Loading...
HomeMy WebLinkAbout2025-2044 TIP.4_7_2025.draftCity of Port Orchard Six -Year Transportation Improvement Program For 2025-2030 TIER 1 (Reasonably Constrained) Proj# Road Name Total Future Phase Federal State (TIF Begin Termini Project Spent Prior Expenditure Start Funding Fund Fund Proj#) Project Title/Project Description End Termini Length Total Est. Cost to 2024 2024 s 2025 2026 2027 2028 2029 2030 Year Status Phase Code Federal Funds Code State Funds Local Funds 1.1 Bay Street Pedestiran Pathway ROW PO Shoreline: Add 14-ft Multi -Modal (bikes & pedestrians) Sidney Ave. Foot 1.2 2,280,000 1,140,000 1,140,000 0 0 0 0 0 0 0 2013 S ROW STP 1,923,590 0 300,212 waterfront pathway & cantilevered retaining wall Ferry to Annapolis 0 0 0 0 0 0 0 0 0 2018 P ROW 0 581,000 following historic Mosquito Fleet trail and Foot Ferry N/A pedestrian bridge across Black Jack Creek. 1.2 Bay Street Pedestrian Pathway CN The CN phase for the 14-ft Multi -Modal (bike & ped) 1.2 1,115,000 650,000 465,000 0 0 0 0 0 0 0 2018 S CN 1,115,000 waterfront pathway/cantilevered retailing wall 3,000,000 0 3,000,000 0 0 0 0 0 0 0 2024 S CN ConnWA 3,000,000 1,500,000 following the historic Mosquito Fleet trail. Includes the demolition/removal of (5) overwater structures. N/A __...,, _ � ..2 � , o �_,.. 1.4 Old Clifton/ Anderson Hill Intersection Improvements Old Clifton Rd / Intersection Improvements (roundabout) as Anderson Hill Rd. 0 300,000 0 0 300,000 300,000 0 0 0 0 0 2027 S PE Developer:$320,000 + 700,000 + McCormick 0 identified in the McCormick Urban Village Trans Plan Intersection 2,000,000 0 0 2,000,000 0 2,000,000 0 0 0 2028 P CN TIF; $786,000 0 TIF 1.4 and partially funded by Bayside Mit Funds. 1.5 Old Clifton Rd Non -Motorized Improvements Old Clifton Road: Roadway Improvements identified in the McCormick McCormick Village 0.75 450,000 150,000 0 450,000 0 450,000 0 0 2026 P PE 0 450,000 Urban Village Trans Plan. Design and Construction. to Anderson Hill Rd. 2,000,000 2,700,000 2027 P CN STP(U), TIB/CS TIF 1.5, 2.07 Separated pathway and shoulder facilities. RCO 1.7 Bethel Phase 5a - Bethel/Lincoln/ Mitchel RABs Bethel/Lincoln/Lunb Safety and capacity improvements to intersection erg/ Mitchell 0 4,000,000 800,000 0 2021 S PE 800,000 and reconfiguration of approaches. Phase 1 Lincoln 0 1,100,000 2,100,000 2100000 2022 S CN HSP 1,500,000 TIB LAP 1,100,000 700,000 TIF 2.04e Mitchel completed. 1.8 Bethel Phase 1a - Blueberry RAB Bethel Road/ Phase la. Bethel/ Blueberry RAB 60% PE in 2022 Blueberry 0 3,341,000 0 250,000 285,000 160,000 125,000 2022 S PE 0 0 535,000 and start ROW for Phase la/b. Intersection 268,000 134,000 134,000 2024 S ROW 0 268,000 2,788,000 2788000 2026 P CN TIB/ 0 2,788,000 FIF 2.04a UAP/CS 1.9 Bethel ase lb - Salmonberry RAB Bethel Road; Phaselb. Bethel/ Salmonberry RAB Round and Salmonberry 0 11,467,000 0 375,000 891,000 497,000 394,000 2023 S PE 0 0 1,272,000 roadway segment design from Blueberry to intersection; 3,206,000 1,603,000 1,603,000 0 2024 S ROW 0 3,206,000 Salmonberry. Salmbonberry from Bethel to City Salmonberry East 7,370,000 7,370,000 2026 P CN TIB/UAP/ 0 7,370,000 FIF 2.04a Limits. CS 1.10 Bethel Phase 4b; Vallair Ct Connector Bethel Intersection improvements and road extension and Road/Walmart Drive 0.25 3,000,000 0 0 1,000,000 0 0 0 0 1,000,000 0 2027 P PE & ROW 0 0 1,000,000 intersection