HomeMy WebLinkAbout050-25 - TK Elevator Company - ContractDocusign Envelope ID: FDAD D758-4A02-4DBD-85E5-94C36B72AF4C
Port Orchard Contract #:050-25
Authorized Amount: $6,000.00
Date Start: 5/1/2025
Date End: 5/l/2026
AGREEMENT FOR SERVICES — CONTRACTOR
THIS AGREEMENT is entered into by and between the City of Port Orchard, Washington, a
municipal corporation ("City") and TK Elevator Corporation organized under the laws of the State of
Washington located and doing business at 12530 135TH AVE NE KIIZKLAND, WA 98034. Mason
Fisher 425.898.3756.
RECITALS:
WHEREAS, the City has determined it needs to have certain services performed for its residents
but does not have the manpower, resources, or expertise to perform such services; and
WHEREAS, the City desires to have the Contractor perform such services pursuant to certain tenns
and conditions;
NOW, THEREFORE, in consideration of the mutual benefits and conditions hereinafter
contained, the Parties hereto agree as follows:
AGREEMENT:
1. Scope and Schedule of Services to be Performed by Contractor.
A. A. Contractor shall perform those services described in Exhibit "A" ("Scope of Work"),
which is attached hereto and incorporated herein by this reference as if set forth in full. The services to be
performed shall be in accordance with the terms, conditions, and pricing authorized under the Washington
State Department of Enterprise Services Contract No. 28723 — Elevator Full Service Maintenance, Testing,
and Repair Services. The Contractor shall request and obtain prior written approval from the City if the
scope or schedule is to be modified in any way.
B. Unless otherwise specified in the attached Scope of Work, all tools, equipment, supplies,
chemicals or any other materials necessary for the completion of the services described in the Scope of
Work shall be provided by the Contractor.
C. The Contractor shall report any known or discovered damage or potential hazard
involving City property immediately to the City of Port Orchard Public Works Department or, in the
case of an emergency, by calling 911. Hazardous conditions shall be immediately remedied or secured
by the Contractor to prevent further damage and/or to protect the public from injury.
D. Any incidents, accidents, or altercations with members of the public or with City staff
shall be immediately reported to the City of Port Orchard Public Works Department. The City's Public
Works Director may require a written report describing the incident or accident.
City of Port Orchard and TK Elevator Corporation
Ordinary Maintenance Contract No.
Page 1 of 16
Updated 4/2022 IBDR
1572422.1- 366922 -0039
Docusign Envelope ID: FDAD D758-4A02-4DBD-85E5-94C36B72AF4C
E. The Contractor shall remedy, in a timely manner, and at its expense, any damage to City
property due to the negligence of the Contractor or the Contractor's employees.
F. Contractor acknowledges and understands that it is not the City's exclusive provider of
these services and that the City maintains its unqualified right to obtain these services through other
sources. Contractor further represents that the services furnished under this Agreement will be
performed in accordance with generally accepted professional practices in effect at the time such services
are performed.
2. Time of Completion. Upon the Effective Date of this Agreement, Contractor shall
complete the work and provide all goods, materials, and services between May 1, 2025 and May 1, 2026.
3. Compensation and Method of Payment. The City shall pay the Contractor for services
rendered according to the rates and methods set forth below.
[Check all applicable payment terms]
❑ LUMP SUM. Compensation for these services set forth in Exhibit A shall be a
Lump Sum of $ , including applicable Washington State Sales
Tax, for the services contemplated in this Agreement.
X TIME AND MATERIALS NOT TO EXCEED. Compensation for these services
shall not exceed $6,000.00 per year, including applicable Washington State Sales Tax,
without written authorization and will be based on the list of billing rates and
reimbursable expenses attached hereto as Exhibit "A."
❑ TIME AND MATERIALS. Compensation for these services shall be on a time and
materials basis according to the list of billing rates and reimbursable expenses attached
hereto as Exhibit `B."
❑ OTHER
All invoices shall be paid by City warrant within thirty (30) days of receipt of a complete invoice. If the
City objects to all or any portion of any invoice, it shall so notify the Contractor of the same within
fifteen (15) days from the date of receipt and shall pay that portion of the invoice not in dispute, and the
Parties shall immediately make every effort to settle the disputed portion.
A. Defective or Unauthorized Work. The City reserves its right to withhold payment from
Contractor for any defective or unauthorized goods, materials, or services. If Contractor is unable, for
any reason, to complete any part of this Agreement, the City may obtain the goods, materials or services
from other sources, and Contractor shall be liable to the City for any additional costs incurred by the
City. "Additional costs" shall mean all reasonable costs, including legal costs and attorneys' fees,
incurred by the City beyond the maximum Agreement price specified above. The City further reserves
its right to deduct these additional costs incurred to complete this Agreement with other sources, from
any and all amounts due or to become due the Contractor.
B. Final Payment: Waiver of Claims,
PAYMENT SHALL CONSTITUTE A WAIVER
City of Port Orchard and TK Elevator Corporation
Ordinary Maintenance Contract No.
