Loading...
HomeMy WebLinkAboutBay Street Demo - PlansBAY STREET OVERWATER STRUCTURE DEMOLITION CITY OF PORT ORCHARD, WASHINGTON SEC. 25, T. 24, R. 01E, W.M. July 2025 PUBLIC WORKS PROJECT NO. PW2025-019 BID DOCUMENT PROJECT P ET SITE SILVE ALE OUND s BAINBR E F'Fiy ISLAND O s FI'; ON SE, of Np � SEGMENT �� n BEA RFNCFST PORT OR ARID BAY ST y���� GORST m 11 Q CO) P 16 O° A v QQ� m hFsrFR s 2 A, �Ja co sr Q- 0 SpOc SST @,9yST J J? w Px FIU ' o�V �¢ VICINITY MAP NOT TO SCALE RECOMMENDED BY: K. CHRIS HAMMER, PE, PMP CITY ENGINEER WASHINGTON P.E. # 33744 INDEX TO DRAWINGS SHT. NO. DWG. NO. SHEET TITLE 01 02 - 03 COVER SHEET HORIZONTAL CONTROL PLAN 04 - 06 07 - 10 DEMOLITION & TEMPORARY EROSION CONTROL PLANS DEMOLITION & TEMPORARY EROSION CONTROL DETAILS SKILLINGS, INC. 5016 LACEY BLVD. SE LACEY, WA 98503 (360)491-3399 IAN LEE, P.E. PROJECT MANAGER PATRICK SKILLINGS, PMP CITY OF PORT ORCHARD MAYOR ROB PUTAANSUU CITY OF PORT ORCHARD COUNCIL MEMBERS MARK TRENARY JAY ROSAPEPE SCOTT DIENER ERIC WORDEN HEIDI FENTON FRED CHANG, MAYOR PRO-TEM JOHN MORRISSEY PUBLIC WORKS DIRECTOR DENIS RYAN CITY ENGINEER K. CHRIS HAMMER, PE, PMP DATE REVISIONS JOB NUMBER DESIGNED BY:K. LANE 7/10/25 NO. DATE DESCRIPTION N a 22001 Uc BAY STREET OVERWATER ENTERED BY: I. LEE, P.E. 7/10/25 wa Tr, SKI � BID SET CHECKED R.:I. LEE, P.E. 7 10 25 ORCHARD STRUCTURE DEMOLITION PROJ. ENGR.:I. LEE, P.E. 7/10/25 � SHEET Plotted By. Kazuma Lane on 7/10/25 12:31 PM R orr ERti9/�� - —� ,�'— 01 Saved By Klone on 7/1o/zs 11as AM �SSzoxnLEN��� 5016 Lacey Boulevard SE, Lacey, Washington 98503 COVER SHEET OF (360) 491-3399 Fax (360) 491-3857 PORT ORCHARD 1A/q 10 G Project 2022 22001 Port Orchard BaySi CAD SHEETS WATERFRONT—MITCHELL POINT 22001_PL_DM_EXH_CV.dw 07,111/2025 SHEETS zx" , I I 'I I' I /-/ -;z / /\ I. ! / % rqX- I I, , 313+00 I rll� 315+pp _ L2~- BAY STREET / Q20341418.92162.36 318+00 319+00 320+00 371 316+OC23- E:558392.0002 317+00 L26 \ - - - - - _ I\ PT. 314+81.75 - � N:204607.7383 E: 558503.3186 PT: 316+65.66 BAY TREET N:204755.0631 :2PC: 3172.4131 E:558613.2486 N: 204672.4138 w o E:558554.3090 PC: 320+43.14 ui W 'CON PT. 322+00.59 N: 205083.2344 E:558799.7804-N: 205120.5718 v o -I--L- IZ�o -- M IE:558936.4574 L - _ _ __ ------ - ---- ----- - - PERRY AVENUE - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - I PERRY AVENUE 323+0b I X I / / I / / I PLAN VIEW - BAY STREET Y STA: 312+15 - STA 323+80 LINE TABLE: ALIGNMENTS LINE # LENGTH DIRECTION START POINT END POINT ALIGNMENT BEGIN STATION END STATION L25 82.36 N38' 15' 09"E N:204607.74,E:558503.32 N:204672.4138, E:558554.3090 Y 314+81.75 315+64.11 L26 377.48 1 N29' 36' 50"E IN: 204755.O6,E:558613.25 N:205083.2344, E:558799.7804 Y 316+65.66 320+43.14 HORIZONTAL CONTROL LEGEND: CONSTRUCTION CENTERLINE ---------- RIGHT OF WAY LINE e9 SURVEY CONTROL POINT 40 20 0 40 80 SCALE IN FEET SURVEY CONTROL POINTS: BENCH MARK MAG NAIL SET IN PAVEMENT ELEVATION = 10.17 N: 204695.40 E: 558554.36 BENCH MARK CONCRETE MONUMENT Q"NOS MITCHELL 5 RM 2" EL = 12.08 N: 205120.57 E: 558936.45 CURVE TABLE: ALIGNMENTS CURVE # RADIUS LENGTH DELTA START POINT END POINT ALIGNMENT BEGIN STATION END STATION C22 1438.26 219.39 8.74 N:204418.94, E:558392.00 N:204607.74, E:558503.32 Y 312+62.36 314+81.75 C23 1100.22 101.55 5.29 N:204672.41, E:558554.31 N:204755.06, E:558613.25 Y 315+64.11 316+65.66 C26 100.00 157.45 90.21 N:205083.23, E:558799.78 N:205120.57, E:558936.46 Y 320+43.14 322+00.59 DATE I REVISIONS JOB NUMBER DESIGNED BY: K. LANE 7/10/25 NO. DATE DESCRIPTION WA NG PORT ORCHARD -BAY STREET 22001 ENTERED BY: LANE 7/10/25 off, � � � Q j BID SET CHECKED : 1. I. LEE, P.E. 7/10/25 ORCHARD OVERWATER STRUCTURE DEMOLITION PROJ. ENGR.R.: I. LEE, P.E. 7/10/25 � SHEET Plotted By Kazuma Lane on 7/10/25 12:32 PM e cry eRti°� 02 Saved By Hare on 7/1o/z5 n:n7 AM �sS,oxnLEN 5016 Lacey Boulevard SE, Lacey, Washington 98503 OF (360) 491-3399 Fax (360) 491-3857 PORT ORCHARD WA HORIZONTAL CONTROL PLAN 10 G: Project 2022 22001 Port Orchard BaySt CAD SHEETS WATERFRONT-MITCHELL POINT 22001-PL_DM_EXH-HZ.dw 07/11/2025 SHEETS i1 i 1 I 1 1 i 1 1 / 1 / 7 7 i x i �- -PT: 322+00.59---- N:205120.5718 _ _ _ PT: 330+13.84 E:558936.4574 - - - - - - - - - - - - 1.