Loading...
03/19/2018 - MinutesUtility Committee Minutes Meeting of March 19, 2018 Page 1 of 2 City of Port Orchard Utility Committee Meeting Minutes March 19, 2018 Utility Committee Members Cindy Lucarelli, Jay Rosapepe and Fred Chang met on March 19, 2018 at 9:30 a.m. at the Port Orchard City Hall – Room #306. Also present: Public Works Director/City Engineer Mark Dorsey and Water/Sewer Utility Manager Thomas Hunter. WSUD Draft Franchise Agreement - Update: PWD Dorsey advised Committee members that efforts to obtain an executed Franchise Agreement with WSUD have failed. The primary issue is WSUD’s continued refusal to comply with the City’s desire to have ALL contractors and/or utility providers meet the requirements of a Right-of- Way Permit (Traffic Control Plan and Bonding.) PWD Dorsey to send an email to General Manager Wilson, advising WSUD that no RW Permits will be issued until the Agreement is executed and work performed within the RW without a RW Permit will be stopped. To be continued. Foster Pilot Project Participation - Discussion: WSUM Hunter provided Committee members with a brief overview of the Foster Pilot Project, whereby the legislatively directed (Senate Bill #6091) – Department of Ecology managed Project; 1) Is an outcome of the Hirst decision. 2) Involves Municipal Water Law/Water Rights. 3) Involves historical water source withdrawal mitigation vs. future mitigations options. 4) Includes Local, State and Tribal participation. 5) Can draw upon the recent 5-year long USGS Groundwater Study results. 6) Will ultimately assist in the City’s future need to convert the Well#12/#13 ‘permitted’ source(s) to ‘perfected’ source(s). To be continued. Marina Pump Station CIP - Update: PWD Dorsey provided Committee members with an update on this much needed Sanitary Sewer CIP. Having scored well enough to be offered a 20-year $4.1M loan at 2% terms, the City has recently completed the professional services procurement process for the Ad Ready Design and Permitting phase of the project, selecting RH2 Engineering. The City is now working with RH2 on developing the Project Scope and Budget. To be continued. Well No. 9 - Update: PWD Dorsey and WSUM Hunter updated Committee members on the Well No. 9 Water Treatment Retrofit Construction Project, being that due to an ‘omission’ within our Contract template, the Project was again re-advertised on March Utility Committee Minutes Meeting of March 19, 2018 Page 2 of 2 16, 2018, with the new Bid Opening now scheduled for March 30, 2018. To be continued. Next Meeting(s): April 16, 2018 - 9:30 a.m. - City Hall (Room #306) Next SAC Meeting(s): April 18, 2018 - 6:30 p.m. - SKWRF Meeting Room Meeting adjourned at 10:22 a.m. cc: Council, City Attorney, Mayor and Department Heads