Loading...
HomeMy WebLinkAbout048-25 - Total Property Services, LLC - Supplement / Change Order 1CITY OF PORT ORCHARD 7 Authorization for Change Order No. 1 Date: 8/1/25 Project: City Hall Landscape Restoration Contract / Job # C048-25 Contractor: Total Property Services, LLC 2111 S 90th St. Tacoma, WA 9844 THIS CHANGE ORDER AUTHORIZES (add description). Additional Work/Construction Change Directives: COP#01- Additional weeding in the lower planter along Bay Street in preparation for the plantings. After discussion an additional Rhododendron at the level 2 entrance was added to the project so the size of plants matched. $1,872.37 before tax. COP#02- Additional work for irrigation system was required to trouble shoot damaged system during excavat on of footing drains by COPO PW. Additional time needed to repair irrigation damaged by concrete flat work repairs post pre -bid walk. 32 hours f materials. $3,269.24 before tax. COP#03- Additional work to diagnose drainage issues with planters. It was determined the soil that was placed in planters was unable to properly drain, potting soil was mixed into the planters and the amount of irrigation was reduced significantly. $2,484.27 before tax. Change Order #1 Totals- $8,335.09 w/ tax. Contract History Amount Sales Tax Total Date Appvd by Original Contract $26,770.14 $2,489.62 $29,259.76 16 -Apr -25 Mayor Change Order 1 $7,625.88 $709.21 $8,335.09 01 -Aug -25 PW Director Total Contract $34,396.02 $3,198.83 $37,594.85 I have reviewed the Change Order information above and certify that to the best of my knowledge descriptions and costs are true and accurate. Wes_ Contract r Approval Signature Doug Horner Principal Printed Name & Title Pub Ic orks Direc r Printe ame Change Orders that do not exceed 10%, with a maximum of $50,000, of either legally authorized budget limit or contract Approved: amount established by City Council can be approved by the Public Works Director. Change Orders that do not exceed 10%, with a maximum of Attest: $100,000, of either legally authorized budget limit or contract amount established by City Council are to be approved by the Mayor. Change Orders over $100,000 or exceed a total of 10% require Council Action. Mayor City Clerk Council Approval Date