Loading...
HomeMy WebLinkAbout058-25 - Source Electric, LLC - Contract Exhibit CCITY OF PORT ORCHARD SEWER LIFT STATION CONTROLS UPGRADE PORT ORCHARD, WASHINGTON 0 N N 4 ND N N O N 06 N O T O c- O w F- a) m O w H- H - 0 J 0 O O U 0 > O) O) N O O O) O D c O J 0 H- D 0 J o1 l A Al\::JLEVERETT SHELTON ABERDEEN OLYMPIA 5 CENTRALIA A CH EH AL S KELSO TA VICINITY MAP a NO SCALE N Know what's below. Call before you dig. REVISIONS DATE BY DESIGNED K. TAYLOR DRAWN K TAYLOR ______ ________________________________________________ __________ _______ CHECKED M. CASANOVA APPROVED C. WITTMAN AN 7 EAGLE CREST (BASE BID) GOLDEN POND (ADDITIVE ALTERNATIVE 2) TREMONT (ADDITIVE ALTERNATIVE 1) CEDAR HEIGHTS (ADDITIVE ALTERNATIVE 3) FLOWER MEADOWS •" (BASE BID) SEDGWICK (BASE BID) LOCATION MAP NO SCALE Q DRAWING INDEX _____ DWG NO. ______ SHT NO. SHEET TITLE 1 G01 COVER SHEET, DRAWING INDEX, LOCATION AND VICINITY MAPS 2 G02 SURVEY CONTROL PLAN - TREMONT, GOLDEN POND, AND EAGLE CREST LIFT STATIONS 3 G03 SURVEY CONTROL PLAN - FLOWER MEADOWS, CEDAR HEIGHTS, AND SEDGWICK LIFT STATIONS 4 D01 TREMONT, GOLDEN POND, EAGLE CREST DEMOLITION DETAILS 5 D02 FLOWER MEADOWS, CEDAR HEIGHTS, SEDGWICK DEMOLITION DETAILS 6 E01 ELECTRICAL LEGEND AND ABBREVIATIONS 7 E02 TYPICAL SOFT STARTER ELEMENTARY DIAGRAM 8 E03 ELECTRICAL DETAILS 9 E11 TREMONT ONE -LINE (ADDITIVE ALTERNATIVE 1) 10 E12 TREMONT SITE PLAN (ADDITIVE ALTERNATIVE 1) 11 E21 GOLDEN POND ONE -LINE (ADDITIVE ALTERNATIVE 2) 12 E22 GOLDEN POND SITE PLAN (ADDITIVE ALTERNATIVE 2) 13 E31 EAGLE CREST ONE -LINE (BASE BID) 14 E32 EAGLE CREST SITE PLAN (BASE BID) 15 E41 FLOWER MEADOWS ONE -LINE (BASE BID) 16 E42 FLOWER MEADOWS SITE PLAN (BASE BID) 17 E51 CEDAR HEIGHTS ONE -LINE (ADDITIVE ALTERNATIVE 3) 18 E52 CEDAR HEIGHTS SITE PLAN (ADDITIVE ALTERNATIVE 3) 19 E61 SEDGWICK ONE -LINE (BASE BID) 20 E62 SEDGWICK SITE PLAN (BASE BID) 21 101 TYPICAL NETWORK BLOCK DIAGRAM 22 102 TYPICAL RTU PANEL LAYOUT 23 103 TYPICAL RTU WIRING DIAGRAM 24 104 TYPICAL RTU WIRING DIAGRAM CONTINUED 25 105 TYPICAL CONTROL SYSTEM BLOCK DIAGRAM PROJECT NAME CITY OF PORT ORCHARD SEWER LIFT STATION CONTROLS UPGRADE 216 PROSPECT STREET PORT ORCHARD, WA 98366 COVER SHEET, DRAWING INDEX, LOCATION AND VICINITY MAPS DRAWING NO. 1 OF 25 G01 a- 0 N N O N cd N 0 > 0 v Z O w F- 0 O O O O O co O) Q) N O I.- 0' 0 D C O y..r O F- 0 N O O F- >- 0 J PMX #2002 w w Op O PMX #2003 PARAMETRIX CONTROL TABLE POINT NO. NORTHING EASTING ELEVATION DESCRIPTION 1005 197247.92 1191099.32 227.76 SET MAG NAIL 2002 197434.55 1191035.36 225.33 SET MAG NAIL 2003 197273.75 1191039.44 226.58 SET MAG NAIL N PMX #1005 TREMONT LIFT STATION (ADDITIVE ALTERNATIVE 1) PLAN SCALE IN FEET 0 20 40 REVISIONS DATE BY DESIGNED K. TAYLOR DRAWN K TAYLOR CHECKED M. CASANOVA APPROVED C. WITTMAN AN SS PMX #2004 S i h�o 6 PMX #2005/ Sc SS '�pEN GO '� PMX #1007 PARAMETRIX CONTROL TABLE POINT NO. NORTHING EASTING ELEVATION DESCRIPTION 1007 198140.72 1190475.93 154.86 SET MAG NAIL 2004 198138.50 1190348.74 157.24 SET MAG NAIL 2005 198164.21 1190452.01 154.03 SET MAG NAIL GOLDEN POND LIFT STATION (ADDITIVE ALTERNATIVE 2) PLAN SCALE IN FEET N 0 20 40 S PMX #2000 -157 0 PARAMETRIX CONTROL TABLE POINT NO. NORTHING EASTING ELEVATION DESCRIPTION 1000 199515.02 1190605.76 156.53 SET MAG NAIL 2000 199666.82 1190583.35 156.26 SET MAG NAIL 2001 199464.19 1190597.47 156.46 SET MAG NAIL PMX #1000 m (-0 I v' ;PH � I PMX #2001 EAGLE CREST LIFT STATION (BASE BID) PLAN SCALE IN FEET 0 20 40 HORIZONTAL DATUM (WSRN): HORIZONTAL DATUM FOR THIS SURVEY IS NAD 1983(11), WASHINGTON STATE PLANE NORTH ZONE COORDINATE SYSTEM, U.S. SURVEY FEET, BASED ON THE WASHINGTON STATE REFERENCE NETWORK (WSRN) WITH VERIFICATION TIES TO THE FOLLOWING MONUMENTS PUBLISHED BY WSDOT GLOVER NORTHING: 199935.657 EASTING: 1199588.470 WHITE NORTHING: 199896.661 EASIING: 1201075.324 VERTICAL DATUM (WSRN): VERTICAL DATUM FOR THIS SURVEY IS NAVD 88 BASED ON THE WASHINGTON STATE REFERENCE NETWORK (WSRN) WITH VERIFICATION TIES TO THE FOLLOWING MONUMENTS PUBLISHED BY WSDOT GLOVER ELEVATION: 171.584 WHITE ELEVATION: 202.411 PROJECT NAME CITY OF PORT ORCHARD SEWER LIFT STATION CONTROLS UPGRADE 216 PROSPECT STREET PORT ORCHARD, WA 98366 LEGEND 0 O G fl EEl El 0 SS Fp N SP El X X - OP T ss SD SURVEY NOTES: SET MAG NAIL SET REBAR WITH CAP BOLLARD CONIFER TREE SHRUB CATCH BASIN SOLID CATCH BASIN CATCH BASIN ROUND DOOR GATE POST MAIL BOX UNKNOWN VAULT POWER GUY ANCHOR POWER POLE WITH LIGHT AND TRANSFORMER POWER POLE WITH DROP LINE STREET LIGHT POWER JUNC11ON BOX POWER METER POWER PANEL POWER VAULT POWER TRANSFORMER SIGN STEEL POST SEWER CLEAN OUT MANHOLE SEWER SEWER VAULT WATER HOSE BIB WATER METER WATER VALVE STAND PIPE TELEPHONE JUNCTION BOX TELEPHONE RISER BUILDING LINE BUILDING EAVE EDGE OF ASPHALT ASPHALT FLOW LINE TOP BACK OF CURB CURB FLOW LINE WHEEL STOP CENTERLINE DFFCH/EDGE OF WATER RIP RAP EDGE OF CONCRETE CHANNELIZA11ON EDGE OF GRAVEL BOARD FENCE HOGWIRE FENCE CHAIN LINK FENCE HEDGE LINE GAS LOCATES OVERHEAD POWER LINE POWER LOCATES COMMUNICATION LOCATES WATER LOCATES SEWER LOCATES STORM LOCATES TOP OF SLOPE TOE OF SLOPE MAJOR CONTOUR MINOR CONTOUR CROWN OF ROAD 1. THIS MAP CORRECTLY REPRESENTS CONDITIONS AND FEATURES EXISTING AT THE TIME OF THIS SURVEY IN MAY, 2023. 2. CONVENT10NAL AND GPS SURVEY EQUIPMENT WAS USED IN THE PERFORMANCE OF THIS SURVEY. ALL EQUIPMENT IS MAINTAINED IN CONFORMANCE WITH CURRENT STATE STATUTE. 3. THIS SURVEY WAS PREPARED BY FIELD TRAVERSE AS PER WAC 332-130-090, PART C. RELATIVE ACCURACY EXCEEDS 1 FOOT IN TEN THOUSAND. 4. ALL SURFACE FEATURES AND INVERT STRUCTURE ELEVAT10N SHOWN HEREON WERE FIELD LOCATED AND MEASURED BY PARAMETRIX FOR THIS SURVEY. UNDERGROUND UTILITY LINES ARE BASED UPON A COMBINATION OF SURFACE FEATURE MEASUREMENTS AND ONSITE UNDERGROUND UTILITY MARKINGS PERFORMED BY OTHERS. 