084-24 - Puget Sound Energy - ContractDocusign Envelope ID: 5A88DF55-1112-4D7A-AOB4-743B59BEBCEO ruuc l COMMERCIAL ELECTRIC FACILITIES CONTRACT ' SOUND ENERGY Date 08/19/2024 Contract is subject to revision after 90 days CUSTOMER (OWNER) NAME CITY OF PORT ORCHARD CO-OWNER NAME (IF APPLICABLE) SERVICE ADDRESS 1201 SIDNEY AVE CITY PORT ORCHARD STATE ZIP 98366 WA BILLING ADDRESS 216 PROSPECT ST CITY PORT ORCHARD STATE WA ZIP 98366 PHONE 360-876-7048 EMAIL jbrown@portorchardwa.gov PSE WORKORDER NO. 101176603 Summary of Charges: Construction Costs: $ 27,737.58 Transformation Charges: $ 9,083.77 Less Applicable Margin Allowance: $ 0 Sub -Total (Potential Refundable Costs): $ 36,821.35 Permitting Fees*: $ 235.94 Relocation/Removal of Existing Facilities: $ 3,041.81 Other Non -Refundable Construction Charges: $ 3,629.38 Sub -Total (Non -Refundable Costs): $ 6,907.13 Less Deposit Paid in Advance: $ 0 Initial Total Amount to be Billed Under This C n ct: $ 43,728.48 Customer Initials Brief Description of Work: REMOVE IDLE THREE PHASE TRANSFORMER BANK, REPLACE POLE, RELOCATE PRIMARY SPANS. Brief Description of Other Costs: FLAGGING, MATERIALS & LABOR *If the above Permitting Fees are associated with service work only, those costs will be billed with the applicable service charges below after the service is energized. SECONDARY SERVICE CHARGES (PERMANENT AND TEMPORARY) ARE NOT INCLUDED IN THE SUMMARY OF CHARGES ABOVE Any applicable Secondary Service Type charges listed below will be billed after your service line installation, based on the actual work performed. Base Costs, in the table below, are based on the current tariff pricing as of the date of installation and include the Schedule 87 tax effect. These charges also do not include permitting fees, trenching and other excavation related work that is your responsibility. The Secondary Service Type charges from the list below that apply to your project will be invoiced on a second bill. Secondary Service Tyl2e 1480 Voltage or Below Cost w/Schedule 87 tax effect Single wire run to handhole or transformer $912.07 Each additional run of wire(per circuits) $189.92 Each additional trip beyond 1st trip due to customer needs $564.25 per trip Hourly rate for additional engineering at customer's request $246.24 Underground Temporary Service Charge $230.00 Overhead Temporary Service Charge $474.00 Overhead to Overhead Permanent Service Charge $914.28 Underground to Underground Permanent Service Charge $749.75 Overhead to Underground Permanent Service Charge $1,401.23 C tilnmer In#als: By signing this contract you are authorizing PSE to continue with all the needed elements to complete your project. Upon receipt of a signed contract, PSE will bill you for the amount indicated on the "Total Amount to Be Billed Under This Contract" line. The bill will sent to the billing address listed on this contract. PSE requires payment of these line extension charges prior to scheduling construction. Payments can be made via pse.com (fees may apply), by mail, or at a PSE Pay Station. Delaying payment may result in a construction delay for your project. Customer requested changes in the scope of the project m y resm, ye 116 additional charges, and/or delays to your project. Signature: L�' rulwwName: ROBERT PUTAANSUU Title: Mayor Date:10/21/2024 B96492E3F5847D... Docusign Envelope ID: 5A88DF55-1112-4D7A-AOB4-743B59BEBCEO TERMS AND CONDITIONS PROJECT INFORMATION 1. The PSE drawing shows the proposed scope of your project including the location of permanent, above ground electrical facilities required to provide electrical service to your project. Fault current information for transformers associated with your project is noted on the work sketch drawing. Please review this drawing as soon as possible to ensure there are no unforeseen conflicts between PSE's design and your project. If you determine there are conflicts or if you identify a discrepancy while reviewing the drawing for your project, please contact me at the number below. This is attached as Exhibit A. 2. Additional construction -related information and information on metering and service entrance requirements areprovided in PSE's Electric Service handbook for commercial projects. If you would like a copy of the handbook please contact me at the number below. It is your responsibility to provide your project manager, site superintendent, and/or subcontractors with any relevant information from this correspondence that apply to their work in support of your project. 