048-23 - Lincoln Construction, Inc. - Supplement / Change Order 911.11wAIADocument G7010 - 2017 Change Order PROJECT: (Name and address) CONTRACT INFORMATION: CHANGE ORDER INFORMATION: Port Orchard City Hall Building Contract For: Construction Change Order Number: 009 Improvements 216 Prospect Street Date: May 23, 2023 Date: March 4, 2025 Port Orchard, WA 98366 OWNER: (Name and address) ARCHITECT: (Name and address) CONTRACTOR: (Name and address) City of Port Orchard Rice Fergus Miller, Inc. Lincoln Construction Inc. 216 Prospect Street 275 51h Street, Suite 100 11803 101st Ave E, Suite 201 Port Orchard, WA 98366 Bremerton, WA 98337 Puyallup, WA 98373 THE CONTRACT IS CHANGED AS FOLLOWS: (Insert a detailed description of the change and, if applicable, attach or reference specific exhibits. Also include agreed upon adjustments attributable to executed Construction Change Directives) Change Order Proposal: COP 53r1 — Wall Base $496.00 COP 54 — BacNET License $1,929.00 COP 55 — PSE Conduit Install $1,235.00 The original Contract Sum was $ 8,245,941.00 The net change by previously authorized Change Orders $ 476,877.34 The Contract Sum prior to this Change Order was $ 8,722,818.34 The Contract Sum will be increased by this Change Order in the amount of $ 3,660.00 The new Contract Sum including this Change Order will be $ 8,726,478.34 The Contract Time will be increased by Zero (0) days. The new date of Substantial Completion will be NOTE: This Change Order does not include adjustments to the Contract Sum or Guaranteed Maximum Price, or the Contract Time, that have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. Rice Fergus Miller, Inc. AR HI KT (Firm nkmt SIGNATURE Dean Kell PRINTED NAME AND ATLE March 4, 2025 DATE Lincoln Construction CONTRACTOR (Firm name) 74m" R"&V SIGNATURE Thomas Romberg -Project Manager PRINTED NAME AND TITLE 03-06-2025 DATE Citv of Port Orchard !. (R (Firm n� SIGNATURE INTED NAME AND TITLE _?11113__ DATE AIA Document G701 — 2017. Copyright @ 1979, 1987, 2000 , 2001 and 2017. All rights reserved. 'The American Institute of Architects," "American Institute of Architects," "AIA," the AIA Logo, and "AIA Contract Documents" are trademarks of The American Institute of Architects. This document was produced at 19:36:33 ET on 03/05/2025 under Order No.3104238988 which expires on 06/30/2025, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents' Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com. User Notes: (3139ADA59) �I CITY OF PORT ORCHARD Authorization for Change Order No. 9 Date: 3/3/2025 Project: City Hall Renovation Contract / Job # C048-23 Contractor: Lincoln Construction, Inc. 11803 10151 Ave. E. Suite 201 Puyallup, WA 98373 THIS CHANGE ORDER AUTHORIZES (add description). Additional Work/Construction Change Directives: COP 053111- Wall Base Level 1 Entrance per PR 036. $496.00 COP 054- Additional required BACNET license per RFI 056. $1,929.00 COP 055- Additional work for PSE conduit from vault to pole. $1,235.00 Total Change Order $3,660.00 w/o tax. See above COP's, RFI's and AIA for breakdown. In all other respects the Underlying agreement between the parties shall remain in full force and effect, amended as set forth herein, but only as set forth herein. Amount Contract History Sales Tax Total