5. THE SURVEYOR MAKES NO GUARANTEE THAT THE UNDERGROUND UTILITIES SHOWN COMPRISE ALL SUCH UTILITIES IN THE AREA, EITHER IN SERVICE OR ABANDONED. THE SURVEYOR FURTHER DOES NOT WARRANT THAT THE UNDERGROUND UTILITIES SHOWN ARE IN THE EXACT LOCATION INDICATED ALTHOUGH HE DOES CERTIFY THAT THEY ARE LOCATED AS ACCURATELY AS POSSIBLE FROM INFORMATION AVAILABLE. SURVEY CONTROL PLAN - TREMONT, GOLDEN POND, AND EAGLE CREST LIFT STATIONS DRAWING NO. 2 OF 25 G02 IZ M N O N O N 06 N 0 >i 0 C 0 w F- 0 0 O O O O L C 0 0 F- 0 M O C-) F- 0 J PARAMETRIX CONTROL TABLE POINT NO. NORTHING EASTING ELEVATION DESCRIPTION 1009 192050.61 1193256.81 213.72 SET R/CAP 2006 192259.23 1193339.73 216.68 SET MAG NAIL 2007 192084.58 1193254.13 214.67 SET MAG NAIL O ------217 214- it O \I , 213 SD y\ Ski O PMX #2007 Q �O /L 4 0 PMX #1009 FLOWER MEADOWS LIFT STATION (BASE BID) PLAN SCALE IN FEET N 0 20 40 REVISIONS DATE BY DESIGNED K. TAYLOR DRAWN K TAYLOR CHECKED M. CASANOVA APPROVED C. WITTMAN AN ,O PMX #2006 SURVEY NOT AVAILABLE CEDAR HEIGHTS LIFT STATION (ADDITIVE ALTERNATIVE 3) PLAN SCALE IN FEET 0 20 40 0 I PARAMETRIX CONTROL TABLE POINT NO. NORTHING EASTING ELEVATION DESCRIPTION 1016 188890.46 1192788.08 187.20 SET R/CAP 2010 188734.93 1192831.26 196.54 SET R/CAP 2011 188926.13 1192738.28 182.74 SET R/CAP PROJECT NAME CITY OF PORT ORCHARD SEWER LIFT STATION CONTROLS UPGRADE 216 PROSPECT STREET PORT ORCHARD, WA 98366 sy SEDGWICK LIFT STATION (BASE BID) PLAN SCALE IN FEET 0 20 40 0 PMX #1016 v PMX #2010 SURVEY CONTROL PLAN - FLOWER MEADOWS, CEDAR HEIGHTS, AND SEDGWICK LIFT STATIONS DRAWING NO. 3 OF 25 TREMONT DEMO PHOTO SCALE: NONE EAGLE CREST DEMO PHOTO 2 SCALE: NONE • REVISIONS DATE BY DESIGNED C. CARLSON DRAWN J. VONDERAHE CHECKED M. CASANOVA APPROVED C. WITTMAN ONE INCH AT FULL SCALE. IF NOT, SCALE ACCORDINGLY LIFT STATION CTRLS UPGRADE JOB No. 216-1589-011 MAY 2025 BUI a of Liibi 36 . 4/29/25 GOLDEN POND DEMO PHOTO 2 SCALE: NONE Parametrik 1019 39th Avenue SE, Suite 100 • Puyallup, WA 98374 Ph: 253.604.6600 PROJECT NAME EAGLE CREST DEMO PHOTO 1 SCALE: NONE CITY OF PORT ORCHARD SEWER LIFT STATION CONTROLS UPGRADE 216 PROSPECT STREET PORT ORCHARD, WA 98366 NOTES: 0 SALVAGE MOTOR STARTER PANELS AND RE -USE FOR TEMPORARY PUMP CONTROL DURING CONSTRUCTION. DISPOSE OF PANELS AFTER INSTALLATION OF NEW RTU. 2. PRESERVE INTERCONNECTING WIRING AND CONDUIT DURING CONSTRUCTION. TREMONT, GOLDEN POND, EAGLE CREST DEMOLITION DETAILS DRAWING NO. 4 OF 25 D01 FLOWER MEADOWS DEMO PHOTO 1 SCALE: NONE 5 •:i / - •7 �r t � I• u;r ■+r 11 Mw FLOWER MEADOWS DEMO PHOTO 2 SCALE: NONE SEDGWICK CEDAR HEIGHTS DEMO PHOTO 1 DEMO PHOTO 3 SCALE: 1 1/2" = 1'-0" SCALE: NONE BUI C OF WA REVISIONS DATE BY DESIGNED C. CARLSON ' o ONE INCH AT FULL SCALE. DRAWN IF NOT, SCALE ACCORDINGLY Parametrik J. VONDERAHE CHECKED FILE NAME LIFT STATION CTRLS UPGRADE 1023 36 �� `�ISTE 1 1019 39th Avenue SE, Suite 100 • Puyallup, WA 98374 M. CASANOVA JOB N°. 216-1589-011 SI0NAL�l Ph: 253.604.6600 APPROVED C. WITTMAN DATE MAY 2025 4/29/25 Yr • PROJECT NAME CITY OF PORT ORCHARD SEWER LIFT STATION CONTROLS UPGRADE 216 PROSPECT STREET PORT ORCHARD, WA 98366 NOTES: 0 SALVAGE MOTOR STARTER PANELS AND RE -USE FOR TEMPORARY PUMP CONTROL DURING CONSTRUCTION. DISPOSE OF PANELS AFTER INSTALLATION OF NEW RTU. 2. PRESERVE INTERCONNECTING WIRING AND CONDUIT DURING CONSTRUCTION. SEDGWICK DEMO PHOTO 2 SCALE: 1 1/2" = 1'-0" FLOWER MEADOWS, CEDAR HEIGHTS, SEDGWICK DEMOLITION DETAILS DRAWING NO. 5 OF 25 Ali PLAN SYMBOLS ONE -LINE SYMBOLS SCHEMATIC SYMBOLS ABBREVIATIONS GENERAL NOTES CONDUIT SYMBOLS RECEPTACLE AND SWITCH SYMBOLS XXX##-### EQUIPMENT ID TAG CONTROL RELAYS AND CONTACTORS A AMPERES LOP LOCAL CONTROL PANEL 1. THE INSTALLATION OF ALL EQUIPMENT CONDUIT ID TAG DUPLEX WALL RECEPTACLE, 120V MOTOR, 3 PHASE. VOLTAGE AC ALTERNATING CURRENT LOS LOCAL CONTROL STATION SHOWN ON THESE DRAWINGS OR DESCRIBED CONTROL DEVICE COIL CKT CONDUIT ID TAGXXX A/D ANALOG TO DIGITAL LTG LIGHTING IN THE SPECIFICATIONS SHALL CONFORM TO X-### P = POWER C = CONTROL TYPE CKT = CIRCUIT NUMBER X-### P = POWER C = CONTROL M AND HORSEPOWER AS ### XXX INDICATES TYPE: ADD ADJUSTABLE LTS LIGHTS THE REQUIREMENTS SET FORTH IN THE S = SIGNAL X = SPARE TYPE: WP = WEATHERPROOF S = SIGNAL X = SPARE INDICATED. ALT = ALTERNATING RELAY AF AMPERE FRAME LP LIGHTING PANEL LATEST EDITIONS OF ALL APPLICABLE CODES 3/4"C-(3)#12 CALLOUT INDICATING G = GROUNDED CR = CONTROL RELAY AFD ADJUSTABLE FREQUENCY DRIVE (M) MODIFIED AND UTILITY COMPANY STANDARDS. CONTACT IG = ISOLATED GROUND GENERATOR LR = LATCHING RELAY CONDUIT SIZE, NUMBER OF G AFF ABOVE FINISHED FLOOR mA MILLIAMPERES THE UTILITY COMPANY REPRESENTATIVES WIRES, AND WIRE SIZE. GF = GROUND FAULT CIRCUIT xxKW = SIZE MOTOR, SINGLE PHASE. TR/TDR = TIMING RELAY/ AFG ABOVE FINISHED GRADE MCC MOTOR CONTROL CENTER AND VERIFY THEIR REQUIREMENTS. INTERRUPTOR xxKW M VOLTAGE AND HORSEPOWER TIME -DELAY RELAY X-### CALLOUT INDICATING AS INDICATED. AIC AMPERES INTERRUPTING CAPACITY MCCB MOLDED CASE CIRCUIT BREAKER DUPLEX RECEPTACLE, xx MOTOR M = MOTOR STARTER AMP AMPERES MCP MOTOR CIRCUIT PROTECTION OR 2. THIS IS A GENERALIZED LEGEND SHEET. THIS CONDUIT NUMBER AND EMERGENCY/STAND-BY xx = HORSEPOWER CONTACTOR ANN ANNUNCIATOR MAIN CONTROL PANEL CONTRACT MAY NOT USE ALL INFORMATION WIRE PER SCHEDULE. M OL ### = DEVICE ID NUMBER AS AMMETER SWITCH MCM THOUSAND CIRCULAR MILS (KCMIL) SHOWN. EXPOSED CONDUIT SINGLE RECEPTACLE, 120V POWER CIRCUIT BREAKER,H f-o'xo- AT AMMETER TRIP MON MONITOR - - - - - - - CONCEALED CONDUIT SINGLE RECEPTACLE, xxAF xxAF ❑ 3 POLE, ABOVE 1500V. TAG TAG CONTACTS, NORMALLY OPEN ATS AUTOMATIC TRANSFER SWITCH MOV MOTOR OPERATED VALVE 3. NOTIFY THE ENGINEER IMMEDIATELY IF EMERGENCY/STAND-BY MOTOR STARTER WITH AUTO AUTOMATIC MS MOTOR STARTER CAPON CONDUIT STUB xxAT xxAT xxAF = FRAME SIZE I I AND NORMALLY CLOSED. CONFLICTS IN EQUIPMENT LOCATIONS ARE 0 CONDUIT TURNING UP DOUBLE DUPLEX RECEPTACLE, 120V xxAT = TRIP RATING THERMAL OVERLOAD, 3 POLE. TAG = CONTROL DEVICE AWG AMERICAN WIRE GAUGE MTD MOUNTED DISCOVERED, OR IF PROBLEMS ARISE DUE TO COIL ID NUMBER BCG BARE COPPER GROUND MTG MOUNTING FIELD CONDITIONS, LACK OF INFORMATION, CONDUIT TURNING DOWN DOUBLE DUPLEX RECEPTACLE, WITH NO �f� C CONDUIT MTS MANUAL TRANSFER SWITCH OR ANY OTHER REASON. CONDUIT WITH SEAL FITTING EMERGENCY/STAND-BY TIMING RELAY CONTACTS CAB CABINET (N) NEW DRAWOUT DRAWOUT CONTROL POWER TAG CAP CAPACITOR NC NORMALLY CLOSED 4. INFORMATION SHOWN MAY NOT BE ALL UNDERGROUND DIRECT SPECIAL PURPOSE WALL NORMALLY OPEN, CLOSES AFTER BURIAL CONDUITS RECEPTACLE, RATING AS NOTED. TAG TRANSFORMER. ° TIME DELAY (NOTC). CB CIRCUIT BREAKER NEG NEGATIVE INCLUSIVE. SEE ALSO ANSI C37.3, Y1.1, Y32.2, FLEXIBLE CONDUIT CIRCUIT BREAKER, 3 POLE xxVA TAG = DEVICE TAG ID TAG = DEVICE TAG ID CC CONTROL CABLE, CLOSING COIL NEMA NATIONAL ELECTRICAL AND Y32.9. xxAF xxAF UNLESS OTHERWISE NOTED. xxV-yyV xxxVA = SIZE CHH COMMUNICATION HANDHOLE MANUFACTURER'S ASSOCIATION • INDICATES REMOVALxAT xxV = PRIMARY VOLTAGE NORMALLY CLOSED, OPENS CKT CIRCUIT NEUT NEUTRAL 5. EQUIPMENT SHOWN IN HALF TONE OR GREY (ab) SINGLE POLE SWITCH (SEE NOTE Si).S1xxAT o) xxAF = FRAME SIZE - - - - GROUND CONDUCTOR * = SINGLE POLE xxAT = TRIP RATING yyV = SECONDARY VOLTAGE AFTER TIME DELAY (NCTO). CMH COMMUNICATION MANHOLE NO NORMALLY OPEN, NUMBER TONE ARE EXISTING OR BY OTHERS. 