HomeMy WebLinkAbout006-25 - Ordinance - Comprehensive Plan AmendmentsDocusign Envelope ID: 4DBDDAA5-5C18-4C53-A2DC-F7723E49AC9D
ORDINANCE NO. 006-25
AN ORDINANCE OF THE CITY OF PORT ORCHARD, WASHINGTON, RELATING TO
THE PORT ORCHARD COMPREHENSIVE PLAN ADOPTED UNDER THE STATE OF
WASHINGTON'S GROWTH MANAGEMENT ACT, CHAPTER 36.70A RCW;
ADOPTING AN AMENDMENT TO THE TRANSPORATION IMPROVEMENT
PROGRAM, THE CAPITAL FACILITIES ELEMENT, AND AN AMENDMENT TO THE
LAND USE DESIGNATION MAP OF THE PORT ORCHARD COMPREHENSIVE PLAN
AND TO THE LEGISLATIVE ZONING MAP; PROVIDING FOR SEVERABILITY,
CORRECTIONS, AND PUBLICATION; AND SETTING AN EFFECTIVE DATE.
WHEREAS, with the passage of the Washington State Growth Management Act in 1990
(GMA), Chapter 36.70A RCW, local governments are required to adopt a comprehensive plan that
outlines strategies to accommodate the needs of a growing population; and
WHEREAS, in June 1995, the Port Orchard City Council adopted a Comprehensive Plan for
the City of Port Orchard and its urban growth area, pursuant to the requirements set forth in the
GMA; and
WHEREAS, consistent with the GMA, the City periodically updates the Comprehensive
Plan to reflect changing conditions and interests in the City; and
WHEREAS, the City of Port Orchard completed its most recent periodic update of its
Comprehensive Plan in December 2024 by Ordinance 021-24, as required by the GMA; and
WHEREAS, the City is authorized to adopt annual amendments to the City's
Comprehensive Plan pursuant to RCW 36.70A.470 and 36.70A.106; and
WHEREAS, the City initiated an open application period for proposed Comprehensive
Plan amendments by the required deadline date of January 31, 2025, as required by the GMA
and Port Orchard Municipal Code (POMC); and
WHEREAS, the submitted, requested amendment affects the City's Transportation
Improvement Program; and
WHEREAS, additionally, the amendment submittal affects the Capital Facilities Element;
and
WHEREAS, the amendment submittal affects 13 properties located approximately 0.22
miles southwest of SW Old Clifton Road and Lloyd Parkway identified as Kitsap County Assessor
Parcel Numbers 032301-2-101-2009, 032301-2-071-2005, 032301-2-070-2006, 032301-2-087-
2007, 032301-2-090-2002, 032301-2-089-2005, 032301-2-088-2006, 032301-2-061-2007,
032301-2-060-2008, 032301-2-059-2001, 032301-2-092-2000, 032301-2-091-2001, and
032301-2-094-2008; and
WHEREAS, additionally, the amendment submittal proposes a revision and update to
Docusign Envelope ID: 4DBDDAA5-5C18-4C53-A2DC-F7723E49AC9D
Ordinance No.
006-25 Page 2 of 46
the Land Use Designation Map of the Comprehensive Plan; and
WHEREAS, the impacted properties are currently designated Industrial in the Port
Orchard Comprehensive Plan Land Use Designation Map; and
WHEREAS, the properties are currently designated Light Industrial in the adopted Port
Orchard Zoning Map; and
WHEREAS, the amendment submittal proposes a revision and update to the adopted
City of Port Orchard Zoning Map, by designating the properties Medium -Density Residential in
the Port Orchard Comprehensive Plan Land Use Designation Map; and
WHEREAS, the Comprehensive Plan amendment would redesignate the properties
Residential 3 in the adopted Port Orchard Comprehensive Zoning Map; and
WHEREAS, on February 19, 2025, the City Council Land Use Committee publicly reviewed
the 2025 Comprehensive Plan amendments; and
WHEREAS, on March 13, 2025, the City Council approved the 2025 Comprehensive Plan
amendment docket, consistent with POMC 20.04.060; and
WHEREAS, on April 10, 2025, notice of the proposed amendments to the City's
Comprehensive Plan was sent to the Washington State Department of Commerce at least sixty
days before the amendments were adopted, in accordance with RCW 36.70A.106; and
WHEREAS, on April 10, 2025, a SEPA Determination of Non -Significance was issued, and
provided to the public, agencies, and other interested parties in accordance with the requirements
of POMC 20.04.080, and published in the newspaper of record and on the City website, and
emailed to the Washington Department of Ecology; and
WHEREAS, on April 22, 2025, a Notice of Hearing was published in the City's newspaper of
record, advertising a public hearing to be held by the Planning Commission on the proposed 2025
Comprehensive Plan amendment, and the notice was provided to the public, agencies and other
interested parties in accordance with the requirements of POMC Chapter 20.04.080; and
WHEREAS, on April 22, 2025, a Notice of Hearing was mailed to property owners within
300 feet of impacted properties regarding the proposed 2025 Comprehensive Plan amendment
and Legislative Zoning Map amendment; and
WHEREAS, on May 6, 2025, the Planning Commission held a public hearing and took public
testimony on the 2025 Comprehensive Plan amendments and Legislative Zoning Map amendment;
and held the hearing until June 3, 2025; and
WHEREAS, the Planning Commission heard oral testimony from 11 individuals; and
Docusign Envelope ID: 4DBDDAA5-5C18-4C53-A2DC-F7723E49AC9D
Ordinance No.
006-25 Page 3 of 46
WHEREAS, the City received three written comments regarding the proposal; and
WHEREAS, on June 3, 2025, the Planning Commission continued the public hearing and
took additional public testimony on the 2025 Comprehensive Plan amendments and Legislative
Zoning Map amendment and voted to recommend approval of the amendments to City Council;
and
WHEREAS, on June 10, 2025, the City Council considered all public testimony received,
considered the Planning Commission's recommendation and finds that it is in the public interest to
adopt the proposed amendments to the City's Comprehensive Plan; now, therefore,
THE CITY COUNCIL OF THE CITY OF PORT ORCHARD, WASHINGTON, DO ORDAIN AS
FOLLOWS:
SECTION 1. The City Council hereby adopts the above recitals as findings in support
of this Ordinance.
SECTION 2. As additional findings and conclusions in support of this Ordinance, the
City Council finds that the amendments adopted by this Ordinance are consistent with the goals
and policies of the City's adopted 2024 Comprehensive Plan and are consistent with the state
Growth Management Act and other applicable law.
SECTION 3. The City Council finds that the amendments adopted by this Ordinance will
not, individually or cumulatively, result in adverse effects to the public health, safety or welfare.
SECTION 4. The City Council finds that no adverse impacts to the environment are
anticipated to result from the amendments adopted by this Ordinance.
SECTION 5. The City Council finds that the amendments adopted by this Ordinance
are consistent with the land uses and growth projects which were the basis of the adopted
Comprehensive Plan, are compatible with neighboring land uses and surrounding
neighborhoods, and are not anticipated to cause adverse impacts to public services or facilities.
SECTION 6. Adoption of Amendments to Comprehensive Plan and Zoning Map. In
accordance with the above -described Findings and Conclusions, the City Council hereby amends
the Port Orchard Comprehensive Plan by approving and adopting the 2025 amendments to the
Port Orchard Comprehensive Plan. Such amendments are attached to this Ordinance as Exhibit 1
and incorporated herein by this reference as if set forth in full. The amendments include revisions
to the Capital Facilities Element, Transportation Improvement Program, and the update to the
Land Use Designation Map of the Port Orchard Comprehensive Plan. Additionally, the amendment
to the City of Port Orchard Zoning Map is attached to this Ordinance as Exhibit 2 and incorporated
herein by this reference as if set forth in full.
SECTION 7. Severability. If any sentence, section, provision, or clause of this
Ordinance or its application to any person, entity or circumstance is for any reason held invalid
Docusign Envelope ID: 4DBDDAA5-5C18-4C53-A2DC-F7723E49AC9D
Ordinance No.
006-25 Page 4 of 46
or unconstitutional, the remainder of the Ordinance, or the application of the provision to
other persons, entities, or circumstances is not affected.
SECTION 8. Corrections. Upon the approval of the city attorney, the city clerk and/or
code publisher is authorized to make any necessary technical corrections to this Ordinance,
including but not limited to the correction of scrivener's/clerical errors, references, Ordinance
numbering, section/subsection numbers, and any reference thereto.
SECTION 9. Publication and Effective Date. This Ordinance shall be in full force and
effect five (5) days after posting and publication as required by law. A summary of this
Ordinance may be published in lieu of the entire Ordinance, as authorized by state law.
PASSED by the City Council of the City of Port Orchard, APPROVED by the Mayor and
attested by the Clerk in authentication of such passage this 10th day of June 2025.
Signed by:
3B96492E3F5847D...
Robert Putaansuu, Mayor
ATTEST:
Brandy Wallace, MMC, City Clerk
APPROVED AS TO FORM:
Signed by:
?nz7n1F9FF9nAF7
Charlotte A. Archer, City Attorney
PUBLISHED: June 13, 2025
EFFECTIVE DATE: June 18, 2025
ATTACHMENTS:
11►11t1III(ti;j"�,I
V RT Q1?
.� �.•RpdR �r
A.
• A
,110p WA.S
Exhibit 1: 2025 Amendments to the Comprehensive Plan including:
1. Capital Facilities Element
2. Transportation Improvement Program
3. Land Use Designation Map of the Comprehensive Plan
Docusign Envelope ID: 4DBDDAA5-5C18-4C53-A2DC-F7723E49AC9D
Ordinance No. 006-25
Page 5 of 45
Exhibit 2: 2025 Amendment to the City of Port Orchard Zoning Map:
Chapter 9. Capital Facilities
9.1 Introduction
This periodic update to the Capital Facilities Element of the 2024 Comprehensive Plan provides information
about the City's existing facilities and plans for future facilities needed to service the growing population. The
Capital Facilities Element helps guide the City in providing appropriate facilities and desirable levels of service
to its residents and businesses. The Capital Facilities Element reviews the general requirements and available
funding, connects capital facilities planning to other functional plans, and reviews goals and policies that guide
planning. It also provides an overview of the current capital facility portfolio and identifies future needs and
investments for the next six years.
The City of Port Orchard owns and manages a
Capital Facilities Vision variety of capital facilities, which include roads,
Provide outstanding capital facilities to parks, utility systems, police facilities, and
serve a growing and changing city. administrative buildings. In addition to the facilities
owned and managed by the City, there are publicly
owned capital facilities managed by other entities. These include, but are not limited to, schools, library, sewage
treatment, and public transit. Privately owned utilities (electrical, natural gas, and telecommunications)
conduct their own planning processes and maintain their own system plans. The City influences private system
planning through its authority to regulate land uses and its obligation to develop and maintain a Comprehensive
Plan.
The state requires the City to demonstrate comprehensive and coordinated planning for all capital facilities
serving the City's residents, businesses, and community. The Public Facilities and Services Goal of the Growth
Management Act (GMA) requires that the public facilities and services necessary to support development shall
be adequate at the time of occupancy and use, without decreasing service levels below locally established
minimum standards. Kitsap County's Countywide Planning Policies also require the City to have a plan that
ensures adequate facilities and services are or will be available to serve the City's employment and population
growth allocations. If limited funding or other circumstances would prevent the city from providing adequate
facilities and services, the GMA requires the city to re-evaluate the Land Use Element and make sure that plans
for capital facilities and land use are consistent.