Date Appvd by Original Contract $8,245,941.00 $766,872.51 $9,012,813.51 13-Jun-22 council Change Order 1 $44,711.00 $4,158.12 $48,869.12 11-Oct-23 PW Director Change Order 2 $92,579,00 $8,609.85 $101,188.85 12-Dec-23 Council Change Order 3 $44,925.00 $4,178.03 $49,103.03 19-Dec-23 council Change Order 4 $24,044.00 $2,236.09 $26,280.09 5-Mar-24 Pw Director Change Order 5 $125,145.00 $11,638.49 $136,793.49 28-May-24 council Change Order 6 $130,275.34 $12,115.61 $1-42,390.95 13-Aug-24 council Change Order 7 ($1,161.00) -$107.97 -$1,268.97 28-May-24 Pw Director Change Order 8 $16,359.00 $1,521.39 $17,880.39 09-Jan-25 Pw Director Change Order 9 $3,660.00 $340.38 $4,000.38 03-Mar-25 Pw Director Total Contract $8,726,478.34 $811,562.49 $9,538,040.83 I have reviewed the Change Order information above and certify that to the best of my knowledge descriptions and costs are true and accurate. 74m" Contractor Approval Signature Public Works Directo Thomas Romberg -Project Manager Printed Name & Title -S Pc� 4"A — S.Ap-hq Printed Name 41 Change Orders that do not exceed 10%, with a maximum of $50,000, of either legally authorized budget limit or contract Approved: amount established by City Council can be approved by the Public Works Director. Change Orders that do not exceed 10%, with a maximum of Attest: $100,000, of either legally authorized budget limit or contract amount established by City Council are to be approved by the Mayor. Change Orders over $100,000 or exceed a total of 10% require Council Action. Mayor City Clerk Council Approval Date CHANGE PROPOSAL REQUEST To: Port Orchard City Hall Attn.: Jason Ritter-Lopatowski Lincoln Construction COP NO: 53R1 CCD/PR No.: PR 036 Date: 2/18/2025 Proj ect: LCI Project No.: 1257 A. TOTAL MATERIAL/EQ BASE COST $ B. TOTAL LABOR COST $ - SUBTOTAL Is - C. OVERHEAD AND PROFIT (15%) $ - SUBTOTAL $ - D. SUBCONTRACT COST $ 430.00 E. OVERHEAD AND PROFIT ON SUBCONTRACT COST (12%) $ 51.60 SUBTOTAL $ 481.60 H. BOND (GC ONLY) $ 14.45 SUBTOTAL $ 14.45 TOTAL CHANGE PROPOSAL COST I $ 496 CONTRACT TIME ADJUSTMENT DAYS TBD Lincoln Construction, Inc. Wo-" R--6ny U CONTRACTOR 2/ 18/2025 DATE Tom Romberg Approved COPO 2/18/25 0 1114. 00 g3.3 (2) Lincoln Construction Change Order Request To: Jason Ritter-Lopatowski RFM Architects Owner COP/CCD/PR #: Re: Port Orchard Citv Hall Please provide a change order for the following work: I base per PR 036 Date: 2/18/2025 COP #: 53R1 PR 036 Total price per attached breakdown: $ 496 State and local sales tax: include X not included Extension of time: TBD We have proceeded with the work Work will not proceed without formal authorization This price is good for 5 days from the above date, after which this request is subject to revision Sincerely, %pia-" ,Rai - ;Vna1.ed M-ayen Lincoln Construction CHANGE ORDER REQUEST SUMMARY Port Orchard City Hall COP: REV: �DATE: DESCRIPTION: Owner COP/CCD/PR #: PR 036 Wall Base Level 1 LABOR HOURS RATE TOTAL PROJECT MANAGER X 99.58 = $ SUPERINTENDENT X 98.35 = $ ASSISTANT SUPERINTENDENT X 97.65 = $ CARPENTER X 97.65 = $ LABORER X 97.65 = $ X $ X _ $ - SUBTOTAL $ - SMALL TOOL ALLOWANCE @ 0.0% $ SUBTOTAL $ MARK-UP @ 15.0% $ TOTALLABOR $ MATERIALS/EQUIPMENT PHASE CODE UNITS RATE 1 X = $ 1 X = $ 1 X = $ 1 X = $ SUBTOTAL $ USE TAX ON MATERIALS