HomeMy WebLinkAbout09/16/2025 - Work Study - Packet, Revised171. Meeting Location: Contact us:
Council Phone (360)
portor hard
4407
216 Prospect Street cityhall@portorchardwa.gov
Port Orchard, WA 98366 www.portorchardwa.gov
REVISED 9/15/2025
City Council
Work Study Session
Tuesday, September 16, 2025
6:30 PM
Pursuant to the Open Public Meetings Act, Chapter 42.30 RCW, the City Council is conducting its public meeting
in a hybrid format with options for in -person attendance in the Council Chambers at City Hall or remote viewing
and participation via Zoom (link below). The meeting is streamed live on the City's YouTube channel, click here.
Remote Access
Link: https://us02web. zoom. us/j/87978394172
Zoom Meeting ID: 879 7839 4172
Zoom Call -In: 1 253 215 8782
Guiding Principles
Are we raising the bar in all of our actions?
Are we honoring the past, but not living in the past?
Are we building positive connections with our community and outside partners?
Is the decision -making process building a diverse, equitable, and inclusive community?
1. Call to Order
A. Pledge of Allegiance
2. Discussion Items
A. Schedule for the 2025-2026 Mid -Biennial Review (Crocker)
B. General Sewer Plan Presentation (Ryan, Crocker)
C. Multifamily Tax Exemption (MFTE) (Bond)
Estimated Time: 40 Minutes
3. Good of the Order
4. Adjournment
ADA Requirements
In compliance with the American with Disabilities Act, if you need accommodations to participate in this meeting, please
contact the City Clerk's office at (360) 876-4407. Notification at least 48 hours in advance of meeting will enable the City
September 16, 2025 Meeting Agenda
to make arrangements to assure accessibility to this meeting.
REMINDER: Please silence all electronic devices while City Council is in session.
To subscribe to our general news & public notices click the link: http://portorchardwa.gov/subscribe
For current City Council member and contact information, please visit https://portorchardwa.gov/departments/city-
council/.
For Committee Membership please visit https://portorchardwa.gov/city-council-advisory-committees/.
September 16, 2025 Meeting Agenda
2
rfl City of Port Orchard
ORCHARD 216 Prospect Street, Port Orchard, WA 98366
(360) 876-4407 • FAX (360) 895-9029
Agenda Staff Report
Discussion Items: Schedule for the 2025-2026 Mid -Biennial Review (Crocker)
Meeting Date: September 16, 2025
Prepared By: Noah Crocker, M.B.A., Finance Director
Presenter: Noah Crocker, M.B.A., Finance Director
Summary and Background: Discuss the proposed timeline for the 2025-2026 Mid -Biennial Review
Process
Relationship to Comprenhensive Plan: TBD
Recommendation: Discussion
Alternatives: TBD
Attachments:
Mid -Biennial Budget Review Schedule 2025-2026.pdf
3
ORCHARD
Mid -Biennial Budget Review Schedule
• Departments provided Budget Status Report
• Finance Director reviews Budget Status Report with Mayor
• Departments are consulted on possible modifications to the budget
• Potential Department Director interview on modifications
• October 7-10, 2025 Council Finance Committee initial review of Status Report
• October 14, 2025 Public Hearing on Revenue Sources leading to setting of 2026 Property
Tax Levy Collection
• October 21, 2025 Work Study Session Mid -Biennial Review modification
recommendations
• October 21, 2025 Public Hearing on modifications to the Biennial Budget shall be
advertised at least once and shall be held no later than the first Monday in December
and may be continued from time to time.
• October 28, 2025 Ordinance setting 2026 Property Tax Levy Collection
• October 28, 2025 Ordinance Adopting Budget Amendments for 2025-02026
• At such hearing, the Council may consider a proposed Ordinance to carry out any
modification, subject to the other provisions on RCW 35.34.
NOVEMB
DECEMBER
• Finance Director records modifications to the Biennial Budget
Ong City of Port Orchard
ORCHARD 216 Prospect Street, Port Orchard, WA 98366
1.. (360) 876-4407 • FAX (360) 895-9029
Agenda Staff Report
Discussion Items: General Sewer Plan Presentation (Ryan, Crocker)
Meeting Date: September 16, 2025
Prepared By: Sayre Thompson, PW Procurement Specialist
Presenter: Denis Ryan, CPWP-M, CPRP, Public Works Director
Summary and Background: The City of Port Orchard recently completed a Sewer Rate Study to guide
planning through 2030. The study reviewed how much revenue is needed to operate and maintain the
sewer system, and proposed a new rate structure that's simpler and more equitable.
To support rising costs and major infrastructure projects —like pump station replacements and basin
improvements —the City will need to increase sewer revenue by about 3.5% annually. These upgrades
will be funded through a mix of rate revenue, developer fees, grants, and low -interest loans.