improvements included in the Bethel Intersection to 0 0 2,000,000 0 0 0 0 0 1,000,000 2028 P CN 0 TIB 0 1,000,000 TIF 1.7 Road Corridor study Vallair Ct. 1.14 Sidney Road SW Sidewalk Sidney Glen Address gap in sidewalk along school frontage Elementary 0.95 1,895,000 0 235,000 0 2023 P PE 173,000 62,000 Sidewalk 1,660,000 1,660,000 2024 P CN SRTS 1,222,000 438,000 TIF 2.05 1.16 SR166 Bay Street Reconstruction SR166 from Geiger Raise street to address sea level rise and improve to to Frederick 7,259,000 200,000 1,135,000 0 0 0 2022 S PE CDS 1,000,000 135,000 current standard in accordance with redevelopment 5,924,000 5,924,000 2026 S CN KRCC 2,000,000 649,000 plans. Amount shown does not include water and sewer utility improvments. N/A Citywide corridors, 1.17 Street Lighting Improvements highest priority Currently funded work include Pottery, Sidney Rd. locations 1,310,000 0 0 100,000 100,000 2023 S PE HSIP 0 0 Future applications to be submitted for Tremont 210,000 1,000,000 1,000,000 2024 S CN HSIP 210,000 0 P DN/CN HSIP 1,100,00 0 N/A 1.18 Tremont Phase 2 and 3 Port Orchard Blvd to Sidney Ave. 4/8/2025 Page 1 of 7 C:\Users\ fink\AppData\Local\Microsoft\Windows\INetCache\Content.Outlook\PWL32QI4\2025-2044 TIP.4_7_2025.draft City of Port Orchard Six -Year Transportation Improvement Progran For 2025-2030 TIER 1 (Reasonably Constrained) Proj# Road Name (TIF Begin Termini Proj#) Project Title/Project Description End Termini Non motorized connectivity study and design of elements for future ROW and/or CN application 2.12 & 2.30 1.19 SR160 Sedgwick Phase 2a New Intersection Total Future Phase Federal State Project Spent Prior Expenditure Start Funding Fund Fund Length Total Est. Cost to 2024 2024 s 2025 2026 2027 2028 2029 2030 Year Status Phase Code Federal Funds Code State Funds Local Funds 4,732,000 0 732,000 732,000 2023 S PE PedBike 732,000 0 1,000,000 1,000,000 2027 P ROW PedBike TBD TBD 3,000,000 3,000,000 2029 P CN PedBike TBD TBD New Roundabout midway between SR16 and Bethel Rd. 1,550,000 0 0 600,000 600,000 2027 P PE BuildAm 600,000 Facilitate development. 60% DN and ROW acquisition for 950,000 950,000 2028 P ROW BuildAm 950,000 two lane RAB that will be innitially constructed as one TIF lane. Also acquisition of a reminent on the north side 2.04B west of the proposed RAB. 1.20 Bethel Phase 4a; Lund RAB New Intersection New roundabout at Bethel and Lund Intersection. 1,000,000 0 0 500,000 0 500,000 2027 P PE STP 432,500 67,500 500,000 0 500,000 2029 P ROW STP 432,500 67,500 2.04 TIF 1.21 Old Clifton/ McCormick Woods Dr. RAB Old Clifton Rd / Intersection Improvements (roundabout) as Anderson Hill Rd. 0 1,600,000 0 0 250,000 250,000 0 2025 P PE Developer 450,000 identified in the McCormick Urban Village Trans Plan Intersection 0 0 0 0 0 2025 P ROW Removed from project 0 and partially funded by Bayside Mit Funds. TIF 2.08 1,350,000 1,350,000 2027 P CN Developer 1,750,000 Total Capital Pojects $47,699,000 $2,940,000 $10,302,000 $37,964,000 $6,454,000 $8,180,000 $13,258,000 $2,050,000 $7,650,000 $1,000,000 $8,028,590 $4,832,000 $25,719,212 Maintenance Projects Total 2024 Future Exp 2025 2026 2027 2028 2029 2030 1.51 Annual Pavement Maintenance Includes patching, crack -sealing, striping, and other 656,500 56,500 600,000 100,000 100,000 100,000 100,000 100,000 100,000 On going S CN 600,000 activities 1.52 * Annual