2025.01 Monthly Budget ReportMONTHLY BUDGET FINANCIAL STATUS UPDATE To: Mayor and Council members From: Noah Crocker, Finance Director Period: January 2025 OVERVIEW: The Finance Department is committed to providing clear information to the Mayor, Council, and staff regarding the budget status of the city. We have prepared the following reports to keep you up to date on the current budget status of the city. 1) Budget Report 2) Detail Fund Summary Report BUDGET REPORT: The Budget report will first provide Operational Funds and follow up with Capital Projects Funds. This report does not include beginning fund balance. This report is designed to provide a high-level view of each fund reviewing total revenues and expenses. The report does provide expense information by department. The goal of the city is to pay all current budget year expenses with current budget year revenues. We are not quite there yet, and this will show in the Surplus (Deficit) line at the end of each fund. We expect that future budget cycles will smooth out revenues and expenditures. The Budget Report provides information on current revenues and expenditures by fund including the following: • The original budgeted amount. • Current budget which would reflect any amendments that have been made. • Period activity which details the revenue and expense activity for the period in which the report was run. • Fiscal activity will provide the year-to-date expense and revenue amounts. • Variance Shows the difference between budgeted and actual. • The percentage remaining is the amount still needed to reach the budgeted amount. X�.-wag17Ig1T1:nIi•I: Igtiato] ►II]w &Igm/_ M The Cash and Investment Fund Summary provides information on current total cash & investment balances by Fund. POINTS OF INTEREST: Current Expense Fund 001— The Current Expense Fund is used for the general governmental functions of the City. As of January 31, 2025, 9% of budgeted revenues were received. The table provides budget versus actual (YTD) data by source of revenue. SALES TAX REVENUES SUMMARY • Total 2025 Budget: $7,300,000 • Total 2025 YTD Actuals: $615,894 • Year -to -Date Actual revenue collected is 2.41% lower when compared to Prior Year -to -Date Actuals • Year -to -Date Actual revenue collected is 7.8% higher when compared to Year -to -Date Budgeted The following tables provide additional sales tax information: Table 1: shows revenue received by month over a three-year period. Monthly Sales Tax -Three Year Comparison 800,000 700,000 600,000 500,000 300,000 200,000 251 Table rprovides current data for sales tax revenue collected Year-to-clate. ENTERPRISENTILITY FUNDS OPERATIONS: Water operation Water operations budgeted revenue in the amount of $4,305,885 for 2025. Through January, the city has received $292,115 or —7% of the 2025 budgeted revenues. Revenues for the water utility, in winter and spring, are typically lower with larger monthly revenues received during the warmer summer and fall months. Water Operations expended $188,075 through January representing —5% of the 2025 budget. In addition, the water operational budget includes transfers which occur throughout the year. The City manages its transfers according to policy goals, cashflow needs, and realized expenses for water capital projects, stabilization targets, and debt service payments. The 2025 budget includes $1,944,700 for transfers. A total of $1,665 was transferred to fund 413 for Well 11, Melcher Pump Station. Water Service Payments 700,000 6Cxr,000 50-�,OD 4CXD,000 202.3 3 .C�Ci 202.4 E 2025 . I(XI,0 