Sedgwick Bethel DRAFT Existing Conditions Report CLEAN May 2024SedgW'*1Ck Bethel
Subarea Plan
DRAFT May 2024
Prepared for the
City of Port Orchard
ORCHARD
Prepared by
MAKERS
Leland Consulting Group
DRAFT May 2024
Contents
1. Introduction.................................................................................................................. 1
1.1 Plan Background and Context................................................................................ 1
Heading............................................................................................................................. 1
1.2 Study Area.................................................................................................................. 2
1.3 PSRC Regional Centers Framework......................................................................... 3
2. Existing Conditions........................................................................................................ 5
2.1 Existing Land Use and Zoning................................................................................... 5
2.2 Transportation...........................................................................................................16
Recent Transportation Planning Efforts..........................................................................16
Vehicular Circulation and Access..................................................................................19
Pedestrian Circulation and Access................................................................................22
BicycleFacilities...............................................................................................................23
Transit................................................................................................................................24
2.3 Parks, Open Space, and Critical Areas..................................................................26
Parksand Open Space...................................................................................................26
CriticalAreas....................................................................................................................26
2.4 Market Conditions Assessment................................................................................28
EconomicProfile..............................................................................................................28
DevelopmentPipeline.....................................................................................................31
Buildable Lands & Future Capacity...............................................................................32
2.5 Port Orchard Comprehensive Plan.........................................................................33
3. Goals and Vision.........................................................................................................35
3.1 Opportunities, Assets, and Challenges...................................................................35
3.2 Alternatives..............................................................................................................36
Heading............................................................................................................................36
3.3 Urban Design Framework.........................................................................................36
3.4 Land Use and Housing.............................................................................................36
3.5 Transportation...........................................................................................................36
3.6 Parks, Open Space, and Critical Areas..................................................................36
Port Orchard Sedgwick Bethel Subarea Plan • Existing Conditions
DRAFT May 2024
Exhibit
EXHIBIT 1-1
Caption............................................................................................................ 1
EXHIBIT 1-2
Sedgwick-Bethel Study Area..........................................................................
2
EXHIBIT 2-1
New Residential Developments in Sedgwick - Bethel ..................................
5
EXHIBIT 2-2
Existing Land Uses............................................................................................ 6
EXHIBIT2-3
Zoning.............................................................................................................. 8
EXHIBIT 2-4
Block Frontage Map#9.................................................................................13
EXHIBIT 2-5
Looking west from Sedgwick Road..............................................................14
EXHIBIT 2-6
Bethel Sedgwick Corridor Plan Conceptual Rendering .............................16
EXHIBIT 2-7
Bethel Sedgwick Corridor Schematics.........................................................17
EXHIBIT 2-8
Bethel Sedgwick Corridor Cross Sections.....................................................18
EXHIBIT 2-9
Port Orchard Transportation Improvement Program (TIP) Map.................21
EXHIBIT 2-10
Planned Non -Motorized Routes....................................................................24
EXHIBIT 2-1 1
Kitsap Transit Existing and Planned Facilities...............................................25
EXHIBIT 2-12
Parks, Open Space and Critical Areas........................................................27
EXHIBIT 2-13
Age in Sedgwick-Bethel Subarea and Port Orchard, 2023 ........................28
EXHIBIT 2-14
Household Incomes in the Sedgwick-Bethel Subarea and Port Orchard,
2023...................................................................................................................29
EXHIBIT 2-15
Top Job Sectors in Sedgwick-Bethel Subarea, 2012 and 2021 ..................30
EXHIBIT 2-16
Commuting Patterns in the Sedgwick-Bethel Subarea, 2021 ....................30
EXHIBIT 2-17
Existing and Pipeline Units in the Sedgwick-Bethel Subarea .....................31
EXHIBIT 2-16
Vacant and Redevelopable Parcels in Sedgwick-Bethel Subarea ...........
32
EXHIBIT 3-1
Sedgwick-Bethel Opportunities, Assets, and Challenges ...........................35
0 =*A
TABLE1-1 Caption............................................................................................................... 1
TABLE 1-2 Sedgwick-Bethel Subarea Capacity Summary ............................................... 4
TABLE 2-1 Building Types for Centers.................................................................................. 9
TABLE 2-2 Land Uses for Centers......................................................................................... 9
TABLE 2-3 City of Port Orchard Transportation Improvement Program (TIP) .................20
TABLE 2-4 Planned Nonmotorized Routes.........................................................................23
TABLE3-1 Caption..............................................................................................................36
Port Orchard Sedgwick Bethel Subarea Plan • Existing Conditions
Introduction - DRAFT May 2024
1. Introduction
1.1 Plan Background and Context
Heading
Body
Heading
Heading
EXHIBIT 1-1 Caption
SOURCE: MAKERS, 2024
TABLE 1-1 Caption
Text
SOURCE: City of Port Orchard, MAKERS, 2022
Port Orchard Sedgwick Bethel Subarea Plan - Existing Conditions
Introduction - DRAFT May 2024
1.2 Study Area
The Sedgwick-Bethel subarea spans across a total of 235.7 acres and is situated at the
intersection of Sedgwick Road and Bethel Road. It is bordered by Port Orchard's
unincorporated area to the east and by Blackjack Creek to the west. The study area
extends to the north, encompassing recent developments and other vacant and
developable lands. Revisions in the southern boundary excluded environmentally
sensitive wetland areas.
The current boundary of Sedgwick-Bethel subarea does not comply with the latest
Puget Sound Regional Council (PSRC) criteria for Countywide Centers. Following a
thorough evaluation and consultation with the city, the study area has been expanded
and revised in alignment with the PRSC Countywide Centers framework. This expansion
presents Port Orchard with new prospects for residential and commercial growth in this
part of the city.
EXHIBIT 1-2 Sedgwick-Bethel Study Area
r
C.
East x
sedgwick Bethel - — Port Orchard
y
1
Proposed New Subarea Boundary
G _ _ &Isfrg Subarea Boundary
Pori Orchard
Y Port Orchard VGA
o 40 soo Feer
N
Source _ Esrr Maxar. Earthsrar Geographics. aid the GIS User Community
SOURCE: City of Port Orchard, 2024
Port Orchard Sedgwick Bethel Subarea Plan - Existing Conditions 2
Introduction • DRAFT May 2024
1.3 PSRC Regional Centers Framework
PSRC 2018 Regional Centers Frameworks establishes eligibility requirements for
countywide centers designation. Below are the baseline standards expected for
countywide centers in each county.
Designation Criteria for Countywide Growth Centers
Identified as a countywide center in the countywide planning policies
Located within a city or unincorporated urban area
Demonstration that the center is a local planning and investment priority:
Identified as a countywide center in a local comprehensive plan; subarea
plan recommended
Clear evidence that area is a local priority for investment, such as
planning efforts or infrastructure
The center is a location for compact, mixed -use development; including:
A minimum existing activity unit density of 10 activity units per acre
Planning and zoning for a minimum mix of uses of 20 percent residential
and 20 percent employment unless unique circumstances make these
percentages not possible to achieve.