Ensuring that public facilities are available when growth occurs is critical to the quality of life for Port Orchard's
residents, businesses, and visitors. The implementation of the Capital Facilities Element and related plans will
help realize the community's vision for community facilities, as well as the vision and goals of the Land Use
Element. This Element also functions in coordination with the Comprehensive Plan's Utilities, Parks, and
Transportation Elements and functional system plans for water, wastewater, and stormwater. These are
discussed in more detail in Section 9.7.
Capital facilities and functional plans guide planning and budgetary decisions. A list of capital facility
improvements planned in the next six years are described in Section 9.7. The functional plans provide a
complete facility inventory, as well as needs, projected costs, and funding sources.
Port Orchard Comprehensive Plan DECEMBER 2024 Amended June 2025
9.2 Financial Overview
The City strategically manages community resources and carefully balances investments in new facilities
and infrastructure with costs to maintain and operate existing facilities. Identifying costs and funding for
capital projects planned in the next six years supports the development of the City's annual budget and
provides a path toward implementing facility projects.
The Capital Facilities Element uses many revenue sources to fund the capital improvement projects,
including sales tax, business and occupation tax, utility rates, state revenues, bonds, and grants. Impact
fees and other specific revenues allowed under the Growth Management Act also offer potential funding
sources.
A partial list of capital facilities funding sources and financing tools is included below:
Tax Revenue
• Property Tax
• Retail Sales and Use Tax
• Business License Fees
• Real Estate Excise Taxes
• Utility Tax (Electric, Water, Sewer, Refuse, Stormwater, Natural Gas, Telephone)
• Other tax revenue may include lodging excise taxes, admission tax, liquor tax, transportation
benefit district (TBD), and motor vehicle fuel taxes.
Impact Fees
• Transportation Impact Fees
• Park Impact Fees
• School Impact Fees (Transferred to South Kitsap School District pursuant to Interlocal Agreement)
Enterprise Activities
• System Development Fees (Capital Facility Charges, General Facility Fees, etc.)
• Water User Fees/Rates
• Sewer User Fees/Rates
• Stormwater Utility Fees/Rates
Bonds
• General Obligation Bonds
• Revenue Bonds
• Levy Lid Lift
Federal Funding Programs
• Surface Transportation Program (STP)
• Transportation Alternatives Program (TAP)
• Highway Bridge Program (HBP)
• Highway Safety Improvement Program (HSIP)
• Safe Route to School Program (SRTS)
Port Orchard Comprehensive Plan DECEMBER 2024 Amended June 2025
• Transportation, Community, and System Preservation (TCSP) Program
• Recreational Trails Program
• Community Development Block Grants
• Energy Retrofits for Public Buildings — Department of Commerce
• Public Works Board funding — Department of Commerce
• Climate Pollution Reduction Grants
Washington State Funding Programs
• Washington State Transportation Improvement Board
• The Pedestrian Bicycle Safety Program
• Public Works Board funding — Department of Commerce
9.3 Planning Connections
Capital improvement recommendations are drawn primarily from City leadership and the functional plans
specific to each City department or facility type. Water, sewer, and stormwater have specific requirements
according to state and federal law and planning for parks and recreation facilities is included in a parks
focused functional plan. Each plan contains a system inventory and a forecast of demand and capacity
based on population and regulatory mandates. The functional plans identify capital investments that
replace or maintain existing facilities for continued service required to meet future demand for at least a
20 -year period. The plans also define the customer service level for each facility and provide system -
specific operating policies.
Planning for capital facilities also coordinates with other agency efforts. For example, Port Orchard's capital
facilities plan considers Kitsap County's plans to redevelop the governmental campus, invest in
transportation infrastructure, etc.
Port Orchard Comprehensive Plan DECEMBER 2024 Amended June 2025
9.4 Functional Plans
The Capital Facilities Element highlights recommendations from the City's functional plans in the table
below. These plans are adopted into the Capital Facilities Element by reference.
Table 9-1. Functional Plan Update Schedule
FUNCTIONAL PLAN
UPDATE FREQUENCY
Water System Plan (2021)
10 -year cycle, as needed
Provides a basis for six -year capital improvement planning and forecasts 20 -year needs
General Sewer System Plan (2016)
6 -10 -year cycle, as needed
Addresses aging infrastructure and system expansion to accommodate development;
updates policies and practices, data, finances, and growth forecasts; Recommends
improvements for the city's wastewater system
Stormwater and Watersheds Comprehensive Plan (2023)
6 -10 -year cycle, as needed
Establishes the city's storm and surface water policy
Parks, Recreation & Open Space (PROS) Plan (2022)
6 -10 -year cycle, as needed
Recommends 20 -year capital project projects to guide growth and development of Port
Orchard's parks and open space system.
Transportation Improvement Program (2025)
every 1-2 years, as needed
Identifies improvements to the city's transportation network planned for the next six years
as well as within a twenty-year horizon
9.5 Future Needs
While there are unique challenges in each functional area, aging infrastructure, compliance with new laws
and regulations, and increased demand for services impact all Port Orchard's capital facilities plans.
Aging Infrastructure. Some of Port Orchard's capital facilities are aging or inadequate for current service
needs and will require repairs and replacement over the next 20 years. The costs of replacing utility
infrastructure, roads, and municipal buildings can be substantial and take years to plan and implement.
To get an accurate picture of capital facility needs, Port Orchard will conduct a comprehensive facility
condition assessment (FCA). The FCA will highlight current deficiencies at the systems and facility level and
projected repairs needed over the long term. It could include recommendations to prioritize preventative
maintenance and develop a feasible schedule to address capital facility needs. The FCA is a critical first step
to improve the way Port Orchard manages, maintains, and funds its capital facilities to be more resilient
and cost-effective.
New Laws and Regulations. Changing state and federal mandates governing capital facilities systems
require the City to monitor and review its systems to ensure compliance. For example, requirements for
implementing projects, programs, and maintenance continue to evolve and are more stringent than in
2007 when the City received its first National Pollutant Discharge Elimination System Municipal
Stormwater Permit (NPDES), a Federal Clean Water Act mandate that affects programs citywide. The City
operates in accordance with the 2024-2029 General Permit (Ecology 2024). The 2024 General permit
Port Orchard Comprehensive Plan DECEMBER 2024 Amended June 2025
includes numerous requirements including but not limited to the adoption of the 2O24 Stormwater Manual
for Western Washington; updates to the City's development regulation, operations, mapping, and public
outreach; and a source control, inspection, and reporting program. The City intends to comply with all
2O24 General Permit conditions in accordance with the timelines specified therein.
Increased Demand. Capital facility investments will also be needed to ensure the City continues to deliver
the high -quality municipal services customers expect and keep pace as the community grows and changes.
Increased demand for services will also require investing in capital facilities across all functional areas.
To plan to meet future service demands, the City should conduct a citywide facilities study. Building on
findings from the facility condition assessment, this plan will assess current and future space needs,
recommend investments to address critical near -term deficiencies, and develop an implementation
strategy to provide facilities needed to serve the Port Orchard community into the future. This plan will
consider facilities investments to better serve the community that could potentially include expanding the
downtown civic campus, investing in appropriately sized public works and police facilities, and increasing
investments in maintenance and operations of City parks and throughout the portfolio.
Partner Efforts. The Port Orchard community benefits from its proximity to centers for recreation, open
space, and sports fields outside City limits and/or owned and managed by other agencies or groups, such
as the South Kitsap School District and Kitsap County. Creating and strengthening regional partnerships
enable Port Orchard and its partners to provide greater facilities and opportunities than would be possible
alone. The City should coordinate with and support these non -city service providers, such as school
districts, libraries, and solid waste processors, as they plan for new or improved facilities, for example
Kitsap County's campus redevelopment. The City of Port Orchard is already working with Kitsap County
and other nearby jurisdictions to implement the 2OO1 Mosquito Fleet Trail Master Plan to expand a regional
water trail including shoreline access with launch points, rest areas, and parking facilities.
Port Orchard Comprehensive Plan DECEMBER 2024 Amended June 2025
9.6 Goals and Policies
The goals and policies for Port Orchard's capital facilities align with the Comprehensive Plan vision and
build on the goals and policies in each Element.
Goal I. Ensure that infrastructure, facilities, and services are adequate to
meet present and future needs.
Policy CF -1 Establish minimum levels of service (LOS) and regularly monitor and update standards for
staffing and public facilities to reflect community preferences for quality -of -service delivery
and align with functional plans. Correct LOS deficiencies through capital improvements.
Policy CF -2 Require that urban level facilities and services are provided prior to or concurrent with
development. These services include, but are not limited to, transportation
infrastructure, parks, potable water supply, sewage disposal, stormwater and surface water
management, and solid waste management.
Policy CF -3 Facilitate adequate planning for services and facilities by coordinating with utility providers
on annual updates of population, employment, and development projections. Encourage
providers to improve accessibility to public services by making information available,
convenient, and complete.
Policy CF -4 Address disparities in historically underserved populations by ensuring transportation,
utilities, telecommunications, and other infrastructure are equitably distributed and
maintained, and that siting or expansion of essential public facilities does not unduly affect
any one group of people or geographic area.
Policy CF -5 Maintain an inventory of existing capital facilities owned by public entities.
Policy CF -6 Acquire property sufficient to provide capital facilities at established levels of service,
according to the deficiencies and needs provided in the City's functional plans.
Policy CF -7 Ensure that new growth and development pay a fair, proportionate share of the cost for
facilities needed to serve such growth and development. Seek to reduce the per unit cost
of facilities and services by coordinating improvements such as utilities and roads and
encouraging urban intensity development within the City and Urban Growth Areas.
Goal 2. Leverage facilities investments to efficiently use public resources
and improve quality of life.
Policy CF -8 Direct growth within the community where adequate public facilities exist or can be
efficiently provided when feasible.
Policy CF -9 Encourage the joint use of utility corridors for open space and non -motorized pathways and
trails, provided that such joint use is consistent with limitations prescribed by applicable
law and prudent utility practice. Coordinate and cooperate with other jurisdictions to
encourage cooperative planning of future facilities, reduce redundancy, and implement
multijurisdictional utility facility expansions and improvements.
Policy CF -10 Explore opportunities to acquire land to serve the public and municipal purposes.
Port Orchard Comprehensive Plan DECEMBER 2024 Amended June 2025
Policy CF -11 Consider developing multi -use facilities that can serve more than one public need. Explore
opportunities for public/private partnerships and funding sources that could provide a mix
of public facilities and other uses such as commercial and residential within the same
development, where appropriate.
Policy CF -12 Consider investing in sidewalks, trails, and other capital facilities that enhance walkability
in an effort to reduce health disparities and improve well-being and quality of life.
Policy CF -13 Design and locate capital facility improvements to reduce crime risks and optimize public
safety through increased visibility at joint use facilities (e.g., streets, public buildings, etc.).
Policy CF -14 Ensure that site selection, construction, operation, and maintenance of capital facilities is
environmentally sensitive, safe and reliable, aesthetically compatible with surrounding land
uses, economical to consumers, and does not adversely impact vulnerable populations.
Goal 3. Equitably engage with the community around capital facilities
planning.
Policy CF -15 Provide meaningful inclusive opportunities for community involvement in the planning of
capital facilities, prioritizing the inclusion of historically underrepresented populations.
Policy CF -16 Coordinate with local Tribes in planning capital facilities, especially in areas with cultural
significance.
Policy CF -17 Encourage public awareness and consult public input when considering the need for and
proposed locations of new public facilities.