�2 - - N:55 663. 896 910 E:559663.6910 324+00 C27 C28 328+00 322+00 323+00 L29 325 0FN2 L30 3 6+p L31 32 00 C29 L32 C301- �y' " PC: 325+12.02 25+93.96 - - - PT: 327+68.81 _ - N:204965.6684 926.0913 PC: 327+00.46 - PC: 329+57.36 o E:559206.6309 278.3815 N:204872.1094N:204839.3981 N:204790.0946 E: 559370.1803 E: 559430.1085E: 559607.7954 5+20.75 PT: 326+09.29 PC: 328+54.20:961.3915 N: 204918.4964 N: 204801.0386 E: 559214.2438 E: 559291.6937 E: 559506.4731 PT: .97 I N: 204789.3789.3749 E: 5595 i 9.4035 PLAN VIEW - BAY STREET Y STA: 321+00 - 331+50 LINE TABLE: ALIGNMENTS LINE # LENGTH DIRECTION START POINT END POINT ALIGNMENT BEGIN STATION END STATION L29 311.43 S60' 10' 20"E N:205120.57,E:558936.46 N:204965.6684, E:559206.6309 Y 322+00.59 325+12.02 L30 73.21 S61' 10' 21"E N:204961.39,E:559214.24 N:204926.0913, E:559278.3815 Y 325+20.75 325+93.96 L31 91.17 S59' 24' 58"E N:204918.50,E:559291.69 N:204872.1094, E:559370.1803 Y 326+09.29 327+00.46 L32 85.46 S63' 19' 43"E N:204839.40,E:559430.11 N:204801.0386, E:559506.4731 Y 327+68.75 328+54.20 HORIZONTAL CONTROL LEGEND: CONSTRUCTION CENTERLINE RIGHT-OF-WAY LINE SURVEY CONTROL POINT 40 20 0 40 80 SCALE IN FEET Ya:�•� a-�K•� � n:z•� � 1•m � r,� BENCH MARK CONCRETE MONUMENT �2 "NOS MITCHELL 5 RM 2" EL = 12.08 N: 205120.57 E: 558936.45 CURVE TABLE: ALIGNMENTS CURVE # RADIUS LENGTH DELTA START POINT END POINT ALIGNMENT BEGIN STATION END STATION C27 500.00 8.73 1.00 N:204965.67, E:559206.63 N:204961.39, E:559214.24 Y 325+12.02 325+20.75 C28 500.00 15.33 1.76 N:204926.09, E:559278.38 N:204918.50, E:559291.69 Y 325+93.96 326+09.29 C29 1000.00 68.29 3.91 N:204872.11, E:559370.18 N:204839.40, E:559430.11 Y 327+00.46 327+68.75 C30 110.26 54.76 28.46 N:204801.04, E:559506.47 N:204789.37, E:559559.40 Y 328+54.20 329+08.97 DATE I REVISIONS JOB NUMBER DESIGNED BY: K. LANE 7/10/25 NO. DATE DESCRIPTION WA NG PORT ORCHARD - BAY STREET 22001 ENTERED BY: LANE 7/10/25 off, � � � Q j BID SET CHECKED R.K. 1. I. LEE, P.E. 7/10/25 mumORCHARD OVERWATER STRUCTURE DEMOLITION PROJ. ENGR.: I. LEE, P.E. 7/10/25 SHEET Plotted By Kazuma Lane on 7/10/25 12:32 PM e cry eRti°� 03 Sul By Klane on 7/1o/z5 n:n7 AM �sS,oxnLENC' 5016 Lacey Boulevard SE, Lacey, Washington 98503 OF (360) 491-3399 Fax (360) 491-3857 PORT ORCHARD WA HORIZONTAL CONTROL PLAN 10 G: Project 2022 22001 Port Orchard BaySt CAD SHEETS WATERFRONT-MITCHELL POINT 22001-PL-DM-EXH-HZ.dw 07/11/2025 SHEETS DEMOLITION KEYNOTES: 0 EXISTING HMA SURFACE. O2 EXISTING SUBGRADE. O EXISTING OVER -WATER STRUCTURE. 0 EXISTING UNSUITABLE SOIL. EXISTING BROKEN UP CONCRETE MAY BE USED AS SUBGRADE NEAR SHORELINE. O5 CONCRETE BARRIER TYPE 2 (PRECAST). O6 EXISTING GRAVEL SHOULDER. O7 EXISTING PILES. DATE Plotted By Kazuma Lane on 7/10/25 12:32 PM Saved By Klan, on 7/10/25 11:51 AM 0: Project 2022 22001 Port Orchard Ba St CA r%l A k1 \/IC\AI 1693 BAY STREET & 1699 BAY STREET APPROX. 40' f9 1 f3 1 2 1 2 1 APPROX. 11' APPROX. 