3. The Excavation Requirements & Final Grade Certification must be signed by the project owner or designee and returned to me along with a signed copy of this contract. This is attached as Exhibit B. 4. Transformers have been sized for diversified commercial loads only, and shall not be used for high load factor (continuous) temporary power uses, such as electric heaters for dry -out. Fault currents for non- residential transformers in your project are noted on the attached PSE design drawing. Please notify the PSE representative listed on this contract immediately if you believe there are conflicts between this design and your project. It is your responsibility to provide your project manager, site superintendent, and subcontractors with any information from this correspondence and it's attachments that apply to their work. 5. The requirements for trenching by customers on public right-of-ways and/or on Puget Sound Energy easements must be signed by the project owner or designee and returned along with a signed copy of this contract. This is attached as Exhibit C. POTENTIAL REFUNDS Margin Allowance: If PSE has not provided a Margin Allowance or if your Margin Allowance exceeds $75,000, PSE agrees to calculate and refund the Margin Allowance, subject to Schedule 85. Refund requests must be made within six (6) years of the date on which the facilities installed under this contract are energized. Customers are responsible for making the one-time refund request. DIM Refund: Other refunds associated with the line extension charge may be available if additional permanent service hook-ups are made to your line extension. These service hook-ups must be made within five (5) years of the date on which your project is initially energized Customers are responsible for making all refund requests. A refund may be requested one (1) time within six (6) years of the date on which your line extension is initially energized. It is the customer's responsibility to make the refund request. Your refund request should be directed to PSE's Customer Accounting Coordinators at Schedule85refundrequests@pse.com. RATE SCHEDULE 85 All terms and conditions, costs, and refunds are in accordance with PSE's Rate Schedule 85, and any discrepancies between this contract and the Rate Schedule will be resolved in favor of the Rate Schedule. Rate Schedule 85 contains more detailed information covering costs, refunds, rights, and obligations than is reflected in this contract. The entirety of Rate Schedule 85 can be viewed at PSE's website www.pse.com. This cost information is valid for 90 days from the Date Issued, and is subject to being updated after that time. I have read both pages and agree to the terms and conditions outlined in this contract and its attachments. The amount noted on this contract is an estimated cost; however PSE's Schedule 85 line extension tariff requires customers to pay the actual cost of construction. PSE will determine the actual cost of the job once construction is complete. If the actual cost of the job is more than 10% above or below the estimated cost, an additional billing or refund will result to account for the difference. Docusign Envelope ID: 5A88DF55-1112-4D7A-AOB4-743B59BEBCEO VruuE:I SOUND ENERGY REQUIREMENTS FOR TRENCHING BY CUSTOMERS ON PUBLIC RIGHT-OF-WAYS AND/OR ON PUGET SOUND ENERGY, INC. EASEMENTS The following outlines most local governmental guidelines and company standards for trenching on a public right-of-way or Puget Sound Energy, Inc. (PSE) easement. Any trenching performed by the customer, or their contractor, under a PSE permit or easement must comply with these requirements. 