Capacity and planning for additional growth
The center supports multi -modal transportation, including:
Transit service
Pedestrian infrastructure and amenities
Street pattern that supports walkability
Bicycle infrastructure and amenities
Compact, walkable size of one -quarter mile squared (160 acres), up to
half -mile transit walkshed (500 acres)
TABLE 1-2 below summarizes the existing, pipeline, and additional land capacity for
units, population and jobs in the Subarea. According to Kitsap County's Countywide
Planning Policies, Countywide Centers must show a minimum of 10 Activity Units per
acre. An Activity Unit is one person or one job. As shown, the subarea with existing and
pipeline development meets this criteria, and with additional land capacity has a total
capacity in the future for up to 20.6 Activity Units per acre.
Port Orchard Sedgwick Bethel Subarea Plan • Existing Conditions 3
Introduction - DRAFT May 2024
TABLE 1-2 Sedgwick-Bethel Subarea Capacity Summary
Sedgwick-Bethel
Existing Pipeline Existing +
Pipeline
Acres 235.7
Additional
Land
Capacity
Total
235.7
Housing Units
292
457
749
1015
1764
Single Family
156
151
307
29
336
Condo
0
0
0
0
0
Multifamily
136
306
442
986
1428
People per
Household
Single Family
2.8
2.8
2.8
2.8
2.8
Condo
2.3
2.3
2.3
2.3
2.3
Multifamily
2.0
2.0
2.0
2.0
2.0
Population
716
1,042
1,758
2,059
3,817
Jobs
619
10
629
408
1,037
Activity Units
1,335
1,052
2,387
2,467
4,854
AUs / Acre
10.1
20.6
Requirements
Required Acres
160-500
160-500
Actual Acres
235.7
235.7
Surplus / Shortfall
75.7
75.7
Required Use Mix
Actual Res. Mix
20% Res. / Emp.
/ 6%
20% Res. /
Emp.
79%
Actual Emp. Mix
24%
21
Required AUs/Acre
10
10
Actual AUs/Acre
10.1
20.6
Surplus / Shortfall
0.1
10.6
SOURCE: City of Port Orchard, LCG
Port Orchard Sedgwick Bethel Subarea Plan - Existing Conditions 4
Existing Conditions - DRAFT May 2024
2. Existing Conditions
2.1 Existing land Use and Zoning
In recent years, there have been EXHIBIT 2-1 New Residential
significant developments in Sedgwick- Developments in Sedgwick -
Bethel, transforming the area. The Bethel
predominant land use now consists of
detached single-family homes, which are
built on previously undeveloped greenfield
sites. Sedgwick-Bethel continues to contain a
mix of land uses including a grocery store,
retail shops, and restaurants, and general
services (see EXHIBIT 2-2). There are other
civic facilities, such as Family Christian
Center and Hidden Creek Elementary
School, located within one mile of the
SOURCE: Google Earth, 2024
subarea, to the south and southeast. The
Bethel Centre, Sedgwick Plaza, and Fred Meyer are three commercial clusters located
along Bethel Road and Sedgwick Road.
In 2017, major residential construction projects began in Sedgwick-Bethel. The first of
these projects was Andaiso Village, a single-family subdivision, situated in the
northwestern quadrant of the study area. Following its completion, Magnolia Ridge and
Sidney Ridge subdivision started construction nearby. In addition, a new multifamily
residential complex, Pottery Creek Apartments, was recently built on the southern edge
of the subarea. Another multifamily project located along Blueberry Road, is under
construction and will likely be completed in early 2025. See 2.4 Development Pipeline.
One of the most notable features of these new housing developments is the inclusion of
playgrounds and open spaces, which enhance the quality of life for residents and offer
a greater sense of community through shared spaces.
Port Orchard Sedgwick Bethel Subarea Plan - Existing Conditions 5
Existing Conditions • DRAFT May 2024
EXHIBIT 2-2 Existing Land Uses
Retail
Medical
Greenbelt
Community Shopping Center
Storage Warehouse
��lSedgwick Bethel
Grocery
Single Family Housing
Q Port Orchard
Restaurant/Eateries
Multifamily Housing (5+ Units)
® Port Orchard UGA
Auto Service/Convenience Market Manufactured Home
Office
Undesignated
i 0 400
00 800 Feet
SOURCE: City of Port Orchard, MAKERS, 2024
The zoning for the subarea includes Commercial Mixed Use (CMU), Commercial Heavy
(CH), Commercial Corridor (CC), Residential 1 (R1), Residential 2 (R2), Residential 3 (R3),
and Residential (R4) (EXHIBIT 2-3). TABLE 2-1 and TABLE 2-2 list the key building types and
land uses for centers.
Generally, the maximum height for buildings and structures within Sedgwick-Bethel is
three stories, or 35 feet. Port Orchard's subarea policies describe a need to support
focused growth with compact development forms, and the height limits are a
significant barrier to achieving the added dwelling units and vertical mixed -use
buildings necessary to focus growth into the subarea. Allowing more height enables
Port Orchard Sedgwick Bethel Subarea Plan • Existing Conditions
Existing Conditions • DRAFT May 2024
developments to create additional dwelling units that help spread out of the cost of
construction. The cost and risk of developing mixed -use structures and leasing ground -
floor commercial space typically can be offset by a higher amount of residential floor
area. Since the COVID-19 pandemic, developers are indicating increased risk
associated with commercial development due to continued uncertainty about the
retail and particularly office markets. This further increases the attractiveness of
developments with a higher share of residential floor area.
Port Orchard allows height increases through the use of a transfer -of -development -
rights (TDR) ordinance adopted in 2019 in partnership with Kitsap County (Chapter 20.41
POMC). TDR programs are complex and require savvy participants and willing rural
landowners to participate. No project has yet used Port Orchard's TDR program, and
other Washington jurisdictions have found it difficult to attract participants to TDR
programs outside of the highest -priced markets.
Increased height limits and potentially larger buildings will be mitigated by the broad
set of multifamily and commercial design standards Port Orchard already has in place
(Chapter 20.127 POMC). These include standards to provide high -qualify building
massing, light and air access, useable open space, attractive materials, windows and
entries, and other provisions.
According to the Port Orchard Housing Action Plan, the economic benefits of light
wood frame construction are maximized with height limits in the 65-85 feet range. The
Housing Action Plan makes specific recommendations for height limits in several zones
that exist in the subarea.