cXI I Jan Feb Mar Apr May lugs Jul Aug Seta Oct Nov Exec Storm Drainage operations- Storm Operations budgeted revenue in the amount of $2,448,800 for 2025. Through January, the city has received $351,243 or —15% of its annual budgeted revenue. Storm Drainage Operations expended $99,787 through January, representing —5% of the 2025 operating budget. The storm drainage operational budget includes transfers which occur throughout the year. The City manages its transfers according to policy goals, cashflow needs, and realized expenses for storm capital projects, stabilization targets, and debt service payments. The 2025 budget includes $723,800 for transfers. A total of $8,263 was transferred to fund 424 for debt service payments for the DOE Decant Station. Storm Drainage Payments 250,000 2ck�,00c loin 150,0L) 2 t 2 024 2025 a e 50,DDOy� q e Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Sewer operation — Sewer operations budgeted revenue in the amount of $6,071,750 is budgeted for 2025. Through January, the city has received $518,696 or —9% of the 2025 budgeted revenues. Sewer Operations expended $327,398 through January representing —6% of the 2025 budget. The sewer operational expense budget includes transfers which occur throughout the year. The City manages its transfers according topolicy goals, cashflovvneeds, and realized expenses for sewer capital projects, stabilization targets, and debt service payments. The 2025budget includes $Z,083,075for transfers. Atotal nf$1,839was transferred tnfund 433for Marina Pump Station, Sewer Lift Controls. Sewer Service Payments 700,000 Real Estate Excise Tax (BEET) Fund 109 and Impact Mitigation Fee Fund 111 The City's Real Estate Excise Tax receipts fluctuate monthly. January 2025 receipts are higher than January 2024 by about double. Total Real estate Excise Tax revenues have a YTD growth rate of 99%. The table below shows balances through January for BEET 1 & 2 and Impact fees. These restricted funds are used as a local funding source for capital projects that have been documented in the City's comprehensive plans. REET funds are also used for debt payments. w 2025-2026 Beginning Balance - 3,916,725 365,235 140,873 6,847,926 1,903,311 4,620,216 29,984 - 93,800 2025-2026 Revenue Received*L. - 39,922 " 55,714 318 53,941 113,077 121,944 - 8,225 - 2025-2026 Expenses Budgeted (59,000).. (1,173,500) (300,000) (3,910,532) (3,217,200) (5,032,100) (29,984) (907,519) (93,800) 2025-2026 obligated Expenses (2,783,147) (119,923) - (183,800) (600,000) 2025-2026EndingBalance (59,000); - 1,025'. 141,191'I 2,991,335 (1,384,612)'. (889,940), (0)', (799,294} - The table above shows 2025 beginning fund balances, biennial revenue received to date, expenses budgeted for the biennium and expenses which are obligated for future projects but have not yet been officially budgeted. The intent of this table is to snapshot and illustrate available balances and what is projected for the end of the biennium. Impact Fees received for January 2025 are as follows: o Parks $25,462 o Transportation $28,660 o School District Impact $8,224 BEET revenues received in January: o REET 1 $106,866.38 o REET 2 $106,866.37 CAPITAL CONSTRUCTION BUDGET PROGRESS Capital Construction Fund 302: The following General capital projects are in progress: 1) Project Account #15-City Hall Remodel a. City Staff Time, Construction i. The Solar Canopy is anticipated to be complete by spring. 