The proposed changes aim to keep rates fair, transparent, and financially sustainable while ensuring
reliable sewer service for the community.
Relationship to Comprenhensive Plan: 8 - Utilities
Recommendation: Staff recommends that the City Council review the proposed sewer rate structure
and consider its adoption, taking into account community input, financial impacts, and long-term
utility planning.
Alternatives: The City could maintain the current rate structure, but doing so may result in revenue
shortfalls and continued inequities in how sewer costs are distributed.
Attachments:
Port Orchard Sewer Rates Draft Report v8 (with Appendix).pdf
20250610 Port Orchard Sewer Rates v10.pptx
COPO General Sewer Plan - DRAFT - 07-02-2025_revised_clean.pdf
•
j
` _� •: . - f • ♦ ' ";` ovvman company 4
• 3 +� ``� it s� , �`1� O
I� W
❖>FCS
a Bowman company
August 6, 2025
Noah Crocker, Finance Director
City of Port Orchard
216 Prospect Street
Port Orchard, WA 98366
Re: DRAFT Sewer Utility: Revenue Requirement, Cost -of -Service Analysis, and Rate Design
Dear Mr. Crocker:
FCS, a Bowman company, is pleased to submit this report summarizing the results of the revenue requirement,
cost -of -service, and rate design study for the City's sewer utility. We want to thank you and City staff for your
assistance and participation in data collection, analysis review, and discussion of key policy topics.
It has been a pleasure to work with you and other City staff on this effort. Please let us know if you have any
questions or need additional information. Tage Aaker, the study's project manager, can be reached at (425) 615-
6487 or Tage.Aaker@bowman.com.
Sincerely,
John Ghilarducci
Principal
Tage Aaker
Senior Project Manager
Zech Hazel
Assistant Project Manager
•:> FCS
fcsgroup.com I bowman.com
City of Port Orchard
Sewer Rate Study
Contents
August 2025
page ii
Exhibits................................................................................................................................................................................................................................ iii
1. Introduction...................................................................................................................................................................................................................1
Background...................................................................................................................................................................................................................1
RevenueRequirement Forecast............................................................................................................................................................................1
Costof Service Analysis............................................................................................................................................................................................2
RateDesign...................................................................................................................................................................................................................2
2. Fiscal Policies.................................................................................................................................................................................................................3
OperatingReserve — Fund 431..............................................................................................................................................................................3
CapitalReserve — Fund 433....................................................................................................................................................................................3
AdoptedCity Fiscal Policies....................................................................................................................................................................................4
StabilizationReserve — Fund 432.........................................................................................................................................................................4
DebtManagement.....................................................................................................................................................................................................4
Summaryof Fiscal Policies......................................................................................................................................................................................6
3. Revenue Requirement...............................................................................................................................................................................................7
FundBalances.............................................................................................................................................................................................................. 7
Economicand Inflation Factors.............................................................................................................................................................................7
Operating Revenues and Expenses.....................................................................................................................................................................8
CapitalImprovement Program(CIP)...................................................................................................................................................................8
OverallRevenue Requirement Forecast..........................................................................................................................................................10
4. Cost -of -Service Analysis.........................................................................................................................................................................................12
Background.................................................................................................................................................................................................................12
FunctionalCost Allocation....................................................................................................................................................................................12
CustomerClass Distinctions.................................................................................................................................................................................13
CostAllocation...........................................................................................................................................................................................................14
5. Rate Design..................................................................................................................................................................................................................15
Background.................................................................................................................................................................................................................15
RateDesign.................................................................................................................................................................................................................15
6. Summary.......................................................................................................................................................................................................................16
UpdatingThis Study's Findings...........................................................................................................................................................................16
RateComparisons....................................................................................................................................................................................................16
AppendixA: Existing Rate Schedule.......................................................................................................................................................................17
•:;>FCS
,,. �,a fcsgroup.com bowman.com
8
City of Port Orchard
Sewer Rate Study
Exhibits
August 2025
page iii
Exhibit 1.
Revenue Requirement Diagram........................................................................................................................................1
Exhibit 2.
Cost -of -Service Analysis Overview...................................................................................................................................2
Exhibit3.
Summary of Fiscal Policies..................................................................................................................................................6
Exhibit4.
Allocation of Utility Cash......................................................................................................................................................7
Exhibit 5.
Economic and Inflation Factors.........................................................................................................................................7
Exhibit 6.
Capital Improvement Program (2025-2030)................................................................................................................9
Exhibit 7.
Capital Funding (2025-2030)..............................................................................................................................................9
Exhibit 8.
Annual Revenue Requirement Forecast (2025-2030).............................................................................................10
Exhibit 9.