AND EQUIPMENT 0.0% $ MARK-UP @ 15.0% $ TOTAL MATERIAL/EQUIPMENT $ SUBCONTRACTS PHASE CODE UNITS RATE 1 X = $ 1 X = $ Rubensteins 1 X 430.00 = $ 430.00 1 X = $ 1 X = $ 1 X = $ X = $ X = $ SUBTOTAL $ 430.00 MARK-UP @ Sub Direct Cost 0 12.0% Less Sub Fee $ 51.60 TOTAL SUBCONTRACTS $ 481.60 PROPOSAL SUBTOTAL $ 481.60 BONDS/Liability/Builders Risk/B&O Tax 3.000% $ 14.45 PROPOSAL TOTAL $ 496.05 Updated: 9/30/2011 Page 4 of 6 POCH PR 036 Wall Base Level 1 From: Ron Langley <ronl@rubensteins.com> Sent: Monday, January 13, 2025 11:55 AM To: Tom Romberg <tom.romberg@lincolnnw.com> Cc: Debbie Howells <Debbie.Howells@Iincolnnw.com>; Bill Markham <bill.markham@lincolnnw.com> Subject: Re: FW: POCH PR 036 Wall Base Level 1-To Rubensteins-Again 1-13-25 Tom, Do you guys have a roll of base left over? It is not very much but I would have to buy a full roll plus delivery fee to get it here. If you have some base left over it would just be a trip charge. Trip Charge $250.00 Material and labor: Material $247.00, Labor $180.00 ($427.00) Total $677.00 Thankyou Ron Langley Project Manager Rubenstein's Contract Carpet, LLC Office: 360-753-0085 FAX: 360-753-3723Ce ll: 360-910-5572www. ru ben ste i ns. co m CHANGE PROPOSAL REQUEST To: Port Orchard City Hall Attn.: Jason Ritter-Lopatowski A. TOTAL MATERIAL/EQ BASE COST $ B. TOTAL LABOR COST $ Lincoln Construction COP NO: CCD/PR No.: Date: 2/13/2025 Proj ect: LCI Project No.: 54 1257 SUBTOTAL $ - C. OVERHEAD AND PROFIT (15%) $ - SUBTOTAL $ - D. SUBCONTRACT COST $ 1,672.00 E. OVERHEAD AND PROFIT ON SUBCONTRACT COST (12%) $ 200.64 SUBTOTAL $ 1,872.64 H. BOND (GC ONLY) 56.18 SUBTOTAL $ 56.18 TOTAL CHANGE PROPOSAL COST I $ 1,929 CONTRACT TIME ADJUSTMENT DAYS TBD Lincoln Construction, Inc. CONTRACTOR 2/13/2025 DATE 6i"W" R-rske y Tom Romberg Approved COPO 2/19/25 U 01114.00 g3.3 (2) Lincoln Construction Change Order Request To: Jason Ritter-Lopatowski RFM Architects Owner COP/CCD/PR #: Re: Port Orchard Citv Hall Please provide a change order for the following work: Additional required BACNET License Date: 2/13/2025 COP #: 54 Total price per attached breakdown: $ 1,929 State and local sales tax: includ( X not included Extension of time: TBD We have proceeded with the work Work will not proceed without formal authorization This price is good for 5 days from the above date, after which this request is subject to revision Sincerely, %(monad R--kv-;Dw ct %W"/M Lincoln Construction CHANGE ORDER REQUEST SUMMARY Port Orchard City Hall COP: REV:��DATE: DESCRIPTION: Owner COP/CCD/PR #: Additionanl BACNET License LABOR HOURS RATE PROJECT MANAGER X 99.58 = SUPERINTENDENT ASSISTANT SUPERINTENDENT CARPENTER LABORER SUBTOTAL SMALL TOOL ALLOWANCE @ SUBTOTAL MARK-UP @ TOTALLABOR MATERIALS/EQUIPMENT X 98.35 = X 97.65 = X 97.65 = X 97.65 = X _ X = 0.0% 15.0% PHASE CODE UNITS RATE 1 X = $ TOTAL 1 X = $ 1 X = $ 1 X = $ SUBTOTAL $ USE TAX ON MATERIALS AND EQUIPMENT 0.0% $ MARK-UP @ 15.0% $ TOTAL MATERIAL/EQUIPMENT $ - SUBCONTRACTS PHASE CODE UNITS RATE 1 X = $ 1 X = $ Crescent Mechanical 1 X 1,672.00 = $ 1,672.00 1 X = $ 1 X = $ 1 X = $ X = $ X = $ SUBTOTAL $ 1,672.00 MARK-UP @ Sub Direct Cost 0 12.0% Less Sub Fee $ 200.64 TOTAL SUBCONTRACTS $ 1,872.64 PROPOSAL SUBTOTAL $ 1,872.64 BONDS/Liability/Builders Risk/B&O Tax 3.000% $ 56.18 