2 = 2 POLE CO CONDUIT ONLY OL OVERLOAD HEAT TRACE ono NORMALLY OPEN, CONDUIT RUN, BROKEN AND 3 = 3 WAY WITH NO TAG DISCONNECT OR TOGGLE �'` INSTANTANEOUS CLOSE, OPENS COMM COMMUNICATION OT OVER TEMPERATURE 6. VERIFY ALL COLOR REQUIREMENTS BEFORE 4 = 4 WAY DRAWOUT DRAWOUT °�° SWITCH AFTER TIME DELAY (NOTO). COND CONDUCTOR OIT OPERATOR INTERFACE TERMINAL ORDERING MATERIALS. CONTINUED ON SAME M = HP RATED, LOCKABLE CPT CONTROL POWER TRANSFORMER P POLE, PUMP SHEET OR AS NOTEDPOWER OR DISTRIBUTION xxAF TAG = DEVICE TAG ID CP CONTROL PANEL PB PULLBOX 7. CONDUIT SIZE AND FILL SHALL BE AS OS = OCCUPANCY SENSOR HOME RUN TO PANELBOARD P = SWITCH WITH PILOT LIGHT xxKVA Y TRANSFORMER, 3 PHASE xxAF - SWITCH RATING IN NORMALLY CLOSED, AMPERES INSTANTANEOUS OPEN, CR CONTROL RELAY PBSW PUSHBUTTON SWITCH INDICATED. WHERE NO SIZE IS SHOWN, THE OR AS INDICATED WP = WEATHERPROOF xxV-yyV UNLESS OTHERWISE NOTED. CLOSES AFTER TIME DELAY CS CONTROL STATION PEC PHOTOELECTRIC CELL CONDUIT SHALL BE SIZED IN ACCORDANCE CABLE TRAY I xxKVA = SIZE TAG CIRCUIT BREAKER (NCTC). CT CURRENT TRANSFORMER PDB POWER DISTRIBUTION BLOCK WITH THE EDITION OF THE NATIONAL NOTES: xxV = PRIMARY VOLTAGE TAG = DEVICE TAG ID DB DIRECT BURIAL PF POWER FACTOR ELECTRIC CODE ADOPTED BY THE AUTHORITY Si LOWER CASE LETTERS IN PARENTHESIS yyV = SECONDARY VOLTAGE O O JUNCTION BOX LOCATION xxA xxA = TRIP RATING IN SENSING DEVICE CONTACTS DC DIRECT CURRENT PGRS PVC COATED GALVANIZED RIGID HAVING CODE ENFORCEMENT JURISDICTION. JO ADJACENT TO A SWITCH OR LIGHT FIXTURE DEMO DEMOLITION STEEL WHERE NO FILL IS INDICATED, PROVIDE (3) #12 DIAG DIAGRAM pH MEASURE OF ACIDITY OR WIRES. PROVIDE 3/16" INCH NYLON PULL ROPE INDICATE A SWITCHED CIRCUIT AND IDENTIFY THE AMPERES ATS TRANSFER SWITCH, ATS OR MTS AS INDICATED. 3 POLE CLOSES CLOSES FIXTURE/SWITCH COMBINATIONS. FOR FOUR TAG FUSE RISING FALLING DEVICE TYPE DISC DISCONNECT ALKALINITY IN EACH EMPTY CONDUIT. ® xxAF = RATING LAMP FLUORESCENT FIXTURES WIRED IN PAIRS EQUIPMENT AND INSTRUMENT SYMBOLS UNLESS OTHERWISE NOTED. TAG = DEVICE TAG ID ° FLOW SWITCH DISTR DISTRIBUTION PH PHASE WITHIN EACH FIXTURE, THE "a" SWITCH xxA xxA = TRIP RATING, IN DIV DIVISION PLC PROGRAMMABLE LOGIC XXX##-### IEQUIPMENT ID TAG CONTROLS THE OUTER LAMPS AND THE "b" AMPERES ° DP DISTRIBUTION PANEL CONTROLLER SWITCH CONTROLS THE INNER LAMPS. WIRE 3 MOTOR STARTER WITH THERMAL °� LEVEL/FLOAT SWITCH DPDT DOUBLE POLE, DOUBLE THROW PM PHASE MONITOR GENERATOR LAMP FIXTURES SIMILARLY. OVERLOAD. 3 PHASE UNLESS lJ DPST DOUBLE POLE, SINGLE THROW PNL PANEL xxKW xxKW = SIZE OTHERWISE NOTED. COVER CONTROL DEVICES PRESSURE SWITCH (E) EXISTING PNLBD PANELBOARD MOTOR S2 NUMBERS IN PARENTHESIS ADJACENT TO A LIGHT * = NEMA SIZE H A SELECTOR SWITCH ASSEMBLY, EE ELECTRICAL ENCLOSURE POS POSITION, POSITIVE xx xx = HORSEPOWER FIXTURE OR RECEPTACLE INDICATE THE I / 3 -POSITION °' TEMPERATURE SWITCH EHH ELECTRICAL HANDHOLE POT POTENTIOMETER LIGHTING PANEL BRANCH CIRCUIT FEEDING THE TYPICAL CONFIGURATIONS: ELEM ELEMENTARY PPS PACKAGED POWER SUPPLY EQUIPMENT CONNECTION DEVICE. VARIABLE FREQUENCY DRIVE. O O HOA-HAND/OFF/AUTO EMERG EMERGENCY PRI PRIMARY VFD 3 PHASE UNLESS OTHERWISE X00 L 0 R - LOCAL/OFF/REMOTE LIMIT SWITCH CONTACTS ENCL ENCLOSURE PWR POWER INSTRUMENT LOCATION ### NOTED. o EFFL EFFLUENT (R) RELOCATED OT THERMOSTAT LOCATION ### = DEVICE ID NUMBER pp °O� NORMALLY OPEN CLOSES ON EGO EQUIPMENT GROUND CONDUCTOR RCPT RECEPTACLE LIGHTING SYMBOLS 0X0 REACHING LIMIT EQPT EQUIPMENT RCT REPEAT CYCLE TIMER DISCONNECT SWITCH, UNFUSED 0o NORMALLY CLOSED, OPENS ON ETM ELAPSED TIME METER RT RESET TIMER xxA Eli xxA = AMPERAGE RATING 1 LUMINAIRE WITH IDENTIFICATION TAG ELECTRONIC SOFT STARTER O O �° ### WITH BYPASS. 3 PHASE OOX REACHING LIMIT FDR FEEDER RVSS REDUCED VOLTAGE SOFT STARTER DISCONNECT SWITCH, FUSED NL ID = TYPE, PER LIGHTING SCHEDULE UNLESS OTHERWISE NOTED. FE FLOW ELEMENT SCCR SHORT CIRCUIT CURRENT RATING xxAF I L xxAF = FRAME RATING O(a)NL = UNSWITCHED NIGHT LIGHT PUSHBUTTON, NORMALLY OPEN FIT FLOW INDICATION TRANSMITTER SCHD80 SCHEDULE 80 PVC ART I r fl a SWITCH CONTROL ### = DEVICE ID NUMBER O o aQ AND NORMALLY CLOSED WIRE, CABLE, AND TERMINAL SYMBOLS xxAT = TRIP RATING (LPXX/X) = FLEX FLEXIBLE SCR SILICON CONTROLLED RECTIFIER LPXX/X = POWER SOURCE PANEL ENCLOSED CIRCUIT BREAKER WIRING INSIDE ENCLOSURE FLUOR FLUORESCENT SD SMOKE DETECTOR xxAF ®1 xxAF = FRAME RATING AND CIRCUIT NUMBER _ - - - _ FO FIBER OPTIC SIG SIGNAL xxAT LINE OR LOAD REACTORFREINDICATING LIGHT, X INDICATES FIELD WIRING xxAT = TRIP RATING O SURFACE MOUNTED LUMINAIRE X UENCY SN SLID NEUTAL COLOR: CONDUCTORS CONNECTED FSH Q FLOAT SWITCH HIGH SPD SORGE PROTECTIVE DEVICE MH MANHOLE A = AMBER FSO FLOAT SWITCH OVERFLOW SPDT SINGLE POLE, DOUBLE THROW WALL MOUNTED LUMINAIRE �J KIRK KEY INTERLOCK B = BLUE I CONDUCTORS NOT CONNECTED FU FUSE SST STAINLESS STEEL HH HANDHOLE C = CLEAR FUT,(F) FUTURE SV SOLENOID VALVE GROUND ROD o- POLE MOUNTED LUMINAIRE ST SHUNT TRIP G = GREEN SPLICE OR TERMINATION FVNR FULL VOLTAGE, NON -REVERSING SW SWITCH R = RED GROUND ROD AND BOX FUSE W = WHITE ❑ FEED -THROUGH TERMINAL FVR FULL VOLTAGE, REVERSING SWBD SWITCHBOARD �1 WALL/CEILING MOUNTED EXIT LIGHT - FWD FORWARD SWGR SWITCHGEAR DIRECTIONAL ARROW WHERE CURRENT TRANSFORMER Y = YELLOW O DEVICE TERMINAL GEN GENERATOR SYNC SYNCHRONIZING WALL -MOUNTED CONTROL INDICATED, SHADED AREA INDICATES GFCI GROUND FAULT CIRCUIT TB TERMINAL BOX PANEL, PANELBOARD, OR INDICATING LIGHT, ❑� SHORTING BLOCK TERMINAL CABINET. SHOWN ILLUMINATED FACE. VOLTAGE TRANSFORMER PUSH -TO -TEST INTERRUPTER TC TIMED CLOSING fp WITH EQUIPMENT ID TAG. PHOTOELECTRIC CELL I' SURGE ARRESTOR GND GROUND TEL TELEPHONE MISCELLANEOUS DEVICES GRS GALVANIZED RIGID STEEL TERM TERMINAL PNL-100 I 'c7 7j EMERGENCY LIGHT WITH SELF- SENSOR H HYDROGEN PYROXIDE TO TIMED OPENING u CONTAINED BATTERY X ELAPSED TIME METER/ O-�o SOLENOID HH HANDHOLE TSP TWISTED SHIELDED PAIR X INDICATES DEVICE TYPE: ETM HOURMETER FLOOR -STANDING HOA HAND -OFF -AUTOMATIC TST TWISTED SHIELDED TRIAD I I I A = AMMETER HORN HOR HAND -OFF -REMOTE UGND UNDERGROUND DISTRIBUTION ASSEMBLY,I \ AS=CURRENT CURRENT SWITCH SUCH AS MCC, SWITCHBOARD, V = VOLTMETER HPS HIGH PRESSURE SODIUM UV ULTRAVIOLET OR XFMR. SHOWN WITH FIRE ALARM SYMBOLS VS = VOLT SWITCH L�J BELL HT HEAT TAPE VA VOLT-AMPERES EQUIPMENT ID TAG. WH = WATTHOUR METER HTR HEATER VAR VOLT-AMPERES REACTIVE SUCH I I FRCP I FIRE ALARM CONTROL PANEL PM = POWER QUALITY METER BUZZER HV HIGH VOLTAGE VFD VARIABLE FREQUENCY DRIVE COMBINATION SMOKE/HEAT HZ HERTZ (CYCLES PER SECOND) VH VAR -HOUR SH ® POWER RECEPTACLE RESISTOR OR HEATER ELEMENT IND LT INDICATING LIGHT VS VOLTMETER SWITCH DETECTOR CAPACITOR INCAND INCANDESCENT W WIRE, WATTS �F] HORN AND STROBE ->>- BUS STAB ON MCC OR INSTR INSTRUMENT, INSTRUMENTATION WH WATTHOUR METER UTILITIES SYMBOLS VACUUM BREAK SWITCH SWITCHGEAR, OR CORD AND I/O INPUT/OUTPUT WHDM WATTHOUR DEMAND METER (ELECTRICITY UTILITY METER 0 MANUAL PULL