2) Project Account #18-South Kitsap Community Events Center including Plaza a. City Staff Time, Design Consulting Services 3) Project Account #53-Givens Park Sport Court Remodel a. City Staff Time, Design Consulting Services Street Capital Construction Fund 304: The following Street capital projects are in progress: 1) Project Account #11-TIP 1.1 Bay St Pedestrian Path ROW a. City Staff Time, Right of Way Consulting Services 2) Project Account #45-TIP 1.14 Sidney non -motorized a. City Staff Time, Design Consulting Services 3) Project Account #41-TIP 1.15 Pottery Ave Non -Motorized a. City Staff Time, Construction Mgmt. Services, Construction 4) Project Account #42-TIP 1.16 SR166/Bay Street Re -Construction a. City Staff Time, Design Consulting Services 5) Project Account #47-TIP 1.18 Tremont Phase 2 &3 a. City Staff Time, 6) Project Account #27-TIP 1.2 Bay St Pedestrian Path Construction a. City Staff Time, Design Consulting Services 7) Project Account #22-TIP 1.7 Bethel Phase 5a-Mitchel Roundabout a. City Staff Time, Construction Mgmt. Services, Construction 8) Project Account #38-TIP 1.8 & 1.9 Blueberry & Salmonberry a. City Staff Time, Design Consulting Services 9) Project Account #65-TIF 1.4 Anderson Hill RAB a. City Staff Time, 10) Project Account #66-TIP 1.19 SB 160 2A a. City Staff Time, Water Capital Construction Fund 413: The following Water capital projects are in progress: 1) Project Account #16-Water CIP #3-Well 11 Treatment and Pumping Site Improvements a. City Staff Time, Design Services, Construction 2) Project Account #36-Water CIP #10-Melcher Pump Station Rehab a. City Staff Time 3) Project Account #41-Pottery Ave Non -Motorized (Water) a. City Staff Time, Construction Mgmt. Services, Construction 4) Project Account #42-Water CIP#19a Water Main- SR166Bay Water Re -Construction a. City Staff Time, Design 5) Project Account #60-Well #7 a. Nothing at this time 6) Project Account #67-Water CIP #22 Foster Mitigation a. City Staff Time, 7) Project Account #70-Water CIP #08 Old Clifton Water Main 390-580 Intertie a. Nothing at this time Storm Drainage Capital Construction Fund 423: The following Storm Capital projects are in progress: 1) Project Account #41- Pottery Ave Non -Motorized (Storm) a. City Staff Time, Design Services, Construction 2) Project Account #42-TIP 1.16 SR166/Bay Street Re -Construction a. City Staff Time, Design Services 3) Project Account #68-South Sidney Regional Stormwater Facility a. City Staff Time, Design Services 4) Project Account #TBD-Ruby Creek Culvert Replacement a. City Staff Time Sewer Capital Construction Fund 433: The following Sewer capital projects are in progress: 1) Project Account #04-Sewer CIP #1-Marina SW Pump Station a. City Staff Time, Design Services, Construction 2) Project Account #37-Sewer Lift Station Controls Upgrade a. City Staff Time, Design Services 3) Project Account #41-Pottery Ave Non -Motorized (Sewer) a. City Staff Time, Construction Mgmt. Services, Construction 4) Project Account #42-TIP 1.16 SR166/Bay Street Re -Construction a. City Staff Time, Design Services 5) Project Account #43-SWCIP # SB South Sidney Lift Station (Ruby Creek) a. City Staff Time, Design Services 6) Project Account #45-2nd Sidney Force Main a. City Staff Time, Design Services 7) Project Account #58-Bay Street Sewer Lift Station Design a. City Staff Time, Design Services Budget Report For Fiscal: 2025 Period Ending: 01/31/2025 OPERATIONS Group Summary Variance Original Current Period Fiscal Favorable Percent Departmen... Total Budget Total Budget Activity Activity (Unfavorable) Remaining Fund: 001- Current Expense Revenue 00-Revenues 14,581,138.07 14,581,138.07 1,315,782.99 1,315,782.99 -13,265,355.08 