Page 2 of 16
Updated 4/2022 IBDR
1572422.1- 366922 -0039
CONTRACTOR'S ACCEPTANCE OF FINAL
OF CLAIMS, EXCEPT THOSE PREVIOUSLY
Docusign Envelope ID: FDAD D758-4A02-4DBD-85E5-94C36B72AF4C
AND PROPERLY MADE AND IDENTIFIED BY CONTRACTOR AS UNSETTLED AT THE TIME
REQUEST FOR FINAL PAYMENT IS MADE.
4. Prevailing Wages. The Contractor shall pay prevailing wages as required by law and shall
comply with Chapters 39.12 and 49.28 RCW. Prior to beginning work under this Contract, the Contractor
shall submit — on behalf of itself and each and every Sub -Contractor — a "Statement of Intent to Pay
Prevailing Wages," which must be approved by the Department of Labor and Industries (See link below.)
Following the final acceptance of the work, or termination of this Agreement, whichever occurs last, the
Contractor must submit — on behalf of itself and every Sub -Contractor — an "Affidavit of Wages Paid" for
final payment. Final payments shall be made in accordance with the requirements of Chapter 39.12 RCW.
Refer to https://fortress.wa.gov/hii/wa elg ookup/nrvWa_elg ookup.aspx for Washington State
Prevailing Wage rates.
5. Changes. The City may issue a written amendment for any change in the goods,
materials, or services to be provided during the performance of this Agreement. If the Contractor
determines, for any reason, that an amendment is necessary, Contractor must submit a written
amendment request to the person listed in the Notice section of this Agreement within fourteen (14)
calendar days of the date Contractor knew or should have known of the facts and events giving rise to
the requested change. If the City determines that the change increases or decreases the Contractor's costs
or time for performance, the City will make an equitable adjustment. The City will attempt, in good faith,
to reach agreement with the Contractor on all equitable adjustments. However, if the Parties are unable
to agree, the City will determine the equitable adjustment as it deems appropriate. The Contractor shall
proceed with the amended work upon receiving either a written amendment from the City or an oral
order from the City before actually receiving the written amendment. If the Contractor fails to require
an amendment within the time allowed, the Contractor waives its right to make any claim or submit
subsequent amendment requests for that portion of the contract work. If the Contractor disagrees with
the equitable adjustment, the Contractor must complete the amended work; however, the Contractor may
elect to protest the adjustment as provided in Subsection A through E of the "Claims" Section 6 below.
The Contractor accepts all requirements of an amendment by: (1) endorsing it, (2) writing a separate
acceptance, or (3) not protesting in the way this section or Section 6 provides. An amendment that is
accepted by Contractor as provided in this section shall constitute full payment and final settlement of all
claims for contract time and materials and for direct, indirect, and consequential costs, including costs of
delays related to any work, either covered or affected by the change.
6. Claims. If the Contractor disagrees with anything required by an amendment, another
written order, or an oral order from the City, including any direction, instruction, interpretation, or
determination by the City, the Contractor may file a claim as provided in this section. The Contractor
shall give written notice to the City of all claims within fourteen (14) calendar days of the occurrence of
the events giving rise to the claims, or within fourteen (14) calendar days of the date the Contractor knew
or should have known of the facts or events giving rise to the claim, whichever occurs first. Any claim
for damages, additional payment for any reason, or extension of time, whether under this Agreement or
otherwise, shall be conclusively deemed to have been waived by the Contractor unless a timely written
claim is made in strict accordance with the applicable provisions of this Agreement.
City of Port Orchard and TK Elevator Corporation
Ordinary Maintenance Contract No.
Page 3 of 16
Updated 4/2022 IBDR
1572422.1- 366922 -0039
Docusign Envelope ID: FDAD D758-4A02-4DBD-85E5-94C36B72AF4C
At a minimum, a Contractor's written claim shall include the information set forth in
subsections A, items 1 through 5 below.
FAILURE TO PROVIDE A COMPLETE, WRITTEN NOTIFICATION OF
CLAIM WITHIN THE TIME ALLOWED SHALL BE AN ABSOLUTE
WAIVER OF ANY CLAIMS ARISING IN ANY WAY FROM THE FACTS
OR EVENTS SURROUNDING THAT CLAIM OR CAUSED BY THAT
DELAY.
A. Notice of Claim. Provide a signed written notice of claim that provides the following
information:
1. The date of the Contractor's claim;
2. The nature and circumstances that caused the claim;
3. The provisions in this Agreement that support the claim;
4. The estimated dollar cost, if any, of the claimed work and how that estimate
was determined; and
5. An analysis of the progress schedule showing the schedule change or disruption
if the Contractor is asserting a schedule change or disruption.
B. Records. The Contractor shall keep complete records of extra costs and time incurred as
a result of the asserted events giving rise to the claim. The City shall have access to any of the
Contractor's records needed for evaluating the protest.
The City will evaluate all claims, provided the procedures in this section are followed. If the City
determines that a claim is valid, the City will adjust payment for work or time by an equitable adjustment.
No adjustment will be made for an invalid protest.
C. Contractor's Duty to Complete Protested Work. In spite of any claim, the Contractor
shall proceed promptly to provide the goods, materials and services required by the City under this
Agreement.
D. Failure to Protest Constitutes Waiver. By not protesting as this section provides, the
Contractor also waives any additional entitlement and accepts from the City any written or oral order
(including directions, instructions, interpretations, and determination).