STATION A TERMINATOR OR POTHEAD PLUG CONNECTION. ISB INTRINSICALLY SAFE BARRIER WP WEATHERPROOF ISR INTRINSICALLY SAFE RELAY WR WEATHER RESISTANT AND SOCKET GROUND CONNECTION JB JUNCTION BOX WT WATER TIGHT ® PLYWOOD BACKBOARD SEAL -OFF KA KILOAMPERES XFMR TRANSFORMER • KCMIL THOUSANDS OF CIRCULAR MILS KV KILOVOLTS KVA KILOVOLT AMPERES BUI c KVAR KILOVOLT AMPERES REACTIVE KWH KILOWATT HOURS REVISIONS DATE BY DESIGNED' O �, PROJECT NAME DRAWING NO. C. CARLSON ONE INCH AT FULL SCALE. CITY OF PORT ORCHARD 6 OF 25 DRAWN IF NOT, SCALE ACCORDINGLY Pa ra m et r i k E LECTRI CAL LEG E N D AN D J. VONDERAHE FILE NAME 023 36 SEWER LIFT STATION CONTROLS UPGRADE CHECKED LIFT STATION CTRLS UPGRADE SI0NAL �� 1019 39th Avenue SE, Suite 100 • Puyallup, WA 98374 ABBREVIATIONS E01 M. CASANOVA JOB No. S Cs Ph: 253.604.6600 216-1589-011 216 PROSPECT STREET APPROVED DATE C. WITTMAN MAY 2025 4/29/25 PORT ORCHARD, WA 98366 NOTES: L1 - - -0 L1 Ti - - - - - - � 480-120VAC TRANSFORMER APPLICABLE FOR GOLDEN POND AND 1000 SEDGWICK LIFT STATIONS. TAG ID 2 PROVIDE CONTROL POWER VIA 120 VAC LINE -TO -NEUTRAL FOR __ ��-------- DESCRIPTION 03XXXVA C L2 RVSS T2 MTREMONT, EAGLE CREST, FLOWER MEADOWS AND CEDAR HEIGHTS 1001PH 60HZ L2 -0 XXHP 2 XXXVAC 3PH LIFT STATIONS. / 1 -0 L3 T3 3� PROVIDE SEAL -IN CIRCUIT OR PUMP SENSOR DESIGNED TO MAINTAIN 1002 L3 MCP OVERTEMP AND SEAL FAIL INTERLOCK UNTIL RESET PUSH BUTTON IS OPERATED. 1003 1004 1005 1006 1007 1008 1009 1010 1011 L- CONTINUED FROM LOWER LEFT LINE 1023 1024 1025 1026 1027 1028 1029 1911 ILIaAlrel\I1ro7:7.7aV N MSH TSH 13 Q -O �0AUTOTOPLC 1030 �--�--- -� 1012 OOX SUBMERSIBLE PUMP SENSORS 1013 1014 SOFT STARTER RUN RELAY 1031 1032 CR2-1 CRII -FM-2 G 1033 SOFT STARTER RUNNING TO PLC 1015 RESET CR3-1 ETM RUN TIME 1034 0SOFT STARTER FAULT TO PLC 1016 CR6-1 FAULT 1035 MOTOR OVERTEMP TO PLC 1017 _ ff - _ CR SOFT STARTER rnnn —I ni n 3 FAULT RELAY CR7-1 FAULT 1036 PUMP SEAL FAIL TO PLC 1018 1019 1020 1021 1022 1023 L -CONTINUED TO UPPER RIGHT LINE 1024 • REVISIONS DATE BY DESIGNED C. CARLSON DRAWN J. VONDERAHE CHECKED M. CASANOVA APPROVED C. WITTMAN AUTO RUN CALL RELAY N -CONTINUED TO UPPER RIGHT LINE 1024 PROJECT NAME CITY OF PORT ORCHARD SEWER LIFT STATION CONTROLS UPGRADE 216 PROSPECT STREET PORT ORCHARD, WA 98366 N- CONTINUED FROM LOWER LEFT LINE 1023 MOTOR OVERTEMP RELAY PUMP SEAL FAIL RELAY 00 LIFT STATION SITE VOLTAGE HP TREMONT 240 VAC 3 GOLDEN POND 480 VAC 7.5 EAGLE CREST 208 VAC 5 FLOWER MEADOWS 208 VAC 7.5 CEDAR HEIGHTS 240 VAC 2 SEDGWICK 480 VAC 20 TYPICAL SOFT STARTER ELEMENTARY DIAGRAM DRAWING NO. 7 OF 25 E02 NEMA 4X PAD -LOCKABLE JUNCTION BOX ZOWN, B -ORANGE, C -YELLOW N -GRAY, G -GREEN COORDINATE PAD AND ANCHOR BOLT SIZE AND LOCATION WITH EQUIPMENT MANUFACTURER C9 zz zoo cn 0 <0 1 1 MALE CAM LOCK CONNECTOR (T' B 0 GREEN GRAY YELLOW PORTABLE GENERATOR RECEPTACLE DETAIL 1 WEATHERHEA SCALE: NONE RADIO ANTENNA COAXIAL CABLE i 2 ) MAIN CELL ANTENNA GROUND PLAN ANCHOR CONDUIT TO EQUIPMENT RACK OR STRUCTURE PER SITE WITH STRUT STRAPS 0 LENGTH AS NEEDED 0 PERFORM RADIO STUDY PRIOR TO ANTENNA INSTALLATIC PROVIDE MAST LENGTH AND RADIO ANTENNA ORIENTATIC AS NECESSARY FOR DIRECTIONAL RADIO COMMUNICATIO WITH PUBLIC WORKS SHOP. 0 ORIENT THE CELL ANTENNAS IN THE SAME DIRECTION AS THE RADIO ANTENNA. 3. THIS DETAIL IS A REPRESENTATION OF THE ANTENNA MOUNTING SYSTEM. THE CONTRACTOR SHALL SUBMIT SHOP DRAWINGS OF THE PROPOSED ANTENNA MOUNT. • REVISIONS DATE BY DESIGNED C. CARLSON DRAWN J. VONDERAHE CHECKED Checker APPROVED C. WITTMAN O 0 U, a:: #4 @ 12" (N J EACH WAY (NO ANCHOR BOLT EPDXY INTO SLAB #4 @ 12" ALL AROUND DOWELED WITH EPDXY EQUIPMENT PAD DETAIL 2 SCALE: NONE ANTENNA ANCHOR KIT GALVANIZED RIGID CONDUIT ANTENNA MOUNT DETAIL 3 SCALE: NONE 2" x 6" RIGID CONDUIT NIPPLE WEATHERHEAD CABLE FINISH GRADE GROUT ROUGHEN STRUT BRACIN nnnnl In ATrn nnnrlkln RICATED PANEL K CONCRETE POLE BASES RAIN HOOD EQUIPMENT RACK DETAIL 4 SCALE: NONE PROJECT NAME CITY OF PORT ORCHARD SEWER LIFT STATION CONTROLS UPGRADE 216 PROSPECT STREET PORT ORCHARD, WA 98366 G EL I] ELECTRICAL DETAILS DRAWING NO. 8 OF 25 E03 FROM UTILITY 3P, 4W, 240/120V P-102 RTU-1 125A PDB, 240V, 3PH, 4W b\ 20A RVSS-1 3 p1i UM -1 M I EUSERC UTILITY METER Li 60A 3P 125AF 35AT 20A 3P RVSS-2 RCPT -1 TERMINATION BOX INEMA 4X _ 600V, 5P, 300A 20A 20A 20A )3P )3P 1P U PM SPD PLC P-121 TB -2 P-122 • REVISIONS DATE BY DESIGNED C. CARLSON DRAWN J. VONDERAHE CHECKED M. CASANOVA APPROVED C. WITTMAN NAME: TREMONT RTU-1 SERVICE v 3 VOLTAGE: 240 NEUTRAL BUS: YES LOCATION: TREMONT LS GROUND BUS: YES FED FROM: PSE UTILITY PHASE: 3 MAIN BREAKER SIZE: 35 AMPS FEED (OCPD SIZE): WIRE: 4 MINIMUM BUS SIZE: 125 AMPS ENCLOSURE TYPE: NEMA4X HERTZ: 60 FAULT CURRENT BRACING: 25k AMPS, RMS SYMMETRICAL CONNECTED LOAD ASSET NUMBER EQUIPMENT NAME OR LOAD LOAD LOAD LTG RCPT MOTOR HVAC MISC LARGEST LOAD DESCRIPTION VOLT PH HP AMPS KVA TYPE MOTOR SIZE UNIT P-1 PUMP 1 9.6 A 240 3 0.0 9.6 4.0 LM 0.0 0.0 0.0 0.0 0.0 4.0 P-2 PUMP 2 9.6 A 240 3 0.0 9.6 4.0 M 0.0 0.0 4.0 0.0 0.0 0.0 PLC -1 PLC 16 A 120 1 0.0 16.0 1.9 X 0.0 0.0 0.0 0.0 1.9 0.0 Connected Totals: 0.00 0.00 3.99 0.00 1.92 3.99 TREMONT RTU-1 SERVICE LOAD CALCULATION CONNECTED KVA METHOD NEC DEMAND CALC.KVA TOTAL LIGHTING (L) LOAD: L 0.00 ALL @ 125% 0.00 TOTAL RECEPTACLE (R) LOAD: R 0.00 FIRST 10KVA @ 125% 0.00 REMAINDER OVER 10KVA 50% 0.00 TOTAL MOTOR (M) LOAD: M 3.99 ALL @ 100% 3.99 LM 3.99 125% OF LARGEST 125% 4.99 TOTAL HVAC (H) LOAD: H 0.00 ALL @ 125% 0.00 TOTAL MISCELLANEOUS (X) LOAD: X 1.92 ALL @ 125% 2.40 TOTAL KVA: 9.90 KVA 11.38 KVA AVERAGE AMPS @ 240 volts 23.82 AMPS 27.37 AMPS PROJECT NAME CITY OF PORT ORCHARD SEWER LIFT STATION CONTROLS UPGRADE 216 PROSPECT STREET PORT ORCHARD, WA 98366 TREMONT ONE -LINE (ADDITIVE ALTERNATIVE 1) DRAWING NO. 9 OF 25 E11 NI RT-1 ( 3 j ANTENNA MAST `✓ EXISTINb r,/-\ur\ Hivu VUSTS �i TB -1 � P-102 O TB -2 % C-103 1 S-101 MOUNTING FLANGE, /' (P -122j I TB -4 S-102 TELEPHONE POLE 2 LE I I / _ _ / 1 P-1 LSL � M WET WELL P-2 M 1 WET WELL CLASS I, DIVISION 2 BOUNDARY TREMONT SITE PLAN SCALE: 1" = 1'-0" • REVISIONS DATE BY DESIGNED C. CARLSON DRAWN J. VONDERAHE CHECKED M. CASANOVA APPROVED C NOTES: /1 CLASS I, DIVISION 1, GROUP D SPACE INSIDE WET WELL. CLASS I, DIVISION 2, GROUP D OUTSIDE WET WELL UP TO 3' FROM OPENING AND 18" ABOVE GRADE. PROVIDE SEAL -OFFS ABOVE GRADE. 2 COORDINATE LEVEL FLOAT AND ELEMENT MOUNTING ELEVATION WITH THE CITY. ( 3 j DEMOLISH EXISTING RTU. INSTALL NEW RTU IN PLACE. MTS-1 I TB -1 AND TB -2 SHALL BE RATED CLASS I, DIVISION 2 14 EXPLOSION -PROOF. UM -1 I 5. NOT ALL CONDUIT BETWEEN PANELS ARE SHOWN, FOR CLARITY. 