HomeMy WebLinkAbout2025-0710 Port Orchard Sidney Road_Proposal Schedule A_Addendum 1Addendum 1
Bid Proposal Form
SIDNEY ROAD NON -MOTORIZED IMPROVEMENTS
SCHEDULE A
SAFE ROUTES TO SCHOOL IMPROVEMENTS
Bid Item
No.
WSDOT
SPEC
Description
UNIT
QTY.
Unit Price
TOTAL
Al
1-09
MOBILIZATION
L.S.
1
LUMP SUM
A2
1-04
MINOR CHANGE
CALC
1
$ 27,500.00
$ 27,500.00
A3
1-05
RECORD DRAWINGS (MIN BID $2,000)
L.S.
1
LUMP SUM
A4
1-05
ROADWAY SURVEYING
L.S.
1
LUMPSUM
A5
1-05
ADA FEATURES SURVEYING
L.S.
1
LUMP SUM
A6
1-07
APPRENTICESHIP INCENTIVE
CALC
1
$ 2,000.00
A7
1-07
APPRENTICESHIP PENALTY
CALC
1
$ (2,000.00)
A8
1-07
SPCC PLAN
L.S.
I
LUMP SUM
A9
1-10
PROJECT TEMPORARY TRAFFIC CONTROL
L.S.
1
LUMP SUM
A10
2-01
CLEARING AND GRUBBING
L.S.
1
LUMPSUM
All
2-02
REMOVAL OF STRUCTURES AND OBSTRUCTIONS
L.S.
1
LUMP SUM
Al2
2-03
ROADWAY EXCAVATION INCL. HAUL
C.Y.
1910
A13
2-03
GRAVEL BORROW INCL. HAUL
TON
1547
A14
2-09
STRUCTURE EXCAVATION CLASS B INCL. HAUL
C.Y.
890
A15
2-09
SHORING OR EXTRA EXCAVATION CLASS B
S.F.
6300
A16
4-04
CRUSHED SURFACING BASE COURSE
TON
1250
A17
4-04
CRUSHED SURFACING TOP COURSE
TON
1120
A18
5-04
HMA CL. 1/2 IN. PG 58H-22
TON
560
A19
5-04
COMMERCIAL HMA
TON
60
A20
7-02
FLARED END SECTION 12 IN. DIAM
EACH
1
A21
7-02
FLARED END SECTION 12 IN. DIAM WITH TRASH GUARD
EACH
1
A22
7-04
SOLID WALL PVC STORM SEWER PIPE 12 IN. DIAM.
L.F.
1010
A23
7-04
SOLID WALL PVC STORM SEWER PIPE 4 IN. DIAM.
L.F.
40
A24
7-04
POLYPROPYLENE STORM SEWER PIPE 12 IN. DIAM.
L.F.
240
City of Port Orchard
Sidney Road Non -Motorized Improvements
Project Manual
Page / 14
Addendum 1
Bid Proposal Form
SIDNEY ROAD NON -MOTORIZED IMPROVEMENTS
SCHEDULE A
SAFE ROUTES TO SCHOOL IMPROVEMENTS
Bid Item
No.
WSDOT
SPEC
Description
UNIT
QTY.
Unit Price
TOTAL
A25
7-04
SOLID WALL PVC PRESSURE RATED STORM SEWER PIPE 12 IN. DIAM.
L.F.
250
A26
7-05
CATCH BASIN TYPE 1
EACH
6
A27
7-05
CONCRETE INLET
EACH
2
A28
7-05
CATCH BASIN TYPE 2 48 IN. DIAM.
EACH
6
A29
7-05
CATCH BASIN TYPE 2 72 IN. DIAM.
EACH
1
A30
7-05
LOCKING SOLID METAL COVER AND FRAME FOR CATCH BASIN
EACH
2
A31
7-05
ADJUST CATCH BASIN
EACH
6
A32
7-05
CONNECTION TO DRAINAGE STRUCTURE
EACH
5
A33
7-08
TRENCH VAPOR BARRIER
S.Y.
360
A34
7-12
REPLACE VALVE BOX
EACH
5
A35
7-14
RESETTING EXISTING HYDRANT
EACH
1
A36
8-01
EROSION CONTROL AND WATER POLLUTION PREVENTION
L.S.
1
LUMP SUM
A37
8-02
TOPSOIL TYPE A
S.Y.
40
A38
8-02
BARK OR WOOD CHIP MULCH
S.Y.
40
A39
8-02
PSIPE PRUNUS LAUROCERASUS
EACH
120
A40
8-02
SEEDING AND FERTILIZING
S.Y.
70
A41
8-04
CEMENT CONC. TRAFFIC CURB
L.F.
160
A42
8-04
CEMENT CONC. TRAFFIC CURB AND GUTTER
L.F.
2620
A43
8-05
POTHOLE EXISTING UTILITY
EACH
5
A44
8-05
ADJUST CABLE VAULT
EACH
1
A45
8-09
RAISED PAVEMENT MARKER TYPE 2
HUND
0.89
A46
8-14
CEMENT CONC. SIDEWALK
S.Y.
1620
A47
8-14
CEMENT CONC. CURB RAMP TYPE PARALLEL A
EACH
1
A48
8-14
CEMENT CONC. CURB RAMP TYPE PARALLEL B
EACH
2
A49
8-14
CEMENT CONC. CURB RAMP TYPE COMBINATION
EACH
2
City of Port Orchard
Sidney Road Non -Motorized Improvements
Project Manual
Page / 15
Addendum 1
Bid Proposal Form
SIDNEY ROAD NON -MOTORIZED IMPROVEMENTS
SCHEDULE A
SAFE ROUTES TO SCHOOL IMPROVEMENTS
Bid Item
No.
WSDOT
SPEC
Description
UNIT
QTY.
Unit Price
TOTAL
A50
8-14
CEMENT CONC. CURB RAMP TYPE PERPENDICULAR A
EACH
4
A51
8-14
CEMENT CONC. CURB RAMP TYPE SINGLE DIRECTION A
EACH
2
A52
8-15
QUARRY SPALLS
C.Y.
10
A53
8-20
RRFB SYSTEM AT SW BIRCH RD, COMPLETE
L.S.
1
LUMP SUM
A54
8-20
RRFB SYSTEM AT GLENWOOD RD SW, COMPLETE
L.S.
1
LUMP SUM
A55
8-21
PERMANENT SIGNING
L.S.
I
LUMP SUM
A56
8-22
PLASTIC CROSSWALK LINE
S.F.
770
A57
8-22
PLASTIC STOP LINE
L.F.
100
A58
8-22
PAINTED WIDE LINE
L.F.
3080
A59
8-22
PLASTIC BICYCLE LANE SYMBOL
EACH
9
TOTAL SCHEDULE A
City of Port Orchard
Sidney Road Non -Motorized Improvements
Project Manual
Page / 16