E. Failure to Follow Procedures Constitutes Waiver. By failing to follow the procedures
of this section, the Contractor completely waives any claims for protested work and accepts from the
City any written or oral order (including directions, instructions, interpretations, and determination).
7. Limitation of Actions. CONTRACTOR MUST, IN ANY EVENT, FILE ANY
LAWSUIT ARISING FROM OR CONNECTED WITH THIS AGREEMENT WITHIN 120
CALENDAR DAYS FROM THE DATE THE CONTRACT WORK IS COMPLETE (OR THIS
AGREEMENT TERMINATES, WHICHEVER EVENT OCCURS FIRST) OR CONTRACTOR'S
ABILITY TO FILE THAT SUIT SHALL BE FOREVER BARRED. THIS SECTION FURTHER
LIMITS ANY APPLICABLE STATUTORY LIMITATIONS PERIOD.
City of Port Orchard and TK Elevator Corporation
Ordinary Maintenance Contract No.
Page 4 of 16
Updated 4/2022 IBDR
1572422.1- 366922 -0039
Docusign Envelope ID: FDAD D758-4A02-4DBD-85E5-94C36B72AF4C
8. Duration of Agreement; Extensions. This Agreement shall be in full force and effect for
a period commencing 5/1/2025 and ending 5/l/2026 unless sooner terminated under the provisions
contained in Section 18 "Termination". Time is of the essence of this Agreement in each and all of its
provisions in which performance is required. The City reserves the rights to review the Agreement at
regular intervals to assure the quality of services provided by the Contractor. This Agreement may be
extended by the City up to two times each of a one-year duration (for a total of two years if both
extensions are enacted). Such notice of extension shall be provided by the City to the Contractor prior
to contract expiration.
9. Ownership and Use of Documents.
A. Ownership. Any records, files, documents, drawings, specifications, data, or information,
regardless of form or format, and all other materials produced by the Contractor in connection with the
services provided to the City, shall be the property of the City whether the project for which they were
created is executed or not.
B. Records preservation. Contractor understands that this Agreement is with a government
agency and thus all records created or used in the course of Contractor's work for the City may be
considered "public records" and be subject to disclosure by the City under the Public Records Act,
Chapter 42.56 RCW ("the Act"). Contractor agrees to safeguard and preserve records in accordance with
the Act. The City may be required, upon request, to disclose the Agreement, and the documents and
records submitted to the City by Contractor, unless an exemption under the Public Records Act applies.
If the City receives a public records request and asks Contractor to search its files for responsive records,
Contractor agrees to make a prompt and thorough search through its files for responsive records and to
promptly turn over any responsive records to the City's public records officer at no cost to the City.
10. Independent Contractor. Contractor and City agree that Contractor is an independent
contractor with respect to the services provided pursuant to this Agreement. As the Contractor is
customarily engaged in an independently established trade which encompasses the specific service
provided to the City hereunder, no agent, employee, representative or sub -contractor of the Contractor
shall be or shall be deemed to be the employee, agent, representative or sub -contractor of the City. In the
performance of the work, the Contractor is an independent contractor with the ability to control and
direct the performance and details of the work, the City being interested only in the results obtained
under this Agreement. Nothing in this Agreement shall be considered to create the relationship of employer
and employee between the Parties hereto. Neither Contractor nor any employee of Contractor shall be
entitled to any benefits accorded City employees by virtue of the services provided under this Agreement.
The City shall not be responsible for withholding or otherwise deducting federal income tax or social
security or contributing to the State Industrial Insurance Program, or otherwise assuming the duties of an
employer with respect to the Contractor, or any employee of the Contractor. The City may, during the term
of this Agreement, engage other independent contractors to perform the same or similar work that the
Contractor performs hereunder.
11. Standard of Care. The Contractor represents and warrants that it, and the Contractor's
employees, have the requisite training, skill and experience necessary to provide the services under this
Agreement and are appropriately accredited and licensed by all applicable agencies and governmental
City of Port Orchard and TK Elevator Corporation
Ordinary Maintenance Contract No.
Page 5 of 16
Updated 4/2022 IBDR
1572422.1- 366922 -0039
Docusign Envelope ID: FDAD D758-4A02-4DBD-85E5-94C36B72AF4C
entities. Contractor further warrants that it has or will have a valid Port Orchard business license during
the entire time that this Agreement is in effect. Services provided by the Contractor and the Contractor's
employees under this Agreement will be performed in a manner consistent with that degree of care and
skill ordinarily exercised by members of the same profession currently practicing in similar
circumstances.
The Contractor and the Contractor's employees shall conduct themselves in a professional manner at all
times when on site. The Contractor's employees shall wear clothing and/or a uniform which clearly
identifies them as an employee of the Contractor.
The Contractor further represents and warrants that it shall provide proper supervision for any employees
utilized to perform the services herein and shall ensure that all employees are properly trained and
qualified. The Contractor shall ensure that all workplace safety requirements of state or federal law are
strictly observed at all times. The Contractor warrants that all employees have been trained to comply
with state and federal standards (including but not limited to standards for handling chemicals, WISHA
and OSHA) relevant to the duties to be performed in accordance with the Scope of Work.