11' 1 --------------------------------------- T---------------------------------------------------------- ----------------------- IIIIIl TYPICAL ROADWAY SECTION 1693 BAY STREET & 1699 BAY STREET REVISIONS ATE DESCRIPTION a N� SKI L L I mas 1 93 �Sroxn ENC� 5016 3L_DM_EXH_01.dw 07/11/2025 Lacey Boulevard SE, Lacey, Washington 98503 (360) 491-3399 Fax (360) 491-3857 0.75' 10 5 0 10 20 SCALE IN FEET DEMOLITION KEYNOTES: DEMOLITION LEGEND: -SAW- SAWCUT LINE — x — HIGH VISIBILITY FENCE EX. BEACH ARMORING LIMITS CONSTRUCTION CENTERLINE ROW LINE —OHW ORDINARY HIGH WATERMARK (OHW) I \ \ \ \ \ EX. BUILDING LIMITS TURBIDITY / DEBRIS CURTAIN ® CONCRETE BARRIER TYPE 2 0 CONCRETE BARRIER TYPE 2 TERMINAL OTURBIDITY / DEBRIS CURTAIN LIMITS. CURTAIN MUST BE INSTALLED A MINIMUM OF 10' BEYOND EXISTING BUILDING LIMITS. DEMOLISH EXISTING OVERWATER STRUCTURE 1693 BAY STREET (APPROX. 1,400 OS.F.). REMOVE ALL EXISTING STRUCTURES AND DECKING. WORK AREA INCLUDES ASPHALT DRIVEWAY TO EDGE OF SAWCUT LINE, WORK AREA DOES NOT INCLUDE PILE REMOVAL. DEMOLISH EXISTING OVERWATER STRUCTURE 1699 BAY STREET (APPROX. 1,930 s0 S.F.). REMOVE ALL EXISTING STRUCTURES AND DECKING/PATIO AREA, WORK AREA DOES NOT INCLUDE PILE REMOVAL. OIF EX. UTILITY SERVICES LINES (SANITARY & WATER) ARE NOT CAPPED & ABANDONED. CONTACT CITY OF PORT ORCHARD PUBLIC WORKS. 5O REMOVE EXISTING MAILBOX AND POST. sO BEGIN / END REMOVING BITUMINOUS PAVEMENT. TEMPORARY EROSION CONTROL KEYNOTES: O HIGH VISIBILITY FENCE. SEE DETAIL ON SHEET 07. ROADWAY KEYNOTES: CONCRETE BARRIER TYPE 2 (PRECAST) SEE DETAIL ON SHEET 08 & 09. 0 USE TWO ANCHORING PINS PER BARRIER. PIN MUST BE 1" DIAM. BY 30" LENGTH. O2 CONCRETE BARRIER TYPE 2 (PRECAST) TERMINAL. SEE DETAIL ON SHEET 08. GENERAL NOTES: 1. THE CONTRACTOR SHALL NOTIFY ADJACENT PROPERTY OWNERS 3 DAYS PRIOR TO THE START OF CONSTRUCTION, AND AGAIN AT THE START OF CONSTRUCTION. NAMES AND ADDRESSES WILL BE FURNISHED BY THE OWNER. 2. CONTRACTOR SHALL PROTECT ALL SURVEY MONUMENTS AND SHALL COMPLY WITH RCW 58.09.130 AND WAC 332-120-040 IF ANY MONUMENT IS TO BE DISTURBED. 3. PROTECT ALL EXISTING BEACH ARMORING. 4. ALL ITEMS TO BE PRESERVED AND PROTECTED UNLESS OTHERWISE NOTED ON PLANS. 5. OVERWATER STRUCTURES TO BE REMOVED, BUT PILES MUST BE PROTECTED. 6. TYPE 2 D.O.T. TURBIDITY CURTAIN TO BE CONSTRUCTED UNDERNEATH BUILDINGS DURING DEMOLITION. THE TURBIDITY CURTAIN FUNCTIONS DURING LOW AND HIGH TIDES. 7. FLOATING DEBRIS GENERATED FROM DEMOLITION INSIDE THE TURBIDITY / DEBRIS CURTAIN PERIMETER SHALL BE REMOVED AT THE END OF EACH WORKING DAY. FLOATING DEBRIS GENERATED FROM DEMOLITION OUTSIDE THE TURBIDITY / DEBRIS CURTAIN PERIMETER SHALL BE REMOVED AND SECURED IMMEDIATELY. JOB NUMBER PORT ORCHARD - BAY STREET 22001 BID SET ORCHARD OVERWATER STRUCTURE DEMOLITION SHEET DEMOLITION & TEMPORARY EROSION of PORT ORCHARD WA CONTROL PLAN SHEETS E 319+00 / 319+5Ow4 SS ss - ss - — sS ss���_ - DEMOLITION KEYNOTES: O EXISTING HMA SURFACE. O2 EXISTING SUBGRADE. O EXISTING OVER -WATER STRUCTURE. O4 EXISTING UNSUITABLE SOIL. EXISTING BROKEN UP CONCRETE MAY BE USED AS SUBGRADE NEAR SHORELINE. O5 CONCRETE BARRIER TYPE 2 (PRECAST). O6 EXISTING GRAVEL SHOULDER. O7 EXISTING PILES. OS EXISTING CONCRETE SEAWALL SINCLAIR INLET _ 320+00 Y LINE PLAN VIEW RAY STREET 1763 BAY STREET & 1777 BAY STREET Y LINE STA: 318�+85 ti 319+85 I 7 2'12'1 11 VARIES 4'-7' 1 2' 1 2' __T ----------------------- 1777 BAY STREET' �J N STA: 319+85E 320+72 / �rIT111111 '1111,1I TYPICAL ROADWAY SECTION 1763 BAY STREET & 1777 BAY STREET ---------- 10' am 2 1 l� 3.65' 10 5 0 10 20 SCALE IN FEET DEMOLITION KEYNOTES: LEGEND: snw SAWCUT LINE — x — HIGH VISIBILITY FENCE - - - - - - - EX. BEACH ARMORING LIMITS CONSTRUCTION CENTERLINE ROW LINE —OHW — ORDINARY HIGH WATERMARK (OHW) EX. BUILDING LIMITS ----------- TURBIDITY / DEBRIS CURTAIN ® CONCRETE BARRIER TYPE 2 CONCRETE BARRIER TYPE 2 TERMINAL OTURBIDITY / DEBRIS CURTAIN LIMITS. CURTAIN MUST BE INSTALLED A MINIMUM OF 1 10' BEYOND EXISTING BUILDING LIMITS. DEMOLISH EXISTING OVERWATER STRUCTURE 1693 BAY STREET (APPROX. 