90.98% Revenue Total: 14,581,138.07 14,581,138.07 1,315,782.99 1,315,782.99 -13,265,355.08 90.98% Expense 01- Finance 1,208,345.51 1,208,345.51 75,656.83 75,656.83 1,132,688.68 93.74% 02 - Court 663,800.00 663,800.00 54,919.22 54,919.22 608,880.78 91.73% 03 - law Enforcement 6,693,982.59 6,693,982.59 538,948.23 538,948.23 6,155,034.36 91.95% 04 - Community Development 3,292,767.68 3,292,767.68 274,630.36 274,630.36 3,018,137.32 91.66% 05 - Public Works 2,270,214.22 2,270,214.22 155,124.73 155,124.73 2,115,089.49 93.17% 06 - Miscellaneous 1,863,000.00 1,863,000.00 2,037.23 2,037.23 1,860,962.77 99.89% 07-Administration 2,098,917.00 2,098,917.00 157,366.06 157,366.06 1,941,550.94 92.50% Expense Total: 18,091,027.00 18,091,027.00 1,258,682.66 1,258,682.66 16,832,344.34 93.04% Fund: 001 - Current Expense Surplus (Deficit): -3,509,888.93 -3,509,888.93 57,100.33 57,100.33 3,566,989.26 101.63% Fund: 002 - City Street Fund Revenue 00 - Revenues 4,072,866.00 4,072,866.00 141,227.17 141,227.17-3,931,638.83 96.53% ___ ___........... -- Revenue Revenue Total: 4,072,866.00 4,072,866.00 141,227.17 141,227.17-3,931,638.83 96.53% Expense 05 - Public Works 4,043,805.00 4,043,805.00 112,450.70 112,450.70 3,931,354.30 97.22% 06 - Miscellaneous ............. 2,439,100.00 ., 2,439,100.00 0.00 0.00 2,439,100.00 100.00% Expense Total: 6,482,905.00 6,482,905.00 112,450.70 112,450.70 6,370,454.30 98.27% Fund: 002 - City Street Fund Surplus (Deficit): -2,410,039.00 -2,410,039.00 28,776.47 28,776.47 -... ........... 2,438,815.47 _ . _. _ �.. 101.19% Fund: 003 - Stabilization Fund Revenue 00 - Revenues 130,000.00 130,000.00 12,301.73 12,301.73 -117,698.27 90.54% Revenue Total: 130,000.00 130,000.00 12,301.73 12,301.73 -117,698.27 90.54% Fund: 003 - Stabilization Fund Total: m. 130,000.00 130,000.00 12,301.73 12,301.73 _......... -117,698.27 90.54% Fund: 103 - Criminal Justice Revenue 00 - Revenues 438,800.00 438,800.00 44,112.21 44,112.21-394,687.79 89.95% Revenue Total: 438,800.00 438,800.00 44,112.21 44,112.21-394,687.79 89.95% Expense 03 - law Enforcement ..... 651,800.00 651,800.00 10,988.92 10,988.92 ............... 640,811.08 98.31% Expense Total: 651,800.00 651,800.00 10,988.92 10,988.92 640,811.08 98.31% Fund: 103 - Criminal Justice Surplus (Deficit): -213,000.00 -213,000.00 33,123.29 33,123.29 246,123.29 115.55% Fund: 104 - Special Investigative Unit Revenue 00 - Revenues 0.00 0.00 356.23 356.23 356.23 0.00% Revenue Total: 0.00 0.00 356.23 356.23 356.23 0.00% Expense 03 - law Enforcement 4,000.00 4,000.00 0.00 0.00 4,000.00 100.00% Expense Total: 4,000.00 4,000.00 0.00 0.00 4,000.00 100.00% _.. Fund: 104 - Special Investigative Unit Surplus (Deficit): -4,000.00 -4,000.00 356.23 356.23 _ 4,356.23 108.91% Fund: 107 - Community Events Revenue 00 - Revenues .................... 102,200.00 _.. 102,200.00 13,827.41 13,827.41 -88,372.59 86.47% Revenue Total: 102,200.00 102,200.00 13,827.41 13,827.41 -88,372.59 86.47% Expense 07-Administration 102,200.00 102,200.00 378.87 378.87 101,821.13 99.63% :3/1 3f2025 2. 10:19 PM Page ] 3 o(17 Budget Report For Fiscal: 2025 Period Ending: 01/31/2025 Variance Original Current Period Fiscal Favorable Percent Departmen... Total Budget Total Budget Activity Activity (Unfavorable) Remaining Expense Total: 102,200.00 102,200.00 378.87 378.87 101,821.13 99.63% Fund: 107 - Community Events Surplus (Deficit): 0.00 0.00 13,448.54 13,448.54 13,448.54 0.00% Fund: 108 - Paths & Trails Revenue 00 - Revenues 1,000.00 1,000.00 174.55 174.55 -825.45 82.55% Revenue Total: 1,000.00 1,000.00 174.55 174.55 -825.45 82.55% Fund: 108 - Paths & Trails Total: 1,000.00 1,000.00 174.55 174.55 -825.45 82.55% Fund: 109 - Real Estate Excise Tax Revenue 00 - Revenues ...................... 