Port Orchard Sedgwick Bethel Subarea Plan • Existing Conditions 7
Existing Conditions • DRAFT May 2024
EXHIBIT 2-3 Zoning
SOURCE: City of Port Orchard 2023 Zoning
Port Orchard Sedgwick Bethel Subarea Plan • Existing Conditions
Existing Conditions - DRAFT May 2024
TABLE 2-1 Building Types for Centers
Building Type Residential
Zones
Commercial Zones
R1
R2
R3
R4
CMU
CC CH
Key Building Types for Centers
Townhouse --
P*
P
P
P
-- --
Fourplex (and Triplex) --
--
P
P
--
-- --
Apartment --
--
P
P
P
-- --
Mixed Use Shopfront --
--
--
--
P
P --
Single-Story Shopfront --
--
--
--
P
P P
Other Building Types
Detached House P
P
P
--
--
-- --
Backyard Cottage P
P
P
--
--
-- --
Cottage Court P
P
P
--
--
-- --
Duplex: Side -by -Side --
P
P
--
--
-- --
Duplex: Back -to -Back --
P
P
--
--
-- --
Attached House --
P
P
--
--
-- --
Live-Work --
--
--
--
P
P --
General Building --
--
--
--
P
P P
Shopfront House --
--
--
--
P
P --
Key: P= Permitted Use C=Conditional Use -- = Use Note Permitted
SOURCE: Port Orchard Municipal Code 20.32.015 Building type zoning
matrix
*Note: In the R2 zone townhouses are limited to three
or four units (POMC 20.32.090.2)
TABLE 2-2 Land Uses for Centers
Key Land Uses for Centers Residential Zones
Commercial Zones
R1
R2
R3
R4
CMU
CC CH
Residential
Single-family detached P
P
P
--
--
-- --
Two-family --
P
P
--
--
-- --
Single-family attached (2 --
P
P
--
--
-- --
units)
Single-family attached (3-4 --
P
P
P
P
P --
units)
Single-family attached (5-6 --
--
P
P
P
P --
units)
Multifamily (3 or more units) --
--
P
P
P
P --
Permanent supportive housing C
C
C
C
C
C C
Commercial
Group day care (7 to 12) C
C
C
--
P
P --
Port Orchard Sedgwick Bethel Subarea Plan - Existing Conditions 9
Existing Conditions • DRAFT May 2024
Key Land Uses for Centers Residential Zones
R1 R2 R3
Day care center (13 or more) -- -- --
Indoor recreation* -- -- --
Outdoor recreation* -- -- --
Hotel -- -- --
Medical* -- -- --
Office* -- -- --
Personal service* -- -- --
Restaurants -- -- --
Commercial Zones
R4 CMU CC CH
-- C P P
-- P P P
-- C P P
-- P P P
-- C P P
-- P P P
-- P P P
-- P P P
Retail sales:
Up to 5,000 SF GFA -- -- --
-- P
P
P
5,001 - 15,000 SF GFA -- -- --
-- P
P
P
15,001 - 50,000 SF GFA -- -- --
-- --
P
P
Over 50,000 SF GFA -- -- --
-- --
C
P
Convenience store w/ fuel -- -- --
-- --
--
C
Convenience store w/o fuel -- -- --
-- C
P
P
Industrial
Light manufacturing -- -- --
-- --
--
--
Brewery, distillery:
Up 5,000 square feet -- -- --
-- --
--
P
5,001 - 15,000 square feet -- -- --
-- --
C
P
Over 15,000 square feet -- -- --
-- --
--
--
Food processing, boutique -- -- --
-- P
P
P
Self-service storage -- -- --
-- C
C
C
Key: P= Permitted Use C=Conditional Use -- = Use Note Permitted
SOURCE: Port Orchard Municipal Code 20.30.040 Use Table
*Note: Some specific types of uses within these categories have further restrictions per POMC 20.39.040
The CMU zone offers the most flexibility for residential uses because it allows single -
purpose apartment buildings, townhouses, and mixed -use buildings; the CC zone allows
apartments only in mixed -use buildings and residential use is mostly prohibited in the CH
zone. For residential zones, notably the R4 zone prohibits low -density building types and
residential land uses.
Port Orchard Sedgwick Bethel Subarea Plan • Existing Conditions 10
Existing Conditions • DRAFT May 2024
Middle Housing
The City is taking proactive measures to ensure compliance with Washington State's
new middle housing bills, HB 1110 and HB 2321, adopted during the 2023 and 2024
legislative sessions respectively. HB 1 1 10 mandates cities of specific size and locations to
permit multiple dwelling units per lot in areas that are traditionally exclusive to single-
family detached homes. HB 2321 modified the requirements created under HB 1 1 10.
The law is codified under RCW 36.70A.635.
What is Middle Housing?
"Middle housing" includes duplexes, townhouses, cottages, courtyard apartments, and
other building types that fall between the scale of single-family detached houses and
larger apartment buildings. Middle housing units tend to be more affordable to build than
single-family houses and offer greater varieties of layout and sizes that are suited for a
wider range of households. Expanding the areas where middle housing is allowed offer
greater opportunities for "starter homes", or homeownership, to all residents of a
community.
ADUs Duplexes/ Triplexes Fourplexes Cottage Clusters
Nil
Townhouses Courtyard apartments Small apartments (5-10 units)
Source: Makers, 2023
Currently, Port Orchard is a Tier 3 city as described by the Department of Commerce
Middle Housing Model Ordinance User Guide. Tier 3 cities must allow at least two units
per lot. Port Orchard is anticipated to cross the 25,000 population threshold and
become a Tier 2 city, which much must allow at least two units per lot and also at least
four units per lot when any lot provides one affordable housing unit and on lots near
major transit stops.
To implement middle housing effectively, Port Orchard proposes the redesignation of
properties currently within the R1 zone to R2, effectively repealing existing R1 zoning
standards and implementing middle housing building types mandated by HB 1 1 10 in
the R2 district.
Port Orchard Sedgwick Bethel Subarea Plan • Existing Conditions
Existing Conditions • DRAFT May 2024
The City of Port Orchard Housing Action Plan (HAP) provided guidance to promote
middle housing. The middle housing compliance strategy is part of the broader update
and adoption of the Citywide Comprehensive Plan by 2025.
Block Frontage Standards
Chapter 20.127 POMC provides citywide multifamily and commercial design standards.
Article II provides block frontage design standards, which are intended to design sites
and orient buildings with an emphasis on compatible development and creating a
comfortable walking environment. Many of Port Orchard's main streets are designated
on block frontage maps, and specific standards apply to different frontage
designations.
In this subarea Sedgwick Road is designated as "landscaped" and Bethel Road and
portions of Blueberry Road and Geiger Road are designated as "varied" in the
community design framework maps (POMC 20.127.130). Storefront frontages feature
traditional ground -floor commercial spaces at the edge of the public sidewalk.
Landscape frontages feature landscaped setbacks between the sidewalk and
building. Developments with "varied" frontages must use either "storefront" or
"landscaped" frontage standards. In some cases parking is restricted from being
located and visible adjacent to public sidewalks.
Sedgwick Road at the western edge of the subarea is designated as "gateway". This
designation is reserved for areas near highway interchanges with heavy vehicle traffic
and serve the purpose of providing attractive landscaped frontages.
In addition to the existing streets, EXHIBIT 2-4 Block Frontage Map #9 use black dashed
lines to indicate planned locations for new planned streets. Such streets can be
created through a City capital project or as a condition of private development
occurring on applicable lot. The block frontage type that applies on planned streets is
"other", regulated under POMC 20.127.210. In this subarea, the widening of Blueberry
Road and a portion of Geiger Road have been completed as a condition of recent
single-family subdivisions.