1,400 OS.F.). REMOVE ALL EXISTING STRUCTURES AND DECKING. WORK AREA INCLUDES ASPHALT DRIVEWAY TO EDGE OF SAWCUT LINE, WORK AREA DOES NOT INCLUDE PILE REMOVAL. DEMOLISH EXISTING OVERWATER STRUCTURE 1699 BAY STREET (APPROX. 1,930 O S.F.). REMOVE ALL EXISTING STRUCTURES AND DECKING/PATIO AREA, WORK AREA DOES NOT INCLUDE PILE REMOVAL. OIF EX. UTILITY SERVICES LINES (SANITARY & WATER) ARE NOT CAPPED & ABANDONED. CONTACT CITY OF PORT ORCHARD PUBLIC WORKS. O REMOVE EXISTING MAILBOX AND POST. O BEGIN / END REMOVING BITUMINOUS PAVEMENT. TEMPORARY EROSION CONTROL KEYNOTES: Oi HIGH VISIBILITY FENCE. SEE DETAIL ON SHEET 07. ROADWAY KEYNOTES: CONCRETE BARRIER TYPE 2 (PRECAST). SEE DETAIL ON SHEET 08 & 09. O USE TWO ANCHORING PINS PER BARRIER. PIN MUST BE 1" DIAM. BY 30" LENGTH. O2 CONCRETE BARRIER TYPE 2 (PRECAST) TERMINAL. SEE DETAIL ON SHEET 08. GENERAL NOTES: 1. THE CONTRACTOR SHALL NOTIFY ADJACENT PROPERTY OWNERS 3 DAYS PRIOR TO THE START OF CONSTRUCTION, AND AGAIN AT THE START OF CONSTRUCTION. NAMES AND ADDRESSES WILL BE FURNISHED BY THE OWNER. 2. CONTRACTOR SHALL PROTECT ALL SURVEY MONUMENTS AND SHALL COMPLY WITH RCW 58.09.130 AND WAC 332-120-040 IF ANY MONUMENT IS TO BE DISTURBED. 3. PROTECT ALL EXISTING BEACH ARMORING. 4. ALL ITEMS TO BE PRESERVED AND PROTECTED UNLESS OTHERWISE NOTED ON PLANS. 5. OVERWATER STRUCTURES TO BE REMOVED, BUT PILES MUST BE PROTECTED. 6. TYPE 2 D.O.T. TURBIDITY CURTAIN TO BE CONSTRUCTED UNDERNEATH BUILDINGS DURING DEMOLITION. THE TURBIDITY CURTAIN FUNCTIONS DURING LOW AND HIGH TIDES. 7. FLOATING DEBRIS GENERATED FROM DEMOLITION INSIDE THE TURBIDITY / DEBRIS CURTAIN PERIMETER SHALL BE REMOVED AND SECRUED AT END OF EACH WORKING DAY. FLOATING DEBRIS FROM DEMOLITION OUTSIDE THE TURBIDITY / DEBRIS CURTAIN PERIMETER SHALL BE REMOVED AND SECURED IMMEDIATELY. DATE REVISIONS JOB NUMBER DESIGNED BY: K. LANE 7/10/25 NO. DATE DESCRIPTION oN: a NG PORT ORCHARD -BAY STREET 22001 ENTERED BY: 1. LEE, P.E.T 7/10/25 � � Q j BID SET CHECKED R.: I. LEE, P.7/10/25 ORCHARD OVERWATER STRUCTURE DEMOLITION PROJ. ENGR.: I. LEE, P.E. 7 10 25 � SHEET Plotted By Kazuma Lane on 7/10/25 12:33 PM e cry eRti°� 05 Saved By Klane on 7/to/z5 na1 AM a �SS�oxnLEN5016 Lacey Boulevard SE, Lacey, Washington 98503 DEMOLITION & TEMPORARY EROSION OF (360) 491-3399 Fax (360) 491-3857 PORT ORCHARD WA CONTROL PLAN 1 G: Pro'ect 2022 22001 Port Orchard BaySt CAD SHEETS WATERFRONT—MITCHELL POINT 220013L_DM_EXH_02�LT_1.dw 07/11/2025 SHEETS OH — _SS_ SS FM _326+00 w LT I I I OH _ off — I— 10' EX. DECK T i I I I i I i i i 1 22.47' LT_ Y EI ° D ,CEMENT CONC. ° n D DECK D a pp5' D @• d 1. IV/ SS SS SS SS SSSS Ss Ss 10.45' EX. TRAVEL LANE FM I— FM FM FM FM FM 11 "TRAVEL LANE FM ems, i _,�326+50 1 W W W W W w— w— W— �� c TYPICAL SECTION KEYNOTES: c G c EX. ROW O1 EXISTING HMA SURFACE. O2 EXISTING CONCRETE SEAWALL. O PRESERVE & PROTECT EXISTING WOOD PILES. 0 PRESERVE & PROTECT EXISTING CONCRETE DECK AND WOOD STRUCTURE. OREMOVE ALL EXISTING WOOD STRUCTURES, CONCRETE DECK, AND BUILDING. Qs CONCRETE BARRIER TYPE 2 (PRECAST). —SS SS — FM TRAVEL —327+00 w W PLAN VIEW 1883 BAY STREET -A E-11.03'� FM FM N 3 — w G I ROADWAY TYPICAL SECTION 1883 BAY STREET 10' L' 90, 15.11' L OH o OH 0 0 FM FM FM tI F Y LINE FM 32Fs+oo 327+50 _ +— BAY STREET I - 0 0 EX. ROW 0.5' 10 5 0 10 20 SCALE IN FEET DEMOLITION KEYNOTES: SAW SAWCUT LINE EX. BEACH ARMORING LIMITS — CONSTRUCTION CENTERLINE — — — — ROW LINE OHW ORDINARY HIGH WATERMARK (OHW) \ \ EX. BUILDING LIMITS ----------- TURBIDITY / DEBRIS CURTAIN ^ GUARDRAIL ® CONCRETE BARRIER TYPE 2 CONCRETE BARRIER TYPE 2 TERMINAL OTURBIDITY / DEBRIS CURTAIN LIMITS. CURTAIN MUST BE INSTALLED A MINIMUM OF 1 10' BEYOND EXISTING BUILDING LIMITS. DEMOLISH EXISTING OVERWATER STRUCTURE 1693 BAY STREET (APPROX. 