HomeMy WebLinkAbout2025-0710 Port Orchard Sidney Road_Proposal Schedule A_Addendum 1Addendum 1 Bid Proposal Form SIDNEY ROAD NON -MOTORIZED IMPROVEMENTS SCHEDULE A SAFE ROUTES TO SCHOOL IMPROVEMENTS Bid Item No. WSDOT SPEC Description UNIT QTY. Unit Price TOTAL Al 1-09 MOBILIZATION L.S. 1 LUMP SUM A2 1-04 MINOR CHANGE CALC 1 $ 27,500.00 $ 27,500.00 A3 1-05 RECORD DRAWINGS (MIN BID $2,000) L.S. 1 LUMP SUM A4 1-05 ROADWAY SURVEYING L.S. 1 LUMPSUM A5 1-05 ADA FEATURES SURVEYING L.S. 1 LUMP SUM A6 1-07 APPRENTICESHIP INCENTIVE CALC 1 $ 2,000.00 A7 1-07 APPRENTICESHIP PENALTY CALC 1 $ (2,000.00) A8 1-07 SPCC PLAN L.S. I LUMP SUM A9 1-10 PROJECT TEMPORARY TRAFFIC CONTROL L.S. 1 LUMP SUM A10 2-01 CLEARING AND GRUBBING L.S. 1 LUMPSUM All 2-02 REMOVAL OF STRUCTURES AND OBSTRUCTIONS L.S. 1 LUMP SUM Al2 2-03 ROADWAY EXCAVATION INCL. HAUL C.Y. 1910 A13 2-03 GRAVEL BORROW INCL. HAUL TON 1547 A14 2-09 STRUCTURE EXCAVATION CLASS B INCL. HAUL C.Y. 890 A15 2-09 SHORING OR EXTRA EXCAVATION CLASS B S.F. 6300 A16 4-04 CRUSHED SURFACING BASE COURSE TON 1250 A17 4-04 CRUSHED SURFACING TOP COURSE TON 1120 A18 5-04 HMA CL. 1/2 IN. PG 58H-22 TON 560 A19 5-04 COMMERCIAL HMA TON 60 A20 7-02 FLARED END SECTION 12 IN. DIAM EACH 1 A21 7-02 FLARED END SECTION 12 IN. DIAM WITH TRASH GUARD EACH 1 A22 7-04 SOLID WALL PVC STORM SEWER PIPE 12 IN. DIAM. L.F. 1010 A23 7-04 SOLID WALL PVC STORM SEWER PIPE 4 IN. DIAM. L.F. 40 A24 7-04 POLYPROPYLENE STORM SEWER PIPE 12 IN. DIAM. L.F. 240 City of Port Orchard Sidney Road Non -Motorized Improvements Project Manual Page / 14 Addendum 1 Bid Proposal Form SIDNEY ROAD NON -MOTORIZED IMPROVEMENTS SCHEDULE A SAFE ROUTES TO SCHOOL IMPROVEMENTS Bid Item No. WSDOT SPEC Description UNIT QTY. Unit Price TOTAL A25 7-04 SOLID WALL PVC PRESSURE RATED STORM SEWER PIPE 12 IN. DIAM. L.F. 250 A26 7-05 CATCH BASIN TYPE 1 EACH 6 A27 7-05 CONCRETE INLET EACH 2 A28 7-05 CATCH BASIN TYPE 2 48 IN. DIAM. EACH 6 A29 7-05 CATCH BASIN TYPE 2 72 IN. DIAM. EACH 1 A30 7-05 LOCKING SOLID METAL COVER AND FRAME FOR CATCH BASIN EACH 2 A31 7-05 ADJUST CATCH BASIN EACH 6 A32 7-05 CONNECTION TO DRAINAGE STRUCTURE EACH 5 A33 7-08 TRENCH VAPOR BARRIER S.Y. 360 A34 7-12 REPLACE VALVE BOX EACH 5 A35 7-14 RESETTING EXISTING HYDRANT EACH 1 A36 8-01 EROSION CONTROL AND WATER POLLUTION PREVENTION L.S. 1 LUMP SUM A37 8-02 TOPSOIL TYPE A S.Y. 40 A38 8-02 BARK OR WOOD CHIP MULCH S.Y. 40 A39 8-02 PSIPE PRUNUS LAUROCERASUS EACH 120 A40 8-02 SEEDING AND FERTILIZING S.Y. 70 A41 8-04 CEMENT CONC. TRAFFIC CURB L.F. 160 A42 8-04 CEMENT CONC. TRAFFIC CURB AND GUTTER L.F. 2620 A43 8-05 POTHOLE EXISTING UTILITY EACH 5 A44 8-05 ADJUST CABLE VAULT EACH 1 A45 8-09 RAISED PAVEMENT MARKER TYPE 2 HUND 0.89 A46 8-14 CEMENT CONC. SIDEWALK S.Y. 1620 A47 8-14 CEMENT CONC. CURB RAMP TYPE PARALLEL A EACH 1 A48 8-14 CEMENT CONC. CURB RAMP TYPE PARALLEL B EACH 2 A49 8-14 CEMENT CONC. CURB RAMP TYPE COMBINATION EACH 2 City of Port Orchard Sidney Road Non -Motorized Improvements Project Manual Page / 15 Addendum 1 Bid Proposal Form SIDNEY ROAD NON -MOTORIZED IMPROVEMENTS SCHEDULE A SAFE ROUTES TO SCHOOL IMPROVEMENTS Bid Item No. WSDOT SPEC Description UNIT QTY. Unit Price TOTAL A50 8-14 CEMENT CONC. CURB RAMP TYPE PERPENDICULAR A EACH 4 A51 8-14 CEMENT CONC. CURB RAMP TYPE SINGLE DIRECTION A EACH 2 A52 8-15 QUARRY SPALLS C.Y. 10 A53 8-20 RRFB SYSTEM AT SW BIRCH RD, COMPLETE L.S. 1 LUMP SUM A54 8-20 RRFB SYSTEM AT GLENWOOD RD SW, COMPLETE L.S. 1 LUMP SUM A55 8-21 PERMANENT SIGNING L.S. I LUMP SUM A56 8-22 PLASTIC CROSSWALK LINE S.F. 770 A57 8-22 PLASTIC STOP LINE L.F. 100 A58 8-22 PAINTED WIDE LINE L.F. 3080 A59 8-22 PLASTIC BICYCLE LANE SYMBOL EACH 9 TOTAL SCHEDULE A City of Port Orchard Sidney Road Non -Motorized Improvements Project Manual Page / 16