.94 260.93 252.48 244.85 228.56 222.99 236.02 207.57 201.79 A-3 Assembly, churches 311.88 300.57 292.93 280.91 263.30 254.43 271.60 242.45 233.98 A-3 Assembly, general, community halls, libraries, museums 266.07 254.76 246.12 235.10 216.33 208.46 225.80 195.47 188.01 A-4 Assembly, arenas 306.39 295.08 286.44 275.42 256.37 248.50 266.12 235.51 228.05 B Business 260.69 251.13 241.86 231.65 210.99 202.73 222.56 186.21 177.81 E Educational 273.46 263.96 255.62 245.04 228.69 217.00 236.61 200.36 193.94 F-1 Factory and industrial, moderate hazard 160.20 152.78 143.34 138.64 123.55 117.41 132.48 102.44 95.93 F-2 Factory and industrial, low hazard 159.20 151.78 143.34 137.64 123.55 116.41 131.48 102.44 94.93 H-1 High Hazard, explosives 149.46 142.04 133.60 127.90 114.12 106.97 121.74 93.00 N.P.` H234 High Hazard 149.46 142.04 133.60 127.90 114.12 106.97 121.74 93.00 85.50 H-5 HPM 260.69 251.13 241.86 231.65 210.99 202.73 222.56 186.21 177.81 1-1 Institutional, supervised environment 262.22 252.95 244.31 235.67 215.42 209.47 235.71 193.82 187.73 1-2 Institutional, hospitals 434.15 424.59 415.32 405.12 383.35 N.P.` 396.02 358.57 N.P.` 1-2 Institutional, nursing homes 302.01 292.45 283.18 272.97 253.83 N.P.` 263.88 229.05 N.P.` 1-3 Institutional, restrained 295.86 286.31 277.03 266.83 247.95 238.69 257.74 223.17 212.77 1-4 Institutional, day care facilities 262.22 252.95 244.31 235.67 215.42 209.47 235.71 193.82 187.73 M Mercantile 201.37 193.36 184.91 177.28 161.72 156.15 168.45 140.73 134.95 R-1 Residential, hotels 264.67 255.41 246.77 238.13 218.35 212.40 238.17 196.75 190.67 R-2 Residential, multiple family 221.32 212.06 203.42 194.78 175.96 170.01 194.82 154.36 148.28 R-3 Residential, one- and two-familyd 209.61 203.74 198.94 195.12 188.41 181.45 191.77 175.86 165.67 R-4 Residential, care/assisted living facilities 262.22 252.95 244.31 235.67 215.42 209.47 235.71 193.82 187.73 S-1 Storage, moderate hazard 148.46 141.04 131.60 126.90 112.12 105.97 120.74 91.00 84.50 S-2 Storage, low hazard 147.46 140.04 131.60 125.90 112.12 104.97 119.74 91.00 83.50 U Utility, miscellaneous 114.09 107.37 99.89 95.60 85.13 79.54 90.99 67.39 64.19 a. Private Garages use Utility, miscellaneous c. N.P. = not permitted b. For shell only buildings deduct 20 percent d. Unfinished basements (Group R-3) = $23.20 per sq. ft. Page 24 of 24