Port Orchard Sedgwick Bethel Subarea Plan • Existing Conditions 12
Existing Conditions • DRAFT May 2024
EXHIBIT 2-4 Block Frontage Map #9
SOURCE: POMC 20.127.130 Community design framework maps
Aesthetics and Design Standards
Located in the far southeast corner of Port Orchard city limits, this subarea is
transitioning from a rural setting into a more suburban setting. Aesthetics in the subarea
are typical of low -density, auto -oriented commercial and residential development in
the Puget Sound region, mixed with larger vacant parcels consisting of forestlands and
fields.
Most commercial properties contain one-story buildings which are deeply setback from
the street with large expanses of paving or wide landscaped buffers. There are several
drive -through businesses. Commercial signage is typical for the region and mostly
consists of monument signs and wall -mounted signs. Larger commercial buildings
typically have service access in rear -facing areas, while smaller commercial buildings
have trash collection located In cinderblock enclosures in parking areas.
Travel in the area is primarily by automobile, with little or no people walking and biking
visible. This is likely related to the long distances between residential and commercial
land uses and the incomplete nature of the sidewalk and bicycling network. See more
information in 2.2 Transportation.
Port Orchard Sedgwick Bethel Subarea Plan • Existing Conditions 13
Existing Conditions • DRAFT May 2024
Residential development consists of single -unit detached homes and apartment
complexes. Most of the residential developments were built within the last decade and
have been subject to more contemporary standards requiring good street networks
with multiple external connections. There are a few older single-family properties on
large lots fronting the western portion Sedgwick Road. On the eastern portion of
Sedgwick Road there is a concentration of new apartment complexes with three-story
buildings.
Some properties have decorative landscaped perimeters and trees located in parking
lots. The general auto -oriented nature of the environment competes with the aesthetic
benefits of trees, particularly due to the lack of street trees on Bethel Road and
Sedgwick Road. Many of the vacant properties have stands of larger trees and dense
vegetation, particularly to the west. The western half of the subarea has significant
topography, with a north -south ridge that drops steeply at the western boundary. The
east half of the subarea is flatter.
Roadway aesthetics are expected to improve with the implementation of the Bethel
and Sedgwick Road Corridor Plan, which calls for continuous sidewalks and landscape
strips along the length of Bethel Road within the subarea. Building aesthetics will also
improve over time through redevelopment, which must comply with the Port Orchard
multifamily and commercial design standards under Chapter 20.127 POMC. The design
standards ensure that new development is high quality, beneficially contributes to Port
Orchard's character, and upgrades the visual appearance of Port Orchard's principal
vehicular corridors.
EXHIBIT 2-5 Looking west from Sedgwick Road
SOURCE: Google, 2024
Port Orchard Sedgwick Bethel Subarea Plan • Existing Conditions 14
Existing Conditions • DRAFT May 2024
These design standards consist of:
• Article II - Block Frontage Standards (described above). Most importantly, new
buildings must be located adjacent to Bethel and Sedgwick rather than setback
behind parking.
• Article III -Site Planning Standards
o Standards for light and air access to residential dwelling units
o Nonmotorized circulation standards, including minimum connectivity
o Vehicular circulation standards for internal roadways
o Open space standards
o Standards for the design of service areas and mechanical equipment
• Article IV - Building Design Standards
o Prohibition on corporate architecture
o Building massing and articulation standards that reduce the perceived
scale of large buildings
o Building detail requirements for commercial ground floors
o Exterior material standards
o Requirements for treating blank walls
Port Orchard Sedgwick Bethel Subarea Plan • Existing Conditions 15
Existing Conditions • DRAFT May 2024
2.2 Transportation
Recent Transportation Planning Efforts
Bethel Road and Sedgwick Road Corridor Plan 2018
The objective of this study was to develop a comprehensive plan and conceptual
design for the two critical corridors in Port
Orchard: Sedgwick Road (State Route 160) EXHIBIT 2-6 Bethel Sedgwick Corridor
and Bethel Road. The two corridors are Plan Conceptual
major arterials that serve Sedgwick-Bethel
and provide connections to State Route 16,
downtown Port Orchard, and the Southworth
Ferry Terminal. Elements of the study were
centered on:
Ensuring mobility for all users, including
drivers, people walking and bicycling, ,
and transit riders
Supporting existing businesses and future
commercial growth in the area
Guiding future development of the
corridors through design considerations
and funding tools
The proposed design introduces roundabouts
on key segments of both roadways. In
addition, the study recommends
improvements in sidewalk connectivity,
bicycle facilities, and green stormwater SOURCE: Bethel Road and Sedgwick Road
infrastructure. The multi -phase Corridor Plan, City of Port Orchard, 2018
reconstruction of Bethel Road and
Sedgwick Road presents an opportunity to promote pedestrian -friendly green streets
and create an attractive, distinct gateway to the city. Phase I of Bethel Road corridor
improvement, which involves the installation of roundabouts at the intersections of
Bethel Road with Blueberry Road and Salmonberry Road, has been included in the
City's 2024-2020 Transportation Improvement Program (TIP).
Port Orchard Sedgwick Bethel Subarea Plan • Existing Conditions 16
Existing Conditions - DRAFT May 2024
EXHIBIT 2-7 Bethel Sedgwick Corridor Schematics
LEGEND
BeRhel Road- Typical Section A
Bethel Road - Typical Section B
Sedgwick Road - Typical Section
Existing Single -lane Roundabout
Proposed Single -lane Roundabout
Proposed Multi -lane Roundabout
Tre
Mile Hill Drive 1166
I l!
Salmonherry Road
Blueberry Road
a '
SOURCE: Bethel Road and Sedgwick Road Corridor Plan, City of Port Orchard, 2018
Port Orchard Sedgwick Bethel Subarea Plan - Existing Conditions
17
Existing Conditions - DRAFT May 2024
EXHIBIT 2-8 Bethel Sedgwick Corridor Cross Sections
Bethel Road - Typical Section A
Bethel Road - Typical Section B
PI
8
6
31 12' 6 6
B,
Sidewalk
610.%Wd - Vehicle I"
Median Vehicle lane Hike lane Hioswale
Sidewalk
Sedgwick Road - Typical Section
4
4
TY
w:
Velar VBhicle Linz ,'�hi -1. L - ne
ila-, Ri 4 -�- Shured'Path
SOURCE: Bethel Road and Sedgwick Rood Corridor Plan, City of Port Orchard, 2018
Port Orchard Sedgwick Bethel Subarea Plan - Existing Conditions 18
Existing Conditions • DRAFT May 2024
Vehicular Circulation and Access
Bethel Road and Sedgwick Road are important throughfares, providing crucial access
and mobility through Sedgwick Bethel. Salmonberry Road is a residential street that
connects the outlying neighborhood within Port Orchard's Urban Growth Area to Bethel
commercial corridor.
Bethel Road is a key north -south connection. It spans across the southern city limits to
the northern waterfront, providing access to transit centers, ferry terminals, and other
major commercial centers, such as Downtown Port Orchard. It also links State Route 160
and State Route 166 creating a crucial network that connects the city to the other parts
of the county. Bethel Road is primarily a three -lane road with a center turn lane, and
carriers 11,500 to 16,900 Average Weekly Daily Traffic (AWDT), depending on the
segment.