12. Indemnification.
A. Contractor shall defend, indemnify, and hold the City, its officers, officials, employees,
agents and volunteers harmless from any and all claims, injuries, damages, losses or suits including
attorneys' fees, arising out of or resulting from the acts, errors or omissions of the Contractor in
performance of this Agreement, except for injuries and damages caused by the sole negligence of the
City.
B. Should a court of competent jurisdiction determine that this Agreement is subject to RCW
4.24.115, then, in the event of liability for damages arising out of bodily injury to persons or damages to
property caused by or resulting from the concurrent negligence of the Contractor and the City, its
officers, officials, employees, and volunteers, the Contractor's liability, including the duty and cost to
defend, hereunder shall be only to the extent of the Contractor's negligence.
C. It is further specifically and expressly understood that the indemnification provided herein
constitutes the Contractor's waiver of immunity under Industrial Insurance, Title 51 RCW, solely for the
purposes of this indemnification. This waiver has been mutually negotiated by the Parties.
D. The provisions of this section shall survive the expiration or termination of this Agreement.
13. Insurance. The Contractor shall procure and maintain for the duration of the Agreement,
insurance against claims for injuries to persons or damage to property which may arise from or in
connection with the performance of the work hereunder by the Contractor, its agents, representatives, or
employees.
A. Minimum Scope of Insurance. Contractor shall obtain insurance of the types described
below:
City of Port Orchard and TK Elevator Corporation
Ordinary Maintenance Contract No.
Page 6 of 16
Updated 4/2022 IBDR
1572422.1- 366922 -0039
Docusign Envelope ID: FDAD D758-4A02-4DBD-85E5-94C36B72AF4C
limits:
i. Automobile Liability insurance covering all owned, non -owned, hired and leased
vehicles. Coverage shall be written on Insurance Services Office (ISO) form CA
00 01 or a substitute form providing equivalent liability coverage. If necessary,
the policy shall be endorsed to provide contractual liability coverage.
ii. Commercial General Liability insurance shall be written on ISO occurrence form
CG 00 01 and shall cover liability arising from premises, operations, independent
contractors and personal injury and advertising injury. The City shall be named
as an insured under the Contractor's Commercial General Liability insurance
policy with respect to the work performed for the City.
iii. Workers' Compensation coverage as required by the Industrial Insurance laws of
the State of Washington.
B. Minimum Amounts of Insurance. Contractor shall maintain the following insurance
i. Automobile Liability insurance with a minimum combined single limit for bodily
injury and property damage of $1,000,000 per accident.
ii. Commercial General Liability insurance shall be written with limits no less than
$1,000,000 each occurrence, $2,000,000 general aggregate.
C. Other Insurance Provisions. The Contractor's Automobile Liability and Commercial
General Liability insurance policies are to contain, or be endorsed to contain, that they shall be primary
insurance as respect the City. Any Insurance, self-insurance, or insurance pool coverage maintained by
the City shall be excess of the Contractor's insurance and shall not contribute with it.
D. Acceptability of Insurers. Insurance is to be placed with insurers with a current A.M.
Best rating of not less than A-VII.
E. Verification of Coverage. The Contractor shall furnish the City with original certificates
and a copy of the amendatory endorsements, including but not necessarily limited to the additional
insured endorsement, evidencing the insurance requirements of the Contractor before commencement of
the work.
F. Notice of Cancellation. The Contractor shall provide the City with written notice of any
policy cancellation, within two business days of their receipt of such notice.
G. Failure to Maintain Insurance. Failure on the part of the Contractor to maintain the
insurance as required shall constitute a material breach of contract, upon which the City may, after giving
five business days' notice to the Contractor to correct the breach, immediately terminate the contract or,
at its discretion, procure or renew such insurance and pay any and all premiums in connection therewith,
with any sums so expended to be repaid to the City on demand, or at the sole discretion of the City, offset
against funds due the Contractor from the City.
City of Port Orchard and TK Elevator Corporation
Ordinary Maintenance Contract No.
Page 7 of 16
Updated 4/2022 IBDR
1572422.1- 366922 -0039
Docusign Envelope ID: FDAD D758-4A02-4DBD-85E5-94C36B72AF4C
H. No Limitation. Contractor's maintenance of insurance as required by the agreement shall
not be construed to limit the liability of the Contractor to the coverage provided by such insurance, or
otherwise limit the City's recourse to any remedy available at law or in equity.
14. Record Keeping and Reporting.
A. The Contractor shall maintain accounts and records, including personnel, property, financial and
programmatic records which sufficiently and properly reflect all direct and indirect costs of any nature
expended and services performed in the performance of this Agreement and other such records as may be
deemed necessary by the City to ensure the performance of this Agreement.
B. These records shall be maintained for a period of seven (7) years after termination hereof unless
permission to destroy them is granted by the office of the archivist in accordance with RCW Chapter 40.14
and by the City.
15. City's Right of Inspection and Audit.
A. Even though the Contractor is an independent contractor with the authority to control and
direct the performance and details of the work authorized under this Agreement, the work must meet the
approval of the City and shall be subject to the City's general right of inspection to secure the satisfactory
completion thereof. The Contractor agrees to comply with all federal, state, and municipal laws, rules,
and regulations that are now effective or become applicable within the terms of this Agreement to the
Contractor's business, equipment, and personnel engaged in operations covered by this Agreement or
accruing out of the performance of such operations.