1,600,900.00 1,600,900.00 235,021.06 235,021.06 -1,365,878.94 85.32% Revenue Total: 1,600,900.00 1,600,900.00 235,021.06 235,021.06 -1,365,878.94 85.32% Expense 06 - Miscellaneous 7,003,900.00 7,003,900.00 622.80 622.80 7,003,277.20 99.99% Expense Total: 7,003,900.00 7,003,900.00 622.80 622.80 7,003,277.20 99.99% Fund: 109 - Real Estate Excise Tax Surplus (Deficit): -5,403,000.00 -5,403,000.00 234,398.26 234,398.26 5,637,398.26 104.34% Fund: 111- Impact Mitigation Fee Revenue 00-Revenues 2,915,138.00 2,915,138.00 158,119.89 158,119.89 -2,757,018.11 94.58% Revenue Total: 2,915,138.00 2,915,138.00 158,119.89 158,119.89 -2,757,018.11 94.58% Expense 06 - Miscellaneous 5,600,107.00 5,600,107.00 7,163.95 _..., ........_ 7,163.95 5,592,943.05 ........_... _ .. 99.87% Expense Total: 5,600,107.00 5,600,107.00 7,163.95 7,163.95 5,592,943.05 99.87% Fund: 111- Impact Mitigation Fee Surplus (Deficit): -2,684,969.00 -2,684,969.00 150,955.94 150,955.94 2,835,924.94 105.62% Fund: 206 - Bond Redemption Fund Revenue 00 - Revenues ................. 1,247,500.00 1,247,500.00 1,982.28 1,982.28 _..........- -1,245,517.72 99.84% Revenue Total: 1,247,500.00 1,247,500.00 1,982.28 1,982.28 -1,245,517.72 99.84% Expense 06 - Miscellaneous ..... 996,900..... .... _. Expense Total: 996,900.00 996,900.00 0.00 0.00 996,900.00 100.00% _.................... Fund: 206 - Bond Redemption Fund Surplus (Deficit): 250,600.00 250,600.00 1,982.28 1,982.28 -248,617.72 99.21% Fund: 411- Water Operating Revenue 00-Revenues 4,305,885.00 4,305,885.00 292,115.30 292,115.30-4,013,769.70 93.22% Revenue Total: 4,305,885.00 4,305,885.00 292,115.30 292,115.30-4,013,769.70 93.22% Expense 05 - Public Works 4,066,174.99 4,066,174.99 188,075.34 188,075.34 3,878,099.65 95.37% 06 - Miscellaneous 1,944,700.00 1,944,700.00 1,665.24 1,665.24 1,943,034.76 99.91% Expense Total: 6,010,874.99 6,010,874.99 189,740.58 189,740.58 5,821,134.41 96.84% Fund: 411- Water Operating Surplus (Deficit): -1,704,989.99 -1,704,989.99 102,374.72 102,374.72 1,807,364.71 106.00% Fund: 412 - Water Stabilization Revenue 00 - Revenues ........ ......... 0.00 0.00 4,488.84 4,488.84 ........_ .....--.. .........._ 4,488.84 0.00% Revenue Total 0.00 0.00 4,488.84 4,488.84 4,488.84 0.00% Fund: 412 - Water Stabilization Total: 0.00 0.00 4,488.84 4,488.84 4,488.84 0.00% Fund: 414 - Water Debt Service Revenue 00 - Revenues 1,340,500.00 1,340,500.00 4,923.45 4,923.45-1,335,576.55 99.63% Revenue Total: 1,340,500.00 1,340,500.00 4,923.45 4,923.45-1,335,576.55 99.63% Expense 06 - Miscellaneous 1,340,400.00 1,340,400.00 0.00 0.00 1,340,400.00 100.00% 3/3 3f:ZC1:?,5 2.30:59 PINI Page 14 of 17 Budget Report For Fiscal: 2025 Period Ending: 01/31/2025 Departmen... Expense Total: Fund: 414 - Water Debt Service Surplus (Deficit): Fund: 421- Storm Drainage Utility Revenue 00 - Revenues 2,448,800.00 2,448,800.00 351,243.37 351,243.37-2,097,556.63 85.66% ............ _..._... .........._ _......_. Revenue Total: 2,448,800.00 2,448,800.00 351,243.37 351,243.37-2,097,556.63 85.66% Expense Variance Original Current Period Fiscal Favorable Percent Total Budget Total Budget Activity Activity (Unfavorable) Remaining 1,340,400.00 1,340,400.00 0.00 0.00 1,340,400.00 100.00% 100.00 100.00 4,923.45 4,923.45 4,823.45-4,823.45% 05 - Public Works 2,199,044.90 2,199,044.90 99,787.38 99,787.38 2,099,257.52 95.46% 06 - Miscellaneous 723,800.00 723,800.00 8,262.66 8,262.66 715,537.34 98.86% Expense Total: 2,922,844.90 2,922,844.90 108,050.04 108,050.04 2,814,794.86 96.30% _........