Loading...
036-18 - Puget Sound Energy, Inc. - Contract Amendment Bethel, Lincoln, Mitchell Roundabout ProjectDocusign Envelope ID: 58EA24D1-E733-4F6C-8BFB-C498D339EAA1 PUGET SOUND ENERGY EXHIBIT A Form of Custom Street Lighting Order PROJECT NAME: Bethel Lincoln Mitchell RAB Order #: 105104482 LOCATION: 2734 Mitchell Rd SE Port Orchard CUSTOM STREET LIGHTING ORDER — SCHEDULE 51 This Custom Street Lighting Order (this "Order"), dated November 25, 2024, is made and entered into by and between PUGET SOUND ENERGY, INC. ("PSE") and City of Port Orchard ("Customer") (each a "Party," and collectively the "Parties") under and pursuant to the terms of that certain Master Lighting Services Agreement No. 0023, dated 4/2/2018, between the Parties (the "Agreement"). This Order covers certain Lighting and Construction Services authorized by this Order and is, along with the associated Schedule, incorporated into and made a part of the Agreement. Unless specifically defined otherwise herein, terms used in this Order with initial letters capitalized have the meanings given them in the Agreement. The Parties agree as follows: ASSOCIATED SCHEDULE: This Order is also entered into between the Parties in accordance with PSE's Schedule 51, Electric Tariff G, and any future modifications of or changes to such Schedule as may be approved by the WUTC. LIGHTING SERVICES DESCRIPTION: The estimated cost for installing these lighting units is $84,816.04. Description: Install: Luminaires: Qty 2) K 601D Wattage 41W LED Type T2 Style 601 Color Temp 3K Paint Color Fir Green RAL6009 1) ERL 98W LED CHFL T3 3K Fir Green RAL 6009 1) ERL 31W LED CHFL T2 3k Fir Green RAL 6009 1) ERL 39W LED CHFL T3 3K Fir Green RAL 6009 1) ERL 71W LED CHFL T3 3K Fir Green RAL 6009 Arms: Qty 4 Length 8' Type Millerbernd Davit Arm Paint Color Fir Green RAL6009 2) KA55 2' Arm Fir Green RAL 6009 Poles: Qty 2 Mounting Height 25' Style Millerbernd Pole Kind Slip Base Paint Color Fir Green RAL6009 2 ) 25' Millerbend Fixed Base RAL6009 Fir Green -1- Docusign Envelope ID: 58EA24D1-E733-4F6C-8BFB-C498D339EAA1 1) 18' Hapco Lincoln Breakaway Pole Fir Green RAL 6009 1) 18' Hapco Lincoln Direct Bury Fir Green RAL 6009 Additional description: Includes handholes (7) 14x23 4 POS 12) 1x54 anchor bolt assembly CONSTRUCTION SERVICES DESCRIPTION: 1. PSE will provide and install all poles, arms, luminaire, and circuitry to energize system 2. In the area where we are placing our cables and equipment, it is necessary that the area be within four (4) inches of grade. If not, you may be required to pay the cost of relocating or reburying our facilities. 3. Unforeseen soil and pavement conditions are not included and it is your responsibility to reimburse PSE these costs. 4. If unforeseen permits or flaggers are required for present construction it is your responsibility to reimburse PSE these costs. CONSTRUCTION SERVICES AND COSTS BILLING: Upon completion of the Construction Services, PSE shall provide the Customer with an invoice for the Construction Costs incurred by PSE. Customer shall remit payment to PSE for the Construction Costs within thirty (30) days of receiving the invoice. If the actual Construction Costs either exceed, or are below, the estimated Construction Costs, the Customer will be billed or credited the difference between the estimated Construction Costs and the actual Construction Costs MONTHLY BILLING: Billing under this Order will be in accordance with the terms and conditions contained in the terms & conditions of Schedule 51, Electric Tariff G, and the Agreement, and any future modifications of or changes to such Schedule as may be approved by the WUTC. Refer to Schedule 51 on PSE.com for current rates. PSE's standard installation includes Smart Street Light Controls on all LED lights. If this installation includes Smart LEDs, the monthly energy charge will be calculated as measured kWh x rate. If the installation does not include Smart LEDs, the monthly rate is a flat rate based on wattage. Monthly facilities cost is equal to the Value of the System (VOS) x facilities rate. VOS is the estimated installation cost less applicable taxes. Value of System: $76,611.00 Facilities Rate: .00142 Total Monthly Facilities Charge: $108.80 Total monthly cost is equal to the energy cost plus the facilities charge. SERVICE TERM/REMOVAL AND SALVAGE COSTS: Service under this Order is effective for a minimum of fifteen (15) years from the date of this Order (the "Base Term") unless earlier terminated as provided for in the Agreement. If this Order is terminated for any reason during the Base Term, the Customer shall be responsible for all costsZof removal of any Facilities associated with the Services, as well Docusign Envelope ID: 58EA24D1-E733-4F6C-8BFB-C498D339EAA1 as any costs associated with PSE's efforts to salvage the removed Facilities, as set forth in the applicable Schedule. After the expiration of the Base Term, this Order shall continue on a year-to-year basis until terminated by either Party upon at least one (1) year's notice in writing (each, an "Extended Term" and, together with the Base Term, the "Term") unless earlier terminated as provided for elsewhere in this Agreement. The Term may be adjusted by PSE in writing for existing systems purchased by PSE, based on the estimated remaining life and purchase price. If this Order is terminated during any Extended Term, the Customer shall not be responsible for the costs of removal of any Facilities associated with the Services, or any costs associated with PSE's efforts to salvage the removed Facilities. ADDITIONAL TERMS: 1. To transfer the energy and maintenance monthly billing, the new billing party must contact PSE in writing. 2. Non-standard facilities are not kept in PSE inventory for the purpose of maintenance; therefore replacement of non-standard components may not be within the same time as replacement of standard components. Are non-standard components included in this Order? Yes ® No ❑ 3. The monthly billing party for the energy and maintenance will be: Billing Party Name: City of Port Orchard Billing Address: This Order, executed by Customer's duly authorized representative as of the date first written above, is for the Lighting Services described above delivered under PSE's Schedule 51. Customer: City of Port Orchard SDate: ignedd b Signature. y: �� r5 12/19/2024 Printed Name: Robert Putaansuu Title: Mayor Company: g1, energy, Inc. Signature: Lisa Kinney Printed Name: Title: Account Manager Date: 12/20/2024 -3-