Fund Balance Forecast (2025-2030)..............................................................................................................................11
Exhibit 10.
Functional Allocation (2026).............................................................................................................................................13
Exhibit 11.
Customer Statistics by Class (2026)...............................................................................................................................13
Exhibit 12.
Cost -of -Service Analysis Results (2026).......................................................................................................................14
Exhibit13.
Rate Design (2026)...............................................................................................................................................................15
Exhibit 14.
Calculated Bi-Monthly Rates per ERU (2026-2030).................................................................................................15
Exhibit 15.
Jurisdictional Survey — Bi-Monthly Single-family Rates (10 CCF of Sewer Flow) .........................................16
•:;>FCS
.• - ,Y ksgroup.com I bowman.com
9
1. Introduction
Background
The City of Port Orchard (City) is located in Kitsap County and provides sewer collection services to most of the
residents of Port Orchard, with treatment services provided by the West Sound Utility District (WSUD). The City
charges bi-monthly sewer rates to cover both collection and treatment costs.
The City along with WSUD jointly own the South Kitsap Water Reclamation Facility (SKWRF), which provides
treatment services to customers in both jurisdictions. The Wastewater Facilities Management Interlocal
Agreement (the Joint Agreement) describes the operation of the SKWRF and the division of operating and capital
costs. Under the Joint Agreement, each jurisdiction splits the operating costs of the SKWRF based on the number
of equivalent residential units (ERUs) in each jurisdiction, where one ERU is equal to 180 gpd of sewer flow. As of
2024, the City was allocated about 49 percent of the total ERUs and WSUD was allocated 51 percent.
In 2023, the City contracted with FCS, a Bowman Company (FCS), to perform a rate study for its sewer utility. This
study includes the elements that are outlined in the sections below and documented in the rest of the report.
Section 6 summarizes the rate study results and outlines the City's implementation steps.
Revenue Requirement Forecast
The first purpose of this rate study is to develop a funding plan ("revenue requirement") for the years 2025
through 2030, a period that aligns with the capital improvement program. The revenue requirement analysis
identifies the total revenue needed to fully fund the utility on a standalone basis considering operating and
maintenance expenditures, fiscal policy achievement, and the capital project needs of the utility. Exhibit 1
outlines the key inputs in the revenue requirement analysis.
Exhibit 1. Revenue Requirement Diagram
Fiscal Policies
Capital I I I Economic
Improvement I Assumptions
Program (CIP)
Revenue
Requirement
Capital Funding Operating Costs
Section 2 discusses fiscal policies that inform the revenue requirement analysis, and Section 3 describes the
revenue requirement analysis. The initial results of the analysis are the recommended percentage rate
adjustments (as applied to the current rate structure) needed to meet the obligations of the utility. The cost -of -
service and rate design tasks described below will provide an alternative rate structure for the City's
consideration that increases the fairness of how rates are charged to customers, while generating sufficient
revenue and meeting other City policy objectives.
:i'FCS fcsgroup.com I bowman.com 10
City of Port Orchard
Sewer Rate Study
Cost of Service Analysis
August 2025
page 2
The purpose of a cost -of -service analysis (COSA) is to provide a rational basis for distributing the full costs of a
utility (i.e., revenue requirement) to each customer class in proportion to the demands they place on the system.
Detailed cost allocations, along with appropriate customer -class designations, help to increase the degree of
equity that can be achieved in the resulting rate structure.
The cost categories documented in this report include the following:
Customer Costs — The costs related to providing customer billing and related services.
Flow Costs — The costs associated with conveying sewer flow to the SKWRF, which include the costs of
boosting sewer flow, maintaining sewer lines, and other such costs.
Treatment Costs — The costs of operating the SKWRF to process sewer flow as outlined in the Joint
Agreement.
Two customer classes were analyzed: Residential and Non -Residential. The Residential class includes all single-
family and multi -family housing units, and the Non -Residential class includes every other customer. These classes
match those used by the City when determining the number of ERUs in its collection system for the purposes of
dividing treatment costs under the Joint Agreement; each Residential dwelling unit is equal to one ERU, and each
Non -Residential customer is assigned ERUs based on its winter average flow. Exhibit 2 below outlines the
approach taken in this report.
Exhibit 2. Cost -of -Service Analysis Overview
Revenue Requirement
1
Allocate Costs by Function
Customer Flow Treatment
Allocate Costs to Customer Classes
Residential Non -Residential
The results of the COSA are documented in Section 4.
Rate Design
The primary goal of rate design is to ensure the rate structure generates sufficient revenue aligned with the cost
of providing service. While guided by cost -of -service results, the rates also reflect the City's policy objectives. This
report focuses on simplifying the rate structure for Non -Residential customers, given the current complexity of
customer classes — the City currently has approximately twenty non-residential rate classes. The supporting
analysis is provided in Section 5.