Sidewalk & ADA Upgrade Program Repair and replace concrete sidewalks and curb 1,238,000 38,000 1,200,000 200,000 200,000 200,000 200,000 200,000 200,000 On going S CN 1,200,000 ramps as identified in the program 1.53 ** Annual Pavement Management System Paving Projects Pavement replacement projects as identified in the 4,135,000 535,000 3,600,000 600,000 600,000 600,000 600,000 600,000 600,000 On going S CN 3,600,000 pavement management system program Total Maintenance Projects 6,029,500 0 629,500 5,400,000 900,000 900,000 900,000 900,000 900,000 900,000 * Per 2016 ADA transition plan: $180,000 annually over 20 years to comply on arterial streets. ** Per 2016 Pavement Management Analysis Report: $1.45 million annually to maintain network condition (PCI of 70), $500k to keep network PCI above 65 after 5 years. 0 5,400,000 4/8/2025 Page 2 of 7 C:\Users\ fisk\AppData\Local\Microsoft\Windows\INetCache\Content.Outlook\PWL32QI4\2025-2044 TIP.4_7_2025.draft City of Port Orchard Transportation Improvement Program (TIP) For 2031-2044 TIER 2 (Unconstrained) Road Name Total Phase Federal State Priority Begin Termini Project Start Funding Fund Fund Number Project Title/Project Description End Termini Length Total Est. Cost 2031-2035 2036-2044 Year Status Phase Code Federal Funds Code State Funds Local Funds Capital Projects 2.01 Sidney Avenue Tremont Street to 1 3,750,000 3,750,000 0 2029 P PE/RW STP(U) 0 0 3,750,000 The design, permitting, right-of-way acquisition Fireweed 6,750,000 6,750,000 0 2031 P CN !!! Note !!! 0 6,750,000 and construction for this project with bike lanes, Need updated storm drainage and sidewalks. (COMPLETE traffic model TIF 2.01 STREET) STP(U) input before 2.02A Sedgwick Road West - Design, Permitting & ROW SR 16 Interchange to 0.4 462,428 462,428 0 2029 P PE STP(U) 400,000 0 62,428 The design, permitting and right-of-way Sidney Rd. SW 693,642 693,642 0 2030 P RW STP(U) 600,000 0 93,642 acquisition phase for this widening project with 3 lanes (continuous TWTL), bike lanes, sidewalks and box culvert across Blackjack Creek.) TIF 2.02 2.02E Sedgwick Road West - Construction SR 16 Interchange to 0.4 3,468,208 3,468,208 0 2031 P CN STP(U) 3,000,000 0 468,208 The construction phase for this widening project Sidney Rd. SW. with 3 lanes (continuous TWTL), bike lanes, sidewalks and box culvert across Blackjack Creek.) TIF 2.02 2.04A.2 Ramsey Road Widening Sedgwick Road to Widen road to two travel lanes with bike Salmonberry Road 0.5 4,000,000 0 4,000,000 2029 P ALL 0 0 0 facilities, sidewalks and stormwater system TIF 2.04A improvements. Bethel/Sedgwick Corridor Phase 2 - Sedgwick Road: SR-16 2.046 Design, ROW and Construction interchange to Bethel 1,110,000 1,110,000 0 2030 P PE 0 0 1,110,000 Design, ROW acquisition and construction of the 0.7 2,802,000 2,802,000 0 2031 P RW 0 0 2,802,000 second phase of the street improvements per the 12,757,000 12,757,000 0 2032 P CN 12,725,000 0 0 Bethel/Sedgwick Corridor Plan (2018). TIF 2.04E Bethel/Sedgwick Corridor Phase 3 - Blueberrry to Piperberry. 2.04C Design, ROW and Construction DN, ROW, CN. To be addressed with future State 0.25 1,800,000 450,000 2040 P PE intersection improvements at Sedgdwick? 