Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
082-24 - Puget Sound Energy - Contract
Docusign Envelope ID: 550957D8-B2D2-43B1-96FD-B53D94BC1415 ruuc i COMMERCIAL ELECTRIC FACILITIES CONTRACT SOUND ENERGY Date 08/26/2024 Contract is subject to revision after go days CUSTOMER (OWNER) NAME CITY OF PT. ORCHARD, PUBLIC WORKS DEPT. CO-OWNER NAME (IF APPLICABLE) SERVICE ADDRESS 216 PROSPECT ST CITY PORT ORCHARD STATE ZIP 98366 WA BILLING ADDRESS 216 PROSPECT ST CITY PORT ORCHARD STATE WA ZIP 98366 PHONE 360.876.4991 EMAIL KCHAMMER@PORTORCHARDWA. 5 WORKORDER NO. 101173311 Summary of Charges: Construction Costs: $ 33,784.26 Transformation Charges: $ 15,190.31 Less Applicable Margin Allowance: $ 0 Sub -Total (Potential Refundable Costs): $ 48,974.57 Permitting Fees*: $ 48,974.57 Relocation/Removal of Existing Facilities: $ 0 Other Non -Refundable Construction Charges: $ 824.77 )Sub -Total (Non -Refundable Costs)_: $ 1,060.71 Less Deposit Paid in Advance: $ 0 Total Amount to be Billed Under This C aat: $ 50,035.28 Customer Initials tz=_ Brief Description of Work: REMOVE EXISTING 3 PHASE OVERHEAD TRANSFORMER. INSTALL OVERHEAD TO UNDERGROUND PRIMARY LINE EXTENSION. Brief Description of Other Costs: MATERIALS, LABOR & FLAGGING. If the above Permitting Fees are associated with service work only, those costs will be billed with the applicable service charges below after the service is energized. SECONDARY SERVICE CHARGES (PERMANENT AND TEMPORARY) ARE NOT INCLUDED IN THE SUMMARY OF CHARGES ABOVE Any applicable Secondary Service Type charges listed below will be billed after your service line installation, based on the actual work performed. Base Costs, in the table below, are based on the current tariff pricing as of the date of installation and include the Schedule 87 tax effect. These charges also do not include permitting fees, trenching and other excavation related work that is your responsibility. The Secondary Service Type charges from the list below that apply to your project will be invoiced on a second bill. Secondary Service Tvoe 480 Volta a or Below Cost w/Schedule 87 tax effect Single wire run to handhole or transformer $912.07 Each additional run of wire(per circuits) $189.92 Each additional trip beyond ls'trip due to customer needs $564.25 per trip Hourly rate for additional engineering at customer's request $246.24 Underground Temporary Service Charge Overhead Temporary Service Charge $474.00 Overhead to Overhead Permanent Service Charge $914.28 Underground to Underground Permanent Service Charge $749.75 Overhead to Underground Permanent Service Charge $1,401.23 Customer '1kE,als: By signing this contract you are authorizing PSE to continue with all the needed elements to complete your project. Upon receipt of a signed contract, PSE will bill you for the amount indicated on the "Total Amount to Be Billed Under This Contract' line. The bill will sent to the billing address listed on this contract. PSE requires payment of these line extension charges prior to scheduling construction. Payments can be made via pse.com (fees may apply), by mail, or at a PSE Pay Station. Delaying payment may result in a construction delay for your project. Customer requested changes in the scope of the project may result in additional charges, and/or delays to your project. Signed by: Signature: Name: ROBERT PUTAANSUU Title: Mayor Date: 08/27/2024 SS33268C7oF6499_. Docusign Envelope ID: 550957D8-B2D2-43B1-96FD-B53D94BC1415 CIRCUIT FEET ADDED: 20' Sq. Footage: 26574 SQ. I / Panel Size: 1000 AMPS CT I U) I / Heat Type: ELECT Est. Demand: 331.51 KW I 00 I 05Q� I LRC: OA PER CUST I / Q� I % V. Drop: 4.9% % Flicker: 0.0% 300kVA 277/480v I Fault Current: 17,200 I \ \ R/X: 0.3 %Z: 2.10 ROBERT GEIGER ST I \ \ 700 1 620266 714 155446 P01 O 225 kVA 480V (ABC) I I � I O M01 213 CO I— Lu I \ j E "216-546" t ----- -- -- -- J---------- ---------- - It ( 219 623 703 \ P02 6202 M02 tt e \ 15 27 99 gI.a t \ 65T n! M03 - 0253` Vol -_ ,n I EPO SW #79268255436 16 — — 9 A - 300 1rVA (A / m - -- - r ----- --- ---- i #2CU - - I KITSAP ST � I / I I 528 I 600 II / SITE PLAN SCALE: 1" = 50' i i NEW SO AR R E i PRODU OD I' METER t SO i ARRAY I ISC ; r z ' mIL m ---------- -------------- - ------------------------------- t'01 I NEW 1000A PSE, NEI 3R METER CABINET IA PSE 3PHASE PM XFMR & EXCAVATION (8'X8') KITSAP STREET - NEW 14" UG CONDUIT13PHASE CONDUCTORS TO POLE P02 POLE P02 GRID #620246-155427 SOURCE POLE TO NEW PM XFMR: (P02-V01 SCALE: NONE Excavated Dirt Pile \ RoaoslDE Final Grade 18" Min 24" Min To Excavated Dirt Pile i 48" 36"r Backfill for Schedule 40 Conduit Min Max 12" Min (NO Rocks over 10" Diameter Cover % / Separation or foreign objects) Phone & TV — — Primary Power Cable in PSE Provided 1-2" DB120 Conduit JOINT TRENCH DETAIL PRIMARY TRENCH DETAIL (P02-V01) SITE SPECIFIC NOTES P01 GRID #620266-155446: (EXISTING) -EXIST 45' CL3 PSE OWNED POLE TO REMAIN -EXIST (3) 75kVA, 277/480v OF XFMR BANK TO REMAIN P02 GRID #620246-155427: (EXISTING) -EXISTING 40' CL1 PSE OWNED POLE TO REMAIN -REMOVE EXIST (3) 25kVA, 277/480V OH XFMR & C/O'S 2-24R(2) -INST 1/0 3PH PRI TERM ON FG ARM TSU3L1 F 6043.1000 -INST L/I C/O & SURGE ARRESTER FUSE @65T -INST SW #T92682 -INST (3) STIRRUPS & TAPS -INST 4" SEC RISER ON S/O BRACKETS, (ACTUAL= ) RIS4CSS 6042.1000 -INST CABLE #'S Aft-AFM727, BO-AFM728 & CO-AFM729 V01 GRID #620253-155436: (NEW) **CUSTOMER TO REMOVE ALL VEGETATION AROUND V01** -INST 4'-8" SQ VAULT W/ 4'-8" X 5-6" COVER PM3P15S 6045.5000 3-19B -SET 300KVA 3P PM XFMR 277/480V -INST (3) L/B ELBOWS -INST CABLE #'S AO-AFM727, BO-AFM728 & CO-AFM729 -INST 44POS SEC CONN BARS -INST GRID #620253-155436 -CONNECT & TAG CUSTOMER RAN UG SVC (3 RUNS OF #400 KCM CU) M03: -NEW 1000A CT ****CUSTOMER TO REMOVE ALL VEGETATION AT M03** SPAN SPECIFIC NOTES P01-M01: (METER SERIAL #P171644738) -DISCONNECT SVC & REMOVE THE EXIST COMMERCIAL RISER OFF THE EXIST S/O BRACKET & LOWER THE EXIST SVC **CUSTOMER IS RESPONSIBLE TO REMOVE THE EXIST OH-UG SVC WIRE** P02-MO2: -DISCONNECT & REMOVE EXIST OH SVC (SERIAL #P171644736) P02-V01: -INST 1 - 4" DB120 CONDUIT, ±20', (ACTUAL:_') CUSTOMER PROVIDED TRENCH -INST 3-1/0 AL. SOL JACKETED PRI CABLES, ±65', (ACTUAL:_') 5' MIN 3' z z_ MIN 0 " o w O ww Z Q w ma Q VO u- T MIN a z w T MIN 0 a<2 Lu Lww o �o5w 5' MIN w CUSTOMER SVC WIRES o ENTRY LOCATION c 0 a U F WQw i 5'MIN W 5'MIN cnW W U wY PSE 3PH PRI CABLE FROM w o 10' MIN w O 0 0 P02 ENTRY LOCATION Vol /�%a 0 0 0 S a a ROAD OR FRONT PARKING AREA CABLE INSTALLATION DIAGRAM L MINIMUM CLEARANCES FOR Not to scale PSE EQUIPMENT (V01) SCALE: NONE 4' x 4' Work Pit 36" DEEP / \ (Pole Butt Must Be / Exposed) Standoff Bracket UNDERGROUND �/ 15" Min Length CABLE CONDUITS / 5" Mi Conduit Clamp TO THIS QUADRANT Climbing Space \ onduit Field Face Road Face Quadrant (quadrant Climbing Space — Direction of Vehicular Traffic TOP VIEW CUSTOMER -CONDUIT LOC. DETAIL (P02) SCALE: NONE 5-6" 4 -8 g 1,657 Ibs- 44" 20" 3,600 8' 0 0-- --- --- --- �_ 3'-16" TOP VIEW 2„ 6„ �\ 00 00 Crushed 00 00 ' Rock 4'-4" 4'-8" i 4'-8" SIDE VIEW Excavation - 10-1/3 cubic yards VAULT & EXCAVATION DETAIL (V01) Not to scale 6045.5000-1 PO�j620246 � 155427'., 75-k\f&480V-(,4BCJ 65T SW #792682 TRANSFORMER REMOVAL Removed at site: P02 Grid Number: _ 620246-155427 kVA Rating: 25 Foreman to redline the following information Company ID#: Primary phase connected to: Tested Secondary Voltage TRANSFORMER REMOVAL Removed at site: P02 Grid Number: 620246-155427 kVA Rating: 25 Foreman to redline the following information Company ID#: Primary phase connected to: Tested Secondary Voltage TRANSFORMER REMOVAL Removed at site: P02 Grid Number: _ 620246-155427 kVA Rating: 25 Foreman to redline the following information Company ID#: Primary phase connected to: Tested Secondary Voltage TRANSFORMER INSTALLATION (PM) Installed at site: Vol Grid Number: 620253-155436 kVA Rating: 300kVA 277/480v Material ID#: 6259200 Foreman to redline the following information Company ID#: Primary phase connected to: Tested Secondary Voltage CABLE #'S AO-AFM727, BO-AFM728. CO-AFM729 PSE PROVIDE (1) 4" DB120 COND, (20') 620253 Vol 155436 22 0 300 WA 277/480V (ABC) 900 _ I 620240 5430 7 25 kVA (C) 65T 1394 PRIMARY ONE -LINE & UG MAP: AFTER SCALE: NONE S 00 3s JOB SITE 40T30 Ilk M� 4C �� 13-856- 1360 �A l C) BAc 81265 81264 se ;A � 81266� ;10T*:��'3 0 ro N AST C 25T o 13153240 13-1588 3-128TQ0 30 1 0: -257 >^ 13 K7P 40T _ 65�25T + ©cos321 A cBA 100 253 .30 I In �co �ii WE67i 140T- - +� B _40T 1342 c / 65T 1313 I Q 13-150925T 1 YMO C A 16° �j� 1395 - * - - i 1— A © 24F69r-7 1341 40T C, 3� C01342 C 25T o 13-1129 LO 13-1436�oiwsiav B c 140Tx Sw S!!