Sedgwick Road (State Route160) is a two-lane highway that serves as the primary
east/west ferry commuter route to Southworth Ferry Terminal and provide convenient
access to State Route 16 interchange. State Route 16 is a major regional route that
connects Kitsap County to Pierce County through Interstate 5. It eventually links to State
Route 3 to the north, which provide access to Northern Kitsap County.
Based on the Bethel and Sedgwick Corridor Plan, Sedgwick Road has experienced
more crashes than Bethel Road, according to the reported crash frequency between
2013 to 2017. Crashes on Sedgwick Road are spread out along the study segment,
while on the Bethel corridor, certain intersections such as Lund Avenue, Salmonberry,
and Mitchell Road, have experienced more crashes than others. Turning movement
related crashes, either onto or off the corridor, were more common on Bethel Road
than Sedgwick Road, due in part to the fact that Bethel Road has more driveways and
intersections. Additionally, there were no reported crashed involving bicyclist on either
study corridor over the time period that was analyzed. The study recommends
increasing corridor capacity on Sedgwick Road and access management on Bethel
Road to address safety issues and preserve safety, function, and capacity of these
corridors.
Salmonberry Road, a two-lane, east -west connector, runs through residential
neighborhoods, connecting Jackson Avenue to Bethel Road. Salmonberry Road serves
2,300 AWDT.
The subarea does not have a conventional grid system, leading traffic to be
concentrated on a limited number of streets where congestion, safety concerns, and
road wear increase. Side streets primarily function as low -volume, local residential
streets. The City has planned new street connections on Piperberry Way to enhance
pedestrian and vehicular circulation in the area. See EXHIBIT 2-9.
The City's Transportation Improvement Plan (TIP) lists planned transportation projects
and enhancements including intersection improvements, street extension, pedestrian
Port Orchard Sedgwick Bethel Subarea Plan • Existing Conditions 19
Existing Conditions - DRAFT May 2024
and bicycle facilities upgrades, and installation of stormwater infrastructures. Listed
below are the planned transportation projects related to Sedgwick-Bethel.
TABLE 2-3 City of Port Orchard Transportation Improvement Program (TIP)
Bethel/Corridor Phase 1 a Bethel Road: Blueberry Phase 1 a. Bethel/Blueberry
- Bluberry RAB intersection RAB 2022 $3,341,000
Phase 1 b. Bethel/
Bethel/Corridor Phase 1 b Bethel Road: Salmonberry RAB Round and
2 - Salmonberry RAB Salmonberry roadway segment design 2023 $1 1,467,000
intersection from Blueberry to
Salmonberry
SR160/Sedgwick Phase New rounabout mid way
3 2a New intersection between SR16 and Bethel Rd. 2027 $1,550,000
ROW acquisition and design
Bethel/Sedgwick Sedgwick Road: SR-16 Design, ROW acquisition and
4 Corridor Phase 2 - ROW interchange to Bethel construction of Phase 2 per 2030 $16,669,000
and Construction the Bethel/Corridor Plan
Widen road to two travel
5 Geiger Road Widening Sedgwick Road to lanes with bike lanes, 2034 $375,000
Blueberry Road sidewalks and stormwater
system improvements
Provide an extention of
Geiger Road to Piperberry from Ramsey to
6 Piperberry Way Extention Ramsey Road Geiger and a new street 2034 $575,000
connection to the proposed
round about on Sedgwick
Bethel/Sedgwick Design, ROW acquisition and
7 Corridor Phase 3 - ROW Bethel Road: Blueberry construction of Phase 3 per 2032
and Construction
to Sedgwick the Bethel/Sedgwick Corridor $5,822,000
Plan
Design, ROW acquisition and
Bethel/Sedgwick construction of the fourth
8 Corridor Phase 4 - ROW Bethel Road: Lund to phase of the street 2034
Salmonberry improvements per the $8,744,000
and Construction Bethel/Sedgwick Corridor
Plan
Widen road to two travel
Salmonberry Road Ramsey Road to lanes with bike lanes,
9 Widening Bethel Road sidewalks and stormwater 2028 $225,000
system improvements
Port Orchard Sedgwick Bethel Subarea Plan - Existing Conditions 20
Existing Conditions - DRAFT May 2024
Widen road to two travel
10 Ramsey Road Widening Sedgwick Road to lanes with bike lanes, 2029 $2,500,000
Salmonberry Road sidewalks and stormwater
system improvements.
Widen road to two travel
11 Blueberry Road Geiger Road to Bethel lanes with bike lanes, 2036 $600,000
Widening Road sidewalks and stormwater
system improvements
SOURCE: City of Port Orchard Transportation Improvement Plan (TIP) Tier 1 2024-2029 and Tier 2 2030-2043
EXHIBIT 2-9 Port Orchard Transportation Improvement Program (TIP) Map
Billw L.
SE S'ALtif� NBERF
z-----------
Magnolia < 1
Ridge Andaiso � a�
Q Village ChinaiSun
Buffet—•—"1
•—•—•—•� � l SE BLJE3EPRY RF)
Ill Sidney ■ SE SYw"s LN
i Ridge kse,Kooa c;R BETHEL 1
CENTRE 1
■ .0 :iF-iPFRFERSY `NAY 1
7 1
- - �• -�� "Westcoast SEDGWICK 1• ~
Fitness Starbucks PLAZA
in1�11r �3�. SSEDG`NlckRo
�J1MCLIyt3RU ",J -
SOURCE: City of Port Orchard Transportation Improvement Plan (TIP) Tier 1 2024-2029 and Tier 2 2030-2043
Port Orchard Sedgwick Bethel Subarea Plan - Existing Conditions 21
Existing Conditions • DRAFT May 2024
Pedestrian Circulation and Access
The majority of sidewalks that exist are located along a portion of Sedgwick Road (east
of Bethel Road) and Blueberry Road. Sidewalks are also being installed in concert with
new development, generally seen in new subdivisions. However, many older existing
sidewalks have substandard widths and curb cuts, and sidewalks along arterial streets
are fragmented and usually not present on both sides of a street. Most streets outside of
the commercial areas have paved or gravel shoulders, which forces people walking to
share high -volume roadways with vehicles. Pedestrian crossings are limited to the
signalized intersection at Bethel/Sedgwick. Side street intersections and private
driveways often have wide turning radii, which increases crossing distances for people
walking and allows vehicles to turn at higher speeds. Street lighting, which can improve
the safety and comfort of walking at night, is limited.
The missing links in the sidewalk and bicycle networks make existing streets car -centric
and reduce connectivity to neighboring areas. Overall, the environment in the subarea
is unpleasant for people walking and rolling (using mobility devices like wheelchairs and
strollers). Continuous sidewalk and bicycle infrastructure would improve the usefulness
and safety of the pedestrian environment and encourage active transportation.
The City's planned nonmotorized routes improve bicycle and pedestrian access
throughout the city. However, there are no proposed separated or off -road
recreational trails corridors beyond these planned routes. TABLE 2-4 lists the City's
planned nonmotorized routes within the Sedgwick-Bethel subarea.
