Single Family Residential (SFR) Building Permit Fee Estimate
July 28, 2025
Subject to Change without Notice
The following is intended to provide builders with an estimate of the permit cost to build a new
single-family home (SFR) in the City of Port Orchard. The estimate assumes a 2 -story, 3 bedroom,
2,000 square foot house with an attached 400 square foot garage. The exact fees will vary
depending on factors including but not limited to the house size, location within the city, lot
characteristics, and number of fixtures.
Building Permit:
Building Permit Fee, Residential........................................................................................$3,092.00
Plan Review Fee, Residential...............................................................................................$2,009.80
Plumbing, Base + Fixtures......................................................................................................
$115.50
Mechanical, Base + Fixtures...................................................................................................
$153.95
TechnologyFee...........................................................................................................................
$10.00
StateSurcharge.................................................................................................................................
$6.50
Estimated Building Permit Fees
..................................................................$5,387.75
Impact Fees and Storm Drainage Capital Facility Charge (CFC):
These fees are charged on the building permit.
ParkImpact Fee........................................................................................................................$4,850.19
TrafficImpact Fee...................................................................................................................$7,498.00
SchoolImpact Fee...................................................................................................................$1,120.00
Storm Drainage Capital Facility Fee..................................................................................$3,087.00
Impact Fees and Storm Drainage CFC.......................................................$16,555.19
Total Estimated Fees...................................................................................$21,942.941
1 The assumptions used in the calculations above may be found on page 2.
Page 1 of 2
CITY OF PORT ORCHARD
216 Prospect Street
wi.,' rr p,
PERMIT FEE ESTIMATE Port Orchard WA 98366
(360)874-5533
Example for a Single Family Residence permticenter@portorchardwa.gov
July 28, 2025 - SUBJECT TO CHANGE WITHOUT NOTICE
Valuations Used to Calculate
Permit and Plan Review Fees
Type Sq. ft.
Valuation
Main (first) floor: 1,000
$169,090.00
Second floor: 1,000
$169,090.00
New garage, attached: 400
$26,840.00
Total Valuation for Estimate:
$364.660.00
Estimated Fees on Building Permit
Building Permit Fee, Residential $3,092.00
Plan Review, Residential $2,009.80
Plumbing, Base + Fixtures $115.50
Mechanical, Base + Fixtures $153.95
Technology fee surcharge $10.00
State Surcharge $6.50
Impact Fees (school, traffic, park) $13,468.19
Storm Drainage CFC $3,087.00
Total Building Permit Estimate: $21,942.94
Fee Considerations. This is not an exhaustive list. Other fees may apply as there are too many site -specific and/or
project -specific variables. The Utility Connection, Concurrency, Fire Sprinkler, and Electrical are listed below for your
consideration.
Fees due. The plan review fee and technology fee must be paid when the application is submitted. All other fees
listed on the building permit must be paid when the building permit is issued.
Fixture fees. The estimate calculates the mechanical and plumbing fixture fees using those frequently found in a
home of this size: AC, clothes washer, cook stove, ERV, fans, fireplace, gas furnace, gas pipe system, gas water
heater, clothes washer, dishwasher, hose bibbs, tub/showers, and toilets. Fees will vary depending on your project.
Impact fees. Impact fees are assessed on new development for a proportionate share of the capital costs for city
parks, road plans, and school facilities. Park impact fees are determined by number of bedrooms. School impact
fees are based on square footage. Traffic impact fees are in the Transportation Impact Fee Study and Schedule.
Regulations are found in Port Orchard Municipal Code (POMC) 20.182.
Storm Drainage Capital Facility Fee. Storm Drainage CFC can vary. The amount shown in this example is for 1 ISU,
which is typical for most new SFRs. Regulations are found in POMC 13.06.
Utility Connection fees. The estimates below are for connecting to City of Port Orchard Utilities. A separate permit
is required and the connection fees are paid on it. Fees must be paid when the building permit is issued.
If your service provider is West Sound Utility District or Bremerton Utilities, please contact them for information.
Water Connection
Estimate: $14,396.49
Fees (3/4" meter)
NOTE: If a front footage fee is required, it will be calculated at $140.46 per lin. ft. of frontage.
Sewer Connection
Estimate: $15,399.57
Fees (1 ERU)
NOTE: If a front footage fee is required, it will be calculated at $140.46 per lin. ft. of frontage.
Concurrency. An unexpired City -issued Capacity Reservation Certificate (CRC) is required for water, sewer, and
transportation (or water/sewer availability letters if connecting to a different utility district). If a certificate has not
already been issued, a separate CRC application is required and the fees are due when the application is submitted.
If water, sewer and transportation are all required, the total fee is $460.00 ($150 each type + $10 technology fee).
Fire Sprinklers. If a fire sprinkler system is required, a separate permit application and fees are required. Fees are
calculated based on construction costs and are paid when the permit is issued.
Electrical permit. Port Orchard does not issue electrical permits. Contact State L&I for information.
Other fees. Other permit processes and fees may be required. It depends on your project. You can find the Fee
Schedules on the City's website, Permit Center webpage. https://portorchardwa.gov/permit-center/