6 j TB -4 SHALL BE NEMA 4X, 6"H x 6"W x 4"D MINIMUM DIMENSIONS. ``✓✓ INSTALL LEVEL ELEMENT MOISTURE BARRIER IN TB -4. PROVIDE AND INSTALL SEAL -OFF FITTING BETWEEN TB -4 AND WET WELL. 7. PROVIDE ROOF FOR EQUIPMENT RACK. REFER TO SHEET E03 RCPT -1 DETAIL 4. CONDUIT AND CABLE SCHEDULE v2.0 NUMBER CONDUIT QTY & SIZE CONDUIT TYPE WIRE FILL WIRE TYPE FROM TO VIA REMARKS P-101 (1)1" GRS (3)#6, (1)#6N, (1)#8G XHHW-2 RCPT -1 MTS-1 REUSE EXISTING CONDUIT P-102 (1)1" GRS (3)#6, (1)#8G XHHW-2 MTS-1 RTU-1 SEAL OFF P-111 (1)1" GRS (3)#12, (1)#12G XHHW-2 RTU-1 TB -1 P-112 (1)1" GRS MFR - TB -1 P-1 REUSE EXISTING CONDUIT AND CABLE P-121 (1)1" GRS (3)#12, (1)#12G XHHW-2 RTU-1 TB -2 SEAL OFF P-122 (1)1" GRS MFR - TB -2 P-2 REUSE EXISTING CONDUIT AND CABLE C-101 (1)1" GRS (2)#14, #14G XHHW-2 RTU-1 TB -1 SEAL OFF P-1 OVERTEMP/SEAL FAIL C-102 (1)1" GRS (2)#14, #14G XHHW-2 RTU-1 TB -2 SEAL OFF P-2 OVERTEMP/SEAL FAIL C-103 (1)1" GRS (2)MFR - RTU-1 LSL-1, LSH-1 SEAL OFF & TB -4 REUSE EXISTING CONDUIT S-101 (1) 1" GRS (3)TSP - RTU-1 TB -4 (1) LEVEL SIGNAL, (2) SPARES TERMINATE SPARE WIRES IN TB -4 S-102 (1)1" GRS MFR - TB -4 LE -1 SEAL OFF D-101 (1)1" GRS (2)COAX - RTU-1 ANTENNA PROJECT NAME CITY OF PORT ORCHARD SEWER LIFT STATION CONTROLS UPGRADE 216 PROSPECT STREET PORT ORCHARD, WA 98366 TREMONT SITE PLAN (ADDITIVE ALTERNATIVE 1) DRAWING NO. 10 OF 25 E12 P-1 FROM UTILITY 3P, 4W, 480/277V pTi UM -1 M I EUSERC UTILITY METER LYi FDS-1 EUSERC SERVICE ENTRANCE FUSED DISCONNECT SWITCH I I G N ATS-1 O � J __- GJ PNL-A I LI I RCPT -1 XFMR-1 7.5kVA 480-240/120V LrTinI PNL-B RTU-1 1UUAr 45AT 100A PDB, 480V, 3PH, 4W 20A 20A 2p I CONTROLS ,VSS-2 RVSS-1 P-2 P-221 DS -2 )A b 20A • REVISIONS DATE BY DESIGNED C. CARLSON DRAWN J. VONDERAHE CHECKED M. CASANOVA APPROVED C. WITTMAN NAME: GOLDEN POND PNL-A SERVICE v3 VOLTAGE: 480 NEUTRAL BUS: YES LOCATION: GOLDEN POND LS GROUND BUS: YES FED FROM: PSE UTILITY PHASE: 3 MAIN BREAKER SIZE: 60 AMPS FEED (OCPD SIZE): WIRE: 4 MINIMUM BUS SIZE: 100 AMPS ENCLOSURE TYPE: NEMA4X HERTZ: 60 FAULT CURRENT BRACING: 25k AMPS, RMS SYMMETRICAL CONNECTED LOAD ASSET NUMBER EQUIPMENT NAME OR LOAD LTG RCPT MOTOR HVAC MISC LARGEST LOAD LOAD LOAD DESCRIPTION VOLT PH HP AMPS KVA TYPE MOTOR SIZE UNIT I P-1 PUMP 1 PUMP 2 7.5 HP 480 3 7.5 11.0 9.1 LM 0.0 0.0 0.0 0.0 9.1 0.0 0.0 0.0 0.0 9.1 0.0 P-2 7.5 HP 480 3 7.5 11.0 9.1 M 0.0 XFMR-1 PNL-B TRANSFORMER 7.5 KVA 480 1 0.0 15.6 7.5 X 0.0 0.0 0.0 0.0 7.5 0.0 Connected Totals: 0.00 0.00 9.15 0.00 7.50 9.15 GOLDEN POND PNL-A SERVICE LOAD CALCULATION: CONNECTED KVA METHOD NEC DEMAND CALC. KVA TOTAL LIGHTING (L) LOAD: L 0.00 ALL @ 125% 0.00 TOTAL RECEPTACLE (R) LOAD: R 0.00 FIRST 10KVA @ 125% 0.00 REMAINDER OVER 10KVA 50% 0.00 TOTAL MOTOR (M) LOAD: M 9.15 ALL @ 100% 9.15 LM 9.15 125% OF LARGEST 125% 11.43 TOTAL HVAC (H) LOAD: H 0.00 ALL @ 125% 0.00 TOTAL MISCELLANEOUS (X) LOAD: X 7.50 ALL @ 125% 9.38 TOTAL KVA: 25.79 KVA 29.95 KVA AVERAGE AMPS @ 480 volts 31.02 AMPS 36.03 AMPS PROJECT NAME CITY OF PORT ORCHARD SEWER LIFT STATION CONTROLS UPGRADE 216 PROSPECT STREET PORT ORCHARD, WA 98366 NOTES: /1 PROVIDE LABELS WITH THE FOLLOWING TEXT: a. "CAUTION, THIS EQUIPMENT IS POWERED BY MORE THAN ONE SOURCE" b. "480 VOLTS" GOLDEN POND ONE -LINE (ADDITIVE ALTERNATIVE 2) DRAWING NO. 11 OF 25 E21 NOTES: /1 CLASS I, DIVISION 1, GROUP D SPACE INSIDE WET WELL. CLASS I, DIVISION 2, GROUP D OUTSIDE WET WELL UP TO 3' FROM OPENING AND 18" ABOVE GRADE. PROVIDE SEAL -OFFS ABOVE GRADE. COORDINATE LEVEL FLOAT AND ELEMENT MOUNTING ELEVATION ,2 GEN-1 I WITH THE CITY. ( 3 j DEMOLISH EXISTING RTU AND MOTOR STARTER PANEL. INSTALL `�✓ NEW RTU IN PLACE. 4. NOT ALL CONDUIT BETWEEN PANELS ARE SHOWN, FOR CLARITY. I ATS-1 I XFMR-1 OFRTU-1 ANTENNA MAST EXISTING RACK AND POSTS I \ PNL-A T-4 DS -2 C-203 DS -1 S-202 LE / C LSH M O LSL ��;;,,// 1 ® WET WELL M I OWETWELLCLASSI, DIVISION 2 BOUNDARY • REVISIONS DATE BY DESIGNED C. CARLSON DRAWN J. VONDERAHE CHECKED M. CASANOVA APPROVED C. WITTMAN I MTS-1 I UM -1 FDS-1 RCPT -1 5. CANOPY ROOF NOT SHOWN FOR BETTER VIEW OF EQUIPMENT RACK LAYOUT. [ 6 ) TB -4 SHALL BE NEMA 4X, 6"H x 6"W x 4"D MINIMUM DIMENSIONS. '.•.•// INSTALL LEVEL ELEMENT MOISTURE BARRIER IN TB -4. PROVIDE SEAL -OFF BETWEEN TB -4 AND WET WELL. CONDUIT AND CABLE SCHEDULE v2.0 CONDUIT QTY & CONDUIT WIRE NUMBER SIZE TYPE WIRE FILL TYPE FROM TO VIA REMARKS P-201 P-203 (1)1" (1)1" GRS (3)#6, (1)#8G XHHW-2 (3)#12, (1)#12G XHHW-2 PNL-A PNL-B RTU-1 RTU-1 DS -1 DS -2 REUSE EXISTING PNL-A BREAKER REUSE EXISTING CONDUIT AND CABLE REUSE EXISTING CONDUIT REUSE EXISTING CONDUIT GRS P-211 (1)1" GRS (3)#12, (1)#12G XHHW-2 RTU-1 P-221 (1)1" GRS (3)#12, (1)#12G XHHW-2 RTU-1 C-201 (1)1" GRS (2)#14, #14G XHHW-2 RTU-1 P-1 SEAL LEAK/OVERTEMP INTERCEPT CABLES ABOVE EXISTING SEAL -OFF C-202 (1)1" GRS (2)#14, #14G XHHW-2 (2)MFR - (3)TSP - RTU-1 RTU-1 RTU-1 P-2 SEAL LEAK/OVERTEMP LSL-1, LSH-1 TB -4 SEAL OFF & TB -4 INTERCEPT CABLES ABOVE EXISTING SEAL -OFF REUSE EXISTING CONDUIT C-203 (1)1" GRS S-201 (1)1" GRS (1) LEVEL SIGNAL, (2) SPARES TERMINATE SPARE WIRES IN TB -4 S-202 (1)1" GRS MFR - TB -4 LE -1 SEAL OFF D-201 (1)1" GRS (2)COAX - RTU-1 ANTENNA PROJECT NAME CITY OF PORT ORCHARD SEWER LIFT STATION CONTROLS UPGRADE 216 PROSPECT STREET PORT ORCHARD, WA 98366 GOLDEN POND SITE PLAN (ADDITIVE ALTERNATIVE 2) DRAWING NO. 12 OF 25 E22 FROM UTILITY 3P, 4W, 208/120V pTi UM -1 M I EUSERC UTILITY METER P-301 -`� MCB-1 EUSERC SERVICE ENTRANCE 125AF MAIN CIRCUIT BREAKER 80AT P-305 GN ATS-1 P-302 NEMA4X 208V. 3P. 80A P-306 I RTU-1 I 125A PDB, 208V, 3PH, 4W L P -311 TE P-312 P-1 25A 1 '1P RVSS-1 P-2 I)I 125AF 80AT 0\ 25A )gyp RVSS-2 P-321 I MTS-1 b 20A 3P SPD ONE -LINE DIAGRAM SCALE: NONE • REVISIONS DATE BY DESIGNED C. CARLSON DRAWN J. VONDERAHE CHECKED M. CASANOVA APPROVED C. WITTMAN NEMA4X 208V, 3P, 80A I GEN-1 100AF 80AT I 25kW P-304 LI j1 RCPT -1 TERMINATION BOX NEMA4X 600V, 5P, 300A L 1 20A /1P 1 25A /1P GEN BLOCK HTR 25A lip GEN BATTERY CHARGER NEUTRAL FROM TRANSFORMER NAME: EAGLE CREST RTU-1 SERVICE v3 VOLTAGE: 208 NEUTRAL BUS: YES LOCATION: EAGLE CREST LS GROUND BUS: YES FED FROM: PSE UTILITY PHASE: 3 MAIN BREAKER SIZE: 80 AMPS FEED (OCPD SIZE): WIRE: 4 MINIMUM BUS SIZE: 125 AMPS ENCLOSURE TYPE: NEMA4X HERTZ: 60 FAULT CURRENT BRACING: 25k AMPS, RMS SYMMETRICAL CONNECTED LOAD ASSET NUMBER EQUIPMENT NAME OR LOAD LTG RCPT MOTOR HVAC MISC LARGEST LOAD LOAD LOAD DESCRIPTION VOLT PH HP AMPS KVA TYPE MOTOR SIZE UNIT P-1 PUMP 1 PUMP 2 PLC 5 HP 208 3 5.0 16.7 6.0 LM M 0.0 0.0 0.0 0.0 0.0 6.0 P-2 5 HP 208 3 5.0 16.7 6.0 0.0 0.0 6.0 0.0 0.0 0.0 PLC -1 16 A 120 1 0.0 16.0 1.9 X 0.0 0.0 0.0 0.0 1.9 0.0 GEN-1 GEN BLOCK HEATER 2 KVA 120 1 0.0 16.7 2.0 X 0.0 0.0 0.0 0.0 2.0 0.0 GEN-1 GEN BATTERY CHARGER 2 KVA 120 1 0.0 16.7 2.0 X 0.0 0.0 0.0 0.0 2.0 0.0 Connected Totals: 0.00 0.00 6.02 0.00 5.92 6.02 EAGLE CREST RTU-1 SERVICE LOAD