1,400 OS.F.). REMOVE ALL EXISTING STRUCTURES AND DECKING. WORK AREA INCLUDES ASPHALT DRIVEWAY TO EDGE OF SAWCUT LINE, WORK AREA DOES NOT INCLUDE PILE REMOVAL. DEMOLISH EXISTING OVERWATER STRUCTURE 1699 BAY STREET (APPROX. 1,930 30 S.F.). REMOVE ALL EXISTING STRUCTURES AND DECKING/PATIO AREA, WORK AREA DOES NOT INCLUDE PILE REMOVAL. OIF EX. UTILITY SERVICES LINES (SANITARY & WATER) ARE NOT CAPPED & ABANDONED. CONTACT CITY OF PORT ORCHARD PUBLIC WORKS. SO REMOVE EXISTING MAILBOX AND POST. OBEGIN / END REMOVING BITUMINOUS PAVEMENT. ROADWAY KEYNOTES: BEGIN / END CONCRETE BARRIER TYPE 2 (PRECAST). 0 USE WSDOT STD. DETAIL K-80.32-00. SEE DETAIL ON SHEET 08 & 09. DO NOT USE ANCHORING PINS. OEND OVER —WATER STRUCTURE DEMOLITION. PRESERVE & PROTECT EXISTING CONCRETE DECK AND FIRST TWO ROWS OF PILES. GENERAL NOTES: 1. THE CONTRACTOR SHALL NOTIFY ADJACENT PROPERTY OWNERS 3 DAYS PRIOR TO THE START OF CONSTRUCTION, AND AGAIN AT THE START OF CONSTRUCTION. NAMES AND ADDRESSES WILL BE FURNISHED BY THE OWNER. 2. CONTRACTOR SHALL PROTECT ALL SURVEY MONUMENTS AND SHALL COMPLY WITH RCW 58.09.130 AND WAC 332-120-040 IF ANY MONUMENT IS TO BE DISTURBED. 3. PROTECT ALL EXISTING BEACH ARMORING. 4. ALL ITEMS TO BE PRESERVED AND PROTECTED UNLESS OTHERWISE NOTED ON PLANS. 5. OVERWATER STRUCTURES TO BE REMOVED, BUT PILES MUST BE PROTECTED. 6. TYPE 2 D.O.T. TURBIDITY CURTAIN TO BE CONSTRUCTED UNDERNEATH BUILDINGS DURING DEMOLITION. THE TURBIDITY CURTAIN FUNCTIONS DURING LOW AND HIGH TIDES. 7. FLOATING DEBRIS GENERATED FROM DEMOLITION INSIDE THE TURBIDITY / DEBRIS CURTAIN PERIMETER SHALL BE REMOVED AND SECURED AT THE END OF EACH WORKING DAY. FLOATING DEBRIS GENERATED FROM DEMOLITION FROM OUTSIDE THE TURBIDITY / DEBRIS CURTAIN PERIMETER SHALL BE REMOVED AND SECURED IMMEDIATELY. DATE REVISIONS JOB NUMBER DESIGNED BY: K. LANE 7/10/25 NO. DATE DESCRIPTION oN: a NG PORT ORCHARD - BAY STREET 22001 ENTERED BY: 1. LEE, P.E.T 7/10/25 off, �KU L L I �� Q j BID SET CHECKED BY: I. LEE, P.7/10/25 ORCHARD OVERWATER STRUCTURE DEMOLITION PROJ. ENGR.: I. LEE, P.E. 7/10/25 SHEET Plotted By Kazuma Lane on 7/10/25 12: 33 PM a ' 93 9��� 06 a �S E� 5016 Lacey Boulevard SE, Lacey, Washington 98503 DEMOLITION & TEMPORARY EROSION OF Saved By Klane on 7/10/25 12:31 PM S'ox" EN (360) 491-3399 Fax (360) 491-3857 10 G: Pro'ect 2022 22001 Port Orchard Ba St CAD SHEETS WATERFRONT—MITCHELL POINT 22001_PL_DM_EXH_03.dw 07,111/2025 PORT ORCHARD WA CONTROL PLAN SHEETS to z w m w m m r m STAPLE TOP TIE SELF-LOCKING TIE - NYLON 6/6 (MIN. GRADE) 501E MIN. TENSILE STRENGTH, UV STABILIZED 2x2 WOOD POST FENCING FENCING MATERIAL MATERIAL I � a a HIGH DENSITY POLYETHYLENE OR POLYPROPYLENE MESH, AND SHALL BE UV RESISTANT, ORANGE COLOR 1'- 0" MIN. (DEEPER FOR UNSTABLE SOIL) 2' - 0" (DESIRABLE) TYPICAL SECTION STEEL T-BAR POST SELF-LOCKING TIE - NYLON 6/6 (MIN. GRADE), 50# MIN. TENSILE STRENGTH, UV STABILIZED ENVIRONMENTALLY SENSITIVE AREA BOUNDARY 2x2 WOOD OR STEEL T-BAR POST 6' - 0" MAX. { H rr rr rr,.7 rr rr rr � rr rr rr rr rr rr rr rr rr rr rr rr rr rr rr r-. rr rr rr rr rr r�l lfr rr rr rr � rr rr rr rr rr rr rr rr rr rr rr rr rr rr rr rlI rr rr rr rr rr r�l lrr rr rr t� tt� rr t� rr rr t� rr rr rr rr rr rr rr rr rr rr rr'� rr tt� rrrrrrrr�rrrr�rr�rrrr�rrrrrrrr���tttrrrrr.r�rr� ELEVATION FOR REFERENCE ONLY. SEE WSDOT STANDARD DETAILS NOTE 1. Post shall have sufficient strength and durability to support the fence through the life of the project. ELEVATION FENCE ON SLOPE STATE OF WASHINGTON REGISTERED REGISTERED ^� LANDSCAPE ARCHITECT v MARK W. MAURER CERTIFICATE NO. 000598 