350,000 2041 P RW 1,000,000 2044 P CN Bethel/Sedgwick Corridor Phase 4 - Bethel Road: Lund to 2.04D Design, ROW and Construction Salmonberry 616,000 0 616,000 2034 P PE 0 0 616,000 Design, ROW acquisition and construction of the 0.5 1,041,000 0 1,041,000 2035 P RW 0 0 1,041,000 fourth phase of the street improvements per the 7,087,000 0 7,087,000 2036 P CN 7,087,000 0 0 Bethel/Sedgwick Corridor Plan (2018). TIF 2.04D Bethel/Sedgwick Corridor Phase 5 - Bethel Road: Mile Hill 2.04E Design, ROW and Construction Drive to Lund 720,000 0 720,000 2036 P PE 0 0 720,000 Design, ROW acquisition and construction of the 1.1 1,532,000 0 1,532,000 2037 P RW 0 0 1,532,000 fifth phase of the street improvements per the 6,283,000 0 6,283,000 2038 P CN 6,283,000 0 0 Bethel/Sedgwick Corridor Plan (2018). TIF 2.04E 4/8/2025 Page 3 of 7 C:\Users\fisk\AppData\Local\Microsoft\Windows\INetCache\Content.Outlook\PWL32QI4\2025-2044 TIP.4_7_2025.draft City of Port Orchard Transportation Improvement Program (TIP) For 2031-2044 TIER 2 (Unconstrained) Road Name Total Phase Federal State Priority Begin Termini Project Start Funding Fund Fund Number Project Title/Project Description End Termini Length Total Est. Cost 2031-2035 2036-2044 Year Status Phase Code Federal Funds Code State Funds Local Funds 2.05 Sidney Road SW Widening Phase 2 City limits to Berry Lake Roadway widening to three lanes (additional 0.95 500,000 500,000 0 2028 P PE 0 0 500,000 TWTL) including bike lanes, sidewalks, traffic 0 2029 P CN STP(U) 0 TIB 0 3,000,000 calming, and stormwater system improvements. (COMPLETE STREET). TIF 2.05 2.06 Pottery Avenue Widening Pottery Avenue: Widen road to two travel lanes with bike Tremont Place to 0.22 1,600,000 1,600,000 0 2029 P ALL 0 0 1,600,000 facilities, sidewalks and stormwater system Melcher Street TIF 2.06 improvements. 2.07 Old Clifton Rd Shoulder & Pedestrian Improvements Old Clifton Road: Design and construction of shoulder widening, Anderson Hill to 1.35 2,700,000 2,700,000 0 2028 P CN 0 0 2,000,000 street lighting, watermain extension and grade- McCormick Wood Dr. seperated Pedestrian Path as identified in the McCormick Urban Village Trans Plan. TIF 2.07 2.08 Not used 2.09 Melcher Street Widening Reconstruction to widen road to allow two safe Melcher Street: 0.4 1,500,000 0 1,500,000 2032 P ALL 0 0 1,500,000 travel lanes, bike facilities, sidewalks and a Pottery Avenue to stormwater system. Sherman Avenue TIF 2.09 2.10 Fireweed Road Widening Reconstruction widening the road to allow for Fireweed Road: 0.25 1,500,000 0 1,500,000 2035 P ALL 0 0 1,500,000 safe travel lanes, bike facilities, sidewalks and a Sidney Avenue to stormwater system. South Flower Avenue TIF 2.10 2.11 Sherman Avenue Widening Sherman Avenue: Reconstruction widening roadway to allow two Fireweed Road to 0.35 2,000,000 0 2,000,000 2032 P ALL 0 0 2,000,000 safe travel lanes, bike facilities, sidewalks and a Terminus at SR 16 stormwater system. TIF 2.12 2.12 Tremont St Widening - Port Orchard Blvd (Ph. 2) Port Orchard Blvd. Construct roundabouts at Tremont Street/PO Tremont Street to 1.1 809,250 0 809,250 2033 P PE STP(U) 700,000 0 109,250 Blvd. and Bay Street (SR166)/PO Blvd. and curb, Bay Street (SR166) gutter, bike lanes, sidewalks, street lighting, 520,231 0 520,231 2035 P RW STP(U) 450,000 0 70,231 storm drainage and Schedule 74 Undergrounding. 