Goal 4. Develop and maintain adequate and convenient parks, recreation,
and open space areas and facilities for all age groups to serve both
the existing and future population of Port Orchard and
surrounding areas.
Policy CF -18 Encourage private property owners and developers to donate public trail access and parcels
for park development in areas identified for future municipal parks and trail connections.
Policy CF -19 Increase the size and number of parks and open spaces by providing input on development
plans for public parks within Port Orchard's Urban Growth Boundary.
Policy CF -20 Reevaluate the City's park impact fee at least every four years to ensure that the fee is
appropriate based on the City's LOS for parks acquisition, improvement, and maintenance.
Policy CF -21 Collaborate with Kitsap County to explore forming a Municipal Parks District to help fund
and develop community and neighborhood scale parks throughout the city and Urban
Growth Area.
Port Orchard Comprehensive Plan DECEMBER 2024 Amended June 2025
Policy CF -22 Encourage implementation of the City's PROS Plan that outlines a citywide system of trails
that will serve park, recreation, and open space needs. Link a system of trails between
neighborhoods and parks, school sites, and other public property. Utilize public lands and
existing rights -of -way for trail purposes whenever feasible.
Policy CF -23 Place interpretive signs along trails to encourage community, historical, and environmental
awareness, and place distance markers along the trail for walkers and runners.
Policy CF -24 Create new parks in recently annexed areas and update existing parks within newly
annexed portions of the City.
Policy CF -25 In conjunction with partners, develop the Port Orchard Community Events Center as a
recreational and civic amenities hub for Port Orchard and the South Kitsap region.
Goal 5. Ensure that an adequate water supply is available to support the
level of population growth and land development projected within
the City.
Policy CF -26 Maintain water system facilities and drinking water quality in accordance with State and
Federal standards to ensure the high quality of drinking water and level of service is
provided to all customers while maximizing the life of facilities to protect the investment of
ratepayers.
Policy CF -27 Provide adequate water for high quality domestic and fire protection service within the
retail service area.
Policy CF -28 Utilize City -owned and operated sources of supply to maximize efficiency and cost
effectiveness of the water system.
Policy CF -29 Construct new facilities as required to serve the existing and future populations of the
established water service area and South Kitsap Urban Growth Area.
Policy CF -30 Interconnect the City's main water system with the independent facilities serving the City's
580 and 660 Pressure Zones (McCormick Woods System). This will allow for combining the
two existing systems under one water system identification number.
Policy CF -31 Encourage, implement, and maintain land use and water use efficiency and conservation
programs to discourage water waste, promote the prudent use of water resources, and
support protection of habitat and the environment.
Policy CF -32 Work with neighboring water utilities, participate in regional water planning efforts to
establish common goals of uniform water system standards, and facilitate coordination of
efforts toward the adequate provision of water service throughout the region.
Policy CF -33 Revise water service boundaries in cases where the designated water service provider
cannot provide timely or reasonable service.
Policy CF -34 Ensure that land uses permitted in aquifer recharge areas do not lead to contamination of
water resources.
Port Orchard Comprehensive Plan DECEMBER 2024 Amended June 2025
Policy CF -35 Encourage new developments adjacent to properties with private wells or existing septic
systems to connect to the City's water system or, if not feasible, ensure that adverse
impacts to existing wells or septic systems from new development is avoided or mitigated.
Goal 6. Provide safe, reliable, and timely sewer service to consumers at a
fair and reasonable price.
Policy CF -36 Coordinate construction of sewage improvements with other utilities. The City shall require
all new development to connect to public sewer and water systems, unless physically or
financially infeasible.
Goal 7. Ensure that all utility and transportation infrastructure expansion
provides an adequate level of public service to support new
development and is consistent with current land use plans and
development regulations.
Policy CF -37 Utilize best construction methods and practices and innovative techniques in the design
and construction of utilities.
Policy CF -38 Evaluate, monitor, and reduce greenhouse gas emissions in the construction and operation
of capital facilities.
Policy CF -39 Whenever possible, utility construction should be scheduled to minimize disruption of
access to area residences and businesses.
Policy CF -40 Schedule utility construction activities to avoid sensitive times in the lifecycle of fish and
wildlife, such as spawning, nesting, and migration.
Goal 8. Minimize development related impacts to existing hydrologic
conditions and functions and strive to correct current deficiencies
resulting from past development practices such as stormwater-
related flooding.
Policy CF -41 Identify areas within and adjacent to the City and its UGA which are highly sensitive to
changes in hydrologic conditions and functions. Within these highly sensitive areas,
establish standards that provide for near zero change in hydraulic and hydrologic function
on a property, such as no net increase in the peak flow or volume of runoff or erosion
products leaving a site post- development.
Policy CF -42 Encourage Low Impact Development (LID) strategies for stormwater management through
incentives and flexibility in application of regulatory requirements.
Policy CF -43 Utilize new inventories of flood hazard -prone properties in the decision -making process to
prioritize stormwater system improvements.
Policy CF -44 Coordinate the basin planning process with the community planning process to address
surface water runoff and flooding issues.
Policy CF -45 Integrate public regional stormwater detention and retention facilities into the natural
environment.
MPort Orchard Comprehensive Plan DECEMBER 2024 Amended June 2025
Policy CF -46 Recognize that regional facilities can provide aesthetics, recreation, and fish and wildlife
habitat in a community park -like or open space setting.
Goal 9. Support provision of adequate, timely, and efficient fire
protection and emergency medical service within the City.
Policy CF -47 Coordinate with South Kitsap Fire and Rescue on planning for the location of new fire
stations to ensure that they are dispersed throughout the City and located near areas of
high population concentration.
Policy CF -48 Encourage consolidation of duplicate services between fire districts and other entities to
use resources more effectively.
Goal I0. Coordinate land use and school district capital facilities planning.
Policy CF -49 Recognize that schools provide a unifying social and physical amenity that are a key focus
for successful neighborhoods. Encourage elementary schools to be located in or near
neighborhood centers and middle schools, junior high schools and senior high schools to be
located near community centers, including the McCormick Village Center.
Policy CF -50 Support the South Kitsap School District School Board in maintaining and funding individual
school levels of service as adopted and encourage proactive coordination around growth
trends to support the district's demand forecasting (e.g. sharing permitting application
data), in accordance with the City's intent to provide adequate school facilities for the
community.
Policy CF -51 Coordinate with the South Kitsap School District to develop strategies to ensure that
students are not forced to attend a school outside their neighborhood.
Policy CF -52 Review annual reports and update school impact fees as needed.
Policy CF -53 Explore opportunities to develop joint use facilities with the South Kitsap School District,
such as recreational and community center facilities. Develop neighborhood parks adjacent
to school sites whenever possible to promote facility sharing. Facilities on the
neighborhood park site should supplement uses that the school does not provide such as
trails, open space, picnic areas, playground equipment, and multi -purpose paved sport
courts.
Port Orchard Comprehensive Plan DECEMBER 2024 Amended June 2025
9.7 Capital Facilities
This section addresses capital facilities in the following four categories:
1. 9.7.1 Administration and Community Facilities
2. Error! Reference source not found.
3. 9.7.3 Public Works Facilities
4.
Port Orchard Comprehensive Plan DECEMBER 2024 Amended June 2025
5. 9.7.5 Parks Facilities
Each section contains a capital facilities inventory, summarizes key context and issues, recommends
improvements, and proposes projects for the next six -year planning period, with estimated costs and
potential funding sources.
9.7.1 Administration and Community Facilities
This section first covers the facilities supporting City administration and the overall community. It also
briefly covers the
Funding
Source
City Hall Renovations 11,300,000
11,300,000
Facility Condition
Assessment
100,000
100,000
730 Prospect Street
2,000,000
2,000,000
Citywide Facilities Plan
200,000
200,000
Downtown Government
Campus Master Plan
100,000
100,000
Acquire Property for
Government Campus
500,000
500,000
Downtown Parking
Structure (including
property acquisition)
2,000,000
2,000,000
TOTAL
13,300,000
2,900,000
16,200,000
Expenditures
City Hall Renovations 3,577,775
..
7,722,225 11,300,000
Facility Condition Assessment
100,000
100,000
730 Prospect Street
2,000,000
2,000,000
Citywide Facilities Plan
200,000
200,000
Downtown Government Campus
Master Plan
100,000
100,000
cquire Property for Government
Campus
500,000
500,000
Downtown Parking Structure
(including property acquisition)
2,000,000
2,000,000
TOTAL
3,577,775
12,622,225
16,200,000
Port Orchard Comprehensive Plan DECEMBER 2024 Amended June 2025
9.7.2 Fire and Schools
Fire Protection and Schools, community facilities that are owned and maintained by partner agencies.
Inventory
City Hall (includes Police Station & Municipal Court)
.
216 Prospect St
.
28,370
720 Prospect Street Facility (DCD)
720 Prospect St
2,925
Library
87 Sidney Ave
8,586
730 Prospect Street Facility (Kitsap County
Prosecutor)
730 Prospect St
8,028
Employee Parking Lot (Gravel)
213 & 215 Prospect Street
6,500
Existing Conditions
City Hall
City Hall has served as the primary municipal building for Port Orchard's
administrative functions since it was built in 1999. The building is
approximately 28,370 square feet with three stories and a partial fourth
floor. The first floor is occupied by the Police Department and the second
floor by the Mayor's Office, City Clerk, Public Works Administration, and
Finance. The City Council Chambers and Municipal Court are located on
the third floor. Public Works operations staff are located in the Public
Works Shop. Refer to 9.7.3 Public Works Facilities and Error!
Reference source not found. sections for more information.
City Hall is in good condition for its age and was renovated in 2024 to
address needed repairs, security, and ADA accessibility, and improve the
first floor. Condition and improvement information for the first floor is
discussed in the Error! Reference source not found. section. Even with
Figure 9-1. City Hall
these improvements, functional issues remain, including security
concerns, challenging wayfinding, and limited parking. There is also not enough work and support space;
for example, breakrooms have been repurposed as workspace and the Community Development
Department was relocated due to space limitations. Municipal Court is rightsized to accommodate future
growth. Planning for City Hall should consider the space needed to accommodate future growth and the
operational efficiency gained by co -locating all departments.
In response to a need for a new community event center and aligned with Policy CF -25, the City is in the
process of designing the new Port Orchard Community Event Center. This new facility would have rentable
event space for community programming. Designs also include space for the library to relocate. The City's
Council Chambers could also be relocated if supported by leadership, which would free up space for use in
City Hall. See the Library section below for more information on existing conditions and needs.
720 Prospect Street Facility
Port Orchard Comprehensive Plan DECEMBER 2024 Amended June 2025
The Department of Community Development (DCD) is in two facilities, one located adjacent to City Hall at
720 Prospect Street with Building, Code Enforcement, and Parking Enforcement functions (as well as the
City's IT department), and one at 600 Kitsap Street with Planning functions. The Kitsap Street facility is
leased.
The Prospect Street facility is undersized for current and future operations and in fair condition, requiring
maintenance to address age -related needs such as upgrades to the HVAC system. The division of staff
between two buildings and separation from City Hall creates communication and operational inefficiencies.
There is limited parking and City vehicles are parked at City Hall. The public interface also requires patrons
to go between the Prospect Street facility and City Hall to complete applications. For pedestrians passing
between these two buildings, there are no crosswalks and limited ADA compliance. A downtown
government campus master plan is needed to plan the long-term use of this site.
Library
Built in 1960, the City -owned library building houses
the local branch of the Kitsap Public Library. The
building is nearing the end of its useful life, is costly to
maintain, and requires upgrades or relocation of the
library functions. A 2020 site selection process
identified a site for the new library and community
events center.