NOTE TNISPLAN IS IOTA LEGAL ENGINEERINGDOCU- AffNTBUTANEIECTROASCDUPLI MTiff ORIGINAL, SIGNED BY THE ENGINEER AND APPROVED FOR PUBLICATION, IS KEPT ON FBE AT ME WASHINGTON STATE DEPART NENTOFTRANSPORTATXW A COPYAOIYBE OBTAINED UPON REQUEST. HIGH VISIBILITY FENCE STANDARD PLAN 1-10.10-01 SHEET 1 OF 1 SHEET APPROVED FOR PUBLICATION Pasco Bakotich 111 08-11-09 STATE DESIGN ENGINEER DATE Washington State Department of Transportation DATE REVISIONS JOB NUMBER DESIGNED BY: K. LANE 7 10 25 NO. DATE DESCRIPTION N a 22001 PORT ORCHARD -BAY STREET ENTERED BY: W. PRUIETT 7/10/25 �. o ,, ��(�/ BID SET CHECKED BY: I. LEE, P.E. 7/10/25 �I N� ORCHARD OVERWATER STRUCTURE DEMOLITION PROJ. ENGR.: I. LEE, P.E. 7 10 25 SHEET Plotted By Kazuma Lane on 7/10/25 12:33 PM 07 5016 Lacey Boulevard SE, Lacey, Washington 98503 DEMOLITION & TEMPORARY EROSION OF Saved By. More on 7/10/25 12:31 PM S10 ALE (360) 491-3399 Fax (360) 491-3857 10 C:\Project\2022\22001 Port Orchard Bay St CAD SHEETS WATERFRONT-MITCHELL POINT 22001_PL_DM_EXH_03.dw 07,111/2025 1 PORT ORCHARD WA CONTROL DETAILS SHEETS DJ 0 0 J z LU LL r m a !r 0 3' - 8" (TYP.) WIRE ROPE LOOP (TYP.) 1Q # 5 0 # 5 WIRE ROPE LOOP LENGTH r -----------------------------------------------------------------------1 X 1..................................................................................®.......................................................................................... 0 N ....1................_..._.._..._..._..._...._._.._._...___..._....__._..............._._...._.._._...._-__-.._.._........._...._.._......_.._...._._._..._...._._...._..._.._......._._.._...._._........._.._..._..._..._......_ I ....}..............................................................................................................................1 \`--------------------------------- ,----------------------------------------- TOP VIEW A WIRE ROPE LOOP (TYP.) 0# 5 1 - I I iv 2" CLR. (V (TYP.) 'I '.r......................................................................................................... N ............................................................................. I J-------------------------------------------- 1 1/2" (TYP.) a� 19 - 0" OR 12'- 6" FIN 1 1/2" R. 7/8" R. - SEE NOTE 2 END VIEW 3/4" CHAMFER (TYP.) WIRE ROPE LOOP (TYP.) 1/2" CHAMFER (TYP.) � 10" R. N 1 2" CLR. (TYP.) to SIDE VIEW IY fV -----------------------�' N U I -------------------------------------------------------------------------------------------- I I I I ----"- -----"------------------11 1 j[ -----------------------------/ 2 ( #5 6„f ° BARRIER BARRIER f SECTION TERMINAL I 0#5 O3 #5 6" 6" 2 0" SECTION ( BARRIER BARRIER SECTION TERMINAL O#5 ®#5 (TYP) (TYP.) 1/8" DRAFT CL NOTES 1, Type 2 Barrier and Barrier Terminals are allowed in temporary installations only. Do not install new Type 2 Barrier and Barrier Terminals fabricated after December 31, 2019. This plan is provided as a means to verify that any Type 2 Barrier and Barrier Terminals fabricated prior to December 31, 2019 meet the plan requirements and cross -sectional dimensions as specified in Standard Specifications, Section 6-10.3(5). 2. Wire rope loops shall be 3' - 8" long, except for the top loop of the Barrier Terminal, which shall be 2' - 0" long. 3. Except for the locations of the wire rope loops, the dimensions shown in END VIEW are typical for both ends of a Barrier Section or opposing ends of Barrier Terminals. 4. Connecting and Drift Pin head designs vary among different manufacturers. Pin designs that are shaped differently than those shown in the detail are acceptable, if the bearing surface is within the minimum and maximum widths specified. 