_ _. .. Fund: 421- Storm Drainage Utility Surplus (Deficit)-474,044.90 ....__ _. .. ........ -474,044.90 243,193.33 243,193.33 717,238.23 151.30% Fund: 422 - Storm Drainage Stabilization Revenue 00 - Revenues 75,000.00 75,000.00 2,306.72 2,306.72-72,693.28 96.92% Revenue Total: 75,000.00 75,000.00 2,306.72 2,306.72-72,693.28 96.92% Fund: 422 - Storm Drainage Stabilization Total: 75,000.00 75,000.00 2,306.72 2,306.72-72,693.28 96.92% Fund: 424 - Storm Drainage Debt Service Revenue 00 - Revenues 444,000.00 444,000.00 8,262.66 8,262.66-435,737.34 98.14% Revenue Total: 444,000.00 444,000.00 8,262.66 8,262.66-435,737.34 98.14% Expense 06 - Miscellaneous 221,000.00 221,000.00 8,262.66 8,262.66 212,737.34 96.26% Expense Total: 221,000.00 221,000.00 8,262.66 8,262.66 212,737.34 96.26% _. . Fund: 424 - Storm Drainage Debt Service Surplus (Deficit): 223,000.00 223,000.00 0.00 0.00-223,000.00 100.00% Fund: 431- Sewer Operating Revenue 00 - Revenues 6,071,750.00 6,071,750.00 518,696.21 518,696.21-5,553,053.79 91.46% _._._._.. _____._.. .....___ Revenue Total: 6,071,750.00 6,071,750.00 518 696.21 518 696.21-5,553,053.79 91.46% Expense 05 - Public Works 5,661,694.90 5,661,694.90 327,398.39 327,398.39 5,334,296.51 94.22% 06 - Miscellaneous 2,083,075.00 2,083,075.00 1,838.90 1,838.90 2,081,236.10 99.91% Expense Total: 7,744,769.90 7,744,769.90 329,237.29 329,237.29 7,415,532.61 95.75% Fund: 431- Sewer Operating Surplus (Deficit): .,.....__.._�...m................. -1,673,019.90 ._�............ -1,673,019.90 189,458.92 189,458.92 1,862,478.82 111.32% Fund: 432 - Sewer Stabilization Revenue 00 - Revenues ............................ 0.00 ,....0.00 0.00 6,527.47 6,527.47 6,527.47 0.00% Revenue Total: 0.00 6,527.47 6,527.47 6,527.47 0.00% Fund: 432 - Sewer Stabilization Total: 0.00 0.00 6,527.47 6,527.47 6,527.47 0.00% Fund: 434 - Sewer Debt Service Revenue 00 - Revenues 1,081,900.00 1,081,900.00 5,849.97 5,849.97-1,076,050.03 99.46% Revenue Total: 1,081,900.00 1,081,900.00 5,849.97 5,849.97-1,076,050.03 99.46% Expense 06 - Miscellaneous 1,081,500.00 1,081,500.00 0.00 0.00 1,081,500.00 100.00% Expense Total: 1,081,500.00 1,081,500.00 0.00 0.00 1,081,500.00 100.00% Fund: 434 - Sewer Debt Service Surplus (Deficit): 400.00 400.00 5,849.97 5,849.97 5,449.97-1,362.49% Fund: 500 - Equipment Rental and Revolving Revenue 00-Revenues ..................., 1,954,800.00 1,954,800.00 90,140.15 90,140.15 -1,864,659.85 95.39% _ Revenue Total: 1,954,800.00 1,954,800.00 90,140.15 90,140.15 -1,864,659.85 95.39% Expense 10-ER&R 3,110,600.00 3,110,600.00 69,970.28 69,970.28 3,040,629.72 97.75% 3j33f20252;30:19 C%INI F'cst,t' 15 oR12 Budget Report For Fiscal: 2025 Period Ending: 01/31/2025 Original Current Period Departmen Total Budget Total Budget Activity Expense Total: 3,110,600.00 3,110,600.00 69,970.28 Fund: 500 - Equipment Rental and Revolving Surplus (Deficit): -1,155,800.00 -1,155,800.00 20,169.87 Report Surplus (Deficit): -18,552,651.72 -18,552,651.72 1,111,910.91 Variance Fiscal Favorable Percent Activity (Unfavorable) Remaining 69,970.28 3,040,629.72 97.75% 20,169.87 1,175,969.87 101.75% 1,111,910.91 19,664,562.63 105.99% 3/13/2025 2 . 