•:;>FCS
.•- tea, fcsgroup.com I bowman.com 11
City of Port Orchard
Sewer Rate Study
2. Fiscal Policies
August 2025
page 3
The basic framework for evaluating utility revenue needs includes sound fiscal policies. Several policy topics are
important to consider further as part of managing the finances of the City, including operating reserves, capital
reserves, and debt management. The City makes use of four different reserves: operating, stabilization, capital,
and debt service.
When evaluating reserve levels and objectives, it is important to recognize that the value of reserves lies in their
potential use. A reserve strategy that deliberately avoids any use of reserves negates their purpose. The
fluctuation of reserve levels may indicate that the system is working, while the lack of variation over many years
strongly suggests that the reserves are, in fact, unnecessary.
Operating Reserve — Fund 431
An operating reserve is designed to provide a liquidity cushion; it protects the utility from the risk of short-term
variation in the timing of revenue collection or payment of expenses. Industry practice for utility operating
reserves typically ranges from 30 days (8 percent) to 120 days (33 percent) of operating expenses, with the lower
end more appropriate for utilities with stable revenue streams and the higher end of the range more appropriate
for utilities with significant seasonal or consumption -based fluctuations.
Recommended Policy: Achieve a year-end balance target of at least 60 days (16 percent) of
total annual operating expenditures. This equates to $924,000 for the 2025 budget.
Capital Reserve — Fund 433
This reserve provides a source of emergency funding for unexpected asset failures or other unanticipated capital
needs. This capital reserve policy is not intended to guard against catastrophic system failure or extreme acts of
nature. Minimum balances for capital reserves are often based on a percentage (commonly 1 percent to 2
percent) of the original cost of utility fixed assets or an amount determined sufficient to fund an emergency
capital project or equipment failure. Capital reserves larger than these amounts may be prudent if the City is
saving for future capital projects that cannot be funded with same -year rate revenues.
Recommended Policy: Achieve a year-end target of at least 2 percent of the original cost of
fixed assets. In 2025, the City had almost $61 million in sewer assets plus construction in
progress, which results in a $1.2 million capital reserve target. Capital reserves larger than this
may be prudent if the City is saving in advance for future capital projects. This target is
projected to grow over time as the City executes its capital improvement program.
•:;>FCS
.• - 'Y fcsgroup.com I bowman.com 12
City of Port Orchard
Sewer Rate Study
Adopted City Fiscal Policies
August 2025
page 4
Per Resolution No. 053-20, the City's sewer operating reserve (Fund 431) balance must be sufficient to meet
roughly two months of recurring revenue, with a goal to work towards a maximum of three months of revenues.
The City does not have an adopted policy regarding its capital reserve (Fund 433).
Calculating a reserve based on revenue in the rate forecast model can create a circular type of argument, so it
was not modeled that way. As previously noted, operating reserves are typically based on a certain number of
days of operating expenditures. The American Water Works Association (AWWA) published a 2018 Cash Reserve
Policy Guidelines, and it cites recommended reserve levels from the Water Environment Federation, International
City/County Management Association, and the Government Finance Officers Association, all of which reference a
certain number of days of operating expenses. Capital reserves are typically based on a percentage of fixed
assets or an amount sufficient to respond to an emergency capital project.
To make sure the rate plan met the City's adopted policy, FCS tested the combined operating reserve (60 days of
operating expenses) plus the capital reserve (2 percent of fixed assets) to ensure that it was equal to or greater
than 90 days of revenues. In all years of the study period the modeled reserve targets met or exceeded the City's
adopted fiscal policies.
Stabilization Reserve — Fund 432
The City maintains stabilization reserves for each of its water, sewer, and stormwater utilities. Per the City's
adopted fiscal policies, this reserve "shall be used if all efforts have been exhausted to fund a qualifying event
and no reasonable budget adjustments are available to continue to provide essential services to the public." The
policy notes qualifying events as follows:
• The State of Washington or the Federal government formally declares a disaster or emergency.
• A natural or urgent event that jeopardizes public safety, impedes commerce, or threatens additional damage
to City infrastructure.
• Unforeseen events or situations outside of the scope of contingency planning or planned normal course of
government operations.
• An act of war, terrorism, or declaration of Martial law.
Recommended Policy: Per Resolution No. 053-20, the stabilization reserve should target
having 90 days (25 percent) of annual expenditures. Per discussions with City staff, this reserve
is fully funded through the end of 2030. The forecast did not assume these funds were available
for use, nor did the forecast add any funds to this reserve throughout the study period.