730 Prospect Street Facility
In 2024, the City purchased the building located at 730
Prospect Street that includes 20 surface parking
spaces and houses the Kitsap County Prosecutor
Family Support Division. The Kitsap County Prosecutor
plans to relocate to the new County Courthouse Campus in the long term, and this building can be
repurposed to support the City's staffing and employee parking needs as it grows. A downtown
government campus master plan is needed to plan for the long-term use of this site.
Figure 9-2. Kitsap Regional Library's Port Orchard branch
Future Needs
As Port Orchard's population has grown, City staffing has increased to maintain service standards and meet
basic functional requirements.
The following investments are needed:
• In accordance with Policy CF -14, perform required maintenance at all administrative and
community facilities. Consider conducting a facilities condition assessment to document current
conditions and near- and long-term maintenance needs for all capital facilities. Develop a
downtown government campus master plan to plan for the long-term use of the City's downtown
offices and property.
• Invest in the following near -term projects:
o Improve wayfinding at City Hall by installing a centralized reception kiosk and improved
Port Orchard Comprehensive Plan DECEMBER 2024 Amended June 2025
signage.
o Increase security by adding lighting and safety features around exits and limiting publicly
accessible areas.
o Aligned with Policy CF -1O, consider paving gravel lots, acquiring property, or constructing
structured parking to increase available staff and public parking. Provide ADA-accessible
parking near public entrances. The block that includes 64O Bay Street should be considered
for this purpose, consistent with the Downtown Subarea Plan.
o As space becomes available, add staff work and support space, including workstations,
break rooms, and a lactation room.
• As part of a citywide facilities plan, estimate future staff and operational space needs to guide
near -term improvements and property acquisition as well as longer term investments. Encourage
public awareness and input as stated in Policies CF -15 and CF -17. Endeavor to accommodate future
needs, consolidate staff to improve operational efficiency, address accessibility, and other
functional challenges. Aligned with Policy CF -11, consider developing multi -use facilities and
partnering opportunities to meet public need. Consider Police Department needs and coordinate
with plans; see the Error! Reference source not found. section.
• As the City designs the Port Orchard Community Event Center, consider relocating the Council
Chambers as an interim or long-term solution to free up space at City Hall and improve security.
Relocate the library to the event center and determine the best use for the current property.
Priority Investments
Maintaining and strategically planning for Administration and Community capital facilities are the priorities
for the next six years.
Port Orchard Comprehensive Plan DECEMBER 2024 Amended June 2025
Funding Source
City Hall Renovations
11,300,000
11,300,000
Facility Condition
Assessment
100,000
100,000
730 Prospect Street
2,000,000
2,000,000
Citywide Facilities Plan
200,000
200,000
Downtown Government
Campus Master Plan
100,000
100,000
Acquire Property for
Government Campus
500,000
500,000
Downtown Parking
Structure (including
property acquisition)
2,000,000
2,000,000
TOTAL
13,300,000
2,900,000
16,200,000
Expenditures
City Hall Renovations
3,577,775
7,722,225
11,300,000
Facility Condition Assessment
100,000
100,000
730 Prospect Street
2,000,000
2,000,000
Citywide Facilities Plan
200,000
200,000
Downtown Government Campus
Master Plan
100,000
100,000
cquire Property for Government
Campus
500,000
500,000
Downtown Parking Structure
(including property acquisition)
2,000,000
2,000,000
TOTAL
3,577,775
12,622,225
16,200,000
Port Orchard Comprehensive Plan DECEMBER 2024 Amended June 2025
9.7.2 Fire and Schools
Fire Protection
The City of Port Orchard formerly maintained its
own Municipal Fire Department. In 1998, that
department was merged with Kitsap County Fire
District 7, which served the greater South Kitsap
area. In 2OO5, Kitsap County Fire District 7 was
renamed South Kitsap Fire and Rescue to better
represent the communities it serves.
There are currently two staffed fire stations
located within the City of Port Orchard: Station
17, located at 799O McCormick Woods Drive SW,
and Station 31, at 2OO Tremont Street.
Figure 9-3. Tremont Fire Station
More information on Fire Protection levels of service can be found in South Kitsap Fire and Rescue's
Strategic Positioning Plan 2O21 -2O23.
Schools
The South Kitsap School District provides public education to Kindergarten through 12th Grade for the
residents of Port Orchard and the South Kitsap area. It serves 9,112 students. The facilities include ten
elementary (K-5) schools, three middle schools
(6-8) schools, one high school, one alternative
high school, and an academy that encourages
family involvement. One elementary school,
Sidney Glen, is located within Port Orchard City
limits, as is one middle school (Cedar Heights),
and South Kitsap High School and Explorer
Academy. The School District owns property at
the northwest corner of Old Clifton Road and
Feigley Road in the McCormick Village Center that
was acquired for future school facilities. The site
is large enough to accommodate two schools,
including a second high school and a middle or
elementary school.
Figure 9-4. Aerial view of South Kitsap High School
The South Kitsap School District Capital Facilities Plan can provide more information on the facilities and
plans to improve them. It is adopted by reference as a part of this document.
Inventory
N Port Orchard Comprehensive Plan DECEMBER 2024 Amended June 2025
In addition to the facilities above, Fire Station #7 operates as the operations center in case of an emergency.
This facility is owned by the City and leased and operated by South Kitsap Fire and Rescue.
Existing Conditions
City Hall
The Police Department occupies 5,500 square feet of the
first floor of City Hall. While 2024 renovations will maximize
space use and improve some operations, they will not
address many critical needs or add space to accommodate
long-term growth. To alleviate the severely limited space in
the near term, some staff are located in a secure off -site
leased space. Like the administrative department, most
support space has been converted to offices or workspace.
Storage space is also inadequate; many areas have been
repurposed as storage, such as the sallyport. Police officers
have take-home vehicles, but there is no secured parking
area for staff vehicles and inadequate parking for
department meetings.
Figure 9-5. Police offices on ground floor of City Hall
�9r
In addition to City Hall, the Police rent a 3,000 square foot warehouse for tactical training and storage. This
facility is also used to process vehicles for evidence prior to moving them to long-term storage.
Police Shooting Range & Storage
The police shooting range provides a safe location for
officers to train and practice using firearms. The
range is aging, in poor condition, and in need of
maintenance investments, including lane resurfacing
and roof replacement. There is a Conex box on -site
that offers limited storage, but the site lacks
bathroom facilities. There is also concern the outdoor
range may cause increased noise disturbance as the
surrounding residential areas grow. Long-term
storage is located in a fenced area on the same parcel
adjacent to the Public Works Operations Yard.
Figure 9-6. Shooting range
Future Needs
The Police department has grown a lot in recent years and expects to increase staff aligned with the City's
population growth. Many Public Safety facilities are aging with most not sized to accommodate current
staff or future growth.
Continued operations to meet Port Orchard's needs rely on the following steps:
• Review operations and establish level of service standards, where appropriate to assess current
and future needs. The plan should consider workload, geography, and Port Orchard community
Port Orchard Comprehensive Plan DECEMBER 2024 Amended June 2025
needs. Once current and future staffing goals are in place, space needs can be assessed in
accordance with Policy CF -13, to determine the facility space needed to support the Police
department into the future.
• Incorporate plans to construct a Public Safety facility to accommodate future staff and operations
into the citywide facilities plan. Provide secure fleet parking, co -locate large vehicle evidence
storage, and determine the future use of the long-term evidence storage property. If possible,
include tactical training space and an indoor shooting range. Consider building in a central location
free from natural hazards. Purchase property when feasible or use existing City property for a new
facility as outlined in Policies CF -6 and CF -14. Encourage public awareness and input as stated in
Policies CF -15 and CF -17.
• If unable to include in a new Public Safety facility, modernize the existing range by covering and
resurfacing lanes and upgrading parking; install sanitation, water, and electric utilities; and add
secure storage, classroom space, and a firearm cleaning station.
Priority Investments
Funding and expenditures for the needs assessment, facilities plan, and Police Station renovations are
included with financing for City Hall renovations; refer to the Priority Investments chart in the 9.7.1
Administration and Community Facilities section. There are no other major investments budgeted
for Public Safety in the six -year planning period.
9.7.3 Public Works Facilities
The City of Port Orchard and the Public Works Department owns, operates, and maintains infrastructure
to provide drinking water, sewer, stormwater, and surface water services to its residents and businesses.
Investment in this infrastructure is necessary for continued delivery of utility services that are critical for
human health and safety, economic development, as well as supporting a sustainable, healthy environment.
Capital facility investments help to ensure that the City can continue to deliver the high -quality municipal
utility services customers expect. This section first covers the general facilities supporting staff and then
briefly covers the individual utilities. See the Utilities Element or individual functional plans for more
detailed utility information.
Inventory
IT1R' IF
Public Works Shop 1535 Vivian Court 1.82
South Shed Storage 2051 Sidney Ave 3.77
Operations Yard 1278 Lloyd Parkway 14.46
�i■ii Port Orchard Comprehensive Plan DECEMBER 2024 Amended June 2025
Existing Conditions
Public Works Shop
The Public Works Shop houses Public Works
operations crews and the City's maintenance
vehicles and equipment. The main building is in
fair condition and provides space for crew
support, shops, and storage. Materials storage is
severely limited, often forcing crews to obtain
supplies from local vendors. Transportation
signage is purchased as needed as the existing
shop space does not include an area for sign
fabrication. Limited crew space is unable to
support growth in staff and operations.
Figure 9-7. Public Works Shop
Staff and fleet parking space is limited and unable to accommodate growth. There are also two adjacent
structures providing covered parking for fleet and equipment. Fleet requiring heated parking can be stored
in the main building's shop space as well as in one bay at the South Shed. The rest of the site is significantly
undersized with limited yard material storage and no room for expansion.
The facility is located on the west side of Highway 16, making it well located near the McCormick Woods
development, but separated from a large portion of the City, staff, and facilities, including City Hall. This
location may provide operational challenges in the event of a natural hazard.
South Shed
The South Shed Facility is located on a 3.77 -acre site
located at 2035 Sidney Avenue with 2,000 square feet of
warehouse for material and equipment storage. Most of
the land at this location is utilized as a park. Originally a
fire station, the South Shed was repurposed for Public
Works storage in addition to seasonally providing heated
parking for equipment such as sweeper and vactor
trucks. This aging facility is in poor condition but could
be rehabilitated to provide staff workspace and storage.
Expanding outdoor storage will require the relocation of
parks amenities, access, and parking.
Operations Yard
Figure 9-8. South Shed
The Operations Yard is located near the Shop and contains a decant facility and materials laydown storage.
The decant is in good condition but is at capacity as it is used as a regional facility. Spoils frequently do not
have adequate time to dewater, requiring the City to add wicking materials that increase weight and cost
Port Orchard Comprehensive Plan DECEMBER 2024 Amended June 2025
when taken to the Kitsap transfer station. The site has limited materials storage but is large enough to
accommodate additional crew space and materials bins.
Future Needs
Public Works is anticipating an estimated staffing increase in the next ten years, growing from 25 to 32-40
or more staff to meet the needs of the rapidly growing community. The City will need to expand Public
Work facilities to accommodate needed staff and equipment. Major needs for this planning period as
identified by Public Works leadership include:
• In accordance with Policy CF -14, perform required maintenance at all public works facilities.
Conduct a facilities condition assessment to understand the current conditions and near- and long-
term maintenance needs for Public Works and other capital facilities.