CALCULATION: CONNECTED KVA METHOD NEC DEMAND CALC. KVA TOTAL LIGHTING (L) LOAD: L 0.00 ALL @ 125% 0.00 TOTAL RECEPTACLE (R) LOAD: R 0.00 FIRST 10KVA @ 125% 0.00 REMAINDER OVER 10KVA 50% 0.00 TOTAL MOTOR (M) LOAD: M 6.02 ALL @ 100% 6.02 LM 6.02 125% OF LARGEST 125% 7.52 TOTAL HVAC (H) LOAD: H 0.00 ALL @ 125% 0.00 TOTAL MISCELLANEOUS (X) LOAD: X 5.92 ALL @ 125% 7.40 TOTAL KVA: 17.95 KVA 20.94 KVA AVERAGE AMPS @ 208 volts 49.83 AMPS 58.12 AMPS EUSERC METERING SECTION GROUNDING LEGEND EBJ = EQUIPMENT BONDING JUMPER EGO = EQUIPMENT GROUNDING CONDUCTOR GEC = GROUNDING ELECTRODE CONDUCTOR MBJ = MAIN BONDING JUMPER SBJ = SYSTEM BONDING JUMPER SSBJ = SUPPLY-SIDE BONDING JUMPER GEBJ = GROUNDING ELECTRODE BONDING JUMPER PROJECT NAME TRANSFER SWITCH CONNECTION DIAGRAM SCALE: NONE CITY OF PORT ORCHARD SEWER LIFT STATION CONTROLS UPGRADE 216 PROSPECT STREET PORT ORCHARD, WA 98366 EAGLE CREST ONE -LINE (BASE BID) ;OM )R DRAWING NO. 13 OF 25 E31 NOTES: (h1 /1 _ - CLASS I, DIVISION 1, GROUP D SPACE INSIDE WET WELL. - _ CHAIN LINK FENCE - _ - CLASS I, DIVISION 2, GROUP D OUTSIDE WET WELL UP TO 3' FROM _ BOUNDARY - - - ` OPENING AND 18" ABOVE GRADE. PROVIDE SEAL -OFFS ABOVE GRADE. 2 COORDINATE LEVEL FLOAT AND ELEMENT MOUNTING ELEVATION WITH THE CITY. ( 3 j DEMOLISH EXISTING RTU AND MOTOR STARTER PANEL. INSTALL `�✓ RTU PANEL IN PLACE. OTB -1 AND TB -2 SHALL BE RATED CLASS I, DIVISION 2 EXPLOSION -PROOF. 5. NOT ALL CONDUIT BETWEEN PANELS ARE SHOWN, FOR CLARITY. ( 6 j CONTRACTOR SHALL ADD ADDITIONAL RACK TO ACCOMMODATE q Z VAULT '✓ SPACE FOR THE NEW PANEL EQUIPMENT. ( 7 j TB -4 SHALL BE NEMA 4X, 6"H x 6"W x 4"D MINIMUM DIMENSIONS. INSTALL LEVEL ELEMENT MOISTURE BARRIER IN TB -4. PROVIDE SEAL -OFF BETWEEN TB -4 AND WET WELL. 8. PROVIDE ROOF FOR EQUIPMENT RACK. REFER TO SHEET E03 DETAIL 4 GEN-1 )WET WELL CLASS I, DIVISION 2 BOUNDARY y P-1 WET WELL LSL 2 WET WELLIACCESS VAULT M M // 74 LE � 1 I I C -303 2 LSH S-302 1 3 RTU-1 P-331 ! " C-321 P-304 • REVISIONS DATE BY DESIGNED C. CARLSON DRAWN J. VONDERAHE CHECKED M. CASANOVA APPROVED C. WITTMAN PROJECT NAME CITY OF PORT ORCHARD SEWER LIFT STATION CONTROLS UPGRADE 216 PROSPECT STREET PORT ORCHARD, WA 98366 EAGLE CREST SITE PLAN (BASE BID) DRAWING NO. 14 OF 25 E32 I RTU-1 • I 125A PDB, 208V, 3PH, 4W b\ 35A lip RVSS-1 I P-411 P-1 b` 35A qp P-2 RVSS-2 P-404 FROM UTILITY 3P, 4W, 208/120V UM -1 M EUSERC UTILITY METER Li MOB -1 EUSERC SERVICE ENTRANCE MAIN CIRCUIT BREAKER I G N _ b\ 35A qp 7.5 P-3 RVSS-3 B-3 P-431 -432 125AF 125AT P-402 NAME: FLOWER MEADOWS RTU-1 SERVICE v 3 VOLTAGE: 208 NEUTRAL BUS: YES LOCATION: FLOWER MEADOWS LS GROUND BUS: YES FED FROM: PSE UTILITY PHASE: 3 MAIN BREAKER SIZE: 125 AMPS FEED (OCPD SIZE): WIRE: 4 MINIMUM BUS SIZE: 125 AMPS ENCLOSURE TYPE: NEMA 4X HERTZ: 60 FAULT CURRENT BRACING: 25k AMPS, RMS SYMMETRICAL CONNECTED LOAD ASSET NUMBER EQUIPMENT NAME OR LOAD LTG RCPT MOTOR HVAC MISC LARGEST LOAD LOAD LOAD DESCRIPTION VOLT PH HP AMPS KVA TYPE MOTOR SIZE UNIT P-1 PUMP 1 PUMP 2 7.5 HP 208 3 7.5 24.2 8.7 LM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 8.7 0.0 P-2 7.5 HP 208 3 7.5 24.2 8.7 M 0.0 0.0 8.7 P-3 PUMP 3 7.5 HP 208 3 7.5 24.2 8.7 M 0.0 0.0 8.7 0.0 0.0 0.0 PLC -1 PLC 16 A 120 1 0.0 16.0 1.9 X 0.0 0.0 0.0 0.0 1.9 0.0 GEN-1 GEN BLOCK HEATER 2 KVA 120 1 0.0 16.7 2.0 X 0.0 0.0 0.0 0.0 2.0 0.0 GEN-1 GEN BATTERY CHARGER 2 KVA 120 1 0.0 16.7 2.0 X 0.0 0.0 0.0 0.0 2.0 0.r Connected Totals: 0.00 0.00 17.44 0.00 5.92 8.72 MTS-1 NEMA 4X / GEN-1 FLOWER MEADOWS RTU-1 SERVICE LOAD CALCULATION: ATS-1 208V, 3P, 125A / - - CONNECTED KVA METHOD NEC DEMAND CALC. KVA TOTAL LIGHTING (L) LOAD: L 0.00 ALL @ 125% 0.00 TOTAL RECEPTACLE (R) LOAD: R 0.00 FIRST 10KVA @ 125% 0.00 REMAINDER OVER 10KVA 50% 0.00 G I TOTAL MOTOR (M) LOAD: M 17.44 ALL© 100% 17.44 LM 8.72 125% OF LARGEST 125% 10.90 TOTAL HVAC (H) LOAD: H 0.00 ALL @ 125% 0.00 TOTAL MISCELLANEOUS (X) LOAD: X 5.92 ALL @ 125% 7.40 P-401 TOTAL KVA: 32.08 KVA 35.73 KVA AVERAGE AMPS @ 208 volts 89.03 AMPS 99.19 AMPS RCPT -1 TERMINATION BOX LI©'NEMA 4X 600V, 5P, 300A 20A 3P PM • REVISIONS DATE BY DESIGNED C. CARLSON DRAWN J. VONDERAHE CHECKED M. CASANOVA APPROVED C. WITTMAN 20A 3P SPD 20A /1P 25A b\ 25A ip 1P GENI I GEN 1 BLOCK I I BATTERY LHTR CHARGER PROJECT NAME CITY OF PORT ORCHARD SEWER LIFT STATION CONTROLS UPGRADE 216 PROSPECT STREET PORT ORCHARD, WA 98366 FLOWER MEADOWS ONE -LINE (BASE BID) DRAWING NO. 15 OF 25 E41 'oC 3 1 RTU-1 EXISTING RACK ANTENNA MAST i 4 ] TB -1 4 N TB -2 i I P-412 P 422 I , P-432 NEW RACK ADDITION - MTS-1 I RCPT -1 XFMR P-441 - - - - - - - ------------------------------------------------------------ P-402 TB -4 8 ATS-1 TB -3 C-404 S-402 \` M P-21 WET WELL M P-3 � - / / / OWETWELL CLASS I, DIVISION 2 BOUNDARY • REVISIONS DATE BY DESIGNED C. CARLSON DRAWN J. VONDERAHE CHECKED M. CASANOVA APPROVED C. WITTMAN I UM -1 MOB -1 FIRE EXTINGUISHER ISTING RACK NOTES: /1 CLASS I, DIVISION 1, GROUP D SPACE INSIDE WET WELL. CLASS I, DIVISION 2, GROUP D OUTSIDE WET WELL UP TO 3' FROM OPENING AND 18" ABOVE GRADE. PROVIDE SEAL -OFFS ABOVE GRADE. 2 COORDINATE LEVEL FLOAT AND ELEMENT MOUNTING ELEVATION WITH THE CITY. ( 3 j DEMOLISH EXISTING RTU AND MOTOR STARTER PANEL. INSTALL `�✓ RTU PANEL IN PLACE. ( 4 j TB -1, TB -2 AND TB -3 SHALL BE RATED CLASS I, DIVISION 2 EXPLOSION -PROOF. �5. NOT ALL CONDUIT BETWEEN PANELS ARE SHOWN, FOR CLARITY. ( 6 j TERMINATE EXISTING GENSET/ATS CONTROL, BLOCK HEATER '✓ AND BATTERY CHARGER TO NEW RTU. 0 CONTRACTOR SHALL ADD ADDITIONAL RACK TO ACCOMMODATE SPACE FOR THE NEW PANEL EQUIPMENT. ( 8 j TB -4 SHALL BE NEMA 4X, 6"H x 6"W x 4"D MINIMUM DIMENSIONS. ��••// INSTALL LEVEL ELEMENT MOISTURE BARRIER IN TB -4. PROVIDE SEAL -OFF BETWEEN TB -4 AND WET WELL. 9. PROVIDE ROOF FOR EQUIPMENT RACK. REFER TO SHEET E03 DETAIL 4. CONDUIT AND CABLE SCHEDULE CONDUIT QTY & CONDUIT WIRE NUMBER SIZE TYPE WIRE FILL TYPE FROM TO VIA REMARKS P-401 (1)1-1/2" GRS (3)#1, (1)#1N, (1)#6G XHHW-2 RCPT -1 MTS-1 REUSE EXISTING CONDUIT AND CABLE P-402 (1)1-1/2" PVC40 (3)#1, (1)#1N, (1)#6G XHHW-2 GEN-1 MTS-1 P-403 (1)1-1/2" GRS (3)#1, (1)#1N, (1)#6G XHHW-2 MTS-1 ATS-1 P-404 (1)1-1/2" GRS (3)#1, (1)#1N, (1)#6G XHHW-2 ATS-1 RTU-1 P-411 (1)1" GRS (3)#10, (1)#10G XHHW-2 RTU-1 TB -1 SEAL OFF P-412 (1)1" GRS MFR (3)#10, (1)#10G MFR - XHHW-2 - TB -1 P-1 SEAL OFF REUSE EXISTING CONDUIT AND CABLE P-421 (1)1" GRS RTU-1 TB -2 P-422 (1)1" GRS TB -2 P-2 REUSE EXISTING CONDUIT AND CABLE P-431 (1)1" GRS (3)#10, (1)#10G XHHW-2 RTU-1 TB -3 SEAL OFF P-432 (1)1" GRS MFR - TB -3 P-3 REUSE EXISTING CONDUIT AND CABLE P-441 (1)1" PVC40 (4)#12, (1)#12G XHHW-2 RTU-1 GEN-1 REUSE EXISTING CONDUIT AND CABLE C-401 (1)1" GRS (2)#14, #14G XHHW-2 RTU-1 TB -1 SEAL OFF P-1 OVERTEMP/SEAL FAIL C-402 (1)1" GRS (2)#14, #14G