7,225,434 0 7,225,434 2037 P CN STP(U) 6,250,000 0 975,434 TIF 2.13 2.13 Not Used 4/8/2025 Page 4 of 7 C:\Users\fisk\AppData\Local\Microsoft\Windows\INetCache\Content.Outlook\PWL32QI4\2025-2044 TIP.4_7_2025.draft City of Port Orchard Transportation Improvement Program (TIP) For 2031-2044 TIER 2 (Unconstrained) Road Name Total Phase Federal State Priority Begin Termini Project Start Funding Fund Fund Number Project Title/Project Description End Termini Length Total Est. Cost 2031-2035 2036-2044 Year Status Phase Code Federal Funds Code State Funds Local Funds 2.14 Old Clifton Berry Lake Road Intersection 0 0 0 0 0 0 0 Intersection Improvement by Kitsap County 2.15 Blueberry Road Widening Geiger Road to Bethel Widen road to two travel lanes with bike lanes, Road 0.4 1,200,000 0 1,200,000 2036 P ALL 0 0 0 sidewalks and stormwater system improvements. TIF 2.16 2.16 Geiger Road Widening Sedgwick Road to Widen road to two travel lanes with bike Blueberry Road 0.25 750,000 0 750,000 2034 P ALL 0 0 0 facilities, sidewalks and stormwater system TIF 2.17 improvements. 2.17 Salmonberry Road Widening Ramsey Road to Bethel Widen road to two travel lanes, sidewalks, new Road 0.15 2,500,000 0 2,500,000 2031 P ALL 0 0 0 culvert and conveyances to blackjack creek. TIF 2.18 2.18 Piperberry Way Extention Geiger Road to Ramsey Provide an extension of Piperberry from Ramsey Road 0.25 1,150,000 0 1,150,000 2034 P ALL 0 0 0 to Geiger and a new street connection to the proposed roundabout on Sedgwick. TIF 2.19 2.19 Old Clifton & Feilgly Intersection Feigly intersection Complete street improvement identified in the 0 2,800,000 0 2,800,000 2040 P ALL 0 0 0 McCormicks Urban Village Transportation Plan. Continuation of 1.5A TIF 2.21 2.20 Bay Street Pathway - West Tremont to Footferry Continuation of project following study in 1.8 0 4,000,000 4,000,000 0 2030 P ALL 0 0 0 2.21 Bethel Business Connector Lund to Salmonberry via Provides street internal to business district for Cathie Ave., Jerry Ln, 1,400,000 400,000 2032 P ROW traffic conjestion relief on Bethel. Includes and the Walmart 0.25 1 1,000,000 2040 P DN & CN 0 0 0 permanent easement acquisition thru proposed Connector. Home Depot site and adjacent to Salmonberrry TIF 2.04A Atp's site. 2.22 Not Used 2.23 Bay Street Improvements Harrison to Mile Hill Dr Complete Street and utility improvements. Refer intersection with Bay 0 10,000,000 0 10,000,000 2040 P ALL 0 0 0 to Study. Street. 2.24 Bay St. & Port Orchard Blvd Intersection Bay Street at Port Single Lane Round About to address safety and Orchard Boulevard 0 3,000,000 0 3,000,000 2040 P ALL 0 0 0 capacity. Bay Street Pathway crossing. Assumed creek is not impacted by project/ no major mitigation. 4/8/2025 Page 5 of 7 C:\Users\fisk\AppData\Local\Microsoft\Windows\INetCache\Content.Outlook\PWL32QI4\2025-2044 TIP.4_7_2025.draft City of Port Orchard Transportation Improvement Program (TIP) For 2031-2044 TIER 2 (Unconstrained) Road Name Total Phase Federal State Priority Begin Termini Project Start Funding Fund Fund Number Project Title/Project Description End Termini Length Total Est. Cost 2031-2035 2036-2044 Year Status Phase Code Federal Funds Code State Funds Local Funds 2.25 Bay St. & Kitsap Street Intersection Improvement Bay Street at Kitsap Re -align Kitsap intersection to address safety and Street 0 2,000,000 0 2,000,000 2040 P ALL 0 0 0 capacity. Cline to end at Kitsap. Relocate flag pole. Signalized Intersection? 