• In accordance with Policy CF -1, conduct a citywide facilities plan to review current and future level
of service standards, add staff where needed, and increase operational space to accommodate
current and future staff and operations.
• Provide a new public works annex at the industrial center public works yard to house operations
utility staff. The proposed facility should include crew support space (offices, bathroom, showers,
etc.); a heated warehousing for plumbing, electrical, and other materials storage; employee
parking; heated and covered storage bays for equipment and materials; and expanded yard areas
for laydown and materials storage.
• Upgrade the existing Public Works Shop facility to better utilize vertical storage.
• Upgrade the decant facility to increase capacity and add a new composting facility.
• Provide a new Operations East satellite streets facility west of SR16, preferably near the
intersection of Bethel and Lund, and include a crew room and restroom facilities, heated bays for
snowplow equipment, and material storage yard.
• Upgrade the south shed facility to provide additional storage and work space.
Priority Investments
Financial information to support the facility condition assessment and citywide facilities plan can be found
in the 9.7.1 Administration and Community Facilities section. Investments for the next six years have
Port Orchard Comprehensive Plan DECEMBER 2024 Amended June 2025
not been identified for the general Public Works capital facilities. Please see the Utilities section below for
priority infrastructure investments.
Funding
Source
Public Works Annex
5,000,000 5,000,000
Decant Facilities and Yard
Improvements
1,750,000
1,750,000
PW Operations East Station
(Property Acquisition)
5,000,000
5,000,000
PW South Shed Upgrades
2,400,000
2,400,000
TOTAL
14,150,000
14,150,000
Expenditures
..
Public Works Annex 0 5,000,000 5,000,000
Decant Facilities and Yard
Improvements
0
1,750,000
1,750,000
PW Operations East
Station (Property
Acquisition)
0
5,000,000
5,000,000
PW South Shed Upgrades
0
2,400,000
2,400,000
TOTAL
$0
$14,150,000
$14,150,000
9.7.4 Utilities and Transportation
Port Orchard's Public Works Department operates and maintains the City's utilities and transportation
systems. Some of Port Orchard's capital facilities are aging or inadequate for current service needs and will
require repairs and replacement over the next 2O years. The costs of replacing utility infrastructure and
roads are substantial and take years for planning and implementation. The City is working to address
substandard infrastructure and comply with changing state and federal mandates governing capital
facilities. In accordance with Goal 1, the City should ensure that all utility infrastructure expansion provides
an adequate level of public service to support new development consistent with the City's policies, criteria,
and standards. In addition, utility expansion should also be consistent with current land use plans and
development regulations of the State of Washington, Kitsap County, and appropriate local planning
agencies.
The following sections list priority projects for Transportation, Stormwater, Sewer, and Water between
2O23 -2O28. More information on these facilities is provided in the Transportation and Utilities Elements as
well as the individual functional plans.
Port Orchard Comprehensive Plan DECEMBER 2024 Amended June 2025
Transportation
Port Orchard is responsible for City roads and other aspects of the City's transportation system. Details on
all City transportation systems can be found in the Transportation Element as well as the Transportation
Improvement Plan. Priority investments and funding assumptions targeted in the next six years are
summarized below.
Funding
Source
Annual Street Preservation 6,800,000
6,800,000
Projects
Citywide Street Lighting
210,000
1,100,000
1,310,000
Bay Street Pedestrian
Pathway Segments 6-11
6,675,000
2,000,000
8,675,000
Bethel Phase 1
11,808,000
3,000,000
14,808,000
Bethel Phase 4a: Lund RAB
101,250
648,750
300,000
1,050,000
Bethel Phase 4b; Vallair Ct
Connector
1,000,000
1,000,000
Bethel Phase 5a:
Bethel/Lincoln/Mitchel
3,006,507
2,485,493
5,492,000
RABs
Old Clifton Non -Motorized
Improvements
600,000
2,700,000
3,300,000
Old Clifton/Anderson Hill
Intersection Improvements
2,300,000
2,300,000
Pottery Ave Non -Motorized
Improvements
837,183
644,000
1,481,183
Sedgwick Rd W Study
300,000
300,000
Sidney Rd Non -Motorized
1,005,000
1,395,000
2,400,000
SR 160/Sedgwick Phase 2a
550,000
695,000
1,245,000
SR 166/Bay St
Reconstruction
3,532,000
3,000,000
1,746,000
8,278,000
SR166/Port Orchard Blvd
Intersection Improvements
2,100,000
2,100,000
Tremont Phase 2 & 3
732,000
4,125,000
4,857,000
TOTAL
37,424,940
13,005,243
14,966,000
65,396,183
Port Orchard Comprehensive Plan DECEMBER 2024 Amended June 2025
Expenditures
Annual Street Preservation
Projects
6,800,000
6,800,000
N/A
Citywide Street Lighting
N/A
1,310,000
1,310,0001
Bay Street Pedestrian Pathway
Segments 6-11
3,900,000
4,775,000
8,675,000
Bethel Phase 1
368,120
14,439,880
14,808,000
Bethel Phase 4a; Lund Int
1,050,000
1,050,000
Bethel Phase 4b; Vallair Ct
Intersection and Connector
1,000,000
1,000,000
Bethel Phase 5a:
Bethel/Lincoln/Mitchel RABs
1,500,000
3,992,000
5,492,000
Old Clifton Non -Motorized
Improvements
150,000
3,150,000
3,300,000
Old Clifton/Anderson Hill
Intersection Improvements
151,000
2,149,000
2,300,000
Pottery Ave Non -Motorized
Improvements
185,000
1,296,183
1,481,183
Sedgwick Rd W Study
300,000
300,000
Sidney Rd Non -Motorized
2,400,000
2,400,000
SR 160/Sedgwick Phase 2a
1,245,000
1,245,000
SR 166/Bay St Reconstruction
200,000
8,078,000
8,278,000
SR166/Port Orchard Blvd
Intersection Improvements
2,100,000
2,100,000
remont Phase 2 & 3
4,857,000
4,857,000
6,454,120
58,942,063
65,396,183
Port Orchard Comprehensive Plan DECEMBER 2024 Amended June 2025
Stormwater
Port Orchard owns, maintains, and manages its stormwater collection system. Goal 8 states the City should
minimize development related impacts to existing hydrologic conditions and functions and strive to correct
current deficiencies resulting from past development practices such as stormwater-related flooding.
Details on the City's stormwater system can be found in the Utilities Element as well as the 2023
Stormwater and Watersheds Comprehensive Plan. Priority investments and funding assumptions targeted
in the next six years are summarized below.
Funding Sources
Johnson Creek Estuary
Restoration 4,171,550 2,828,450 7,000,000
Annual Stormwater Preservation
600,000
600,000
Sidney Regional Storm
563,492
3,479,841
4,043,333
Sidney Rd. SW Fish Pass Culvert
1,852,842
1,447,158
3,300,000
Sedgwick Balancing Culvert
600,000
600,000
Pottery Non -Motorized
Improvements
80,000
80,000
Annapolis Creek Culvert
Replacement
43,333
4,000,000
4,043,333
Downtown Retrofit
2,860,000
1,350,000
Bay Street Stormwater
Improvements
600,000
600,000
TOTAL
1,286,825
6,024,392
15,815,449
23,126,666
Expenditures
Johnson Creek Estuary
Restoration* 7,000,000 7,000,000
Annual Stormwater
Preservation
N/A
600,000
600,000
Sidney Regional Storm
563,492
3,479,841
4,032,333
Sidney Rd. SW Fish Pass
Culvert
3,300,000
3,300,000
Sedgwick Balancing
Culvert
600,000
600,000
Pottery Non -Motorized
Improvements
80,000
80,000
Annapolis Creek Culvert
Replacement
43,333
4,000,000
4,043,333
Downtown Retrofit
2,860,000
2,860,000
Bay Street Stormwater
Improvements
600,000
600,000
TOTAL
606,825
22,519,841
23,126,666
*WSDOT Lead Agency
Port Orchard Comprehensive Plan DECEMBER 2024 Amended June 2025
Sewer
The City is tasked to provide safe, reliable, and timely sewer service to consumers at a fair and reasonable
price, as seen in Goal 6. Port Orchard owns, operates, and maintains existing wastewater collection and
conveyance facilities. As of 2016, the City's sewer service area was approximately 2,100 acres and was
expected to grow to 5,700 acres. Details on the City's sewer system can be found in the Utilities Element
as well as the 2016 General Sewer Plan Update. Priority investments and funding assumptions targeted in
the next six years are summarized below.
Port Orchard Comprehensive Plan DECEMBER 2024 Amended June 2025
Funding Source
..
Annual Sewer Preservation 300,000 3,200,000 3,500,000
Marina Lift Station
5,900,000
13,000,000
18,900,000
Bay Street Pump Station
Replacement
1,000,000
6,000,000
7,000,000
Lift Station Controls (6) &
Generator (1)
25,000
800,000
825,000
Port Orchard BLVD Lift Station and
Siphon
7,610,000 (WSDOT)
7,610,000
Sidney 2"d Force Main (Pottery
Section)
731,000
731,000
Sidney 2nd Force Main (Ruby Creek
to Pottery)
1,231,838
2,487,162
3,719,000
McCormick Lift Station #3
(Developer Funded)
1,000,000 (D)
1,000,000
Ruby Creek Lift Station
800,000 (D)
2,340,000
3,140,000
Sidney Road Gravity Sewer
2,290,000
2,290,000
Bravo Terrace Lift Station
2,500,000
2,500,000
Bravo Terrace Force Main
4,860,000
4,860,000
Sewer Facility Upgrades
2,000,000
2,000,000
McCormick East L/S and Force
Main
7,600,000
7,600,000
2029 General Sewer Plan Update
350,000
350,000
TOTA
8,187,838
14,800,000
33,627,162
66,025,000
Port Orchard Comprehensive Plan DECEMBER 2024 Amended June 2025
Expenditures
• .
Annual Sewer Preservation 3,500,000 3,500,000
Marina Lift Station
3,100,000
15,800,000
18,900,000
Bay Street Pump Station
Replacement
7,000,000
7,000,000
Lift Station Controls (6) &
Generator (1)
125,000
700,000
825,000
Port Orchard BLVD Lift
Station and Siphon
0
7,610,000
7,610,000
Sidney 2nd Force Main
(Pottery Section)
0
731,000
731,000
Sidney 2nd Force Main (Ruby
Creek to Pottery)
0
3,719,000
3,719,000
McCormick Lift Station #3
(GFF Credit)
0
1,000,000
$1,000,000
Ruby Creek Lift Station
0
3,140,000
3,140,000
Sidney Road Gravity Sewer
2,290,000
2,290,000
Bravo Terrace Lift Station
2,500,000
2,500,000
Bravo Terrace Force Main
4,860,000
4,860,000
Sewer Facility Upgrades
2,000,000
2,000,000
McCormick East L/S and
Force Main
7,600,000
7,600,000
2029 General Sewer Plan
350,000
350,000
•Update
k. TOTAL
3,225,000
62,800,000
66,025,00
Port Orchard Comprehensive Plan DECEMBER 2024 Amended June 2025
Water
Port Orchard Public Works Department maintains and manages the City's water system. With two systems
serving the City (City System) and McCormick Woods (McCormick Woods System), Port Orchard serves
over 4,OOO connections. Goal 5 and its related policies state the City will ensure that an adequate water
supply is available to support the level of population growth and land development projected within the
City. Details on the City's water system can be found in the Utilities Element as well as the 2O2O Water
System Plan. Priority investments and funding assumptions targeted in the next six years are summarized
below.