B. The records and documents with respect to all matters covered by this Agreement shall
be subject at all times to inspection, review or audit by the City during the performance of this
Agreement. All work products, data, studies, worksheets, models, reports, and other materials in support
of the performance of the service, work products, or outcomes fulfilling the contractual obligations are
the products of the City.
16. Contractor to Maintain Records to Support Independent Contractor Status. On the
effective date of this Agreement (or shortly thereafter), the Contractor shall comply with all federal and
state laws applicable to independent contractors including, but not limited to the maintenance of a
separate set of books and records that reflect all items of income and expenses of the Contractor's
business, pursuant to the Revised Code of Washington (RCW) Section 51.08.195, as required to show
that the services performed by the Contractor under this Agreement shall not give rise to an employer -
employee relationship between the Parties which is subject to RCW Title 51, Industrial Insurance.
17. Work Performed at the Contractor's Risk. The Contractor shall take all precautions
necessary and shall be responsible for the safety of its employees, agents, and sub -contractors in the
performance of the work hereunder and shall utilize all protection necessary for that purpose. All work
shall be done at the Contractor's own risk, and the Contractor shall be responsible for any loss of or
damage to materials, tools, or other articles used or held by the Contractor for use in connection with the
work.
City of Port Orchard and TK Elevator Corporation
Ordinary Maintenance Contract No.
Page 8 of 16
Updated 4/2022 IBDR
1572422.1- 366922 -0039
Docusign Envelope ID: FDAD D758-4A02-4DBD-85E5-94C36B72AF4C
18. Termination. The City reserves the right to terminate or suspend this Agreement at any
time, with or without cause, upon seven (7) days' prior written notice. In the event of termination or
suspension, all finished or unfinished documents, data, studies, worksheets, models, reports, or other
materials prepared by the Contractor pursuant to this Agreement shall promptly be submitted to the City.
A. Termination without cause. This Agreement may be terminated by the City at any time
for public convenience, for the Contractor's insolvency or bankruptcy, or the Contractor's assignment
for the benefit of creditors.
B. Termination with cause. The Agreement may be terminated upon the default of the
Contractor and the failure of the Contractor to cure such default within a reasonable time after receiving
written notice of the default.
C. Rights Upon Termination.
i. With or Without Cause. Upon termination for any reason, all finished or
unfinished documents, reports, or other material or work of the Contractor pursuant to this
Agreement shall be submitted to the City, and the Contractor shall be entitled to just and equitable
compensation for any satisfactory work completed prior to the date of termination, not to exceed
the total compensation set forth herein. The Contractor shall not be entitled to any reallocation
of cost, profit or overhead. The Contractor shall not in any event be entitled to anticipated profit
on work not performed because of such termination. The Contractor shall use its best efforts to
minimize the compensation payable under this Agreement in the event of such termination. Upon
termination, the City may take over the work and prosecute the same to completion, by contract
or otherwise.
ii. Default. If the Agreement is terminated for default, the Contractor shall not be
entitled to receive any further payments under the Agreement until all work called for has been
fully performed. Any extra cost or damage to the City resulting from such default(s) shall be
deducted from any money due or coming due to the Contractor. The Contractor shall bear any
extra expenses incurred by the City in completing the work, including all increased costs for
completing the work, and all damage sustained, or which may be sustained, by the City by reason
of such default.
C. Cancelation of Contractor's Insurance. This Agreement may be canceled immediately if
the Contractor's insurance coverage is canceled for any reason, or if the Contractor is unable to perform
the services called for by this Agreement.
D. Termination by Contractor. The Contractor reserves the right to terminate this Agreement
with not less than fourteen (14) days written notice, or in the event that outstanding invoices are not paid
within sixty (60) days.
E. Suspension. The City may suspend this Agreement, at its sole discretion. Any
reimbursement for expenses incurred due to the suspension shall be limited to the Contractor's reasonable
expenses and shall be subject to verification. The Contractor shall resume performance of services under
this Agreement without delay when the suspension period ends.
City of Port Orchard and TK Elevator Corporation
Ordinary Maintenance Contract No.
Page 9 of 16
Updated 4/2022 IBDR
1572422.1- 366922 -0039
Docusign Envelope ID: FDAD D758-4A02-4DBD-85E5-94C36B72AF4C
F. Notice of Termination or Suspension. If delivered to the Contractor in person, termination
shall be effective immediately upon the Contractor's receipt of the City's written notice or such date as
stated in the City's notice of termination, whichever is later. Notice of suspension shall be given to the
Contractor in writing upon one week's advance notice to the Contractor. Such notice shall indicate the
anticipated period of suspension. Notice may also be delivered to the Contractor at the address set forth
in the Notice Section herein.
G. The provisions in this Section shall not prevent the City from seeking any legal remedies
it may otherwise have for the violation or nonperformance of any provisions of this Agreement.