PROPOSAL TOTAL $ 1,928.82 Updated: 9/30/2011 Page 4 of 6 1320 26th St NW #16 CRESCENT Auburn WA 98001 MECHANICAL, INC Phone:253-833-5054 Fax: 253-833-5144 PROPOSED CHANGE ORDER To: Lincoln Construction 11803 101 st Ave Suite 201 Puyallup WA 98373 Subject: Port Orchard City Hall CMI Job No: CMI COP #: Attention: Tom Romberg Date: We request a change order for the following work performed on this project: Description: VRF 2nd BACNet License. Amount of This Change Request: M Detailed Breakdown Attached Ewe are awaiting written direction before proceeding with this work. Work During Regular Hours Only F-IworkDoneonExpeditedBasis Per, we are proceeding with this work F-IworkinProgress Work Already Completed By: Abby Haubrich Title: Project Manager cc: 2UV $1,672 2389 6 2/13/2025 The cost of this change includes only those direct costs which can be identified at this time. There are no impact, ripple or delay costs included. Should it be determined at a later date that we are experiencing impact costs because of multiple changes, delays or other causes beyond our control, we will submit those costs at that time. CRESCENT MECHANCIAL PROPOSED CHANGE ORDER BREAKDOWN Project: Port Orchard City Hall PCO #: 6 Description: VRF BACNet Date: 2/13/2025 I. LABOR: (effective 611124) A. HVAC SHOP 0.0 HRS @ $124.97 = $0.00 B. HVACL FIELD 0.0 HRS @ $126.84 = $0.00 C.HVAC FIELD T&H 0.0 HRS @ $46.70 $0.00 D. DETAILING 0.0 HRS @ $125.00 = $0.00 E. MATERIAL HANDLING 0.0 HRS @ $85.82 = $0.00 F. SUBSISTENCE 0.0 HRS @ $34.65 = $0.00 G. SUPERVISION @ 15% OF A thru E _ $0.00 H. PROJECT MANAGEMENT 0 HRS @ $95.00 = $0.00 LABOR TOTAL $0.00 II. LABOR BURDENS: A. SHOP BURDEN @ 35% OF ITEM IA $0.00 B. SMALL TOOLS @ 5% OF ITEM IB $0.00 C. SAFETY @ 2% OF ITEMS I AND IIA $0.00 LABOR BURDEN TOTAL $0.00 III. MATERIALS & EQUIPMENT: A.BACnet Master $1,329.79 B. BACNet Expansion ($1.22) C. FREIGHT @ 4% OF MATERIAL $53.19 MATERIALS & RENTAL TOTAL $1,381.76 IV. SUBCONTRACTORS: A. Sound Energy B. SUBCONTRACTOR TOTAL V. OTHER DIRECT COSTS: A. OTHER B. OTHER OTHER DIRECT COST TOTAL VI. TOTAL ITEMS I, II, III, IV, V: VII. OVERHEAD AND PROFIT: A. OVERHEAD & PROFIT @ 18% OF ITEM I, II, III, & V B. OVERHEAD & PROFIT @ 10% OF ITEM IV OVERHEAD & PROFIT TOTAL Sub Total VI & VII INSURANCE 2% OF ITEMS I-VII B&O Tax Of Sub Total TOTAL CHANGE REQUESTED $0.00 $0.00 $0.00 $248.72 $0.00 $0.00 $0.00 $1,381.76 $248.72 $1,630.48 $32.61 $8.51 $1 672 CHANGE PROPOSAL REQUEST To: Port Orchard City Hall Attn.: Jason Ritter-Lopatowski A. TOTAL MATERIAL/EQ BASE COST B. TOTAL LABOR COST Lincoln Construction COP NO: 55 CCD/PR No.: Date: 2/25/2025 Proj ect: LCI Project No.: 1257 SUBTOTAL Is - C. OVERHEAD AND PROFIT (15%) $ - SUBTOTAL $ - D. SUBCONTRACT COST $ 1,070.39 E. OVERHEAD AND PROFIT ON SUBCONTRACT COST (12%) $ 128.45 SUBTOTAL $ 1,198.84 H. BOND (GC ONLY) 35.97 SUBTOTAL $ 35.97 TOTAL CHANGE PROPOSAL COST I $ 1,235 CONTRACT TIME ADJUSTMENT DAYS TBD Lincoln Construction, Inc. CONTRACTOR 2/25/2025 DATE Tom Romberg U Approved COPO 3/3/25 0 1114. 