Funding
Source
Old Clifton Transmission
Main (Reservoir to
McCormick Woods Drive)
..
1,235,000
1,235,000
Annual Water Preservation
300,000
400,000
700,000
Well #13
600,000
5,500,000
5,500,000
11,600,000
Well #12
7,000,000 (D)
7,000,000
Well #11 (#3)
465,000
8,500,000
8,965,000
Melcher PS Rebuild (#10)
750,000
500,000
1,250,000
Well #7
500,000
1,015,000
1,515,000
580 to 660 Zone Booster
Station
750,000 (D)
750,000
390-580 Booster Pump
(Glenwood)
725,000
725,000
390-580 Transmission Main
(Glenwood)
515,624 (D)
515,624
660 Zone Storage (CFC
Credit)
2,850,000 (D)
2,850,000
Foster Mitigation
7,200,000
7,200,000
390-580 Intertie and booster
(Old Clifton)
40,000
1,000,000
3,960,000
5,000,000
TOTAL
13,995,624
16,000,000
19,310,000
49,305,624
Port Orchard Comprehensive Plan DECEMBER 2024 Amended June 2025
Expenditures
. .
Old Clifton Transmission
Main (Reservoir to
McCormick Woods Drive) 1,235,000 1,235,000
Annual Water
Preservation
N/A
700,000
700,000
Well #13
6,100,000
5,500,000
11,600,000
Well #12 (CFC Credit)
7,000,000
7,000,000
Well #11 (#3)
2,100,000
6,865,000
8,965,000
Melcher PS Rebuild (#10)
114,000
1,136,000
1,250,000
Well #7
1,515,000
1,515,000
580 to 660 Zone Booster
Station (CFC Credit)
750,000
750,000
390-580 Booster Pump
725,000
(Glenwood) (CFC Credit)
725,000
390-580 Transmission
Main (CFC Credit)
(Glenwood)
515,624
515,624
660 Zone Storage (CFC
Credit)
2,850,000
2,850,000
Foster Mitigation
7,200,000
7,200,000
390-580 Intertie (Old
Clifton)
5,000,000
5,000,000
TOTAL
8,314,000
39,476,624
49,305,624
Port Orchard Comprehensive Plan DECEMBER 2024 Amended June 2025
9.7.5 Parks Facilities
The Parks Element of the 2024 Comprehensive Plan, supplemented by the Parks, Recreation and Open
Space (PROS) Plan, outlines the goals, expectations, and community vision for the City's Parks. This section
draws from those plans with a concentration on capital facilities.
Inventory
Port Orchard owns 89.7 acres of parkland, with a ratio of approximately six acres per every 1,000 residents.
This includes conservancies, resource parks, trails, athletic parks, community centers, special use facilities,
and support facilities.
Parks capital facilities that include structures are listed below; refer to the PROS Plan for a full inventory of
parks.
k Creek Multi -Modal Bridge
r
1301 Area Bay St
mp-Launch
533 Bay St
0.82
Central Park (Clayton Park/Dwight Park)
915 Dwight
1.4
Dekalb Pier
467 Bay St
4.1
Etta Turner Park/Blackjack Creek Park
1301 Arena Bay Street
0.16
Givens Field/Active Club
1025 Tacoma Ave
0.6
Marina And Observation Deck
707 Sidney Pkwy
McCormick Village Park
3201 SW Old Clifton Rd
28.6
Van Zee Park
300 Tremont St
8.3
Existing Conditions
According to the PROS Plan, the City has adequate outdoor park and recreational facilities to serve the
population during the 20 -year planning horizon; however, playground, picnic, sports court, and field sites
are not evenly distributed within a 5- or 10 -minute walk of all residential areas, creating a need for more
neighborhood parks. There are also deficits in indoor recreation facilities, community gardens, and
multipurpose trails.
Additional information on the City's parks and more detailed planning strategies can be found in the City's
PROS Plan and in the Parks Element of this Comprehensive Plan.
Port Orchard Comprehensive Plan DECEMBER 2024 Amended June 2025
Future Needs
The City is committed to providing parks that are safe and well -maintained, enhance residential
neighborhoods, encourage shoreline access, and activate downtown areas.
Considering existing level -of -service for Port Orchard owned parks, the City's projected population growth
will create a need for an additional 61.4 acres of land and 15,661 facility units (square feet of courts, fields,
etc.) by the year 2040, requiring an estimated expenditure of $32,326,076. This does not account for any
maintenance, operation, or repair costs. See the PROs Plan for more information on existing -level -of -
service standards.
The PROS plan highlights the following investments that update and expand existing park facilities.
• In accordance with Policy CF -14, perform required maintenance at all parks and recreation
facilities. Conduct a facilities condition assessment to understand the current conditions and near -
and long-term maintenance needs for all capital facilities.
• As part of a citywide facilities plan, develop a space needs analysis to determine and justify staff
growth and investments needed to achieve the Parks goals. Aligned with Policy CF -11, consider
developing multi -use facilities and partnering opportunities to meet public need.
• Continue plans to design and construct the Port Orchard Community Event Center. The center will
be located at 619 Bay Street on the downtown waterfront and include 7,600-8,600 square feet of
event space and meeting facilities, as well as a 7,000-9,500 square foot library facility with outdoor
decks and an activities area. Consider also relocating the Council Chambers to consolidate
community functions.
• In accordance with Goal 4, perform required maintenance at all parks facilities.
• Protect existing open space and conservancies and acquire and develop parks and trail systems.
• Designate and conserve cultural and historic resources located within park properties; seek joint
funding partnerships with local jurisdictions to create wayfinding and educational signage,
artworks, streetscapes, and gateways.
• Develop a master plan for Givens Park and assess condition, repurposing, or removal of the Active
Club.
• Develop a master plan for expanding Etta Turner Park to the west side of Blackjack Creek. Install
lighting on the bridge and enhance Blackjack Creek.
• Develop master plans for Ruby Creek Regional Park and Sherman Ave Stormwater Park.
• Create and strengthen regional partnerships to enable the City and its partners to provide greater
facilities and opportunities than would be possible alone.
• Acquire property for future park use in areas of need as identified in the Parks Plan, with an
emphasis on the Bethel/Lund and Bethel/Sedgwick Centers.
Port Orchard Comprehensive Plan DECEMBER 2024 Amended June 2025
Priority Investments
Details on current and planned investments in the next 20 years can be found in the PROS Plan. Financial
information to support the facility condition assessment and citywide facilities plan can be found in the
9.7.1 Administration and Community Facilities section. Priority investments and funding assumptions
targeted in the next six years are summarized below.
Funding
Source
Port Orchard Community
IIi1IN:Th1I1!.M!
Event Center
927,430
283,900
18,729,963
6,500,000
1,658,707
28,100,000
Waterfront Plaza Shoreline
Restoration/Enhancement
278,920
352,300
500,000
1,376,780
2,508,000
Orchard St Plaza
792,000
500,000
3,008,000
4,300,000
Givens Park Sport Court
Remodel
253,600
176,400
55,000
485,000
McCormick Village Park
Phase 3
1,250,000
1,250,000
Telford Way Multimodal
Pathway
979,012
979,012
McCormick Village Dr
Multimodal Pathway
1,468,518
1,468,518
Sherman Ave Stormwater
Park
300,000
1,861,039
2,161,039
Paul Powers Park Master
Plan and Redevelopment
500,000
500,000
Givens Park Master Plan
150,000
150,000
Ruby Creek Regional Park
Master Plan
150,000
150,000
TOTAL
1,759,950
3,697,530
1,428,200
19,406,363
7,055,000
8,704,526
42,051,569
Port Orchard Comprehensive Plan DECEMBER 2024 Amended June 2025
6 -Year Expenditures
..
Port Orchard Community
Event Center 4,064,132 24,035,868 $28,100,000
Waterfront Plaza Shoreline
Restoration/Enhancement
360,194
2,147,806
2,508,000
Orchard St Plaza
78,822
4,221,178
4,300,000
Givens Park Sport Court
Remodel
485,000
$485,000
McCormick Village Park
Phase 3 (Impact Fee Credit)
1,250,000
1,250,000
Telford Way Multimodal
Pathway (Impact Fee
Credit)
979,012
979,012
McCormick Village Dr
Multimodal Pathway
(Impact Fee Credit)
1,468,518
1,468,518
Sherman Ave Stormwater
Park
300,000
1,861,039
2,161,039
Paul Powers Park Master
Plan and Redevelopment
500,000
500,000
Givens Park Master Plan
150,000
150,000
Ruby Creek Regional Park
Master Plan
150,000
150,000
TOTAL
37,248,421
42,051,569
Port Orchard Comprehensive Plan DECEMBER 2024 Amended June 2025
City of Port Orchard Six -Year Transportation Improvement Program
For 2025-2030 TIER 1 (Reasonably Constrained)
Proj#
Road Name
Total
Federal
State
(TIF
Begin Termini
Project
Spent Prior to
Future
Phase
Funding
Fund
Fund
Proj#)
Project Title/Project Description
End Termini
Length
Total Est. Cost
2024
2024
Expenditures
2025
2026
2027
2028 2029 2030
Start Year
Status
Phase
Code
Federal Funds
Code
State Funds
Local Funds
Capital Projects
1.1
Bay Street Pedestiran Pathway ROW
PO Shoreline: Sidney
Add 14 -ft Multi -Modal (bikes & pedestrians)
Ave. Foot Ferry to
1.2
2,280,000
1,140,000
1,140,000
0
0
0
0
0 0 0
2013
S
ROW
STP
1,923,590
0
300,212
waterfront pathway & cantilevered retaining wall
Annapolis Foot Ferry
0
0
0
0
0
0
0 0 0
2018
P
ROW
0
581,000
following historic Mosquito Fleet trail and pedestrian
bridge across Black Jack Creek.
1.2
Bay Street Pedestrian Pathway CN
The CN phase for the 14 -ft Multi -Modal (bike & ped)
1.2
1,115,000
650,000
465,000
0
0
0
0
0 0 0
2018
S
CN
1,115,000
waterfront pathway/cantilevered retailing wall
6,000,000
0
3,000,000
3,000,000
0
3,000,000
0
0 0 0
2024
5
CN
ConnWA
3,000,000
1,500,000
following the historic Mosquito Fleet trail. Includes
the demolition/removal of (5) overwater structures.
Includes Seg #3 Ad Ready Doc Prep.
1.4
Old Clifton/ Anderson Hill Intersection Improvements
Old Clifton Rd /
Intersection Improvements (roundabout) as identified
Anderson Hill Rd.
0
300,000
0
0
300,000
300,000
0
0
0 0 0
2027
S
PE
Developer:$320,000 + 700,000 + McCormick
0
in the McCormick Urban Village Trans Plan and
Intersection
2,000,000
0
0
2,000,000
0
2,000,000
0 0 0
2028
S
CN
TIF; $786,000
0
partially funded by Bayside Mit Funds.
1.5
Old Clifton Rd Non -Motorized Improvements
Old Clifton Road:
Roadway Improvements identified in the McCormick
McCormick Village
0.75
450,000
150,000
0
450,000
0
450,000 0 0
2026
P
PE
0
450,000
Urban Village Trans Plan. Design and Construction.
to Anderson Hill Rd.
2,000,000
2,700,000
2027
P
CN
STP(U),
TIB/CS
Separated pathway and shoulder facilities.