£ANY 40T �' COM 65T C.40T 4oT� � 15759 / 21-239 40T BAc A ADA — 13-365 OVERHEAD CIRCUIT MAP SCALE: 6" = 1 MILE POWER GENERAL NOTES - COMMERCIAL PROJECT 1. All materials to be Installed In accordance whit Iluget bound Energy's (HbE) standards. Any deviation trom this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy. 2. All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three (3) working days in advance. 3. Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work to get the underground facilities located. 4. STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk, etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager. 5. SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction materials which would restrict construction and/or equipment access, before work can begin. 6. Roads shall be paved or have a compacted , crushed rock base in place. 7. CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water, storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them. 8. All work is to be done in accordance with local municipal and county permit requirements as applicable. 9. Customer/Developer is responsible to provide, install and maintain all secondary service cables, conduits and crossings from the individual unit's meter base to the designated connection point. 10. Inclement weather conditions may cause delays in construction times and dates. 11. EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer will provide any and all shoring or they will side slope the trench to 1:1. CIRCUIT LOADING TABLE CIRCUIT: EPO-16 AS OF 6/18/2024 A PHASE B PHASE C PHASE EXIST. PEAK LOAD 203 221 210 EST. NEW LOAD 18 18 18 TOTAL 221 239 228 FOREMAN (CHECK BOX WHEN COMPLETED) ❑ PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. ❑ Grid, Cable, and Switch numbers INSTALLED & VERIFIED. ❑ Field Changes RED -LINED on As -built. ❑ Material VERIFIED and CHANGES noted on Paperwork. ❑ Total PRIMARY Cable noted on As -built. ❑ Company ID#'s RECORDED in correct location on As -built. ❑ Indicate correct FUSE SIZE on As -built & VERIFY proper PHASE. ❑ Deviations noted on the As -built and their reason. ❑ I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. Foreman's Signature Print Name Date PROJECT PHASE NOTIF# ORDER# PWR Superior Xfmr Retire Comm OH-UG Conv Svc Retire Job Order X3863474 101173311 583076590 514975883 587036227 108155380 514975886 3002620663 GAS Distribution Service Stubs HP Svc/MSA N/A N/A N/A N/A N/A N/A CABLE TV PHONE Project Manager Contact Information: Manager: Shonda Abercrombie Cell Phone: 360-443-0013 E-Mail: shonda.abercrombie@pse.com PSE Locates Required NO Customer Locates Required YES 0 Vicinity Map \v �` N 5� Q� JOB SITE a ST P 26 w Q m Cl) 0 0 W Owner / Developer Contact Info CITY OF PT. ORCHARD, PUBLIC WORKS DEPT. 216 PROSPECT ST PORT ORCHARD, WA 98110 ATTN: K. CHRIS HAMMER 360-876-4991 office For contacts below dial 1-888-CALL PSE (225-5773) CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES Outages Required YES ONLY TO THE CUST Flagging Required YES REAL ESTATE/EASEMENT ROW REVIEW/EASEMENT PERMIT CITY OF PT. ORCHARD 3 FUNCTION CONTACT PHONE NO DATE 2 PROJECT MGR S. Abercrombie 360-443-0013 5/31/24 1 8/19/24 H.SPARKS CHANGE XFMR LOC DUE TO LARGE H2O MAIN ENGR - POWER Helene Sparks 360-475-7001 5/31/24 REV# DATE BY DESCRIPTION ENGR - GAS N/A N/A N/A COUNTY KITSAP Emer Sect N/A Gas Wk Ctr N/A POWER WK CTR OSSPE DRAWN BY Helene Sparks 360-475-7001 5/31/24 CHECKED BY S. Abererontbie 300.4.43.0013 