XHHW-2 RTU-1 TB -2 SEAL OFF P-2 OVERTEMP/SEAL FAIL C-403 (1)1" GRS (2)#14, #14G XHHW-2 RTU-1 TB -3 LSL-1, LSH-1 TB -4 SEAL OFF SEAL OFF & TB -4 P-3 OVERTEMP/SEAL FAIL C-404 S-401 (1)1" GRS (2)MFR (3)TSP - RTU-1 REUSE EXISTING CONDUIT (1) LEVEL SIGNAL, (2) SPARES TERMINATE SPARE WIRES IN TB -4 (1)1" GRS - RTU-1 S-402 (1)1" GRS MFR - TB -4 LE -1 SEAL OFF D-401 (1)1" GRS (2)COAX - RTU-1 ANTENNA PROJECT NAME CITY OF PORT ORCHARD SEWER LIFT STATION CONTROLS UPGRADE 216 PROSPECT STREET PORT ORCHARD, WA 98366 FLOWER MEADOWS SITE PLAN (BASE BID) DRAWING NO. 16 OF 25 E42 NOTES: I RTU-1 I 125A PDB, 240V, 3PH, 4W P-511 TB - P -512 P-1 ) 15A / 'P RVSS-1 FROM UTILITY 3P, 4W, 480/277V SERVICE DISCONNECT p1i UM -1 M I EUSERC UTILITY METER L i MTS-1 XFMR-1 30kVA 480-240/120V HIGH -LEG DELTA SECONDARY 1LbAF 30AT P-2 RVSS-2 20A 20A 20A 3P )3P 1P PM SPD PLC n I �.J P-521 RCPT -1 P-522 • REVISIONS DATE BY DESIGNED C. CARLSON DRAWN J. VONDERAHE CHECKED M. CASANOVA APPROVED C. WITTMAN NAME: CEDAR HEIGHTS RTU-1 SERVICE v3 VOLTAGE: 240 NEUTRAL BUS: YES LOCATION: CEDAR HEIGHTS LS GROUND BUS: YES FED FROM: CEDAR HEIGHTS SCHOOL PHASE: 3 MAIN BREAKER SIZE: 30 AMPS FEED (OCPD SIZE): WIRE: 4 MINIMUM BUS SIZE: 125 AMPS ENCLOSURE TYPE: NEMA4X HERTZ: 60 FAULT CURRENT BRACING: 25k AMPS, RMS SYMMETRICAL CONNECTED LOAD ASSET NUMBER EQUIPMENT NAME OR LOAD LTG RCPT MOTOR HVAC MISC LARGEST LOAD LOAD LOAD DESCRIPTION VOLT PH HP AMPS KVA TYPE MOTOR SIZE UNIT P-1 PUMP 1 PUMP 2 2 HP 208 3 2.0 7.5 2.7 LM 0.0 0.0 0.0 0.0 0.0 2.7 P-2 2 HP 208 3 2.0 7.5 2.7 M 0.0 0.0 2.7 0.0 0.0 0.0 PLC -1 PLC 16 A 120 1 0.0 16.0 1.9 X 0.0 0.0 0.0 0.0 1.9 0.0 Connected Totals: 0.00 0.00 2.70 0.00 1.92 2.70 CEDAR HEIGHTS RTU-1 SERVICE LOAD CALCULATION: CONNECTED KVA F AFTunn NGr fII\AAF In ('Al r' V\/A TOTAL LIGHTING (L) LOAD: L 0.00 ALL @ 125% 0.00 TOTAL RECEPTACLE (R) LOAD: R 0.00 FIRST 10KVA @ 125% 0.00 REMAINDER OVER 10KVA 50% 0.00 TOTAL MOTOR (M) LOAD: M 2.70 ALL @ 100% 2.70 LM 2.70 125% OF LARGEST 125% 3.38 TOTAL HVAC (H) LOAD: H 0.00 ALL @ 125% 0.00 TOTAL MISCELLANEOUS (X) LOAD: X 1.92 ALL @ 125% 2.40 TOTAL KVA: 7.32 KVA 8.48 KVA AVERAGE AMPS @ 240 volts 17.62 AMPS 20.40 AMPS PROJECT NAME CITY OF PORT ORCHARD SEWER LIFT STATION CONTROLS UPGRADE 216 PROSPECT STREET PORT ORCHARD, WA 98366 1 EXISTING DISTRIBUTION TRANSFORMER SECONDARY IS HIGH -LEG �•/ DELTA. DO NOT USE THE HIGH LEG PHASE FOR EQUIPMENT REQUIRING 120VAC PHASE -TO -NEUTRAL POWER. CEDAR HEIGHTS ONE -LINE (ADDITIVE ALTERNATIVE 3) DRAWING NO. 17 OF 25 E51 NOTES: CHAIN LINK FENCE BOUNDARY XFMR-1 c2i RTU-1 /1 CLASS I, DIVISION 1, GROUP D SPACE INSIDE WET WELL. CLASS I, DIVISION 2, GROUP D OUTSIDE WET WELL UP TO 3' FROM OPENING AND 18" ABOVE GRADE. PROVIDE SEAL -OFFS ABOVE GRADE. ,2 COORDINATE LEVEL FLOAT AND ELEMENT MOUNTING ELEVATION WITH THE CITY. ( 3 j DEMOLISH EXISTING RTU. INSTALL RTU PANEL IN PLACE. OTB -1 AND TB -2 SHALL BE RATED CLASS I, DIVISION 2 EXPLOSION -PROOF. 5. NOT ALL CONDUIT BETWEEN PANELS ARE SHOWN, FOR CLARITY. ( 6 j CONTRACTOR SHALL ADD ADDITIONAL RACK TO ACCOMMODATE SPACE FOR THE NEW PANEL EQUIPMENT. TB -4 SHALL BE NEMA 4X, 6"H x 6"W x 4"D MINIMUM DIMENSIONS. C-503 �••// INSTALL LEVEL ELEMENT MOISTURE BARRIER IN TB -4. PROVIDE S-501 SEAL -OFF BETWEEN TB -4 AND WET WELL. SERVICE 7 TB -4 / NEW RACK ADDITION 8. PROVIDE ROOF FOR EQUIPMENT RACK. REFER TO SHEET E03 DISCONNECT- j DS -1 DETAIL 4. ANTENNA MAST RCPT -1 UM -1 // I __ \\ * MTS-1 4 TB -1 I TB -2 KD P-512 ` P-522 C-503 EXISTING RACK AND POSTS S-502 2 LE 1 P-1 M 2 LSH 1 WET WELL P-2 2 LSL / \\\ N / 7 OWETWELL CLASS I, DIVISION 2 BOUNDARY • REVISIONS DATE BY DESIGNED C. CARLSON DRAWN J. VONDERAHE CHECKED M. CASANOVA APPROVED C. WITTMAN CONDUIT AND CABLE SCHEDULE v2.0 NUMBER CONDUIT QTY & SIZE CONDUIT TYPE WIRE FILL WIRE TYPE FROM TO VIA REMARKS P-501 (1)1" GRS (3)#10, (1)#10G XHHW-2 DS -1 RTU-1 SEAL OFF P-511 (1)1" GRS (3)#12, (1)#12G XHHW-2 RTU-1 TB -1 P-512 (1)1" GRS MFR - TB -1 P-1 REUSE EXISTING CONDUIT AND CABLE P-521 (1)1" GRS (3)#12, (1)#12G XHHW-2 RTU-1 TB -2 SEAL OFF P-522 (1)1" GRS MFR - TB -2 P-2 REUSE EXISTING CONDUIT AND CABLE C-501 (1)1" GRS (2)#14, #14G XHHW-2 RTU-1 TB -1 SEAL OFF P-1 OVERTEMP/SEAL FAIL C-502 (1)1" GRS (2)#14, #14G XHHW-2 RTU-1 TB -2 SEAL OFF P-2 OVERTEMP/SEAL FAIL C-503 S-501 (1)1" (1)1" (1)1" GRS (2)MFR (3)TSP - RTU-1 RTU-1 LSL-1, LSH-1 SEAL OFF & TB -4 REUSE EXISTING CONDUIT (1) LEVEL SIGNAL, (2) SPARES TERMINATE SPARE WIRES IN TB -4 GRS - TB -4 LE -1 S-502 GRS MFR - TB -4 SEAL OFF D-501 (1)1" GRS (2)COAX - RTU-1 ANTENNA PROJECT NAME CITY OF PORT ORCHARD SEWER LIFT STATION CONTROLS UPGRADE 216 PROSPECT STREET PORT ORCHARD, WA 98366 CEDAR HEIGHTS SITE PLAN (ADDITIVE ALTERNATIVE 3) DRAWING NO. 18 OF 25 E52 FROM UTILITY 3P, 4W, 480/277V F UM-1 M I EUSERC UTILITY METER Li I DS -1 SERVICE ENTRANCE FUSED DISCONNECT SWITCH G N ATS-1 BUILDING P-601 I XFMR-1 ,U 5kVA fl 480-240/120V MTS-1 I I GEN-1 LTJ LI..-1 RCPT -1 PNL-B LOAD CENTER LI'240/120V 100A - - - P-603 RTU-1 F 100AF 90AT I I 100A PDB, 480V, 3PH, 4W 20A 35A 35A 1P 3P )3P I RVSS-1 i CONTROLS P-611 TB -3 TB -1 (P -6i2) OCU-1 20 P-1 _ I 1__-__-__-__-__- _I 20 TB -2 P-621 P-622 • REVISIONS DATE BY DESIGNED C. CARLSON DRAWN J. VONDERAHE CHECKED M. CASANOVA APPROVED C. WITTMAN NAME: SEDGWICK PNL-A SERVICE v 3 VOLTAGE: 480 NEUTRAL BUS: YES LOCATION: SEDGWICK LS GROUND BUS: YES FED FROM: PSE UTILITY PHASE: 3 MAIN BREAKER SIZE: 100 AMPS FEED (OCPD SIZE): WIRE: 4 MINIMUM BUS SIZE: 100 AMPS ENCLOSURE TYPE: NEMA 1 HERTZ: 60 FAULT CURRENT BRACING: 25k AMPS, RMS SYMMETRICAL CONNECTED LOAD ASSET NUMBER EQUIPMENT NAME OR LOAD LOAD LOAD LTG RCPT MOTOR HVAC MISC LARGEST LOAD DESCRIPTION VOLT PH HP AMPS KVA TYPE MOTOR SIZE UNIT P-1 PUMP 1 20 HP 480 3 20.0 27.0 22.4 LM 0.0 0.0 0.0 0.0 0.0 22.4 P-2 PUMP 2 20 5 HP KVA 480 480 3 1 20.0 0.0 27.0 10.4 22.4 5.0 M X 0.0 0.0 0.0 0.0 22.4 0.0 0.0 0.0 5.0 0.0 0.0 XFMR-1 PNL-B TRANSFORMER 0.0 OCU-1 ODOR CONTROL UNIT 2 HP 480 3 2.0 3.4 2.8 M 0.0 0.0 2.8 0.0 0.0 0.0 Connected Totals: 0.00 0.00 25.27 0.00 5.00 22.45 SEDGWICK PNL-A SERVICE LOAD CALCULATION: CONNECTED KVA METHOD NEC DEMAND CALC. KVA TOTAL LIGHTING (L) LOAD: L 0.00 ALL @ 125% 0.00 TOTAL RECEPTACLE (R) LOAD: R 0.00 FIRST 10KVA @ 125% 0.00 REMAINDER OVER 10KVA 50% 0.00 TOTAL MOTOR (M) LOAD: M 25.27 ALL @ 100% 25.27 LM 22.45 125% OF LARGEST 125% 28.06 TOTAL HVAC (H) LOAD: H 0.00 ALL @ 125% 0.00 TOTAL MISCELLANEOUS (X) LOAD: X 5.00 ALL @ 125% 6.25 TOTAL KVA: 52.72 KVA 59.58 KVA AVERAGE AMPS @ 480 volts 63.41 AMPS 71.67 AMPS PROJECT NAME CITY OF PORT ORCHARD SEWER LIFT STATION CONTROLS UPGRADE 216 PROSPECT STREET PORT ORCHARD, WA 98366 SEDGWICK ONE -LINE (BASE BID) DRAWING NO. 19 OF 25 E61 NOTES: /1 CLASS I, DIVISION 1, GROUP D SPACE INSIDE WET WELL. CLASS I, DIVISION 2, GROUP D OUTSIDE WET WELL UP TO 3' FROM OPENING AND 18" ABOVE GRADE. PROVIDE SEAL -OFFS ABOVE GRADE. ,2 COORDINATE LEVEL FLOAT AND ELEMENT MOUNTING ELEVATION WITH THE CITY. ( 3 j DEMOLISH EXISTING MOTOR STARTER PANEL. INSTALL NEW RTU `�✓ IN PLACE. CHAIN LINK FENCE BOUNDARY VAULT XFMR-1 DISCONNECT WET WELL CLASS I, \SWITCH � 1 DIVISION 2 BOUNDARY MOB -1 UTILITY DISCONNECT SWITCH I UM -1 ANTENNA MAST 'I \\\ XFMR1IL 11 r • • • REVISIONS DATE BY DESIGNED C. CARLSON DRAWN J. VONDERAHE CHECKED M. CASANOVA APPROVED C. WITTMAN WET WELL ACCESS VAULT ( 4 j TB -1, TB -2 AND TB -3 SHALL BE RATED CLASS I, DIVISION 2 EXPLOSION -PROOF. 