00 g3.3 (2) Lincoln Construction Change Order Request To: Jason Ritter-Lopatowski RFM Architects Owner COP/CCD/PR #: Re: Port Orchard Citv Hall Please provide a change order for the following work: Conduit Install to Vault Date: 2/25/2025 COP #: 55 Total price per attached breakdown: $ 1,235 State and local sales tax: include X not included Extension of time: TBD We have proceeded with the work Work will not proceed without formal authorization This price is good for 5 days from the above date, after which this request is subject to revision Sincerely, %pia-" ,Rai - ;Vna1.ed M-ayen Lincoln Construction CHANGE ORDER REQUEST SUMMARY Port Orchard City Hall COP: REV: �DATE: DESCRIPTION: Owner COP/CCD/PR #: PSE Conduit Install LABOR HOURS RATE TOTAL PROJECT MANAGER X 99.58 = $ SUPERINTENDENT X 98.35 = $ ASSISTANT SUPERINTENDENT X 97.65 = $ CARPENTER X 97.65 = $ LABORER X 97.65 = $ X $ X _ $ - SUBTOTAL $ - SMALL TOOL ALLOWANCE @ 0.0% $ SUBTOTAL $ MARK-UP @ 15.0% $ TOTALLABOR $ MATERIALS/EQUIPMENT PHASE CODE UNITS RATE 1 X = $ 1 X = $ 1 X = $ 1 X = $ SUBTOTAL $ USE TAX ON MATERIALS AND EQUIPMENT 0.0% $ MARK-UP @ 15.0% $ TOTAL MATERIAL/EQUIPMENT $ SUBCONTRACTS PHASE CODE UNITS RATE 1 X = $ 1 X = $ DR Monitoring 1 X 1,070.39 = $ 1,070.39 1 X = $ 1 X = $ 1 X = $ X = $ X = $ SUBTOTAL $ 1,070.39 MARK-UP @ Sub Direct Cost 0 12.0% Less Sub Fee $ 128.45 TOTAL SUBCONTRACTS $ 1,198.84 PROPOSAL SUBTOTAL $ 1,198.84 BONDS/Liability/Builders Risk/B&O Tax 3.000% $ 35.97 PROPOSAL TOTAL $ 1,234.80 Updated: 9/30/2011 Page 4 of 6 C ONITORING NETWORKS, LLC Prapasal Backup Attention: Tom Romberg Job: Port Orchard City Hall Backup Proposal #: 14 Description: PSE Work Date: 2/25/2025 DIRECT JOB EXPENSES DOLLARS Delivery Freight Permit & Inspection Insurance Job Office & Whs. Equipment Small Tools Forklift Non -Productive Labor Engineering & Drafting Lift Job Telephone Travel Expense Jobsite Office Shift Adder Material Sales Tax Excavation TOTAL DIRECT JOB EXPENSE $0.00 "Note: The above price does not include any Impact or Delay Costs. We reserve our rights for any Impact or Delay costs incurred. This Propsal may be withdrawn by D&R Monitoring Networks, LLC. if not accepted within 30 days Invoice Terms / Net 30 Days A Finance Charge of 1.5% will be made on past Due Balances. Corresponding Annual Rate of 18% Minimun Finance Charge. SUMMARY DOLLARS Material Cost $34.00 Labor Hours: 7 Aver. Rate Per Man/Hr.: $122.57 Direct Labor Cost $857.99 Direct Job Expense $0.00 SUB TOTAL $891.99 Overhead: 0% $0.00 SUB TOTAL (w/Overhead) $891.99 Profit: 15% $133.80 Home Office Overhead 5% $44.60 SUB TOTAL (w/Profit & verhead) $1,070.39 TOTAL PRIME COST $1,070.39 SUB CONTRACTORS SUB TOTAL $0.00 Overhead/Profit: 10% $0.00 TOTAL SUB. COST $0.00 SUB TOTAL $1,070.39 Bond: 0.0% $0.00 Sales Tax: 0.0% $0.00 TOTAL SELLING PRICE j $1,070.39 Authorized Signature Dean Pitsch Jr. Dean Pitsch Jr. * Phone-253.327-1065 " Email:dean@drmonitoringnetworks.com " PO Box 44185 Tacoma, WA 98448 LoLoLn(nooU-)aoLno 0 c! O 0 r r r N CO N r 0 j r r r O O r O 0 O O r fl cc 4-1 F— O O O O O O O O O O O co O O O H 3 0 0 0 w U w w w w w w 0 0 o ao 0 0 0 o 0 0 O 1O O O O O r N M N r . L O O r O r r O J Duo U U U w w w w w w o 0 0 0 0 0 0 0 0 0 0 U 0 0 0 0 0 0 0 0 0 0 0 a 0 0 0 0 0 0 0 0 0 0 M O L O CO w c U) ca C1 O O co N r r r r r r r r 00 Iq It U U o a a Y > w w a> 0 0 Y J d O G a Y U❑ ' O LO V' J Z w a' ; O� Z J = m J 0 Z H oaooCL �U0U- O O > M O m m O Z O Z U � Y H L U w w U w U w Z U❑ y N w co a Q 0 0 +c ❑ * � to Hcr cn Y 0 H r N CO 1l- 00 O O r r r