2/22/24 1/4 SEC SE SEC26 T24 R1 E OP MAP N/A PLAT MAP N/A APPROVED BY 253-468-2392 8/22/24 FOREMAN #1 U-MAP NO (POWER) 2401E104 OH CKT MAP 2402EI24 JUGCKTMAP 2401E104 �CIRCUITNO EPO-16 FOREMAN #2 MAPPING JOINT FACILITIES ARRANGEMENTS UTILITIES N/A N/A N/A N/A CONTACT N/A N/A N/A N/A PHONE# N/A N/A N/A N/A PUGET SOUND ENERGY PSE CITY HALL PT. ORCHARD REMOVE EXIST 3P OH BANK & INST OH-UG 3P PRI L/E 216 PROSPECT ST PORT ORCHARD, WA 98366 INCIDENT MAOP N/A N/A Gas Order Elect Order N/A 101173311 SCALE PAGE AS NOTED 1/1 Docusign Envelope ID: 550957D8-B2D2-43B1-96FD-B53D94BC1415 TERMS AND CONDITIONS PROJECT INFORMATION The PSE drawing shows the proposed scope of your project including the location of permanent, above ground electrical facilities required to provide electrical service to your project. Fault current information for transformers associated with your project is noted on the work sketch drawing. Please review this drawing as soon as possible to ensure there are no unforeseen conflicts between PSE's design and your project. If you determine there are conflicts or if you identify a discrepancy while reviewing the drawing for your project, please contact me at the number below. This is attached as Exhibit A. 2. Additional construction -related information and information on metering and service entrance requirements areprovided in PSE's Electric Service handbook for commercial projects. If you would like a copy of the handbook please contact me at the number below. It is your responsibility to provide your project manager, site superintendent, and/or subcontractors with any relevant information from this correspondence that apply to their work in support of your project. 3. The Excavation Requirements & Final Grade Certification must be signed by the project owner or designee and returned to me along with a signed copy of this contract. This is attached as Exhibit B. 4. Transformers have been sized for diversified commercial loads only, and shall not be used for high load factor (continuous) temporary power uses, such as electric heaters for dry -out. Fault currents for non- residential transformers in your project are noted on the attached PSE design drawing. Please notify the PSE representative listed on this contract immediately if you believe there are conflicts between this design and your project. It is your responsibility to provide your project manager, site superintendent, and subcontractors with any information from this correspondence and it's attachments that apply to their work. 5. The requirements for trenching by customers on public right-of-ways and/or on Puget Sound Energy easements must be signed by the project owner or designee and returned along with a signed copy of this contract. This is attached as Exhibit C. POTENTIAL REFUNDS Margin Allowance: If PSE has not provided a Margin Allowance or if your Margin Allowance exceeds $75,000, PSE agrees to calculate and refund the Margin Allowance, subject to Schedule 85. Refund requests must be made within six (6) years of the date on which the facilities installed under this contract are energized. Customers are responsible for making the one-time refund request. DIM Refund: Other refunds associated with the line extension charge may be available if additional permanent service hook-ups are made to your line extension. These service hook-ups must be made within five (5) years of the date on which your project is initially energized Customers are responsible for making all refund requests. A refund may be requested one (1) time within six (6) years of the date on which your line extension is initially energized. It is the customer's responsibility to make the refund request. Your refund request should be directed to PSE's Customer Accounting Coordinators at Schedule85refundrequests@pse.com. RATE SCHEDULE 85 All terms and conditions, costs, and refunds are in accordance with PSE's Rate Schedule 85, and any discrepancies between this contract and the Rate Schedule will be resolved in favor of the