5. NOT ALL CONDUIT BETWEEN PANELS ARE SHOWN, FOR CLARITY. SOME EXISTING EQUIPMENT IS NOT SHOWN FOR CLARITY OF NEW EQUIPMENT. T1 TB -4 SHALL BE NEMA 4X, 6"H x 6"W x 4"D MINIMUM DIMENSIONS. '✓ INSTALL LEVEL ELEMENT MOISTURE BARRIER IN TB -4. PROVIDE SEAL -OFF BETWEEN TB -4 AND WET WELL. CONDUIT AND CABLE SCHEDULE v2.0 NUMBER CONDUIT QTY & SIZE CONDUIT TYPE WIRE FILL WIRE TYPE FROM TO VIA REMARKS P-601 (1)1-1/4" GRS (3)#2, (1)#8G XHHW-2 DS -1 RTU-1 REUSE EXISTING CONDUIT AND CABLE P-603 (1)1" GRS (3)#12, (1)#12G XHHW-2 PNL-B RTU-1 P-611 (1)1" (1)1" (1)1" (1)1" GRS (3)#8, (1)#8G XHHW-2 RTU-1 TB -1 SEAL OFF REUSE EXISTING CONDUIT AND CABLE _ P-612 P-621 GRS GRS MFR (3)#8, (1)#8G MFR - TB -1 RTU-1 P-1 TB -2 SEAL OFF XHHW-2 P-622 GRS - TB -2 P-2 REUSE EXISTING CONDUIT AND CABLE C-601 (1)1" GRS (2)#14, #14G XHHW-2 RTU-1 TB -1 SEAL OFF P-1 OVERTEMP/SEAL FAIL C-602 (1)1" GRS (2)#14, #14G XHHW-2 RTU-1 TB -2 SEAL OFF P-2 OVERTEMP/SEAL FAIL C-603 (1)1" GRS (2)MFR - RTU-1 LSL-1, LSH-1 SEAL OFF & TB -4 REUSE EXISTING CONDUIT S-601 S-602 (1)1" GRS (3)TSP - RTU-1 TB -4 SEAL OFF (1) LEVEL SIGNAL, (2) SPARES TERMINATE SPARE WIRES IN TB -4 (1)1" GRS MFR - TB -4 LE -1 D-601 (1)1" GRS (2)COAX - RTU-1 ANTENNA PROJECT NAME CITY OF PORT ORCHARD SEWER LIFT STATION CONTROLS UPGRADE 216 PROSPECT STREET PORT ORCHARD, WA 98366 SEDGWICK POND SITE PLAN (BASE BID) DRAWING NO. 20 OF 25 E62 I REVISIONS DATE I BY DESIGNED C. CARLSON DRAWN J. VONDERAHE CHECKED M. CASANOVA APPROVED C. WITTMAN A/' t' rl I AAIrrkIAIA t 2 j GEN-1 PROJECT NAME CITY OF PORT ORCHARD SEWER LIFT STATION CONTROLS UPGRADE 216 PROSPECT STREET PORT ORCHARD, WA 98366 NOTES: ( 1 j TRIPLEX PUMP STATION EQUIPMENT ONLY APPLICABLE FOR FLOWER MEADOWS. 0 GENERATOR AND ATS ETHERNET CONNECTION ONLY APPLICABLE FOR EAGLE CREST. �.../ PROVIDE A GE MCR ORBIT LN4 RADIO WITH THE FOLLOWING CARDS: a. SLOT 1: L4E 406.1-470 MHz RADIO. b. SLOT 2: CELLULAR 4G LTE, VERIZON CARRIER. LEGEND COAXIAL ETHERNET 24VDC POWER TYPICAL NETWORK BLOCK DIAGRAM DRAWING NO. 21 OF 25 101 NOTES: ( 1 j TRIPLEX PUMP STATION EQUIPMENT ONLY APPLICABLE FOR FLOWER MEADOWS. 0 0 00 0 __ 71 81 DI O [SI Iii 121 [SI _ o 131 141 I15 161 I17 181 [a] _ [a] [a] [a] [a] 191 201 I21 221 I23 241 [a] [a] [a] [a] [a] [a] 0 0 25 I o {c I28 29 301 311 0000 SWING OUT PANEL DETAIL 1 SCALE: NONE • REVISIONS DATE BY DESIGNED C. CARLSON DRAWN J. VONDERAHE CHECKED M. CASANOVA APPROVED C. WITTMAN o O O 3'-0" PANEL INTERIOR DETAIL 2 SCALE: NONE 0 PROJECT NAME NAMEPLATE SCHEDULE NAME PLATE LINE TEXT 01 1 RUNTIME 20 1 RUNTIME 30 1 RUNTIME ® 1 PUMP1 0 1 PUMP 2 © 1 PUMP 3 70 1 HAND OFF AUTO ® 1 RUNNING 90 1 HAND OFF AUTO 10 I 1 RUNNING 11 I 1 HAND OFF AUTO 12 I 1 RUNNING 13 1 2 SOFT START FAULT RESET 14 I 1 SEAL FAIL 15 1 2 SOFT START FAULT RESET 16 I 1 SEAL FAIL 17 1 2 SOFT START FAULT RESET 18 I 1 SEAL FAIL 191 1 START 20 I 1 OVERTEMP 211 1 START 22 I 1 OVERTEMP 231 1 START 24 I 1 OVERTEMP 25 1 2 SOFT START FAULT 26 1 2 SOFT START FAULT 27 1 2 SOFT START FAULT 28 1 2 FORCE FLOAT MODE 29 1 2 FORCE FLOAT RESET 30 I 1 FLOAT MODE 31 I 1 RUN TIMEOUT CITY OF PORT ORCHARD SEWER LIFT STATION CONTROLS UPGRADE 216 PROSPECT STREET PORT ORCHARD, WA 98366 PANEL INTERIOR IS A GENERAL ARRANGEMENT, AND NOT ALL COMPONENTS ARE SHOWN. REFER TO THE SPECIFICATIONS FOR REQUIRED COMPONENTS. TYPICAL RTU PANEL LAYOUT DRAWING NO. 22 OF 25 lfl L 1000 1001 1002 1003 1004 1005 1006 1007 1008 1009 1010 1011 1012 1013 1014 1015 1016 1017 1018 1019 1020 1021 1022 CONTINUED UPPER RIGHT CONTINUED UPPER RIGHT 120 VAC 1 PH 60HZ - N • REVISIONS DATE BY DESIGNED C. CARLSON DRAWN J. VONDERAHE CHECKED M. CASANOVA APPROVED C. WITTMAN CONVENIENCE RECEPTACLE FLOAT MODE WET WELL LEVEL HIGH CONTINUED UPPER RIGHT CONTINUED FROM LOWER LEFT 1023 T 1024 1025 1026 1027 1028 1029 1030 1031 1032 1033 1034 1035 1036 CONTINUED FROM LOWER LEFT 1037 1038 1039 CONTINUED ON DWG 104 LINE 1100 CONTINUED FROM LOWER LEFT PUMP 1 FLOAT CALL 5 SEC STAGGER START PUMP 2 FLOAT CALL 5 SEC STAGGER START PUMP 3 FLOAT CALL FLOAT PUMP DOWN TIMER FLOAT PUMP DOWN TIME 60 SEC RUN TIMEOUT PUMP MINIMUM OFF TIMER FLOAT PUMP DOWN RUN TIMEOUT CONTINUED ON DWG 104 LINE 1100 PROJECT NAME CITY OF PORT ORCHARD SEWER LIFT STATION CONTROLS UPGRADE 216 PROSPECT STREET PORT ORCHARD, WA 98366 NOTES: 0 TRIPLEX PUMP STATION EQUIPMENT ONLY APPLICABLE FOR FLOWER MEADOWS. TYPICAL RTU WIRING DIAGRAM DRAWING NO. 23 OF 25 103 CONTINUED FROM DWG 103 LINE 1039 1100 1101 1102 1103 1104 1105 1106 1107 1108 1109 1110 1111 1112 1113 1114 1115 1116 1117 1118 1119 1120 1121 1122 1123 • REVISIONS DATE BY DESIGNED C. CARLSON DRAWN J. VONDERAHE CHECKED M. CASANOVA APPROVED C. WITTMAN CONTINUED FROM DWG 103 LINE 1039 24VDC PWR SUPPLY 1 24VDC PWR SUPPLY 2 PROJECT NAME CITY OF PORT ORCHARD SEWER LIFT STATION CONTROLS UPGRADE 216 PROSPECT STREET PORT ORCHARD, WA 98366 TYPICAL RTU WIRING DIAGRAM CONTINUED DRAWING NO. 24 OF 25 104 WET WELL I I I I P1iiii MSH/TSH-1 I I I I I I I P-2 M MSH/TSH-2 I I I I I I 1 OP -3 M L---- MSH/TSH-3 I I I I I I I I I I I I I I I I I I CONTINUE TOP RIGHT CONTINUE TOP RIGHT • REVISIONS DATE BY DESIGNED C. CARLSON DRAWN J. VONDERAHE CHECKED M. CASANOVA APPROVED C. WITTMAN RTU-1 NOTES: 1. REFER TO SPECIFICATION SECTION 40 61 93 FOR PLC I/O SCHEDULE. 0 TRIPLEX PUMP STATION EQUIPMENT ONLY APPLICABLE FOR FLOWER MEADOWS. 0 FIELD VERIFY EXISTING TERMINATED GENERATOR AND ATS I/O, AND TERMINATE TO NEW PLC. GENERATOR AND ATS ONLY APPLICABLE FOR THE FOLLOWING LIFT STATIONS: a. GOLDEN POND b. EAGLE CREST c. FLOWER MEADOWS d. SEDGWICK 4� CONNECT TO CONTACTS FROM SEPARATE RELAYS FOR UTILITY AND EMERGENCY POSITION INDICATION. FROM BOTTOM LEFT FROM BOTTOM LEFT I I LE -1 11-------------------- LSHlo-T -------------------- LSL-10-+-------------------- - - - - - - - - - - - - - OO' - - - - - - - - - - - - - - - i - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - ATS-1 PROJECT NAME CITY OF PORT ORCHARD SEWER LIFT STATION CONTROLS UPGRADE 216 PROSPECT STREET PORT ORCHARD, WA 98366 FROM BOTTOM LEFT TYPICAL CONTROL SYSTEM BLOCK DIAGRAM DRAWING NO. 25 OF 25 105