Loading...
HomeMy WebLinkAboutStatement of Special Inspections - FillablePermit No.: Department of Community Development Permit Center Mailing Address: 216 Prospect Street, Port Orchard, WA 98366 Office is located at 720 Prospect Street permitcenter@portorchardwa.gov (360) 874-5533 Statement of Special Inspections Permit Type: Site Address / Location: Project Description: Primary Contact (Authorized Agent / Applicant): Name: Mailing Address: City, State, Zip Code: Phone: Email Address: Complete the following information. Additional lines may be added, or sheets may be used. Attach relevant and/or documentation attached. Per 2021 IBC 1704.3.1: For each special inspection, identify whether it will be continuous, periodic or performed in accordance with the notation used in the referenced standard where the inspections are defined. Materials, systems, components and work required: Type and extent of each special inspection: Type and extent for each test: Page 1 of 2 Seismic requirements: Where specified in Section 1705.12 or 1705.13, identify the designated seismic systems and seismic force -resisting systems that are subject to the special inspections or tests: Wind requirements: Where specified in Section 1705.11, identify the main windforce-resisting systems and wind -resisting components that are subject to special inspections: Per 2021 IBC 1704.2.1, we are providing documentation of the competence and relevant experience or training of the special inspectors who will perform the special inspections and tests during construction. Special Inspector Name: Company Name: Mailing Address: Email: Phone No. Relevant experience or training: (complete or attach documentation) Prepared by Registered Design Professional in Responsible Charge*: Name: Company Name: Mailing Address: Email: Phone No. The electronic signature below is equivalent to a handwritten signature and is binding for all purposes. Signature: Date: *The statement of special inspections is permitted to be prepared by a qualified person approved by the building official for construction not designed by a registered design professional. Check with the Permit Center prior to submitting. The information on this form and associated documents are considered public records and subject to public disclosure laws in Chapter 42.56 RCW Statement of Special Inspections form (12/30/2024) Page 2 of 2