Loading...
055-23 - Rice Fergus Miller, Inc. - Contract Amendment 1CITY OF PORT ORCHARD Authorization for Amendment No. 1 Date: September 7, 2023 Contractor: Rice Fergus Miller, Inc. Project: City Hall Construction Support 275 5ch Street, Suite 100 Services Bremerton, WA 98337 Contract / Job # CnsS-23 THIS AMENDMENT AUTHORIZES THE FOLLOWING CHANGES TO THE AGREEMENT: An increase of $3,100.00 for documentation for the Public Works entry area to provide an accessible counter and new desk configurations for the City Staff. (See attached for additional information) Agreement C055-23 is amended to read as follows: Section 2. Compensation: TIME AND MATERIALS NOT TO EXCEED. Compensation for these services shall not exceed $376,530.22 without written authorization and will be based on the list of billing rates and reimbursable expenses attached hereto. In all other respects the Underlying agreement between the parties shall remain in full force and effect, amended as set forth herein, but only as set forth herein. Contract History Amount Sales Tax Total Date Appvd by Original Contract $373,430.22 $0.00 $373,430.22 13-Oct-20 Council Amendment 1 $3,100.00 $0.00 $3,100.00 07-Sep-23 Interim PW Director Total Contract $376,530.22 $0.00 $376,530.22 I have reviewed the Change Order information above and certify that to the best of my knowledge descriptions and costs are true and accurate. Contractor Approval Signature Printed Name & Title Interim PubI6Works Director Jacki Brown Printed Name Change Orders that do not exceed 10%, with a maximum of $50,000, of either legally authorized budget limit or contract amount established by City Council can be approved by the Public Approved: Works Director. Change Orders that do not exceed 10%, with a maximum of $100,000, of either legally authorized budget limit or contract amount established by City Council are to be approved by the Mayor. Mayor City Clerk Change Orders over $100,000 or exceed a total of 10% require Council Approval Date Council Action. Page 1 of 4 RICE, fe gumILLER ARCHITECTURE INTERIORS PLANNING VIZLAB 275 Fifth Street, Suite 100 Bremerton, WA 98337 Phone: (360) 377-8773 rfmarch.com Supplemental Services Agreement Project: Port Orchard City Hall Improvements Owner: City of Port Orchard — CA — Contract C055-23 Date of Original Agreement: June 27, 2023 SSA No.: Amendment 01 — September 5, 2023 Project No: 2020013.00 In accordance with the Agreement referenced above, authorization is hereby given to: ® proceed with Additional Services ❑ proceed with revised scope of Basic Services ❑ incur Reimbursable Expenses As follows: RFM's documentation for the Public Works entry area to provide an accessible counter and new desk configurations for the City Staff. The documents package will include a demo plan, floor/ceiling plan, finish plan, elevations, and necessary details to convey the design. RFM will schedule (1) in -person meeting with the Mayor and necessary staff to present no more than (3) rough options. A single selected option will be taken through to completion. RFM will also coordinate with the permitting department as needed for this scope of work. This additional service fee will cover the above -listed scope. In addition to the above scope, but covered under the current CA agreement, RFM will submit the drawing package to Lincoln Construction as a Proposal Request (PR). If the returned pricing is acceptable to the City, Lincoln Construction will proceed with this scope as a Change Order (CO) to their current construction contract. RFM will oversee the construction of this project parallel to the ongoing construction. Compensation shall be adjusted as follows: Public Works Entry Area Documentation: $3,100.00 Drawing Package Submittal: Included in C055-23 contract Total CA SSA 01 Request: $3,100.00 Time for performance shall be adjusted as follows: Not applicable. Upon execution, this Supplemental Services Agreement shall become a part of the original Agreement referenced above, and supplemental services described above shall commence. Page 2 of 4 Supplemental Services Agreement City of Port Orchard - City Hall Improvements September 5, 2023 Page 2 of 2 Submitted by: By: Printed Name: De? � n Kell Title: Principal Date: September5;,2023 Authorized by Owner: c By: Printed Name: Title: 1 4�q, , &� 7/.e Date: I?^ &'Vtr— END OF SUPPLEMENTAL SERVICES AGREEMENT Page 3 of 4 DocuSign Envelope ID: 1 MAD 54-A51 E-41 FB-8D7E-ACD07F8B628C Riafergus TILLER ARCHITECTURE INTERIORS PLANNING VIZLAB 275 Fifth Street, Suite 100 Bremerton, WA 98337 Phone: (360) 377-8773 rfmarch.com 2023 Hourly Billing Rates Date of Proposal: June 15, 2023 Project: Port Orchard City Hall Improvement- Construction Support Services. Project No.: 2020013.00 The hourly billing rates shall be annually adjusted in accordance with normal salary review practices of Rice Fergus Miller. Principal in Charge: $ 250.00 - $ 300.00 Senior Planner: $ 140.00 - $ 300.00 Project Manager: $ 130.00 - $ 250.00 Project Architect: $ 120.00 - $ 250.00 Staff Architect: $ 110.00 - $ 190.00 Project Designer: $ 110.00 - $ 190.00 Staff Designer: $ 100.00 - $ 190.00 Interior Designer: $ 80.00 - $ 200.00 Technical Designer: $ 100.00 - $ 170.00 Production Support: $ 100.00 - $ 170.00 Graphics Visualization: $ 140.00 Project Coordinator: $ 140.00 Administrative Support Staff: $ 90.00 - $ 140.00 Page 19 of 36 Page 4 of 4