1. All trench construction must be performed by a Washington State licensed and bonded contractor. 2. Trench excavation, backfill, restoration, and facility placement must be coordinated with a PSE designated representative, and receive on -site approval by that representative, and local jurisdiction. 3. Right-of-way easement trenching and backfill must be performed during normal business hours, Monday through Friday. Same day excavation and backfill is required for all trenching. Job start notification to the local jurisdiction is the responsibility of Potelco, Inc. Customer shall notify Potelco Project Manager three working days prior to trenching. Penalties for failure to comply with this requirement will be borne by the customer. 4. If the job scope requires excavation beyond a single day, fencing and barricading must be installed around utility facilities exposed above the trench, if allowed, must be in accordance with local regulatory requirements. 5. PSE, all participating utilities, and One -Call Locate, must be notified a minimum of 72 hours in advance of the date and time for right-of-way trenching and facility placement. The One -Call Locate number is 1-800-424-5555. State law requires locating service notification. 6. Excavated material must remain clear of the roadway whenever possible. Excavation material, spoils, and debris shall be removed off -site each day, in accordance with local regulatory requirements. All erosion control requirements in accordance with local regulatory requirements are the responsibility of the customer. 7. Material excavated from the shoulder of the right-of-way shall be properly disposed, and replaced with select backfill material in accordance with local regulatory requirements. 8. Proper compaction is required to comply with local regulatory specifications. If the permit requires compaction testing, the cost of said testing is the responsibility of the customer. 9. All permit requirements, traffic control plans, traffic control and flagging shall meet local regulatory specifications and satisfaction. 10. In the event of failure to abide by the above requirements, PSE reserves the right, at its sole discretion, to assume trenching. In the event of delays due to equipment failure, PSE may assume trenching to meet regulatory and joint construction requirements. The customer is responsible for all trenching costs, and will reimburse the company for costs should PSE perform the trenching. initial Customer Initials: 11. The customer agrees to indemnify, defend and hold harmless PSE from all liability (including reasonable attorneys' fees) arising out of, or in connection with, the above mentione I 7r6' ing activities. Customer Initials: I AGREE TO ADHERE TO THE ABOVE CONDITIONS Service Address: 1201 SIDNEY AVE PORT ORCHARD 98366 Work Order Number: 101176603 SigneYdd by: Signature: �� r5 Name: ROBERT PUTAANSUU Title: Mayor Date10/21/2024 Docusign Envelope ID: 5A88DF55-1112-4D7A-AOB4-743B59BEBCEO PV CJt ' SOUND ENERGY PSE ELECTRICAL FACILITIES EXCAVATION REQUIREMENTS AND FINAL GRADE CERTIFICATION PURPOSE This document is an agreement between Puget Sound Energy (PSE) and the Owner/Developer (Developer) who is providing excavation for the installation of PSE's facilities. This document does not provide an easement for operating rights. If PSE determines that a recordable easement on the Developer's property or other property is necessary, it shall be the Developer's responsibility to obtain such easements in a form acceptable to PSE prior to construction. EXCAVATION REQUIREMENTS The requirements and conditions outlined below apply when you provide the excavation for PSE's electrical facilities as a condition of receiving electrical service for your project. If you need additional information, please call the PSE contact person listed below. Developer is responsible for acquiring utility locates by calling One -Call, 1-800-424-5555 at least 48 hours (two full working week days) prior to digging. The excavation must meet the requirements of the Washington Administrative Code and Safety Standards. 