Port Orchard Sedgwick Bethel Subarea Plan • Existing Conditions 22
Existing Conditions • DRAFT May 2024
Bicycle Facilities
Currently, there are no existing bicycle facilities within Sedgwick-Bethel. However, the
City's planned nonmotorized routes will improve pedestrian and bicycle access and
connect residential neighborhoods to commercial centers, recreational areas, and
Kitsap County nonmotorized routes outside of the city limits. These routes include Bethel
Road (Bay Street to Sedgwick Road), Sedgwick Road (Sidney Road SW to Long Lake
Road), and Salmonberry Road West (Bethel Avenue to Jackson Avenue). Bethel Road
and Sedgwick Road also connect to the Kitsap County nonmotorized routes, and
therefore, these trails are identified as part of the nonmotorized routes in the Kitsap
County Non -Motorized Facilities Plan.
Improvements to Bethel Road have already been programmed through the Bethel
Road and Sedgwick Corridor Plan. Most of Sedgwick Road is designated as highway
and future improvement require collaboration with Kitsap County and the Washington
State Department of Transportation (WSDOT). Continued design improvements for
Salmonberry Road West are part of the Bethel Phase 1 project.
TABLE 2-4 Planned Nonmotorized Routes
Bethel Road On -Street Bike
(Bay Street to Sedgwick Road) - Arterial Lane/Sidewalk 2.62 Planned
Sedgwick Road (Sidney Road On -Street Bike 2.98 Planned
SW to Long Lake Road) - Arterial Lane/Sidewalk
Salmon Berry West On -Street
(Bethel Avenue to Jackson - Bike 0.98 Planned
Avenue) Residential Lane/Sidewalk
SOURCE: City of Port Orchard Non -Motorized Transportation Plan, 2024
Port Orchard Sedgwick Bethel Subarea Plan • Existing Conditions 23
Existing Conditions • DRAFT May 2024
EXHIBIT 2-10 Planned Non -Motorized Routes
ChinaTSun
Buffet �•�•�
ERRY R7
i SESYrVIS
BETHEL —
CENTRE
SE PIPERBCRIZY WAYS
st .SEDGWICK
East
Port Orct
n1r1 166 nnu11n1
2
Non -Motorized Routes Bethel/Sedgwick
11111 Arterial Planned Corridor Study
11111 Residential Planned E. Sedgwick Bethel
Q Port Orchard
Port Orchard UGA
� 1
0 400 600 Feet
N
Ot MtGNE RD � 'r
SOURCE: City of Port Orchard Non -Motorized Transportation Plan, 2024
Transit
Kitsap Transit currently operates Route 8 along Bethel Road in the subarea. This route
provides fixed route transit service between the Port Orchard Ferry Dock and the Fred
Meyer at Sedgwick Road. Route 8 operates six days a week with half-hour headways.
There is currently no transit service offered on Sedgwick Road.
Kitsap Transit's 2022-2042 Long -Range Transit Plan identifies several major projects that
will improve transit service and access in Sedgwick-Bethel. These include the
implementation of high -capacity transit options, such as bus rapid transit (BRT) along
Port Orchard Sedgwick Bethel Subarea Plan • Existing Conditions 24
Existing Conditions - DRAFT May 2024
Bethel Road and constructing a new SR 16 Transit Center with a park -and -ride lot near
the Sedgwick Road interchange (see EXHIBIT 2-1 1). These developments are expected
to improve overall quality of transit service in the area and make it easier for commuters
to get around.
EXHIBIT 2-11 Kitsap Transit Existing and Planned Facilities
AL ALI'
SVC; NF- kC
0
6t
6�
��a
Sidney
Ridge
16
Magnolia a
Ridge u U Andaiso
< Village
- SE BLUE9FRRY kD
SE KnDA cIR BETHEL
CENTRE
SE PIPERBFRRY
hinaTSun
SESYLVs EN
Wesicoast �SEDGWICK
Filness Starbucks PLAZA
��'�►'� Pottery
Creek
r � Fred Meyer Apartments
ju ._._._._._._
r
r._._._._.
€ _ _
SOURCE: City of Port Orchard, Kitsap Transit
iY
5E FAY CT
U �
z a
a
z
U
East
Port Orchard
iso
u
FO
a
O
V
Kitsap Transit
Route 8 Sedgwick Bethel
sF IVES vii I RD O Route 8 stoP s
Port Orchard
Planned Port Orchard UGA
BRT Route
0 400 800 Feet
I I
Port Orchard Sedgwick Bethel Subarea Plan - Existing Conditions 25
Existing Conditions • DRAFT May 2024
2.3 Parks, Open Space, and Critical Areas
Parks and Open Space
Sedgwick-Bethel has few formal open spaces and parks, with South Kitsap Regional
Park being the closest park at approximately two miles away. However, newer
subdivisions feature playgrounds and open space managed by homeowners
associations, which serve as private recreational areas for some residents.
The Port Orchard Parks, Recreation & Open Space Plan (PROS) identified a large site
on Sedgwick/Geiger/Blueberry/Ramsey as a potential local or neighborhood athletic
parks equipped with picnic shelters, playgrounds, multi -purpose fields, and skate dots
(i.e., half -pipes, rails, stairs, and concrete bowls), to support growing need for
recreational activities in the area. There are other opportunities for a park plaza
centrally located in the subarea (see EXHIBIT 2-12).
Critical Areas
Preservation and protection of wetlands and their buffers is central to urban -
environment balance. Wetlands are vital to the local hydrologic cycle and offer a
range of beneficial functions, such as wildlife habitat, improving water quality, reducing
flood risks, and retaining stormwater. When impacts of wetlands are unavoidable,
wetland replacement or wetland mitigation banks must be utilized to mitigate impacts
in accordance with Chapter 20.162 of the Port Orchard Municipal Code.
Blackjack Creek is the largest stream system in Port Orchard, spanning a length of
approximately three miles within the city limits (not including tributaries), and is
considered one of the largest and most productive fish producing streams in South
Kitsap. In recent years, the City has taken steps to protect the Blackjack Creek by
preserving its ecological functions and encouraging restoration. Much of the area
surrounding Blackjack Creek is zoned as Greenbelt.
There are no trails or overlooks that provide public access to Blackjack Creek near
Sedgwick-Bethel. This presents an opportunity for a trail near Blackjack Creek with trail
entrances in adjacent subdivisions. The creation of such trail would promote
recreational activity and cultivate environmental stewardship within the subarea.
The 2023 Port Orchard Stormwater and Watersheds Comprehensive Plan assessed
stormwater system impacts on local receiving water. This assessment was partly based
on the proportion of impervious land surfaces. Lower Blackjack Creek ranked
Moderate/High, an indication of greater level of degradation upon water resources.
Impacts to water resources could increase due to new and upcoming developments in
the area. Surface water and stormwater capital improvement projects (CIP) were
developed to address the problems identified in the plan. Among the ten prioritized CIP
projects is the Salmonberry Road, Lower Blackjack Creek Culvert Retrofit which will
Port Orchard Sedgwick Bethel Subarea Plan • Existing Conditions 26
Existing Conditions • DRAFT May 2024
remove and replace existing culvert with new storm conveyance system (see
EXHIBIT 2-12). The Bethel/Sedgwick Corridor Plan also programmed stormwater
infrastructure along Bethel Road and Sedgwick Road to protect critical downstream
creeks and waterways (i.e. Blackjack Creek).