5. The vertical spacing of the Wire Rope Loops in a Barrier Terminal is determined by the end of the Barrier Segment to which it is being connected. See BARRIER CONNECTION DETAIL (Sheet 2). 114" DRAFT 1 1/2" _ 1 I I _ 6" 2" R. - BEVEL OR CONNECTING PIN 1 TYP. ROUND EDGES 3/4" MAX. (TYP.) PIN WIRE ROPE LOOP I 1 3/4" I.D. LOOP - 1 f t 1/8" FROM BARRIER —� L FACE OF CONCRETE PIN PARTIAL SECTION CB BARRIER SECTION BARRIER TERMINAL ISOMETRIC VIEWS J of WAsgr Aug 17, 2021 CONCRETE BARRIER TYPE 2 STANDARD PLAN K-80.32-00 SHEET 1 OF 2 SHEETS APPROVED FOR PUBLICATION Aug 17, 2021 STATE DESIGN ENGINEER TS Washington State Department of Transportation L FOR REFERENCE ONLY. SEE WSDOT STANDARD DETAILS DATE REVISIONS JOB NUMBER DESIGNED BY: K. LANE 7/10/25 N0. DATE DESCRIPTION OAN A 22001 aF� PORT ORCHARD - BAY STREET ENTERED BY: W. PRUIETT 7/10/25 Qj CHECKED BY: I. LEE, P.E. 7/10/25 \ !EiSKILLIN� ORCHARD OVERWATER STRUCTURE DEMOLITION BID SET PROJ. ENGR.: I. LEE, P.E. 7/10/25 SHEET Plotted By. Kazuma Lane on 7/10/25 12:33 PM a c,r e4�r''��� 08 - 5016 Lacey Boulevard SE, Lacey, Washington 98503 DEMOLITION & TEMPORARY EROSION OF Saved By. "'A1' Plane on 7/10/25 12:31 PM °ti' (360) 491-3399 Fax (360) 491-3857 10 0: Project 2022 22001 Port Orchard Bay St CAD SHEETS WATERFRONT-MITCHELL POINT 22001 _PL_DM_EXH_03.dw 07/11/2025 1 PORT ORCHARD WA CONTROL DETAILS SHEETS SEE NOTE 1 1/2 5/8" WIRE ROPE WIRE SEIZING - SHALL BE EIGHT WRAPS 1 3/4" LD. LOOP OF 16 GAGE WIRE WITH THE ENDS TWISTED TOGETHER, OR EQUIVALENT FASTENING. 2" MIN. _ _ _ 2" MIN. 2 1/2" MAX. 2 1/2" MAX. O PLATE WASHER 1/8" THICK a z z a W tl z 0 O Cr LL O LL N� 1" DIAM. PIN WITH ROUNDED BOTTOM EDGES CONNECTING PINS AND DRIFT PINS SEE NOTE 4 SHEET 1 BARRIER SECTION REINFORCING STEEL BENDING DIAGRAM 9' - 4 3/4" FOR 10' - 0" LONG BARRIER SECTION IT- 10 3/4" FOR 12' - 6" LONG BARRIER SECTION D#5 t 9' - 4 3/4" FOR 10'- 0" LONG BARRIER SECTION 11' - 10 3/4" FOR 12' - 6" LONG BARRIER SECTION 20#s WIRE ROPE LOOP DETAIL SIDE VIEW t '------ _... I ------------- ------------- SHEET 2 BARRIER TERMINAL REINFORCING STEEL BENDING DIAGRAM �4'-6.. O3 #5 1 7 2'- 3_ 2 10 _ T r � t ®#5 WIRE ROPE LOOPS `''-�, ®# 5 HOLE FOR DRIFT PIN t ..._j---------- -- - ........ �.............. ...... t ®#5 PIN TOP VIEW 1' 0" 6' 0" i _ WIRE ROPE LOOPS -• SEE NOTE 1 _ o 3/4" CHAMFER O3 #5 1' 6 - N I U w 2" CLR. 3 114" DIAM. N...__1....................... -..-- __________r________ _ 2" R. -BEVEL I OR ROUND EDGES 3/4' MAX. (TYP.) 1 1/2" (TYP.) - g 2 ®# 5 1 1/ DIAM. 2" CLR. j - PIN A SIDE VIEW BARRIER TERMINAL SEE NOTE 5 ,... it r1 v r - FOR REFERENCE ONLY. SEE WSDOT STANDARD DETAILS I I I I I I I I jjj PIN TT BARRIER CONNECTION DETAIL ' of WA2902 sy�� �sJ, ®� 9�C1 S TER�o ♦��� 10N:a1. ECG Aug 17, 2021 CONCRETE BARRIER TYPE 2 STANDARD PLAN K-80.32-00 SHEET 2 OF 2 SHEETS APPROVED FOR PUBLICATION Aug 17, 2021 STATE DESIGN ENGINEER Washington State Department of Transportation DATE REVISIONS JOB NUMBER DESIGNED BY: K. LANE 7 10 25 NO. DATE DESCRIPTION oN: a NG PORT ORCHARD -BAY STREET 22001 ENTERED BY: 1. LEE, P.E.T 7/10/25 off, � � �� Q j BID SET CHECKED R.: I. LEE, P.7/10/25 ORCHARD OVERWATER STRUCTURE DEMOLITION PROJ. ENGR.: I. LEE, P.E. 7 10 25 � SHEET Plotted By Kazuma Lane on 7/10/25 12:33 PM a c,' e� 09 saved By Klane on 7/10/25 12:31 PM a �SS�oxnLENc'� 5016 Lacey Boulevard SE, Lacey, Washington 98503 DEMOLITION & TEMPORARY EROSION or (360) 491-3399 Fax (360) 491-3857 PORT ORCHARD WA CONTROL DETAILS 10 G: Pro'ect 2022 22001 Port Orchard BaySt CAD SHEETS WATERFRONT—MITCHELL POINT 22001�L—DM—EXH-03.dw 07,111/2025 SHEETS w 0 0 J z UL m G PL 3/8 x 3 x 0'-5 ' 13/16" DIAM. HOLE 3' 3/4" EXPANSION BOLT 7 y 11/2^ e I/16" DIAM. /� 0 i p A 4" I D I 1 