Rate Schedule. Rate Schedule 85 contains more detailed information covering costs, refunds, rights, and obligations than is reflected in this contract. The entirety of Rate Schedule 85 can be viewed at PSE's website www.pse.com. This cost information is valid for 90 days from the Date Issued, and is subject to being updated after that time. I have read both pages and agree to the terms and conditions outlined in this contract and its attachments. The amount noted on this contract is an estimated cost; however PSE's Schedule 85 line extension tariff requires customers to pay the actual cost of construction. PSE will determine the actual cost of the job once construction is complete. If the actual cost of the job is more than 10% above or below the estimated cost, an additional billing or refund will result to account for the difference. Docusign Envelope ID: 550957D8-B2D2-43B1-96FD-B53D94BC1415 Vt'UC,t: l SOUND ENERGY PSE ELECTRICAL FACILITIES EXCAVATION REQUIREMENTS AND FINAL GRADE CERTIFICATION PURPOSE This document is an agreement between Puget Sound Energy (PSE) and the Owner/Developer (Developer) who is providing excavation for the installation of PSE's facilities. This document does not provide an easement for operating rights. If PSE determines that a recordable easement on the Developer's property or other property is necessary, it shall be the Developer's responsibility to obtain such easements in a form acceptable to PSE prior to construction. EXCAVATION REQUIREMENTS The requirements and conditions outlined below apply when you provide the excavation for PSE's electrical facilities as a condition of receiving electrical service for your project. If you need additional information, please call the PSE contact person listed below. 1. Developer is responsible for acquiring utility locates by calling One -Call, 1-800-424-5555 at least 48 hours (two full working week days) prior to digging. The excavation must meet the requirements of the Washington Administrative Code and Safety Standards. 2. Developer shall call the PSE contact person noted below for trench and route approval prior to starting excavation. 3. The electrical primary trench shall be excavated to provide a minimum of 36 inches of facility coverage, to a maximum trench depth of 48 inches. The electric service trench shall be excavated to provide a minimum of 24 inches of facility coverage, to a maximum trench depth of 36 inches. A 12 inch horizontal separation is required between PSE electrical facilities and other utilities within a joint trench. 4. All back fill must be free of sharp objects and construction debris. Developer shall provide and install sand bedding and shading for electrical facility protection as directed by PSE's contact person. Developer is responsible for any damages caused by improper backfill or compaction. 5. Developer agrees to maintain a minimum of 2 feet of horizontal clearance between PSE conduit, pipe or conductors and any foundation on Developer's property. 6. The vault excavation shall be dug to the dimensions noted on the attached work sketch. Vault holes shall have a solid level bottom with a 6 inch deep layer of crushed rock bedding. 7. Developer shall provide the excavation for PSE electrical facilities within the designed location. Developer shall identify and provide final grade, property lines, and utility easements prior to installation of PSE's electrical facilities. 8. Developer will be financially liable for the relocation of PSE's facilities which are inadequately covered, located outside the area where PSE has adequate operating rights, improperly graded inhibiting standard access and/or any damages resulting from dig -ins due to changes or variations in grade that are made after the installation of PSE's facilities. FINAL GRADE CERTIFICATION By my signing below, I certify that the electrical facilities work area shall be at final grade prior to excavation. I assume full responsibility for my excavation work and the resulting location of these facilities. I also agree to indemnify, defend, and hold harmless Puget Sound Energy from all liability arising out of, or in connection with my work, including but not limited to all claims, losses, damages, and expenses, including reasonable attorney's fees, which result from my failure to excavate within easement areas or rights -of -way, or from digging without adequate rights on adjoining properties. Service Address: 216 PROSPECT ST PORT ORCHARD 98366 Work Order Number: 101173311 Signed by: Signature: vP0119gooName: ROBERT PUTAANSUU Title: Mayor Date'.08/27/2024 8833266CMF6499... 