30:19 PM Pago 16 of 17 Budget Report CAPITAL For Fiscal: 2025 Period Ending: 01/31/2025 Group Summary Variance Original Current Period Fiscal Favorable Percent Account Typ... Total Budget Total Budget Activity Activity (Unfavorable) Remaining Fund: 302 - Capital Construction Revenue 2,172,300.00 2,172,300.00 7,854.32 7,854.32 -2,164,445.68 99.64% Expense 4,742,100.00 4,742,100.00 1,962.23 1,962.23 4,740,137.77 99.96% Fund: 302 - Capital Construction Surplus (Deficit): -2,569,800.00 -2,569,800.00 5,892.09 5,892.09 2,575,692.09 100.23% Fund: 304 - Street Capital Projects Revenue 20,240,280.00 20,240,280.00 376,732.97 376,732.97 -19,863,547.03 98.14% Expense ........... 20,947,500.00 20,947,500.00 7,809.76 7,809.76 20,939,690.24 99.96% _....__ Fund: 304 - Street Capital Projects Surplus (Deficit): -707,220.00 -707,220.00 368,923.21 368,923.21 1,076,143.21 152.17% Fund: 413 - Water Capital Revenue 8,124,800.00 8,124,800.00 1,874,158.73 1,874,158.73 -6,250,641.27 76.93% Expense 8,432,800.00 8,432,800.00 2,220.33 2,220.33 8,430,579.67 99.97% Fund: 413 - Water Capital Surplus (Deficit): -308,000.00 -308,000.00 1,871,938.40 1,871,938.40 2,179,938.40 707.77% Fund: 423 - Storm Drainage Capital Facil Revenue 1,273,500.00 1,273,500.00 235,501.13 235,501.13 -1,037,998.87 81.51% Expense 1,460,000.00 1,460,000.00 0.00 0.00 1,460,000.00 100.00% Fund: 423 - Storm Drainage Capital Facil Surplus (Deficit): -186,500.00 -186,500.00 235,501.13 235,501.13 422,001.13 226.27% Fund: 433 - Sewer Capital Revenue 16,135,800.00 16,135,800.00 198,213.93 198,213.93 -15,937,586.07 98.77% Expense 16,729,825.00 16,729,825.00 3,188.40 3,188.40 16,726,636.60 99.98% Fund: 433 - Sewer Capital Surplus (Deficit):-594,025.00 -594,025.00 195,025.53 195,025.53 789,050.53 132.83% Report Surplus (Deficit).-4,365,545.00 -4,365,545.00 2,677,280.36 2,677,280.36 7,042,825.36 161.33% :3/1 3f2025 2 32:35 PM Pale 3 of 4 CASH & INVESTMENT Detail Report Fund Beginning Balance Total Activity Ending Balance 001- Current Expense 18,436,152.82 57,100.33 18,493,253.15 002 - City Street Fund 4,448,362.89 28,776.47 4,477,139.36 003 - Stabilization Fund 3,235,385.04 12,301.73 3,247,686.77 103 - Criminal Justice 576,826.36 33,123.29 609,949.65 104 - Special Investigative Unit 105,095.86 356.23 105,452.09 107 - Community Events 472,383.71 13,448.54 485,832.25 108 - Paths & Trails 17,989.38 174.55 18,163.93 109 - Real Estate Excise Tax 6,523,527.01 234,398.26 6,757,925.27 111- Impact Mitigation Fee 11,214,726.06 150,955.94 11,365,682.00 206 - Bond Redemption Fund 517,370.63 1,982.28 519,352.91 302 - Capital Construction 1,567,976.38 5,892.09 1,573,868.47 304 - Street Capital Projects 952,111.99 368,923.21 1,321,035.20 401- Water -Sewer Utilities 0.00 0.00 0.00 403 - Water -Sewer Cumulative Reserve 0.00 0.00 0.00 411- Water Operating 2,754,162.47 102,374.72 2,856,537.19 412 - Water Stabilization 1,171,575.95 4,488.84 1,176,064.79 413 - Water Capital 8,436,823.26 1,871,938.40 10,308,761.66 414 - Water Debt Service 1,285,004.73 4,923.45 1,289,928.18 421- Storm Drainage Utility 2,328,243.07 243,193.33 2,571,436.40 422 - Storm Drainage Stabilization 602,048.00 2,306.72 604,354.72 423 - Storm Drainage Capital Facil 942,392.10 235,501.13 1,177,893.23 424 - Storm Drainage Debt Service 0.00 0.00 0.00 431- Sewer Operating 8,754,382.59 189,458.92 8,943,841.51 432 - Sewer Stabilization 1,703,654.80 6,527.47 1,710,182.27 433 - Sewer Capital 10,194,669.09 195,025.53 10,389,694.62 434 - Sewer Debt Service 1,526,828.59 5,849.97 1,532,678.56 500 - Equipment Rental and Revolving 5,488,629.03 20,169.87 5,508,798.90 631- Trust and Agency 188.00 10,659.10 10,847.10 632 - Wastewater Treatment Facil Fee 7,928,631.02 83,188.31 8,011,819.33 Grand Total: 101,185,140.83 3,883,038.68 105,068,179.51 Date Range: 01/01/2025 - 01/31/2025 Fund Summary :3/1 3/2025 :2:26::21 PM Page 5 cat 5