19. Force Majeure. Notwithstanding anything to the contrary in this Agreement, any
prevention, delay or stoppage due to strikes, lockouts, labor disputes, acts of God, acts of war, terrorist
acts, inability to obtain services, labor, or materials or reasonable substitutes therefor, governmental
actions, governmental laws, regulations or restrictions, civil commotions, casualty, actual or threatened
public health emergency (including, without limitation, epidemic, pandemic, famine, disease, plague,
quarantine, and other significant public health risk), governmental edicts, actions, declarations or
quarantines by a governmental entity or health organization, breaches in cybersecurity, and other causes
beyond the reasonable control of the Parry obligated to perform, regardless of whether such other causes
are (i) foreseeable or unforeseeable or (ii) related to the specifically enumerated events in this paragraph
(collectively, a "Force Majeure"), shall excuse the performance of such Party for a period equal to any
such prevention, delay or stoppage. To the extent this Agreement specifies a time period for performance
of an obligation of either Parry, that time period shall be extended by the period of any delay in such
Party's performance caused by a Force Majeure. Provided however, that the current COVID-19
pandemic shall not be considered a Force Majeure unless constraints on a Party's performance that result
from the pandemic become substantially more onerous after the effective date of this Agreement.
20. Discrimination Prohibited. The Contractor shall not discriminate against any
employee, applicant for employment, or any person seeking the services of the Contractor under this
Agreement, on the basis of race, color, religion, creed, sex, sexual orientation, age, national origin,
marital status, presence of any sensory, mental or physical disability, or other circumstance prohibited
by federal, State or local law or ordinance, except for a bona fide occupational qualification.
Violation of this Section shall be a material breach of this Agreement and grounds for cancellation,
termination, or suspension of the Agreement by the City, in whole or in part, and may result in
ineligibility for further work for the City.
21. Non -Appropriation of Funds. If sufficient funds are not appropriated or allocated for
payment under this Agreement for any future fiscal period, the City will so notify the Contractor and
shall not be obligated to make payments for services or amounts incurred after the end of the current
fiscal period. This Agreement will terminate upon the completion of all remaining services for which
funds are allocated. No penalty or expense shall accrue to the City in the event that the terms of the
provision are effectuated.
22. Employment of State Retirees. The City is a "DRS-covered employer" which is an
organization that employs one or more members of any retirement system administered by the
Washington State Department of Retirement Systems (DRS). Pursuant to RCW 41.50.139(1) and WAC
City of Port Orchard and TK Elevator Corporation
Ordinary Maintenance Contract No.
Page 10 of 16
Updated 4/2022 IBDR
1572422.1- 366922 -0039
Docusign Envelope ID: FDAD D758-4A02-4DBD-85E5-94C36B72AF4C
415-02-325(1), the City is required to elicit on a written form if any of the Contractor's employees
providing services to the City retired using the 2008 Early Retirement Factors (ERFs), or if the
Contractor is owned by an individual who retired using the 2008 ERFs, and whether the nature of the
service and compensation would result in a retirement benefit being suspended. Failure to make this
determination exposes the City to significant liability for pension overpayments. As a result, before
commencing work under this Agreement, Contractor shall determine whether any of its employees
providing services to the City or any of the Contractor's owners retired using the 2008 ERFs, and shall
immediately notify the City and shall promptly complete the form provided by the City after this
notification is made. This notification to DRS could impact the payment of retirement benefits to
employees and owners of Contractor. Contractor shall indemnify, defend, and hold harmless the City
from any and all claims, damages, or other liability, including attorneys' fees and costs, relating to a
claim by DRS of a pension overpayment caused by or resulting from Contractor's failure to comply with
the terms of this provision. This provision shall survive termination of this Agreement.
23. Assignment and Subcontract. The Contractor shall not assign or subcontract any portion
of the services contemplated by this Agreement without the written consent of the City. Any assignment
made without the prior approval of the City is void.
24. Entire Agreement. This Agreement contains the entire agreement between the Parties,
and no other agreements, oral or otherwise, regarding the subject matter of this Agreement shall be
deemed to exist or bind either of the Parties. If there is a conflict between the terms and conditions of
this Agreement and the attached exhibits, then the terms and conditions of this Agreement shall prevail
over the exhibits. Either Party may request changes to the Agreement. Changes which are mutually
agreed upon shall be incorporated by written amendments to this Agreement.
25. Compliance with Laws. The Contractor agrees to comply with all federal, state, and
municipal laws, rules, and regulations that are now effective or in the future become applicable to
Contractor's business, equipment, and personnel engaged in operations covered by this Agreement or
accruing out of the performance of those operations.
26. Counterparts. This Agreement may be executed in any number of counterparts, each of
which shall constitute an original, and all of which will together constitute this one Agreement.
27. Notices. All notices or other communications required or permitted under this Agreement
shall be in writing and shall be (a) personally delivered, in which case the notice or communication shall
be deemed given on the date of receipt at the office of the addressee; (b) sent by registered or certified
mail, postage prepaid, return receipt requested, in which case the notice or communication shall be
deemed given three (3) business days after the date of deposit in the United States mail; or (c) sent by
overnight delivery using a nationally recognized overnight courier service, in which case the notice or
communication shall be deemed given one business day after the date of deposit with such courier. In
addition, all notices shall also be emailed, however, email does not substitute for an official notice.