2.26 Bay St. & Mitchell and Guy Wetzel Bay Street at Mitchell Reconfigure intersections to address safety and Avenue and Guy Wetzel 0 2,500,000 0 2,500,000 2040 P ALL 0 0 0 capacity. St 2.27 Sidney Avenue Improvements Prospect St. to the Sidewalk and streetscape improvements. Waterfront 0 1,500,000 0 1,500,000 2040 P ALL 0 0 0 Developer Imrpovements? 2.28 Harrison Avenue Improvements Bay Street to the Sidewalk and streetscape improvements. Signal Waterfront 0 1,000,000 0 1,000,000 2040 P ALL 0 0 0 replacement? Developer Project? 2.28 Fredrick Avenue Impr. Prospect to Waterfront. Convert to two way street with angled parking. 0 1,500,000 0 1,500,000 2040 P ALL 0 0 0 Provide sidewalk and streetscape impr. 2.29 New Waterfront Street Frederick to Sidney Sidewalk and streetscape improvements. 0 2,500,000 0 2,500,000 2040 P ALL 0 0 0 "Shared Street" concept. Developer Improvement? Port Orchard Blvd. to 2.30 Tremont St Widening - Port Orchard Blvd (Ph. 3) Sidney Ave. Center median, bike lane, sidewalk, and 0 51000,000 0 5,000,000 2041 P ALL STP(U) 0 -IB, Ped Bik, 0 0 streetscape improvements on Tremont and Sidney. Roundabout at the Tremont/ Sidney intersection for non -motorized safety. Accomodation for fire station. ROW needed on north side of Tremont. Glenwood at McC Wds 2.31 Glenwood at McCormick Woods Drive Interection Dr. Roundabout and approaches for future bike lanes 0 3,000,000 0 3,000,000 2041 P ALL STP(U) 0 -IB, Ped Bik, 0 0 and sidewalks 2.32 Bay Street Pedestiran Pathway - West Kitsap Transit to PO Blvd Multi -use Pathway 0 1,000,000 0 1,000,000 2041 P ALL STP(U) 0 -IB, Ped Bik 0 0 2.33 Port Orchard Blvd. Non -motorized Bay Street to Tremont 4/8/2025 Page 6 of 7 C:\Users\fisk\AppData\Local\Microsoft\Windows\INetCache\Content.Outlook\PWL32QI4\2025-2044 TIP.4_7_2025.draft City of Port Orchard Transportation Improvement Program (TIP) For 2031-2044 TIER 2 (Unconstrained) Priority Number Project Title/Project Description Separated mutli-use pathway using existing paved surfaces, street lighting Road Name Total Begin Termini Project End Termini Length Total Est. Cost 2031-2035 0 1,500,000 0 Phase Federal State Start Funding Fund Fund 2036-2044 Year Status Phase Code Federal Funds Code State Funds Local Funds 1,500,000 2041 P ALL STP(U) 0 -IB, Ped Bik, 0 0 PO Blvd. to Geiger St. 2.34 Bay Street Reconstruction Phase 2 Sidewalk improvments, power undergrounding, 0.2 mi 5,000,000 5,000,000 2034 street lighting, stormwater recontruction, water and sewer utility (separate cost tracking). Interection improvements at PO Blvd and Kitsap 2.35 Bay Street Reconstruction Phase 3 Frederick to Harrison Marque removal, sidewalk improvements, power 0.15 mi 4,000,000 4,000,000 2044 undergrounding, street lighting, stormwater recontruction, water and sewer utility may be added at additional cost S. Kitsap & Lippert 2.36 Pottery Intersections RAB improvemetns to maintain LOS. 4,000,000 6,000,000 2044 Intersection 2.37 Old Clifton/ Lloyd Intersection RAB improvement to maintain LOS 4,000,000 4,000,000 2040 Total Tier 2 Capital Projects 81,827,193 39,593,278 42,233,915 37,495,000 0 32,200,193 Maintenance Project 2.51 Cline Avenue Repairs Replace sidewalk and parking strip. Cline Avenue: 0.13 200,000 0 0 P ALL 200,000 Kitsap Street to Dwight Street Total Tier 2 Maintenance Projects 200,000 0 0 0 0 200,000 4/8/2025 Page 7 of 7 C:\Users\fisk\AppData\Local\Microsoft\Windows\INetCache\Content.Outlook\PWL32QI4\2025-2044 TIP.4_7_2025.draft