2. Developer shall call the PSE contact person noted below for trench and route approval prior to starting excavation. 3. The electrical primary trench shall be excavated to provide a minimum of 36 inches of facility coverage, to a maximum trench depth of 48 inches. The electric service trench shall be excavated to provide a minimum of 24 inches of facility coverage, to a maximum trench depth of 36 inches. A 12 inch horizontal separation is required between PSE electrical facilities and other utilities within a joint trench. 4. All back fill must be free of sharp objects and construction debris. Developer shall provide and install sand bedding and shading for electrical facility protection as directed by PSE's contact person. Developer is responsible for any damages caused by improper backfill or compaction. 5. Developer agrees to maintain a minimum of 2 feet of horizontal clearance between PSE conduit, pipe or conductors and any foundation on Developer's property. 6. The vault excavation shall be dug to the dimensions noted on the attached work sketch. Vault holes shall have a solid level bottom with a 6 inch deep layer of crushed rock bedding. 7. Developer shall provide the excavation for PSE electrical facilities within the designed location. Developer shall identify and provide final grade, property lines, and utility easements prior to installation of PSE's electrical facilities. 8. Developer will be financially liable for the relocation of PSE's facilities which are inadequately covered, located outside the area where PSE has adequate operating rights, improperly graded inhibiting standard access and/or any damages resulting from dig -ins due to changes or variations in grade that are made after the installation of PSE's facilities. FINAL GRADE CERTIFICATION By my signing below, I certify that the electrical facilities work area shall be at final grade prior to excavation. I assume full responsibility for my excavation work and the resulting location of these facilities. I also agree to indemnify, defend, and hold harmless Puget Sound Energy from all liability arising out of, or in connection with my work, including but not limited to all claims, losses, damages, and expenses, including reasonable attorney's fees, which result from my failure to excavate within easement areas or rights -of -way, or from digging without adequate rights on adjoining properties. Service Address: 1201 SIDNEY AVE PORT ORCHARD 98366 SigneYdJ by: Signature: r 4a&ASWA' Name: ROBERT PUTAANSUU Work Order Number: 101176603 Title: Mayor Date:10/21/2024 2806 08/15 Docusign Envelope ID: 5A88DF55-1112-4D7A-AOB4-743B59BEBCEO Sq. Footage: 420 SQ. PUMP STATION_ Panel Size: 400 AMPS Heat Type: N/A Est. Demand: 126 KW LRC: 359A % V. Drop: 2.4% % Flicker: 5.5% 1104 150kVA 277/480v w Fault Current: 10,600 R/X:0.6 %Z:1.70 1112 Q I �1123 M 27-1133 I X M 1137 M 139 114 I � � 709 1128 1132 1136 619883 02 155486 15 kVA (C) 25T 13-477 1025 EPO Q U 16 U 22 II 22 II c°h' `i cl / / 1111-1113 w Q M 1129 II z I 619898 Poll155487 to 75 kVA 480V (ABC SLAG1237 d0 \ ^ ^ 33 1P P03 619876 155485 MELCHER ST 7 SWING 3PH OH PRI FROM \ P03 TO NEW PO4R � �b0 619864 P05 155481 706 1306 GPQj 'A - � Z_ 103 226 / 1230 SITE PLAN SCALE: 1" = 100' 8J 6/826 812 M M 1141 w M 01 PO4 _ M BUSH TRIM REQ'D 61987: 155501 619872 04 155486 3X 50KVA, 277/480V TRANSFORMER REMOVAL Removed at site: Po l Grid Number: 619898-155487 kVA Rating: 25 Foreman to redline the following information Company ID#: Primary phase connected to: Tested Secondary Voltage TRANSFORMER REMOVAL Removed at site: PD l Grid Number: 619898-155487 kVA Rating: 25 Foreman to redline the following information Company ID#: Primary phase connected to: Tested Secondary Voltage TRANSFORMER REMOVAL Removed at site: Po l Grid Number: _619898-155487 