RCO
1.7
Bethel Phase 5a - Bethel/Lincoln/ Mitchel RABs
Bethel/Lincoln/Lunb
Safety and capacity improvements to intersection and
erg/ Mitchell
0
4,000,000
800,000
0
2021
S
PE
800,000
reconfiguration of approaches. Phase 1 Lincoln
0
1,100,000
2,100,000
2100000
2023
S
CN
HSP
1,500,000
TIB UAP
1,100,000
700,000
Mitchel completed.
1.8
Bethel Phase la - Blueberry RAB
Bethel Road/
Phase 1a. Bethel/ Blueberry RAB 60% PE in 2022
Blueberry
0
3,341,000
0
250,000
285,000
160,000
125,000
2022
S
PE
0
0
535,000
and start ROW for Phase la/b.
Intersection
268,000
134,000
134,000
2024
S
ROW
0
268,000
2,788,000
2788000
2027
P
CN
TIB/
0
2,788,000
TIF
UAP/CS
1.9
Bethel ase lb - Salmonberry
Bethel Road;
Phase lb. Bethel/ Salmon berry RAB Round and
Salmonberry
0
11,467,000
0
375,000
891,000
497,000
394,000
2023
S
PE
0
0
1,272,000
roadway segment design from Blueberry to
intersection;
3,206,000
1,603,000
1,603,000
0
2024
S
ROW
0
3,206,000
Salmonberry. Salmbonberry from Bethel to City
Salmonberry East
7,370,000
7,370,000
2027
P
CN
TIB/UAP/
0
7,370,000
Limits.
CS
1.10
Bethel Phase 4b; Vallair Ct Connector
Bethel
Intersection improvements and road extension and
Road/Walmart Drive
0.25
3,000,000
0
0
1,000,000
0
0
0
0 1,000,000 0
2029
P
PE & ROW
0
0
1,000,000
intersection improvements included in the Bethel
Intersection to
0
0
2,000,000
0
0
0
0 0 2,000,000
2030
P
CN
0
TIB
0
1,000,000
Road Corridor study
Vallair Ct.
1.14
Sidney Road SW Sidewalk
Sidney Glen
Address gap in sidewalk along school frontage
Elementary Sidewalk
0.95
1,895,000
0
235,000
0
2023
5
PE
173,000
62,000
1,660,000
1,660,000
2024
S
CN
SRTS
1,222,000
438,000
1.16
SR166 Bay Street Reconstruction
SR166 from Geiger to
Raise street to address sea level rise and improve to
Frederick
7,259,000
200,000
1,135,000
0
0
0
2022
5
PE
CDS
1,000,000
135,000
current standard in accordance with redevelopment
5,924,000
5,924,000
2026
S
CN
KRCC
2,000,000
649,000
plans. Amount shown does not include water and
sewer utility improvments.
Citywide corridors,
1.17
Street Lighting Improvements
highest priority
Currently funded work include Pottery, Sidney Rd.
locations
1,310,000
0
0
100,000
100,000
2023
5
PE
HSIP
0
0
Future applications to be submitted for Tremont
210,000
1,000,000
1,000,000
2024
5
CN
HSIP
210,000
0
P
DN/CN
HSIP
1,100,00
0
1.18
Tremont Phase 2 and 3
Port Orchard Blvd to
Sidney Ave.
Non motorized connectivity study and design of
4,732,000
0
732,000
732,000
2023
S
PE
PedBike
732,000
0
elements for future ROW and/or CN application
1,000,000
1,000,000
2027
P
ROW
PedBike
TBD
6/13/2025 Page 1 of 7 U:\A1_Long Range Projects\2025\Comp Plan Docket\01 - Working Folder\2025-2044 TIP.6_10_2025.final
City of Port Orchard Six -Year Transportation Improvement Program
For 2025-2030 TIER 1 (Reasonably Constrained)
Proj#
Road Name Total
Federal
State
(TIF
Begin Termini Project
Spent Prior to
Future
Phase
Funding
Fund
Fund
Proj#) Project Title/Project Description
End Termini Length
Total Est. Cost
2024
2024
Expenditures
2025
2026
2027
2028
2029
2030
Start Year
Status
Phase
Code
Federal Funds
Code State Funds Local Funds
3,000,000
3,000,000
2029
P
CN
PedBike
TBD
1.19 SR160 Sedgwick Phase 2a
New Intersection
New Roundabout midway between SR16 and Bethel Rd.
1,550,000
0
0
600,000
600,000
2028
S
PE
BuildAm
600,000
Facilitate development. 60% ON and ROW acquisition for
950,000
950,000
2029
P
ROW
BuildAm
950,000
two lane RAB that will be innitially constructed as one lane.
TIF
Also acquisition of a reminent on the north side west of the
proposed RAB.
1.20 Bethel Phase 4a; Lund RAB
New Intersection
New roundabout at Bethel and Lund Intersection.
1,000,000
0
0
500,000
0
500,000
2028
S
PE
STP
432,500
67,500
500,000
0
500,000
2030
P
ROW
STP
432,500
67,500
TIF
1.21 Old Clifton/ McCormick Woods Dr. RAB
Old Clifton Rd /
Intersection Improvements (roundabout) as identified
Anderson Hill Rd. 0
1,600,000
0
0
250,000
250,000
2027
S
PE
Developer
450,000
in the McCormick Urban Village Trans Plan and
Intersection
0
0
1,350,000
1,350,000
2029
S
CN
Developer
0
partially funded by Bayside Mit Funds.
TIF
1.22 Frederick Reconstruction
Bay Street
Sidewalk and drainage improvements assocaited with the
1,500,000
0
0
10,000
10,000
2025
P
PE
10,000
Bay Street Reconstruction Project and redevelopment. In
1,490,000
1,490,000
2026
P
CN
1,490,000
house desien.
TIF
Total Capital Pojects
$50,699,000
$2,940,000
$10,302,000
$45,064,000
$6,464,000
$12,670,000
$13,508,000
$2,550,000
$9,000,000
$2,500,000
$8,893,590
$4,832,000 $27,804,212
Maintenance Projects
Total
2024
Future Exp
2025
2026
2027
2028
2029
2030
1.51 Annual Pavement Maintenance
Includes patching, crack -sealing, striping, and other
656,500
56,500
600,000
100,000
100,000
100,000
100,000
100,000
100,000
On going
S
CN
600,000
activities
1.52 * Annual Sidewalk & ADA Upgrade Program
Repair and replace concrete sidewalks and curb ramps
1,238,000
38,000
1,200,000
200,000
200,000
200,000
200,000
200,000
200,000
On going
S
CN
1,200,000
as identified in the program
1.53 ** Annual Pavement Management System Paving Projects
Pavement replacement projects as identified in the
4,135,000
535,000
3,600,000
600,000
600,000
600,000
600,000
600,000
600,000
On going
S
CN
3,600,000
pavement management system program
Total Maintenance Projects
6,029,500
0
629,500
5,400,000
900,000
900,000
900,000
900,000
900,000
900,000
o 5,400,000
* Per 2016 ADA transition plan: $180,000 annually over 20 years
to comply on arterial streets.
** Per 2016 Pavement Management Analysis Report: $1.45 million
annually to maintain network condition (PCI
of 70), $500k to
keep network PCI above 65 after 5 years.
6/13/2025
Page 2 of 7
U:\A1_Long
Range Projects\2025\Comp Plan Docket\01
- Working
Folder\2025-2044 TIP.6_10_2025.final
City of Port Orchard Transportation Improvement Program (TIP)
For 2031-2044 TIER 2 (Unconstrained)
Road Name
Total
Phase
Priority
Begin Termini
Project
Start
Funding
Federal
State Fund
Number
Project Title/Project Description
End Termini
Length
Total Est. Cost
2031-2035
2036-2044
Year
Status
Phase
Fund Code
Federal Funds Code
State Funds
Local Funds
Capital Projects
2.01
Sidney Avenue
Tremont Street to
1
3,750,000
3,750,000
0
2029
P
PE/RW
STP(U)
2,812,000
0
938,000
The design, permitting, right-of-way acquisition
Fireweed
6,750,000
6,750,000
0
2031
P
CN
5,063,000
0
1,687,000
and construction for this project with bike lanes,
storm drainage and sidewalks. (COMPLETE
STREET)
STP(U)
2.02A
Sedgwick Road West - Design, Permitting & ROW
SR 16 Interchange to
0.4
462,428
462,428
0
2029
P
PE
STP(U)
369,942
0
92,486
The design, permitting and right-of-way
Sidney Rd. SW
693,642
693,642
0
2030
P
RW
STP(U)
554,914
0
138,728
acquisition phase for this widening project with 3
lanes (continuous TWTL), bike lanes, sidewalks
and box culvert across Blackjack Creek.)
2.02B
Sedgwick Road West - Construction
SR 16 Interchange to
0.4
3,468,208
3,468,208
0
2031
P
CN
STP(U)
2,774,556
0
693,652
The construction phase for this widening project
Sidney Rd. SW.
with 3 lanes (continuous TWTL), bike lanes,
sidewalks and box culvert across Blackjack Creek.)
2.04A.2
Ramsey Road Widening
Sedgwick Road to
Widen road to two travel lanes with bike facilities,
Salmonberry Road
0.5
4,000,000
0
4,000,000
2029
P
ALL
0
0
4,000,000
sidewalks and stormwater system improvements.
Bethel/Sedgwick Corridor Phase 2 - Design,
Sedgwick Road: SR -16
2.04B
ROW and Construction
interchange to Bethel
1,110,000
1,110,000
0
2030
P
PE
888,000
0
222,000
Design, ROW acquisition and construction of the
0.7
2,802,000
2,802,000
0
2031
P
RW
2,241,600
0
560,500
second phase of the street improvements per the
12,757,000
12,757,000
0
2032
P
CN
10,205,600
2,551,400
Bethel/Sedgwick Corridor Plan (2018).
Bethel/Sedgwick Corridor Phase 3 - Design,
Blueberrry to Piperberry.
2.04C
ROW and Construction
DN, ROW, CN. To be addressed with future State
0.25
1,800,000
450,000
2040
P
PE
225,000
225,000
intersection improvements at Sedgdwick?
350,000
2041
P
RW
175,000
175,000
1,000,000
2044
P
CN
500,000
500,000
Bethel/Sedgwick Corridor Phase 4- Design,
Bethel Road: Lund to
2.04D
ROW and Construction
Salmonberry
616,000
0
616,000
2034
P
PE
308,000
0
308,000
Design, ROW acquisition and construction of the
0.5
1,041,000
0
1,041,000
2035
P
RW
520,500
0
520,500
fourth phase of the street improvements per the
7,087,000
0
7,087,000
2036
P
CN
3,543,500
0
3,543,500
Bethel/Sedgwick Corridor Plan (2018).
Bethel/Sedgwick Corridor Phase 5 - Design,
Bethel Road: Mile Hill
2.04E
ROW and Construction
Drive to Lund
720,000
0
720,000
2036
P
PE
360,000
0
360,000
Design, ROW acquisition and construction of the
1.1
1,532,000
0
1,532,000
2037
P
RW
766,000
0
766,000
fifth phase of the street improvements per the
6,283,000
0
6,283,000
2038
P
CN
3,141,500
0
3,141,500
Bethel/Sedgwick Corridor Plan (2018).
