Loading...
HomeMy WebLinkAbout01232015 - The Sinclair, LLC - Contract Bill of SaleBILL OF SALE THIS BILL OF SALE is made and executed this 23`d day of January , 2015, by and between The Sinclair, LLC, a Washington Limited Liability Corporation, hereinafter called the Grantor and the City of Port Orchard, a Municipal Corporation, hereinafter called the Grantee. WITNESSETH: That the grantor, for good and valuable consideration, the receipt of which is hereby acknowledged, hereby conveys, sets over, assigns, transfer and deliver and warrants to the City of Port Orchard ownership in the following described personal property situated in Kitsap County, State of Washington, and installed by the Grantor to date, TO WIT: The Pottery Ave. Sewage lift station and related appurtenances, as further described in Exhibit A and itemized in Exhibit B, both of which are attached hereto and incorporated herein by this reference. The Grantor hereby warrants that it is the lawful and sole owner of all the personal pro perty above conveyed, that such items are free from all liens and encumbrances, that the Grantor has the full power to convey and transfer the same, and that the Grantor will defend the same against the claims and demands of any and all persons lawfully making claims thereto. The Grantor further warrants that the execution of this Bill of Sale is an authorized act of said GrantW` Dated at Gig Harbor, Washington, this 23RD day of January 2015 [Remainder of page intentionally left blank] Pottery Lift Station- Bill of Sale GRANTOR: (The Sinclair, LLC) By: Its: Managing Member Print Name: Mathew J. Smith Page 1 of 4 STATE OF WASHINGTON ) )ss COUNTY OF PIERCE ) On this 23`d day of January 2015, before me personally appeared MATHEW J SMITH, to me known to be the managing member for The Sinclair, LLC, a limited liability corporation, that executed the within and foregoing instrument, and acknowledged the said instrument to be the free and voluntary act and deed of said corporation, for the uses and purposes therein mentioned, and on oath stated that he/she was authorized to execute said instrument. I'd Given under my hand and official seal this day of 12015. 0le, daotary Public in folSt t f Washington, 1, residing in-710 PURL k • Vy commission ex q re - ���Ilf llllll ,, Dated at Port Orchard, Washington, this day of J _t tf , 2015. CITY OF PORT ORCHARD By: 0 /.4 ,c.lz 6A!�g� Authorized Agent for the City of Port Orchard STATE OF WASHINGTON ) )ss COUNTY OF KITSAP ) On this day and year above personally appeared before me, an Authorized Agent for the City of Port Orchard, a Municipal Corporation, who executed the foregoing instrument, and acknowledged the said instrument to be the free and voluntary act and deed of said Municipal Corporation for the uses and purposes therein mentioned, and on oath states he is authorized to execute t'"�,l�lit�1 instrument. n`ryr4fsy hand and official seal this day of .12015. rU° NOTAR we+0 — /N ary u In and for th toe f Was gton, (P PUBLIC ;_ \, iding in '-15.20p'O`G,��\\\��� My commis ion expires Pottery Lif�',$Otiof�/"�C110\ff�S,ai��\\ t11111111W Page 2 of 4 EXHIBIT A LIST OF REQUIRED IMPROVEMENTS The following provides a general description of the improvements conveyed under this Bill of Sale: 1. The "Pottery Ave. Lift Station" project as shown in the approved construction plans prepared by RH2 Engineering, Inc. dated May 6, 2014 with City of Prot Orchard approval dated 6/3/14. Specific improvements conveyed under this Bill of Sale includes the following elements found within this approved construction drawings set as follows: a. 10 foot diameter wet well containing 2- 60 HP Vaughn Chopper pumps, along with associated valve vault and meter vault. b. Approximately 89 LF of 15" pvc gravity sewer, 48" diameter inlet manhole, and approximately 48 LF of 12" diameter discharge pressure main. c. Construction of concrete slab foundation and electrical shelter to accommodate electrical service panels and control panels. d. Furnish and install a 125KW emergency standby generator with automatic transfer switch. e. Connection to Existing manhole, Existing manhole overflow connection and air relief valves. The items, quantity and value of the improvements describe above and conveyed under this Bill of Sale are presented in Exhibit B. Pottery Lift Station- Bill of Sale Page 3 of 4 Exhibit B Pottery Ave. Lift Station Cost Data and Inventory December 10, 2014 QUANTITY UNITS UNIT PRICE TOTAL COST Mobilization 1 Lump Sum $ 5,500.00 $ 5,500.00 Fencing, Rockery, and Parking Lot 1 Lump Sum $ 84,920.00 $ 84,920.00 Excavation 670 CY $ 49.50 $ 33,165.00 Connection to Existing Sewer 2 EA $ 5,500.00 $ 11,000.00 48" Diamete manhole and piping 1 EA $ 8,250.00 $ 8,250.00 10 foot diameter wet well with hatch 1 EA $ 4,400.00 $ 4,400.00 Wet well appurtenances 1 Lump Sum $ 35,200.00 $ 35,200.00 Valve Vault and valves 1 EA $ 55,000.00 $ 55,000.00 Meter Vault and meter 1 EA $ 33,000.00 $ 33,000.00 Pumps and Motors 2 EA $ 33,000.00 $ 66,000.00 Electrical 1 Lump Sum $ 82,500.00 $ 82,500.00 Contorl sytem with Shelter 1 Lump Sum $ 104,500.00 $ 104,500.00 Generator 1 Lump Sum $ 71,500.00 $ 71,500.00 Site Lighting 1 EA $ 11,000.00 $ 11,000.00 Exsting Manhole overflow connection 1 EA $ 11,000.00 $ 11,000.00 Waterline and RPB 1 EA $ 11,000.00 $ 11,000.00 Air Relief Valves 1 EA $ 11,000.00 $ 11,000.00 Subtotal $ 638,935.00 Tax @8.6% $ 54,948.41 Total $ 693,883.41 Pottery Lift Station- Bill of Sale Page 4 of 4