Debt Management
The City currently has five outstanding sewer utility -related loans. For the management of current as well as
potential future debt, some considerations are provided below.
Types of Debt Considered as Part of this Forecast
For utilities, there are two primary sources of debt financing: State or federal loans and market debt financing.
•:;>FCS
.• - ,Y fcsgroup.com I bowman.com 13
City of Port Orchard
Sewer Rate Study
State -Administered Loan Programs
August 2025
page 5
State -administered loans (including federal loans administered by the State) are generally preferable to market
debt financing. The interest rate is generally lower for State loans, and the loan terms often offer more flexibility
in administering the debt. For instance, most State loan programs do not include a requirement that the utility
maintain a certain minimum level of debt service coverage.
Market Debt Financing
General Obligation Bonds
General Obligation (G.O.) bonds are voter -approved bonds secured by the full faith and credit of the issuing
agency, committing all available tax and revenue resources to debt repayment. With this high level of
commitment, G.O. bonds have relatively low interest rates. General Obligation taxing authority can be sought as
a backup pledge to reduce the interest rate of utility debt, even if the actual source of repayment is intended to
be utility rates. However, the use of G.O. bond financing is limited in relation to assessed valuation, and G.O.
bonds must be authorized by 60 percent of the voters. For these reasons, G.O. bonds are not often used for
utility capital projects.
Limited Tax General Obligation (LTGO) bonds can also be issued up to a statutory ceiling without a vote of the
people. In Washington, they are sometimes referred to as "council manic" bonds. Unlike G.O. bonds, LTGO debt
does not authorize additional property taxes; instead, it must be repaid within the City's existing taxing authority.
Usually there are competing demands for that funding within a City, and for that reason, LTGO debt is not often
used for utility capital projects either.
Revenue Bonds
Revenue bonds are secured by the revenues of the issuing utility; the debt obligation does not extend to the
City's other revenue sources. With this limited commitment, revenue bonds usually bear higher interest rates
than G.O. bonds. Revenue bonds typically require the achievement of minimum debt service coverage each year.
Revenue bonds can be issued in Washington without a public vote. There is no limit, except the practical limit of
the utility's ability to generate revenue to repay the debt and meet debt service coverage each year.
Forecast Assumption: The forecast assumes that the City will issue revenue bonds when debt
is needed. While low-cost state loans are typically preferred, revenue bonds are conservatively
assumed as they require the forecast to cover higher interest rates and debt service coverage
requirements. If the City secures low-cost state loans, that will be a positive result that will not
negatively impact the forecast, while the inverse could have a negative impact on the forecast
(relying on state loans but ultimately needing to rely on revenue bonds instead which have
higher interest and debt service coverage requirements).
Debt Service / Reserve — Fund 434
A debt reserve is most often required as a condition of bond issuance, though some state loan programs also
require a reserve. The reserve intends to protect bondholders (or the agency issuing loans) from the risk of the
borrower defaulting on their payments and is most often linked to either average annual debt service or
maximum annual debt service.
•:;>FCS
.• - ,Y fcsgroup.com I bowman.com 14
City of Port Orchard August 2025
Sewer Rate Study page 6
Recommended Policy: The policy should be dictated by terms outlined in contracts for debt
obligations.
Debt Service Coverage
Debt service coverage is typically a requirement associated with revenue bonds and some state loans, and it is an
important benchmark to measure the riskiness of the sewer utility's capital funding plans. Coverage is most easily
understood as a factor applied to annual debt service. In such a case, if it issues revenue bonds, the utility agrees
to collect enough revenue to meet operating expenses and not only pay debt service but to collect an additional
factor (often 25 percent) above bonded debt service. The extra revenue is a "cushion" that makes bondholders
more confident that debt service will be paid on time.
Recommended Policy: While a factor of 1.25 is a common legal minimum coverage
requirement for revenue bonds, we recommend a more conservative internal policy coverage
target of at least 1.50 to 2.00 for revenue bond debt. We are not currently aware of any debt
service coverage requirements related to the City's existing sewer utility -related loans.
Summary of Fiscal Policies
Exhibit 3 provides a summary of the recommended fiscal policies for the City.
Exhibit 3. Summary of Fiscal Policies
Achieve a year-end minimum balance target of 60 days (16 percent) of total annual
Operating Reserve
operating expenditures. This target increases as the City's operating costs increase.
Capital Reserve Achieve a year-end target of at least 2 percent of the original cost of fixed assets.
Compare the combined operating plus capital targets against the City's adopted
Operating plus Capital
policy of three months of recurring revenues.
While a factor of 1.25 is a common legal minimum coverage for revenue bonds,
Debt Service Coverage
achieve an internal policy coverage target of at least 1.50 to 2.00+ when possible.