kVA Rating: 25 Foreman to redline the following information Company ID#: Primary phase connected to: Tested Secondary Voltage 619875 PO 155511 SITE SPECIFIC NOTES P01 GRID #619898-155487: (EXISTING) -EXIST (1988) 45' CL1 POLE TO REMAIN -REMOVE 3PH 75KVA, 277/480V OH XFMR BANK P02 GRID #619883-155486: (EXISTING) -EXIST (2005) 45' CL2 POLE TO REMAIN P03 GRID #619876-155485: (EXISTING) -EXIST (2008) 45' CL1 TO REMAIN PO4R GRID #619872-155486: (6° LINE ANGLE) -REPL EXIST (1995) 30' CL4 SEC POLE W/ 45' CL3 POLE W/ GRND (AS STAKED) PD453 6010.1000 **POLE MUST BE INSTALL WITHIN 10' WEST OF THE EXIST POLE** **BUSH TRIM REQUIRED FROM PO4R-P06 (±108')** -INST 12kV 3PH SINGLE WINGARM, 397 AAC TASW313 6033.4012 -INST (1) 11' 8P SINGLE ARM -INST PINS & INSUL (3) INDBSA -INST RIGID CLEVIS (E) INDNRC -CONNECT EXIST (2) OH SEC SPANS FROM P06 TO NEW XFMR BANK -INST (3) 50kVA OH XFMR 277/480v WYE-WYE BANK BNKRXI 6025.3000 -INST (3) L/B CUTOUT ON WOOD ARM, FUSE @15T -INST (3) STIRRUPS & HOT CLAMPS -REMOVE EXIST NEUT DWN GUY & ANCHOR -INST (2) 3/8" DWN GUYS (PRI & NEUT) GYD3SA, GYD3SAN 6013.0100 -INST 24" PLATE ANCHOR L=10' (NW) ANDP24 6012.1000 -RECONNECT EXIST CUSTOMER OH-UG SVC (M01) -NO COMMS HERE P05 GRID #619864-155481: (EXISTING) -EXIST (2016) 50' CL-H1 POLE TO REMAIN P06 GRID #619873-155501: (EXISTING) -EXIST (1993) 35' CL5 SEC POLE TO REMAIN P07 GRID #619875-155511: (EXISTING) -EXIST (1977) 25' CL5 SPAN GUY POLE TO REMAIN M01: (EXIST METER #P171644490) -EXISTING 2 RUNS OF CUSTOMER OWNED UG SVC WIRE TO A 400A CT PANEL SPAN SPECIFIC NOTES: P03-P05-PO4R: -DISCONNECT EXIST 3PH PRIMARY OH WIRES AT P03 AND SWING UNTO NEW PO4R -SEE TABLE FOR ADDITIONAL SPAN NOTES WIRE REMOVAL TABLE Location Wire Size & Type Quantity Length (per conductor) Remarks From To P01 P03 1/0 TPLX OH SEC 2 480' Total Feet (Wire Size & Type) Removed POLE TABLE (NEW) 2-20A Site Pole Data # Grid # Height Class Year Remarks / Location Ref. PO4R 619872-155486 45' 3 PSE Equip # WIRE STRINGING PRIMARY Location Pri Wire Size & Type Quantity Length (Per conductor) Total Actual From To PO4R P03 X 397 MCMTW 3/1 60' 240' 2-15 2-24(2) 3-10 POLE RETIREMENT TABLE TEMP TRANSFERS ST. LIGHT TRANSFERS SITE POLE DATA POLE # TEL TV FIBER TRAIN ID NUMBER GRID # HEIGHT CLASS YEAR TOPPED RMVD PO4 619872-155486 30 5 1995 ❑ ❑ ❑ ❑ ❑ ❑ ❑ TRANSFORMER BANK INSTALLATION Foreman to redline field changes Installed at site: PO4R Grid Number: 619872-155486 Bank Configuration: ®WYE/WYE ❑WYE/DELTA ❑OPEN WYE/OPEN DELTA ❑WYE/WYE 120/208v W/10 120/240v Secondary Voltage: 0120/208v I@ 277/480v 0120/208v W/120/240v 10 0 120/240v 0 240/480v AO Xfmr MID # 6214200 kVA 50KVA, 277/480V BO Xfmr MID # 6214200 kVA 50KVA, 277/480V CO Xfmr MID # 6214200 kVA 50KVA, 277/480V Foreman to redline the following information AO Xfmr Company ID#: BO Xfmr Company ID#: CO Xfmr Company ID#: Tested Secondary Voltage NOTE: The foreman should record one phase -to -neutral and one phase -to -phase voltage. if the bank is a combination 120/208V with single phase 120/240V, record the tested voltage of the 240V connection in addition to the voltage of the 120/208 transformer connections. I 03 619876 1 155485 619864 05 155481 1306 OH MAP: AFTER SCALE: NONE 619� 155487 SLAG1237 619883 PO 155486 15 kVA (C) 25T 13-477 619873 P06 155501 619875 P07 155511 619872 04 155486 3X 50KVA, 277/480V Excavated or Place straw mulch Augered Hole on disturbed area Install silt fence around Secure bottom of fence pole excavation Pole with gravel bags SLOPE �� SLOPE 1 1 FLOWING DITCH or BODY OF WATER TOP VIEW UTILITY POLE EROSION CONTROL DETAIL Not to scale Adjacent to flowing ditches or bodies of water ;o. I ... B •.. 1CDLO I 40T 11 I n 3-664 -1 �SS0IV7H TBM4 �I 15T rohp`� 25T I I ,ti _wE67, >I� I IN X77518TC OVERHEAD CIRCUIT MAP SCALE: 6" = 1 Mi C POWER GENERAL NOTES - COMMERCIAL PROJECT 1. All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy. 2. All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three (3) working days in advance. CUSTOMER NOTES Customer is responsible for all trenching, select backfill, compaction & restoration per Puget Sound Energy Standards & Local Municipality (See PSE Electric Service Handbook for more details). 1. Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work to get the underground facilities located. 2. STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk, etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager. 3. SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction materials which would restrict construction and/or equipment access, before work can begin. 4. Roads shall be paved or have a compacted , crushed rock base in place. 5. CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water, storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them. 6. All work is to be done in accordance with local municipal and county permit requirements as applicable. 7. Inclement weather conditions may cause delays in construction times and dates. 8. EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer will provide any and all shoring or they will side slope the trench to 1:1. 9. EROSION & SEDIMENT CONTROL: Erosion & sediment control shall be per PSE standard practice 0150.3200 techniques for temporary erosion & sediment control & any additional local jurisdiction requirements. (Local jurisdiction may have additional requirements including notes detailing where erosion or sediment control structures are to be installed, cross section details of the typical erosion structures, & special requirements for work in sensitive areas.) 10. Customer is required to have meter inspected and approved by L&I/City prior to construction. CIRCUIT LOADING TABLE CIRCUIT: EPO-16 AS OF 7/29/2024 A PHASE B PHASE C PHASE EXIST. PEAK LOAD 203 221 210 EST. NEW LOAD 7 7 7 TOTAL 210 228 21 FOREMAN (CHECK BOX WHEN COMPLETED) ❑ PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. ElGrid, Cable, and Switch numbers INSTALLED & VERIFIED. ElField Changes RED -LINED on As -built. E]Material VERIFIED and CHANGES noted on Paperwork. ElTotal PRIMARY Cable noted on As -built. ❑ Company ID#'s RECORDED in correct location on As -built. E]Indicate correct FUSE SIZE on As -built & VERIFY proper PHASE. ElDeviations noted on the As -built and their reason. ❑ I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. Foreman's Signature Print Name Date PROJECT PHASE NOTIF# ORDER# PWR Superior Pole & Wire Retire OH Misc Xfmr Retire Temporary Job Order 514874623 101176603 108157657 593259483 583077451 N/A N/A N/A N/A GAS Distribution Service Stubs HP Svc/MSA N/A N/A N/A N/A N/A N/A CABLE TV PHONE Project Manager Contact Information: Manager: Shonda Abercrombie Cell Phone: 360-443-0013 E-Mail: shonda.abercrombie@pse.com PSE Locates Required YES Customer Locates Required NO Vicinity Map l � o w a 0 m _o m MELC ER ST o O d SITF35 J / T EMONT ST E SF A E �Gtio � Owner / Developer Contact Info City of Port Orchard 216 Prospect Street Port Orchard, WA 98366 ATTN: Jacki Brown 360-876-7048 office For contacts below dial 1-888-CALL PSE (225-5773) CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES Outages Required YES Flagging Required YES REAL ESTATE/EASEMENT N/A PERMIT PT. ORCHARD 3 FUNCTION CONTACT PHONE NO DATE 2 PROJECT MGR S. Abercrombie 360-443-0013 7/26/24 1 ENGR - POWER Helene Sparks 360-475-7001 7/26/24 REV# DATE BY DESCRIPTION ENGR - GAS N/A N/A N/A COUNTY KITSAP Emer Sect N/A Gas Wk Ctr N/A POWER WK CTR QSSPE DRAWN BY Helene Sparks 360-475-7001 7/26/24 CHECKED BY S. ABERCROMBIE 360.443.0013 8/5/24 1/4 SEC SE SEC35 T24 R1 E OP MAP N/A PLAT MAP N/A APPROVED BY 253-468-2392 8/14/24 FOREMAN #1 U-MAP NO (POWER) 2401E140 OH CKT MAP 2401E137 JUG CKT MAP 1906E011 CIRCUIT NO EPO-16 FOREMAN #2 MAPPING JOINT FACILITIES ARRANGEMENTS UTILITIES N/A N/A N/A N/A CONTACT N/A N/A N/A N/A PHONE# N/A N/A N/A N/A PUGET MELCER PUMP STATION SOUND REMOVE IDLE 3PH XFMR BANK, REPL POLE & RELOC PRI SPANS ENERGY 1201 SIDNEY AVE PORT ORCHARD, WA 98366 PSE INCIDENT N/A MAOP N/A Gas Order N/A Elect Order 101176603 SCALE I AS NOTED PAGE 1/1