EXHIBIT 2-12
Parks, Open Space and Critical Areas
�.-" I � ~c I j;•a`�. 4-1 fir ,
W
�......... ' F SALMO' a IRR .,i .
y •_�
\•� ,
_ Village
5E SLUES ERRY R7
BETHEL
CENTRE
SE PIPERBERFY 'NAY
Westecast
Fitness Starbucks
v •V���V� ^ SE IVES
MILL•RD��
16
\
,SE MLU E RD _ \'
SOURCE: City of Port Orchard, MAKERS 2024
J
Pori
Pottery
&eek \
Fred Meyer Apartments
I ✓, i - j
U
O
Greenbelt Par
Wetlands [- ISec
Blackjack Creek Q For
Slopes Por
Hydric Soil
0 400 800 Feet
N t
Source. Esd, Maxar, Earthstar Geographies, and the GIS User Community
Port Orchard Sedgwick Bethel Subarea Plan • Existing Conditions 27
Existing Conditions • DRAFT May 2024
2.4 Market Conditions Assessment
Economic Profile
Demographics
Port Orchard is a rapidly growing city, with population growth rates in recent decades
exceeding those of the county and state due to annexation, in -migration, and natural
population growth. This has driven a rapid increase in housing unit demand and
production, including in the Sedgwick-Bethel Subarea.
Overall, the city's population is younger and more diverse than regional averages, with
smaller household sizes than the county and the state, and somewhat lower incomes
than county and statewide averages.
The Sedgwick-Bethel area has very similar age breakdown to Port Orchard as a whole,
as shown below in EXHIBIT 2-13 , with a relatively large share of young residents.
EXHIBIT 2-13Age in Sedgwick-Bethel Subarea and Port Orchard, 2023
17% 18%
■ 65+
■ 45-64
15% 15% ■ 35-44
14% 14%
Sedgwick Port Orchard
SOURCE: ESRI
25-34
■ 15-24
■ 0-14
Port Orchard Sedgwick Bethel Subarea Plan • Existing Conditions 28
Existing Conditions - DRAFT May 2024
Incomes in the Subarea are somewhat higher than in Port Orchard as a whole, as
estimated by ESRI, a leading provider of Geographic Information Systems (GIS) data,
based on U.S. Census and American Community Survey data, although estimates for
smaller geographies can be subject to significant margins of error.
EXHIBIT 2-14 Household Incomes in the Sedgwick-Bethel Subarea and Port Orchard,
2023
100%
90%
80%
70%
60%
50%
40%
30%
20%
10%
0%
Sedgwick Port Orchard
SOURCE: ESRI
Employment
■ $200,000+
■ $150,000 - $199,999
■ $100,000 - $149,999
$75,000 - $99,999
$50,000 - $74,999
■ $35,000 - $49,999
■ $25,000 - $34,999
■ $15,000 - $24,999
■ <$15,000
According to 2023 data received from the Puget Sound Regional Council (PSRC), there
are 619 jobs in the Sedgwick-Bethel subarea. PSRC does not provide a detailed
breakdown of these jobs by sector, but the U.S. Census's OnTheMap tool does provide
estimates for job sectors in the Subarea, shown below. Retail jobs comprise the majority
of employment in the subarea, with various retail centers along the Sedgwick corridor.
Food and other service jobs are also present in smaller quantities. As shown, the
employment mix in the Subarea has not changed significantly over the past decade.
Port Orchard Sedgwick Bethel Subarea Plan - Existing Conditions 29
Existing Conditions - DRAFT May 2024
EXHIBIT 2-15 Top Job Sectors in Sedgwick- Bethel Subarea, 2012 and 2021
70.0%
60.0%
50.0%
40.0%
30.0%
20.0%
10.0%
0.0%
Retail Trade Food / Lodging Other Services
SOURCE: LEHD via Census OnTheMap
Commuting
■ 2021
■2012
r
Wholesale Health Care / Arts,
Social Entertainment,
Assistance and Recreation
The map below shows estimated commuting patterns in the subarea. As shown,
essentially no residents of the Subarea also work in the Subarea. Given the commercial
activity centered around the Bethel-Sedgwick intersection, there is a significant net
inflow of commuters into the Subarea.
EXHIBIT 2-16 Commuting Patterns in the Sedgwick-Bethel Subarea, 2021
121
SOURCE: LEHD via Census OnTheMap
Port Orchard Sedgwick Bethel Subarea Plan - Existing Conditions 30
Existing Conditions - DRAFT May 2024
Development Pipeline
The map below in EXHIBIT 2-17 shows the current housing unit counts as well as pipeline
development in the Subarea. There are currently 156 single-family units and 136
multifamily units, for a total of 292 existing units, with an additional 151 single-family units
and 457 multifamily units currently under construction or in the development pipeline.
Once completed, this will total 749 units in the subarea. Overall, developments nearer
to the arterial roads are apartments and those set farther back are single-family
subdivisions.
EXHIBIT 2-17 Existing and Pipeline Units in the Sedgwick-Bethel Subarea
f
Port Orchard iv
Sedgwick Existing and Pipeline Units
Legend
Q Port Orchard City Limits
L_1 Port Orchard UGA
Water Bodies Leon Park sr
Roads I s�
State Highway
I Collector/A4t nal P
Local Road
Existing Units by Parcel s smrncrry a<
iJ 0
O i Geiger
Plat
/ 0 Z 46 Lots
-3-5
- 5+
Pipeline Units by Parcel
�0
of
O Z o
5+ �
h
0/
R929�City a/Port Orchard, CCG
SOURCE: Kitsap County, City of Port Orchard, LCG
Port Orchard Sedgwick Bethel Subarea Plan - Existing Conditions 31
Existing Conditions • DRAFT May 2024
Buildable Lands & Future Capacity
The map below in EXHIBIT 2-16 shows parcels classified as Vacant, Underutilized, or
Partially -Utilized in the subarea. These classifications were based on the 2019 Kitsap
County Buildable Lands Report, and updated to reflect recent development in the
Subarea. After deducting for critical areas, future infrastructure and right-of-way, and
market factor considerations, there are a total of 28.3 acres available for residential
development and 5.4 acres available for commercial development in the Subarea. This
equates to a capacity for 1,015 housing units (29 Single -Family and 986 multifamily), and
408 jobs, given the assumptions used in the Land Capacity Analysis for Port Orchard's
2023 Comprehensive Plan.
EXHIBIT 2-18Vacant and Redevelopable Parcels in Sedgwick-Bethel Subarea
Port,,Orchard.S,Aeer amy/
�t
Sedgwick1 Parcel Classifications
Legend •SESALMONBERRv RD -
Port Orchard City Limits i
Leora Parlc S�
t/
- Port Orchard UGA
Water Bodles
Roads °
State Highway16
Collector/Arterial 16
i
Local Road Se [tiucncrry Rd se -vile Ref
Parcel Status smsviws Lr
PARTIALLY UTILIZED �
- UNDERUTILIZED y j
Se KotJa Clr _� Q
� _VACANT se eperbcro �ray
e //J r i Oxen°8 .