•:;>FCS
.• - ,Y fcsgroup.com I bowman.com 15
City of Port Orchard
Sewer Rate Study
3. Revenue Requirement
August 2025
page 7
This section summarizes the results of the revenue requirement analysis for 2025 through 2030. As noted
previously, the revenue requirement analysis identifies the total revenue needed to fully fund the utility on a
standalone basis, considering all current financial obligations. Those financial obligations include fiscal policy
achievement, operating costs, debt service costs, and capital costs. Resources to meet those obligations include
fund balances, rate revenues, planned debt issuances, and other funding sources. The result of this analysis is a
series of recommended annual rate adjustments to satisfy the revenue requirement.
Fund Balances
A summary of each fund as of the beginning of 2025 is provided in Exhibit 4 below. These balances are
projected into future years using the forecasted revenues and expenses. The theory behind the minimum target
balances is discussed in more detail in Section 2.
Exhibit 4. Allocation of Utility Cash
Operating Reserve $8,750,000 60-90 days of budgeted expenses (about $1.1 million)
Stabilization Reserve 1,700,000 90 days of budgeted revenues (about $1.6 million)
Capital Reserve 10,190,000 2 percent of the original cost of plant assets (about $1.2 million)
Debt Reserve 1,530,000 One year of debt service payments (about $923,000)
Total Fund Balance $22,180,000 The combined totals from above (about $4.8 million)
Economic and Inflation Factors
The study makes several assumptions about economic inflation factors, account growth, taxes on utility revenues,
and interest returns on the City's fund balances. These are outlined in Exhibit 5 below.
Exhibit 5. Economic and Inflation Factors
10 -year average of the Consumer Price Index for Urban Customers (West
General Cost Inflation 3.00%
Region)
Construction Cost 3 .50% 10 -year average of the Engineering News -Record's 20 -City Avg. Construction
Inflation Cost Index
•:;>FCS
.• - ,Y fcsgroup.com I bowman.com 16
City of Port Orchard
Sewer Rate Study
Labor Cost Inflation 3.00% Discussions with the City
Benefit Cost Inflation 5.00% Discussions with the City
Account Growth
Investment Interest
August 2025
page 8
1.25% Kitsap County Countywide Planning Policies
The Local Government Investment Pool rate for Washington. Forecasted to
4.45%
decrease.
Operating Revenues and Expenses
Annual operating revenues and expenses are based on the City's 2025 and 2026 budgets. Those amounts are
then escalated for future years using the factors described in Exhibit 5 above. The exceptions are sewer rate
revenues, which were estimated using the City's customer billing data, as well as treatment costs.
As described in Section 1, the Joint Agreement splits sewer treatment costs between each jurisdiction (the City
and WSUD) based on their share of the total ERUs in both jurisdictions. So, in addition to modelling an increase
in the cost of treatment based on the general cost inflation factor described in Exhibit 5, a forecast of the
number of ERUs in each jurisdiction was also completed to determine how cost recovery might shift between the
City and WSUD. The City's account growth is described in Exhibit 5. A growth rate of 1.75 percent was used for
WSUD, and so it is forecasted that WSUD will slowly begin to take on more of the treatment costs.
In 2025 the City is expecting to collect $7.3 million in operating revenues. Of this total, about $6.4 million is
expected to come from ongoing utility rates, and the remainder is from miscellaneous fees, interest on the City's
fund balances, and capital facilities charges (CFCs) used to pay for the City's existing debt. The City is expecting
to spend $5.6 million on operating costs, of which $2.0 million is for sewer treatment costs.
The utility has five existing debt obligations — four of which are low interest loans related to sewer utility
construction projects, with interest rates ranging from 0.69 percent up to 2.60 percent. It also has one obligation
it shares with other utilities for a City Hall remodel. The total debt service for these obligations is about $923,000
in 2025, though it will decrease to $749,000 in 2030 as some of the debt service is retired.
Capital Improvement Program (CIP)
The City, along with Consor (the engineering firm preparing the City's sewer master plan), prepared a CIP for the
planning period (2025-2030). The average annual cost of this plan in 2024 dollars is $9.0 million. Inflation to the
year of construction for each project was estimated using the construction cost inflation factor described above.
The annual CIP cost by fiscal year is shown in Exhibit 6 below, and totals $60.3 million.
•:;>FCS
.• - ,Y fcsgroup.com I bowman.com 17
City of Port Orchard
Sewer Rate Study
Exhibit 6. Capital Improvement Program (2025-2030) in Escalated Dollars
N $25
c
g $20
2 $15
$10
$5
$-
August 2025
page 9
The City will use several funding sources to cover its capital needs. Between the low-cost loans the City has
secured, and the revenue bonds planned in this revenue requirement, the City will fund about 26 percent of its
capital plan through debt. As much as 46 percent of the plan will be funded by outside sources, such as
agreements with the Washington Department of Transportation (WSDOT), Kitsap Transit (Kitsap), developer
agreements, and capital facilities charges (CFCs). The remaining 30 percent of the capital plan will be funded by
utility rates and existing fund balances. These capital funding sources are summarized in Exhibit 7 below.