2806 08/15 Docusign Envelope ID: 550957D8-B2D2-43B1-96FD-B53D94BC1415 1" uuc 1 ' SOUND ENERGY REQUIREMENTS FOR TRENCHING BY CUSTOMERS ON PUBLIC RIGHT-OF-WAYS AND/OR ON PUGET SOUND ENERGY, INC. EASEMENTS The following outlines most local governmental guidelines and company standards for trenching on a public right-of-way or Puget Sound Energy, Inc. (PSE) easement. Any trenching performed by the customer, or their contractor, under a PSE permit or easement must comply with these requirements. 1. All trench construction must be performed by a Washington State licensed and bonded contractor. 2. Trench excavation, backfill, restoration, and facility placement must be coordinated with a PSE designated representative, and receive on -site approval by that representative, and local jurisdiction. 3. Right-of-way easement trenching and backfill must be performed during normal business hours, Monday through Friday. Same day excavation and backfill is required for all trenching. Job start notification to the local jurisdiction is the responsibility of Potelco, Inc. Customer shall notify Potelco Project Manager three working days prior to trenching. Penalties for failure to comply with this requirement will be borne by the customer. 4. If the job scope requires excavation beyond a single day, fencing and barricading must be installed around utility facilities exposed above the trench, if allowed, must be in accordance with local regulatory requirements. 5. PSE, all participating utilities, and One -Call Locate, must be notified a minimum of 72 hours in advance of the date and time for right-of-way trenching and facility placement. The One -Call Locate number is 1-800-424-5555. State law requires locating service notification. 6. Excavated material must remain clear of the roadway whenever possible. Excavation material, spoils, and debris shall be removed off -site each day, in accordance with local regulatory requirements. All erosion control requirements in accordance with local regulatory requirements are the responsibility of the customer. 7. Material excavated from the shoulder of the right-of-way shall be properly disposed, and replaced with select backfill material in accordance with local regulatory requirements. 8. Proper compaction is required to comply with local regulatory specifications. If the permit requires compaction testing, the cost of said testing is the responsibility of the customer. 9. All permit requirements, traffic control plans, traffic control and flagging shall meet local regulatory specifications and satisfaction. 10. In the event of failure to abide by the above requirements, PSE reserves the right, at its sole discretion, to assume trenching. In the event of delays due to equipment failure, PSE may assume trenching to meet regulatory and joint construction requirements. The customer is responsible for all trenching costs, and will reimburse the company for costs should PSE perform the trenching. Ef; itial Customer Initials: 11. The customer agrees to indemnify, defend and hold harmless PSE from all liability (including reasonable attorneys' fees) arising out of, or in connection with, the above mentioned trenching activities. initial Customer Initials: I AGREE TO ADHERE TO THE ABOVE CONDITIONS Service Address: 216 PROSPECT ST PORT ORCHARD 98366 Work Order Number: 101173311 Signed by: Signature: ( Sigrt P111dKo � tBB33268C70F6499... Name: ROBERT PUTAANSUU Title: Mayor Date:08/27/2024