063-23 - JMG Constructors, LLC - Supplement / Change Order 1DocuSign Envelope ID: 44277B4B-3CF4-4775-BBBF-1 ED5A37359D3 CITY OF PORT ORCHARD Authorization for Change Order No. 1 Date: 4/2/2024 Contractor: JMG Constructors, LLC Project: Well 11 Site Improvement Proj. PO Box 241 Contract / Job # C063-23 Keyport, WA 98345 THIS CHANGE ORDER AUTHORIZES (add description). Additional Work/Construction Change Directives: Energy code requires the building have a R-9.5 value insulation for the conditioned spaces. The original design and specifications did not call for the exterior walls to be insulated. The following COP describes the work to be completed. COP 004A - R-9.6/1.5" foil faced poly rigid board installed at the interior of the CMU exterior walls, Taped Joints, Installed between furring strips at 16" OC. Fibercorr material, Wall panel installation, Trim installation, Painting Credit, Installation equipment. Change Order #1 Totals- $113,186.71 w/ tax. See COP 004A for breakdown. Amount Sales Tax Total Date Appvd by Original Contract $5,486,306.00 $510,226.46 $5,996,532.46 13-Jun-22 council Change Order 1 $103,556.00 $9,630.71 $113,186.71 23-Apr-24 Council Total Contract $5,589,862.00 $519,857.17 $6,109,719.17 have reviewed the Change Order information above and certify that to the best of my knowledge descriptions and costs are true and accurate. ' 494f, 2'ao� Contractor pproval Signature Ann Granlee - G.M. 04/02/2024 Denis Ryan Digitally signed by Denis Ryan Date: 2024.04.18 13:55:20-07'00' Public Works Director Denis Ryan Printed Name & Title Printed Name E3B96492F3F5847D ``DocuSigned by: Change Orders that do not exceed 10%, with a maximum of 6 PVfaA.IA SWA, $50,000, of either legally authorized budget limit or contract Approved: amount established by City Council can be approved by the Public r� Works Director. Ma Uocusigned by: Change Orders that do not exceed 10%, with a maximum of Attest: �('64 $100,000, of either legally authorized budget limit or contract RRR+RARAR amount established by City Council are to be approved by the City Clerk Mayor. 4/23/2024 Change Orders over $100,000 or exceed a total of 10% require Council Action. Council Approval Date DocuSign Envelope ID: 4427713413-3CF44775-1313BF-1 ED5A37359D3 JMG Constructors LLC COP 004A - Interior Wall Finishes Fibercore 03/18/24 Bid Totals Project No.: McCormick Woods Well #11 Contract No.: 063-23 Owner: City of Port Orchard COP 004 A Interior Wall Finishes Fibercore 03/18/24 Item Description Quantity Unit ITEM COST I Unit I Total 1 Fibercore Materials 1 LS 25,230.00 25,230.00 2 Wall Panel Installation 4960 SF 3.42 16,963.20 3 Trim Installation 2710 LF 3.45 9,349.50 4 Insulation Z Furring 16" O.C. 1 LS 38,801.00 38,801.00 5 Painting Credit 1 LS (8,001.94) (8,001.94) 6 Lift Rental 1 MTH 1,700.00 1,700.00 ITEM.11111111111111111111 :: TOTAL 84,041.76 Subtotal Direct Costs Trucks/Safety/Travel/Small Tools Liability Insurance Profit /Overhead Contractor Bond Subtotal Mark -Ups Total (Rounded) Sub Costs 84,041.76 0.00% - 1.0000% 840.42 21.00% 17,648.77 1.00% 1,025.31 19,514.50 103,556.00 Totals 103,556.00