CFCs, $5,000,000,
8%
Exhibit 7. Capital Funding (2025-2030)
Low -Cost Loans,
$3,600,000, 6%
r
r
Agreements,
$9,800,000, 16%
Revenue Bonds,
$11,900,000, 20%
WSDOT/Kitsap,
$12,000,000, 20%
Grants, $200,000,
0%
•:;>FCS
• .".Y fcsgroup.com I bowman.com 18
City of Port Orchard
Sewer Rate Study
Overall Revenue Requirement Forecast
August 2025
page 10
Exhibit 8 illustrates the projected revenue requirements through 2030. The columns depict various utility costs,
including operating expenses, debt service, and annual rate revenue allocated for capital projects. The solid black
line indicates revenue at current rates, while the dashed line represents revenue with rate increases.
• Solid black line: Revenue at existing rates (including rate revenue and non -rate revenues).
Rate revenue (at current rates) is expected to be roughly $6.4 million in 2025 and increases with the
account growth rate described in Exhibit 5.
Non -rate operating revenues are about $852,000, about half of which is capital facility charge revenue
used to pay for debt.
Dashed black line: Revenues with rate increases.
Rate revenue must increase to allow the utility to fund the operating costs and capital projects. These
rate increases are forecasted to be 3.50 percent from 2026 through 2030.
• [giiii• : Cash operating expenses.
Operating expenses begin at $5.6 million based on the 2025 budget. The 2026 budget ($6.1 million)
and inflation factors described in Exhibit 5 provide the forecast for future years.
• : Debt service.
Existing debt service is approximately $923,000 annually from 2025 through 2029 before dropping to
$750,000 from there on.
New debt service includes revenue bond issuances for capital: $10.0 million in 2028 and $1.9 million in
2030. Annual debt service is expected to start at $822,000 in 2028 and increase to $979,000 in 2030.
• � : Rate -funded capital.
Rate -funded capital totals $1.4 million from 2025 through 2027. This amount does not include funding
from the City's existing fund balances, which are used to fill funding gaps as they arise.
• Data labels: Annual system -wide rate increase and the bi-monthly bill for a single-family residence.
V, $9
o $8
$7
2 $6
$5
$4
$3
$2
$1
$0
Exhibit 8. Annual Revenue Requirement Forecast (2025-2030)
3.50% 3.50% 3.50%
3.50% 3.50% 4 ! RA ^ $187 05 $193.59
Operating & Maintenance Debt Service Rate Funded Capital
Revenue @ 2025 Rates — — Revenue with Increases
•:;>FCS
.• - ,Y fcsgroup.com I bowman.com 19
City of Port Orchard August 2025
Sewer Rate Study page 11
Fund Balance Forecast
As described in Section 1, the combined Operating and Capital Reserves ending fund balance must be greater
than 90 days of operating revenues. Exhibit 9 below provides a projection of the combined fund balance based
on the revenues and expenses described in the Overall Revenue Requirement Forecast. As shown, the combined
fund balance is above the target throughout the planning period.
Exhibit 9. Fund Balance Forecast (2025-2030)
, $14 $12.53
o $12
$10
$8
$6
$4
$2
$-
tih
,LO
$12.50
O,LO QrLll OT4> O,LO OHO
T T ti T ti
Combined Operating and Capital Reserve Ending Balance —Target (90 Days of Revenues)
>FCS
fcsgroup.com l bowman.com 20
City of Port Orchard
Sewer Rate Study
4. Cost -of -Service Analysis
Background
August 2025
page 12
This section summarizes the results of the cost -of -service analysis. The test year for this analysis was 2026, as that
is the first year the City could raise rates under the plan proposed in Section 3. The purpose of a cost -of -service
analysis is to provide a rational basis for distributing the full costs of the utility service to each class of customers
in proportion to the demands they place on the system. Detailed cost allocations, along with appropriate
customer class designations, help to sharpen the degree of proportionality that can be achieved in the resulting
rate structure design. The key analytical steps of the cost -of -service analysis are as follows:
• Functional Cost Allocation. Establishes a rational relationship between functions (activities) and costs.
Each line item of the City's budget is allocated to each function (i.e., customer, flow, and treatment)
based on how those expenses serve the system. For example, utility billing costs would be attributed all
to the customer function, while the public works director might have some costs allocated across
multiple functions.