Notices shall be sent to the following addresses:
Notices to the City of Port Orchard shall be send to the following address:
City Clerk
City of Port Orchard and TK Elevator Corporation
Ordinary Maintenance Contract No.
Page 11 of 16
Updated 4/2022 IBDR
1572422.1- 366922 -0039
Docusign Envelope ID: FDAD D758-4A02-4DBD-85E5-94C36B72AF4C
City of Port Orchard
216 Prospect Street
Port Orchard, Washington 98366
Bwallace(c cityfportorchard.us
Notices to the Contractor shall be sent to the following address:
Phone No.:
Email:
28. Resolution of Disputes; Governing Law.
A. Should any dispute, misunderstanding or conflict arise as to the terms and conditions
contained in this Agreement, the matter shall first be referred to the Mayor, who shall determine the term or
provision's true intent or meaning. The Mayor shall also decide all questions which may arise between the
Parties relative to the actual services provided or to the sufficiency of the performance hereunder.
B. If any dispute arises between the City and the Contractor under any of the provisions of this
Agreement which cannot be resolved by the Mayor's determination in a reasonable time, or if the Contractor
does not agree with the Mayor's decision on a disputed matter, jurisdiction of any resulting litigation shall
be filed in Kitsap County Superior Court, Kitsap County, Washington.
C. This Agreement shall be governed by and construed in accordance with the laws of the State
of Washington. In any suit or action instituted to enforce any right granted in this Agreement, the
substantially prevailing parry shall be entitled to recover its costs, disbursements, and reasonable attorneys'
fees from the other Parry.
29. Title VI.
The City of Port Orchard, in accordance with Title VI of the Civil Rights Act of 1964, 78 Stat. 252, 42
U.S.C. 2000d to 2000d-4 and Title 49, Code of Federal Regulations, Department of Transportation subtitle
A, Office of the Secretary, Part 21, nondiscrimination in federally assisted programs of the Department of
Transportation issued pursuant to such Act, must affirmatively insure that its contracts comply with these
regulations.
Therefore, during the performance of this Agreement, the Consultant, for itself, its assignees, and successors
in interest agrees as follows:
A. Compliance with Regulations. The Consultant will comply with the Acts and the
Regulations relative to Nondiscrimination in Federally -assisted programs of the U.S. Department of
Transportation, Federal Highway Administration (FHWA), as they may be amended from time to time,
which are herein incorporated by reference and made a part of this Agreement.
City of Port Orchard and TK Elevator Corporation
Ordinary Maintenance Contract No.
Page 12 of 16
Updated 4/2022 IBDR
1572422.1- 366922 -0039
Docusign Envelope ID: FDAD D758-4A02-4DBD-85E5-94C36B72AF4C
B. Nondiscrimination. The Consultant, with regard to the work performed by it during this
Agreement, will not discriminate on the grounds of race, color, national origin, sex, age, disability, income -
level, or LEP in the selection and retention of subcontractors, including procurements of materials and leases
of equipment. The Consultant will not participate directly or indirectly in the discrimination prohibited by
the Acts and the Regulations as set forth in Appendix A, attached hereto and incorporated herein by this
reference, including employment practices when this Agreement covers any activity, project, or program
set forth in Appendix B of 49 C.F.R. part 21.
C. Solicitations for Subcontracts, Including Procurements of Materials and Equipment. In all
solicitations, either by competitive bidding, or negotiation made by the Consultant for work to be performed
under a subcontract, including procurements of materials, or leases of equipment, each potential
subcontractor or supplier will be notified by the Consultant of the Consultant's obligations under this
Agreement and the Acts and the Regulations relative to Non-discrimination on the grounds of race, color,
national origin, sex, age, disability, income -level, or LEP.
D. Information and Reports. The Consultant will provide all information and reports required
by the Acts, the Regulations and directives issued pursuant thereto and will permit access to its books,
records, accounts, other sources of information, and its facilities as may be determined by the City or the
FHWA to be pertinent to ascertain compliance with such Acts, Regulations, and instructions. Where any
information required of the Consultant is in the exclusive possession of another who fails or refuses to
furnish the information, the Consultant will so certify to the City or the FHWA, as appropriate, and will set
forth what efforts it has made to obtain the information.
E. Sanctions for Noncompliance. In the event of the Consultant's noncompliance with the non-
discrimination provisions of this Agreement, the City will impose such contract sanctions as it or the FHWA
may determine to be appropriate, including, but not limited to:
i. withholding payments to the Consultant under the Agreement until the contractor
complies; and/or
ii. cancelling, terminating, or suspending the Agreement, in whole or in part.
F. Incorporation of Provisions. The Consultant will include the provisions of paragraphs one
through six in every subcontract, including procurements of materials and leases of equipment, unless
exempt by the Acts, the Regulations and directives issued pursuant thereto. The Consultant will take action
with respect to any subcontract or procurement as the City or the FHWA may direct as a means of enforcing
such provisions including sanctions for noncompliance. Provided, that if the Consultant becomes involved
in, or is threatened with litigation by a subcontractor, or supplier because of such direction, the Consultant
may request the City to enter into any litigation to protect the interests of the City. In addition, the Consultant
may request the United States to enter into the litigation to protect the interests of the United States.