314" ATTACHMENT "A" DETAIL SHIM - SEE NOTE 4 o � D D 55" D 1L3x3x3/8x0'-8� PROTECTED WORK AREA TRAFFIC o OR SIDE ° ° EDGE OF DECK ATTACHMENT "A" ° 9" MIN. (SEE DETAIL) ATTACHMENT "B" D (SEE DETAIL) PCCP� SECTION VIEWS TYPE 1 ANCHOR ATTACHMENT LOCATIONS TRAFFIC °' PROTECTED SIDE sD WORK AREA D , 2" DIAM. PINNING D HOLE (TYP.) D ' D D' HMA � C\'. , • D i TWO PINS REQUIRED ON THE TRAFFIC SIDE - TWO PINS TOTAL, PER BARRIER SECTION 1' _ 0'. MIN. 1" DIAM. x 30" GALVANIZED STEEL PIN (TYP.) SECTION VIEWS TYPE 3 ANCHOR PIN LOCATIONS D 13/16" DIAM. HOLE 3„ o I D I ih� i o i D 4" D D 3/4" EXPANSION BOLT W/ D D 8" HARDENED WASHER (TYP.) 1 3/4" 4 1/2" MIN. EMBEDMENT ATTACHMENT "B" DETAIL TRA)E1 ° '° . TRAFFIC SISIDE (ATTACHMENT "B" ANCHOR SHOWN) ATTACHMENT "AATTACHMENT "A"(SEE DETAID (SEE DETAIL) PCCP D . NOTES 1. The intended use of this plan is for the temporary installation of the Type 2 Concrete Barrier on cement concrete pavement, bridge decks, or hot mix asphalt pavement, and Type F Concrete Barrier on Bridge decks. 2. Use Type 1 Anchors when the concrete pavement or bridge deck is 6" or thicker with 2' wide concrete barrier only. Use Type 2 Anchors (Standard Plan K-80.37) with narrow base barrier. 3. Adjust the location of the Type 1 Anchors to avoid the main reinforcing in the deck when drilling holes. 4. Use shims to properly fit the Type 1 Anchors to the barrier and roadway surfaces. 5. Upon removal of the Type 1 Anchors, clean the bolt holes and fill them with grout according to Standard Specification, Section 6.02.3(20). 6. Remove the Type 3 Anchors by first driving the steel pins down through the barrier further into the pavement to allow lifting the barrier without interference, then re- move the pins from the pavement. 7. After removing the Type 3 Anchors, clean the pin holes and fill them with sealant according to Standard Specification, Section 9-04.2. 1/2 SEGMENT LENGTH 2'-1" 2'-1" (TYP.) j (TYP.) ATTACHMENT LOCATION (TYP.) - SEE NOTE 3 (ATTACHMENT "A" ANCHOR SHOWN) TYPE 1 ANCHOR TEMPORARY INSTALLATION OF PRECAST CONCRETE BARRIER TYPE 2 ON CEMENT CONCRETE PAVEMENT OR BRIDGE DECK, AND TEMPORARY INSTALLATION OF PRECAST CONCRETE BARRIER TYPE F (STANDARD PLAN C-60.10) ON BRIDGE DECK TRAFFIC D TRAFFIC SIDE ° . SIDE 50" (TYP.) D; HMA D °° 2' _ 0" PRECAST CONCRETE BARRIER SECTION (TYP.) PINNING HOLE (TYP.) - ONLY REQUIRED ON TRAFFIC SIDE(S) OF BARRIER N PLAN VIEW TYPE 3 ANCHOR TWO PINS REQUIRED PIN LOCATIONS PER TRAFFIC SIDE — TYPE 3 ANCHOR FOUR PINS TOTAL, PER BARRIER SECTION TEMPORARY INSTALLATION OF PRECAST CONCRETE BARRIER TYPE 2 ON HOT MIX ASPHALT PAVEMENT FOR REFERENCE ONLY. SEE WSDOT STANDARD DETAILS PLAN VIEW TYPE 1 ANCHOR ATTACHMENT LOCATIONS 2'- D" PRECAST CONCRETE BARRIER SECTION (TYP.) X OV WA.8q#zV 7 �O 9 29023 '�C1 S tFTERN ♦� ssfONAL P_ 2020.09.10 10:04:22—07'00' TEMPORARY CONCRETE BARRIER ANCHORING STANDARD PLAN K-80.35-01 SHEET 1 OF 1 SHEET APPROVED FOR PUBLICATION Roark, Steve Digitally 202U09161U235Steve 0 STATE DESIGN ENGINEER Adft Washington Stale Deparinent of Transportation DATE REVISIONS JOB NUMBER DESIGNED BY: K. LANE 7/10/25 NO. DATE DESCRIPTION ? PORT ORCHARD -BAY STREET 22001 ENTERED BY: 1. LEE, P.E.T 7/10/25 "USKILLIN � G ��G!/ BID SET CHECKED R.: I. LEE, P.7/10/25 ORCHARD OVERWATER STRUCTURE DEMOLITION PROJ. ENGR.: I. LEE, P.E. 7/10/25 �� SHEET Platted By. Kazuma Lone on 7/10/25 12:33 PM �•,v, �� 10 Saved By. Mane on 7/10/25 1z:31 PM .,,�, �> 5016 Lacey Boulevard SE, Lacey, Washington 98503 DEMOLITION & TEMPORARY EROSION OF (360)491-3399 Fax (360) 491-3857 10 0:\Pro;ect\2022\22001 Port Orchard Bay st CAo sHEETs WATERFRONT-MITCHELL POINT 220o1_PL_oM_EXH_o3.dw 07/11/2025 PORT ORCHARD WA CONTROL DETAILS SHEETS