2.05
Sidney Road SW Widening Phase 2
City limits to Berry Lake
6/13/2025 Page 3 of 7 U:\A1_Long Range Projects\2025\Comp Plan Docket\01 - Working Folder\2025-2044 TIP.6_10_2025.final
City of Port Orchard Transportation Improvement Program (TIP)
For 2031-2044 TIER 2 (Unconstrained)
Road Name
Total
Phase
Priority
Begin Termini
Project
Start
Funding
Federal
State Fund
Number
Project Title/Project Description
End Termini
Length
Total Est. Cost
2031-2035
2036-2044
Year
Status
Phase
Fund Code
Federal Funds Code
State Funds
Local Funds
Roadway widening to three lanes (additional
0.95
500,000
500,000
0
2028
P
PE
0
0
500,000
TWTL) including bike lanes, sidewalks, traffic
3,000,000
3,000,000
0
2029
P
CN
STP(U)
0 TIB
1,750,000
1,250,000
calming, and stormwater system improvements.
(COMPLETE STREET).
2.06
Pottery Avenue Widening
Pottery Avenue:
Widen road to two travel lanes with bike facilities,
Tremont Place to
0.22
1,600,000
1,600,000
0
2029
P
ALL
0
0
1,600,000
sidewalks and stormwater system improvements.
Melcher Street
2.07
Old Clifton Rd Shoulder & Pedestrian Improvements
Old Clifton Road:
Design and construction of shoulder widening,
Anderson Hill to
1.35
2,700,000
2,700,000
0
2028
P
CN
0
0
2,000,000
street lighting, watermain extension and grade-
McCormick Wood Dr.
seperated Pedestrian Path as identified in the
McCormick Urban Village Trans Plan.
TIF 2.07
2.08
Not used
2.09
Melcher Street Widening
Reconstruction to widen road to allow two safe
Melcher Street:
0.4
1,500,000
0
1,500,000
2032
P
ALL
0
0
1,500,000
travel lanes, bike facilities, sidewalks and a
Pottery Avenue to
stormwater system.
Sherman Avenue
2.10
Fireweed Road Widening
Reconstruction widening the road to allow for
Fireweed Road:
0.25
1,500,000
0
1,500,000
2035
P
ALL
0
750,000
750,000
safe travel lanes, bike facilities, sidewalks and a
Sidney Avenue to
stormwater system.
South Flower Avenue
2.11
Sherman Avenue Widening
Sherman Avenue:
Reconstruction widening roadway to allow two
Fireweed Road to
0.35
2,000,000
0
2,000,000
2032
P
ALL
0
1,000,000
1,000,000
safe travel lanes, bike facilities, sidewalks and a
Terminus at SR 16
stormwater system.
2.12
Tremont St Widening - Port Orchard Blvd (Ph. 2)
Port Orchard Blvd.
Construct roundabouts at Tremont Street/PO
Tremont Street to
1.1
809,250
0
809,250
2033
P
PE
STP(U)
700,000
0
109,250
Blvd. and Bay Street (5R166)/PO Blvd. and curb,
Bay Street (SR166)
gutter, bike lanes, sidewalks, street lighting, storm
520,231
0
520,231
2035
P
RW
STP(U)
450,000
0
70,231
drainage and Schedule 74 Undergrounding.
7,225,434
0
7,225,434
2037
P
CN
STP(U)
6,250,000
0
975,434
2.13
Not Used
2.14
Old Clifton Berry Lake Road Intersection
0
0
0
0
0
0
0
Intersection Improvement by Kitsap County
6/13/2025 Page 4 of 7 U:\A1_Long Range Projects\2025\Comp Plan Docket\01 - Working Folder\2025-2044 TIP.6_10_2025.final
City of Port Orchard Transportation Improvement Program (TIP)
For 2031-2044 TIER 2 (Unconstrained)
Road Name
Total
Phase
Priority
Begin Termini
Project
Start Funding Federal State Fund
Number Project Title/Project Description
End Termini
Length Total Est. Cost 2031-2035
2036-2044 Year Status Phase Fund Code Federal Funds Code State Funds Local Funds
2.15 Blueberry Road Widening
Geiger Road to Bethel
Widen road to two travel lanes with bike lanes,
Road
0.4 1,200,000 0
1,200,000 2036 P ALL 0 0 1,200,000
sidewalks and stormwater system improvements.
2.16
Geiger Road Widening
Sedgwick Road to
Widen road to two travel lanes with bike facilities,
Blueberry Road
0.25
750,000
0
750,000
2034
P
ALL
0
0
750,000
sidewalks and stormwater system improvements.
2.17
Salmonberry Road Widening
Ramsey Road to Bethel
Widen road to two travel lanes, sidewalks, new
Road
0.15
2,500,000
0
2,500,000
2031
P
ALL
0
0
2,500,000
culvert and conveyances to blackjack creek.
2.18
Piperberry Way Extention
Geiger Road to Ramsey
Provide an extension of Piperberry from Ramsey
Road
0.25
1,150,000
0
1,150,000
2034
P
ALL
0
0
1,150,000
to Geiger and a new street connection to the
proposed roundabout on Sedgwick.
2.19
Old Clifton & Feilgly Intersection
Feigly intersection
Complete street improvement identified in the
0
2,800,000
0
2,800,000
2040
P
ALL
0
0
2,800,000
McCormicks Urban Village Transportation Plan.
Continuation of 1.5A
2.20
Bay Street Pathway - West
Tremont to Footferry
Continuation of project following study in 1.8
0
4,000,000
4,000,000
0
2030
P
ALL
1,500,000
1,500,000
1,000,000
2.21
Bethel Business Connector
Lund to Salmonberry via
Provides street internal to business district for
Cathie Ave., Jerry Ln, and
1,400,000
400,000
2032
P
ROW
400,000
traffic conjestion relief on Bethel. Includes
the Walmart Connector.
0.25
1
1,000,000
2040
P
DN & CN
0
0
1,000,000
permanent easement acquisition thru proposed
Home Depot site and adjacent to Salmonberrry
Atp's site.
2.22
Not Used
2.23
Bay Street Improvements
Harrison to Mile Hill Dr
Complete Street and utility improvements. Refer
intersection with Bay
0
10,000,000
0
10,000,000
2040
P
ALL
7,500,000
0
2,500,000
to Study.
Street.
2.24
Bay St. & Port Orchard Blvd Intersection
Bay Street at Port
6/13/2025 Page 5 of 7 U:\A1_Long Range Projects\2025\Comp Plan Docket\01 - Working Folder\2025-2044 TIP.6_10_2025.final
City of Port Orchard Transportation Improvement Program (TIP)
For 2031-2044 TIER 2 (Unconstrained)
Road Name
Total
Phase
Priority
Begin Termini
Project
Start
Funding
Federal
State Fund
Number
Project Title/Project Description
End Termini
Length
Total Est. Cost
2031-2035
2036-2044
Year
Status
Phase
Fund Code
Federal Funds
Code
State Funds
Local Funds
Single Lane Round About to address safety and
Orchard Boulevard
0
3,000,000
0
3,000,000
2040
P
ALL
2,400,000
0
600,000
capacity. Bay Street Pathway crossing. Assumed
creek is not impacted by project/ no major
mitigation.
2.25
Bay St. & Kitsap Street Intersection Improvement
Bay Street at Kitsap
Re -align Kitsap intersection to address safety and
Street
0
2,000,000
0
2,000,000
2040
P
ALL
0
0
2,000,000
capacity. Cline to end at Kitsap. Relocate flag
pole. Signalized Intersection?
2.26
Bay St. & Mitchell and Guy Wetzel
Bay Street at Mitchell
Reconfigure intersections to address safety and
Avenue and Guy Wetzel
0
2,500,000
0
2,500,000
2040
P
ALL
0
0
2,500,000
capacity.
St
2.27
Sidney Avenue Improvements
Prospect St. to the
Sidewalk and streetscape improvements.
Waterfront
0
1,500,000
0
1,500,000
2040
P
ALL
0
750,000
750,000
Developer Imrpovements?
2.28
Harrison Avenue Improvements
Bay Street to the
Sidewalk and streetscape improvements. Signal
Waterfront
0
1,000,000
0
1,000,000
2040
P
ALL
0
0
1,000,000
replacement? Developer Project?
2.29
New Waterfront Street
Frederick to Sidney
Sidewalk and streetscape improvements. "Shared
0
2,500,000
0
2,500,000
2040
P
ALL
0
0
2,500,000
Street" concept. Developer Improvement?
Port Orchard Blvd. to
2.30
Tremont St Widening - Port Orchard Blvd (Ph. 3)
Sidney Ave.
Center median, bike lane, sidewalk, and
0
5,000,000
0
5,000,000
2041
P
ALL
STP(U)
1,200,000
FIB, Ped Bik,
0
3,800,000
streetscape improvements on Tremont and
Sidney. Roundabout at the Tremont/ Sidney
intersection for non -motorized safety.
Accomodation for fire station. ROW needed on
north side of Tremont.
Glenwood at McC Wds
2.31
Glenwood at McCormick Woods Drive Interection
Dr.
Roundabout and approaches for future bike lanes
0
3,000,000
0
3,000,000
2041
P
ALL
STP(U)
0
FIB, Ped Biki
0
3,000,000
and sidewalks
2.32
Bay Street Pedestiran Pathway - West
Kitsap Transit to PO Blvd
Multi -use Pathway
0
1,000,000
0
1,000,000
2041
P
ALL
STP(U)
7,500,000
FIB, Ped Bik,
0
250,000
2.33
Port Orchard Blvd. Non -motorized
Bay Street to Tremont
6/13/2025 Page 6 of 7 U:\A1_Long Range Projects\2025\Comp Plan Docket\01 - Working Folder\2025-2044 TIP.6_10_2025.final
City of Port Orchard Transportation Improvement Program (TIP)
For 2031-2044 TIER 2 (Unconstrained)
Road Name
Priority Begin Termini
Number Project Title/Project Description End Termini
Separated mutli-use pathway using existing paved
surfaces, street lighting
Total Phase
Project Start Funding Federal State Fund
Length Total Est. Cost 2031-2035 2036-2044 Year Status Phase Fund Code Federal Funds Code State Funds Local Funds
0 1,500,000 0 1,500,000 2041 P ALL STP(U) 750,000 FIB, Ped Biki 0 750,000
PO Blvd. to Geiger St.
2.34 Bay Street Reconstruction Phase 2
Sidewalk improvments, power undergrounding,
0.2 mi 5,000,000 5,000,000 2034
3,750,000 1,250,000
street lighting, stormwater recontruction, water
and sewer utility (separate cost tracking).
Interection improvements at PO Blvd and Kitsap
2.35 Bay Street Reconstruction Phase 3
Frederick to Harrison
Marque removal, sidewalk improvements, power
0.15 mi 4,000,000 4,000,000 2044
3,000,000 1,000,000
undergrounding, street lighting, stormwater
recontruction, water and sewer utility may be
added at additional cost
S. Kitsap & Lippert
2.36 Pottery Intersections
RAB improvemetns to maintain LOS.
4,000,000 6,000,000 2044
4,000,000 2,000,000
Intersection
2.37 Old Clifton/ Lloyd Intersection
RAB improvement to maintain LOS
4,000,000 4,000,000 2040
1,500,000 2,500,000
Total Tier 2 Capital Projects
81,827,193 39,593,278 42,233,915
40,949,112 4,400,000 35,778,181
Maintenance Project
2.51 Cline Avenue Repairs
Replace sidewalk and parking strip. Cline Avenue: 0.13 200,000 0 0 P ALL 200,000
Kitsap Street to
Dwight Street
Total Tier 2 Maintenance Projects
200,000
0
0
0
0 200,000
6/13/2025 Page 7 of 7 U:\A1_Long Range Projects\2025\Comp Plan Docket\01 - Working Folder\2025-2044 TIP.6_10_2025.final