30. Non -waiver of Breach. The failure of either Party to insist upon strict performance of
any of the covenants and agreements contained herein, or to exercise any option herein contained in one
or more instances, shall not be construed to be a waiver or relinquishment of said covenants, agreements,
or options, and the same shall be in full force and effect.
City of Port Orchard and TK Elevator Corporation
Ordinary Maintenance Contract No.
Page 13 of 16
Updated 4/2022 IBDR
1572422.1- 366922 -0039
Docusign Envelope ID: FDAD D758-4A02-4DBD-85E5-94C36B72AF4C
31. Modification. No waiver, alteration, modification of any of the provisions of this
Agreement shall be binding unless in writing and signed by a duly authorized representative of the City
and the Contractor.
32. Severability. Any provision or part of this Agreement held to be void or unenforceable
under any law or regulation shall be deemed stricken, and all remaining provisions shall continue to be valid
and binding upon the City and the Contractor, who agree that the Agreement shall be reformed to replace
such stricken provision or part with a valid and enforceable provision that comes as close as reasonably
possible to expressing the intent of the stricken provision.
IN WITNESS WHEREOF, the City and the Contractor have executed this Agreement as of the
dates listed below.
CON14AG, QZ:
BY:EtbaVu 66WW A,
Title:
General Manager
Date: 5/8/2025
City of Port Orchard and TK Elevator Corporation
Ordinary Maintenance Contract No.
Page 14 of 16
Updated 4/20221BDR
1572422.1- 366922 -0039
CITY �e��2T ORCHARD:
BY: ��' Pln�aalA SUd�
Robert Putaansuu
Mayor
Date: May 8, 2025
ATTEST/AUTHENTICATE:
Brandy Wallace, MMC, City Clerk
APPROVED AS TO FORM:
Signed by:
Port Orchard City Attorney's Office
Docusign Envelope ID: FDADD758-4A02-4DBD-85E5-94C36B72AF4C
Exhibit A
Maintenance Agreement Field Order for Washington State
Department of Enterprise Services Master Contract Number 28723
Elevator Inspections, Maintenance, & Repairs
Scope.
We will service 1 Hydraulic Elevator under the terms of the master state contract number 28723 at the location(s) listed below:
Unit Name
Address
Type
Serial #
Monthly price
Visit
Frequency
730 Prospect St
730 Prospect St,
Port Orchard, WA
98366
Hydraulic
$250
12
TOTAL MONTHLY
$250
Price.
The price for the services as stated in this agreement shall be Two Hundred Fifty Dollars and 00/100 Cents
excluding taxes, payable monthly in 30 days in arrears. A 15% markup will be added to the material cost for replacement and
refurbished parts. The above rate is subject to bi-annual adjustments based upon the percentage change in the labor wage rates
including fringe benefits paid to the local examiners in the area in which the equipment is located. Repairs, service calls and
overtime calls will be billed in accordance with the Master State Contract number 28723.
Term.
This work order shall become effective on May 1, 2025, and its term shall be 12 months.
Acceptance.
TK Elevator Corporation:
730 Prospect St
TK Elevator Corporation
Approval:
By:
By:
By:
(Signature of TK Elevator Representative)
Mason Fisher
Account Manager
425.898.3756
(Signature of Authorized Individual)
(Signature of Authorized Individual)
(Print or Type Name)
(Print or Type Name)
(Print or Type Title)
(Print or Type Title)
(Date)
(Date of Approval)
(Date of Approval)
Page 1 of 1
Docusign Envelope ID: FDADD758-4A02-4DBD-85E5-94C36B72AF4C
Exhibit A
Maintenance Agreement Field Order for Washington State
Department of Enterprise Services Master Contract Number 28723
Elevator Inspections, Maintenance, & Repairs
Scope.
We will service 1 Hydraulic Elevator under the terms of the master state contract number 28723 at the location(s) listed below:
Unit Name
Address
Type
Serial #
Monthly price
Visit
Frequency
Port Orchard City Hall
216 Prospect St,
Port Orchard, WA
98366
Hydraulic
$250
12
TOTAL MONTHLY
$250
Price.
The price for the services as stated in this agreement shall be Two Hundred Fifty Dollars and 00/100 Cents
excluding taxes, payable monthly in 30 days in arrears. A 15% markup will be added to the material cost for replacement and
refurbished parts. The above rate is subject to bi-annual adjustments based upon the percentage change in the labor wage rates
including fringe benefits paid to the local examiners in the area in which the equipment is located. Repairs, service calls and
overtime calls will be billed in accordance with the Master State Contract number 28723.
Term.
This work order shall become effective on May 1, 2025, and its term shall be 12 months.
Acceptance.
TK Elevator Corporation:
Port Orchard City Hall
TK Elevator Corporation
Approval:
By:
By:
By:
(Signature of TK Elevator Representative)
Mason Fisher
Account Manager
425.898.3756
(Signature of Authorized Individual)
(Signature of Authorized Individual)
(Print or Type Name)
(Print or Type Name)
(Print or Type Title)
(Print or Type Title)
(Date)
(Date of Approval)
(Date of Approval)
Page 1 of 1