l
1 O
SvNn _ i ti„O
�qR
0 a
'y
SOURCE: Kitsap County, City of Port Orchard, LCG
i
- — SESEDGWICK RD - -- — -
500 �' 1`00 stn
�
Source Ktfsop County, City of Pcr 01hIld, LCG
Port Orchard Sedgwick Bethel Subarea Plan • Existing Conditions 32
Existing Conditions • DRAFT May 2024
2.5 Port Orchard Comprehensive Plan
The 2016 Comprehensive Plan does not have specific policies for the Sedgwick-Bethel
subarea. It describes the need for a subarea plan as:
The Sedgwick/Bethel Mixed Use Center consist of the Bethel Commercial corridor
from Salmonberry to the North to the city boundary to the south and along the
Sedgwick corridor connecting to SR-16 to the west. In addition to commercial
development and commercially zoned vacant land, this area includes a future
park site and land zoned for multifamily development. The area is served by
Kitsap Transit. The City should work to develop a sub area plan for this area prior
to the next periodic comprehensive plan update.
The 2016 Comprehensive Plan includes several policies (below) to ensure all of its
subareas develop consistent with the community's vision. This subarea plan aims to fulfill
and align with the Centers general goals and suggested policies outlined in the
Comprehensive Plan.
Policy CN-1. Prioritize the City's residential, commercial and light industrial growth
and infrastructure investments within designated Centers, in
accordance with VISION 2050 and the Countywide Planning Policies.
Policy CN-2. Focus future growth in designated, higher intensity areas in an effort to
encourage the preservation of open space and maintain surrounding
neighborhood character.
Policy CN-3. Shorten commutes by concentrating housing and employment in
strategic locations, which provides residents opportunities to live and
work in the same neighborhood.
Policy CN-4. Provide commercial services that serve the population of the Center,
surrounding neighborhoods, the city, and the region (dependent on the
suitability of the scale of each Center).
Policy CN-5. Support pedestrian and transit uses by promoting compact, mixed -use
areas with appropriate infrastructure that provide a variety of activities.
Policy CN-6. Balance objectives for accommodating growth, encouraging
compatibility, promoting housing affordability, and offering a wide
range of housing types.
Policy CN-7. Provide access to parks and public pedestrian spaces by creating them
within each Center or by creating connections to existing public and
open spaces.
Policy CN-8. During subarea planning for Centers, develop an implementation plan
that addresses how the City will meet Center goals through appropriate
Port Orchard Sedgwick Bethel Subarea Plan • Existing Conditions 33
Existing Conditions • DRAFT May 2024
land use designations, annexation, development of capital facilities and
utilities, and related measures.
Policy CN-9. The City shall direct growth to Centers of all types through focused
regulations and directed capital projects.
Policy CN-10. The City should support employment growth, the increased use of non -
automobile transportation options, and the preservation of the
character of existing built-up areas by encouraging residential and
mixed -use development at increased densities in designated Centers.
Policy CN-1 1. The City shall ensure that higher density development in Centers is either
within walking or biking distance of jobs, schools, and parks and is well -
served by public transit.
Policy CN-12. The City shall create and designate zoning that allows a mix of uses to
accommodate concentrations of employment and housing.
Policy CN-13. The City shall encourage abroad range of housing types and
commercial uses within designated Centers, through zoning and
development regulations that serve a local, citywide, or regional
market.
Policy CN-14. The City shall encourage the creation of public open space, private
open space, and parks within and serving designated centers
Port Orchard Sedgwick Bethel Subarea Plan • Existing Conditions 34
Goals and Vision - DRAFT May 2024
I _
Longtime vacant
commercial land; likely
indicates a surplus of
commercial zoning and
large opportunity for
— new multifamily
i
I Steep sloi:�es
I west of
� I the subarea
I SR 16
I Transit Center
Ruby -
Creek
3. Goals and Vision
3.1 Opportunities, Assets, and Challenges
EXHIBIT 3-1 Sedgwick-Bethel Opportunities, Assets, and Challenges
Opportunity for a trail
along Blackjack Creek
Tremont with connections
lo/frorn subdivisions
O pp or Iuni I on Ihls sou l hwest
corner to create a mixed- se
�\ development withpark/plaza
Potential site to develop local or _ neighborhood park to increase - ` _ 1 '---4 Salmonberry
recreation capacity I } : # I
i Ridge
r
I Village Sedgwick Road acts
as physical banner
forpedesirians
s i 33,
II East
Neighborhood
r-� set ec'•:tii!'e ec �__� 160 so�•fhvronh ;IIIIII711
r
Commercial
—Center
---- No indirect routes for
students to sately walk
f I and bike from the
1 _ I subarea to the
'lc SUbGrCa 'IaS —
good regional access
I with state highways,
which supports the
commercial uses
❑ 0.1 0.2 Miles
fJ I I
Opportunities
1 Major connections
t - e Street extension
Infill development
Park opportunities
<- Nature trail
• SR 16
Transit Center
trJ�
Bethel I
I
Kitsap Transit is planning bus
Lund
rapid transit along Bethel Road
between Downtown and
Sedgwick Road
r
vIv
a o
ttt
212
010
It 1—
�6
r
East
I
Port Orchard
Potential to extend
Kitsap Transit planned rs
BRT route to Ruby Crack
to support more°x
compact development 'm
in both subareas
�� of
Is
�I
Challenges
nur Fast moving Vatiic/
barrier
Pedestrian -challenged
intersection
vW Land use
development barrier
SOURCE: City of Port Orchard, MAKERS
Bethel
Elementary School
Grocery and home
goods store
provides daily
needs and Hidden Creek
supports jobs Elementary
Existing Conditions
* Assets
Bethel/Sedgwick
Corridor Study
Pending
development
M Natural areas
• Bus stops
= Parks
41 Commercial
Streams
Centers
_ ] Sedgwick Bethel
• Neighborhoods
Port Orchard
Schools
Port Orchard UGA
General O p port u n if i e s/ O bse rvaf i o ns:
• Kitsap Transit planned BRT route on Bethel Road
could facilitate more compact development
• The Bethel/Sedgwick corridor planned
pedestrian/bicycle infrastructure will create
safer routes for all travelers
• Need/opportunity for parks and/or gathering
spaces to serve the subarea
• Property ownership and public street grid is
highly fragmented
• Extend street grid as development occurs to
enhance connectivity
Port Orchard Sedgwick Bethel Subarea Plan - Existing Conditions 35
Goals and Vision - DRAFT May 2024
3.2 Alternatives
Heading
Heading
Heading
TABLE 3-1 Caption
Text
SOURCE: City of Port Orchard, MAKERS, 2022
3.3 Urban Design Framework
3.4 Land Use and Housing
3.5 Transportation
Key Findings
3.6 Parks, Open Space, and Critical Areas
Port Orchard Sedgwick Bethel Subarea Plan - Existing Conditions
36