HomeMy WebLinkAbout036-18 - Puget Sound Energy, Inc. - Supplement / Change Order HPIS Improvement ProjectDocusign Envelope ID: A66B2FED-94CE-47EB-9875-D027B7E309A1
PUGET SOUND ENERGY
EXHIBIT A
Form of Custom Street Lighting Order
PROJECT NAME: HPIS Improvement Project Order #: 105102979 101173061
LOCATION: Various
CUSTOM STREET LIGHTING ORDER — SCHEDULE 53
This Custom Street Lighting Order (this "Order"), dated March 18,2025 , is made and entered into by and between
PUGET SOUND ENERGY, INC. ("PSE") and City of Port Orchard ("Customer") (each a "Party," and collectively
the "Parties") under and pursuant to the terms of that certain Master Lighting Services Agreement No. 0023, dated
4/2/2018, between the Parties (the "Agreement"). This Order covers certain Lighting and Construction Services
authorized by this Order and is, along with the associated Schedule, incorporated into and made a part of the
Agreement. Unless specifically defined otherwise herein, terms used in this Order with initial letters capitalized have
the meanings given them in the Agreement. The Parties agree as follows:
ASSOCIATED SCHEDULE:
This Order is also entered into between the Parties in accordance with PSE's Schedule 53, Electric Tariff G, and any
future modifications of or changes to such Schedule as may be approved by the WUTC.
LIGHTING SERVICES DESCRIPTION:
The installation charge of the listed lighting units was estimated to be $48,407.45.
Description:
PSE to change out SLAS8922 to 174W LED 12' arm
SLAG1517 to 174W Led (2 on pole) 18' and 12' arm
SLAG119 to 136W LED and relocated 6' arm
SLAG1481 to 111W LED 6' arm
SLAG119 to 136W LED 6' arm
2) 35' wood poles class 3 with 12' arms install new 31W LED and 111W LED
1) 40' wood pole class 3 with 10' install new 174W LED
1) 35' wood pole class 3 with 10' install new 174W LED
1) 30' wood pole class 3 with 6' arm install new 71W LED
1) 40' wood pole class 3 with 16' arm install new 71W LED
1) 40' wood pole class 3 with 18' arm install new 136W LED
619235-155596 existing wood pole with 16' arm install new 111W LED
1) 40' wood pole class 3 with 18' arm new 136W LED
1) 30' wood pole class 3 with 8' arm install new 111W LED
618996-155058 existing wood pole with 12' arm install new 136W LED
2) 35' wood pole class 3 with 12' arm install new 111W LED
618955-155062 existing wood pole with 12' arm install new 136W LED
618951-155054 existing wood pole with 12' arm install new 111W LED
Relocate 619584-155073 SLAG118 approx 7' south of Pottery Ave
Flagging is included
CONSTRUCTION SERVICES DESCRIPTION:
PSE to change out SLAS8922 to 174W LED 12' arm
SLAG1517 to 174W Led (2 on pole) 18' and 12' arm
SLAG119 to 136W LED and relocated 6' arm
SLAG1481 to 111W LED 6' arm
SLAG119 to 136W LED 6' arm
-1-
Docusign Envelope ID: A66B2FED-94CE-47EB-9875-D027B7E309A1
2) 35' wood poles class 3 with 12' arms install new 31W LED and 111W LED
1) 40' wood pole class 3 with 10' install new 174W LED
1) 35' wood pole class 3 with 10' install new 174W LED
1) 30' wood pole class 3 with 6' arm install new 71W LED
1) 40' wood pole class 3 with 16' arm install new 71W LED
1) 40' wood pole class 3 with 18' arm install new 136W LED
619235-155596 existing wood pole with 16' arm install new 111W LED
2) 40' wood pole class 3 with 18' arm new 136W LED
3) 30' wood pole class 3 with 8' arm install new 111W LED
618996-155058 existing wood pole with 12' arm install new 136W LED
4) 35' wood pole class 3 with 12' arm install new 111W LED
618955-155062 existing wood pole with 12' arm install new 136W LED
618951-155054 existing wood pole with 12' arm install new 111W LED
Relocate 619584-155073 SLAG118 approx 7' south of Pottery Ave
Flagging is included
BILLING:
Billing under this Order will be in accordance with the terms and conditions contained in the terms & conditions of
Schedule 53, Electric Tariff G, and the Agreement, and any future modifications of or changes to such Schedule as
may be approved by the WUTC.
The basis of the monthly energy charge for the Lighting Services as currently constituted under Rate Schedule 53 is
as follows:
Units and Wattage breakdown:
5) 174W LED @ $21.12 x 5 =$105.60
6) 136W LED @ $21.06 x 6 = $126.36
7) 111 W LED @ $17.19 x 7= $120.33
1) 31W LED @ $8.34
2) 71WLED@$13.03x2=$26.06
LED @ $13.03 x 2 = $26.06
The total monthly charge for this installation is as follows:
Total monthly charge: $386.69
For Construction Services and Costs, these costs will be billed as follows:
Upon completion of the Construction Services, PSE shall provide the Customer with an invoice for the Construction
Costs incurred by PSE. Customer shall remit payment to PSE for the Construction Costs within thirty (30) days of
receiving the invoice.
SERVICE TERM/REMOVAL AND SALVAGE COSTS:
Service under this Order is effective for a minimum of twenty five (25) years from the date of this Order (the "Base
Term") unless earlier terminated as provided for in the Agreement. If this Order is terminated for any reason during
the Base Term, the Customer shall be responsible for all costs of removal of any Facilities associated with the Services,
as well as any costs associated with PSE's efforts to salvage the removed Facilities, as set forth in the applicable
Schedule. After the expiration of the Base Term, this Order shall continue on a year-to-year basis until terminated by
either Party upon at least one (1) year's notice in writing (each, an "Extended Term" and, together with the Base Term,
-2-
Docusign Envelope ID: A66B2FED-94CE-47EB-9875-D027B7E309A1
the "Term") unless earlier terminated as provided for elsewhere in this Agreement. The Term may be adjusted by
PSE in writing for existing systems purchased by PSE, based on the estimated remaining life and purchase price. If
this Order is terminated during any Extended Term, the Customer shall not be responsible for the costs of removal of
any Facilities associated with the Services, or any costs associated with PSE's efforts to salvage the removed Facilities.
ADDITIONAL TERMS:
1. To transfer the energy and maintenance monthly billing, the new billing party must contact PSE in writing.
2. Non-standard facilities are not kept in PSE inventory for the purpose of maintenance; therefore replacement
of non-standard components may not be within the same time as replacement of standard components.
Are non-standard components included in this Order? Yes ❑ No ❑x
3. The monthly billing party for the energy and maintenance will be: City of Port Orchard
This Order, executed by Customer's duly authorized representative as of the date first written above, is for the Lighting
Services described above delivered under PSE's Schedule 53.
Customer: CtDN1YOrchard
r ��Sw
Signature: r6b
Date: 8/14/2025
Rob Putaansuu
Printed Name:
Title: Mayor
Company: twtdtind Energy, Inc.
�Sa pl(,�ct.V'Sbl�t 8/15/2025
Signature: BA312C5134J Date:
Lisa Dickerson
Printed Name:
Title: Account Manager
-3-