• Customer Class Distinctions. Identify the customer classes that will be evaluated as part of the study
and the relevant customer statistics used for cost allocation. It is appropriate to group customers that
exhibit similar usage characteristics and service requirements. The rate study used just two classes:
Residential and Non -Residential.
• Cost Allocation. Allocates the costs from the functional cost allocation to different customer classes
based on their unique demands for service as defined through the cost classification process. For
example, the cost of billing the utility's customers is based on the number of customer accounts, while
the cost of providing collection services is based on contributions to sewer flow. The results identify
shifts in cost recovery by customer class from that experienced under the existing rate structure.
Functional Cost Allocation
The first step in the cost -of -service analysis is to define the functions or activities that are supported by the sewer
utility. As described in Section I, the functions of service are customer, flow, and treatment.
Test -year (2026) revenue requirements for each accounting line item are assigned to the functions of service. As
the City primarily operates as a sewer collection utility, most of the City's line items are related to the Flow
function. Some billing -related line items are allocated to the Customer function. As described in previous
sections, the payments for the Joint Agreement are entirely related to the treatment of sewer flow, and so all $2.0
million of that cost is allocated to the Treatment function.
Using direct assignments to the functions of service for each of the City's accounting line items, the full
functional allocation of the utility's costs can be calculated. Exhibit 10 below summarizes the functional
allocation. As shown, flow costs are the largest share of the utility's costs at 65.36 percent, followed by
treatment costs at 31.79 percent, and finally customer costs at 2.85 percent.
•:;>FCS
.• - ,Y fcsgroup.com I bowman.com 21
City of Port Orchard
Sewer Rate Study
Exhibit 10. Functional Allocation (2026)
Customer
$190,000
2.85%
Flow
$4,440,000
65.36%
Treatment
$2,140,000
31.79%
Total
$6,730,000
100.00%
August 2025
page 13
Customer Class Distinctions
A class of service is a grouping of utility customers with similar characteristics who are served at similar costs.
Classes of service can be defined based on several factors such as sewer flow patterns, service requirements,
geography, or other factors. The classes evaluated as part of the sewer rate study include just two: Residential
and Non -Residential. These customer statistics are used to allocate costs to each class:
• Number of Accounts. Used to allocate Customer costs.
• Water usage (in thousands of gallons — kgal). Used to allocate Flow costs. An annualized winter -
average usage is used for the Residential class to remove water usage related to irrigation. Total annual
usage is used for Non -Residential.
• Equivalent residential units (ERUs). Used to allocate Treatment costs, ERUs are the defined metric by
which Treatment costs are shared with WSUD under the Joint Agreement. One ERU is equal to 180
gallons per day of water use.
Account and water usage statistics are based on customer billing statistics from 2022, with four years of
estimated account growth included as described in Exhibit 5. ERU statistics are taken from the 2024 count of
ERUs done for the Joint Agreement, with two years of estimated account growth. Exhibit 11 summarizes the
forecasted customer stats for each customer class in 2026.
Exhibit 11. Customer Statistics by Class (2026)
Residential
4,614
93.71%
217,192
72.86%
5,690
83.75%
Non -Residential
310
6.29%
80,898
27.14%
1,104
16.25%
Total
4,924
100.00%
298,090
100.00%
6,794
100.00%
•:;>FCS
.• - 'Y fcsgroup.com I bowman.com 22
City of Port Orchard August 2025
Sewer Rate Study page 14
Cost Allocation
The last step in the cost -of -service analysis is to assign costs by function (see Exhibit 10) to each class using
relevant customer statistics (Exhibit 11). The allocated cost of service can then be compared to the actual
revenue collection by class to determine where adjustments need to be made.
Exhibit 12 summarizes the results of the cost -of -service analysis for 2026. Results are shown assuming the 3.50
percent rate increase planned for 2026 in Section 3 takes effect.
Exhibit 12. Cost -of -Service Analysis Results (2026)
Residential $5,535,709 $5,177,543 106.92%
Non -Residential 1,195,679 1,553,845 76.95%
Total $6,731,388 $6,731,388 100.00%
A cost -of -service analysis is a reasonable allocation of the test year revenue requirement to classes of service
based on available financial and operational data, expectations of future demands for service, and the allocation
methodologies described in the previous sections. Given the need for assumptions and these other factors, FCS
recommends a reasonable range for class -specific results to be plus or minus 5 percent. Based on this framework,
the cost -of -service results indicate that the revenue generated by the Residential class exceeds its cost of service.
This means that the rates charged to the Residential class are over -collecting relative to its cost -of -service. In
contrast, the Non -Residential class is below the reasonable target, and therefore the rates charged to that class
are generating less than their fair cost share.
Strategies to address the cost -of -service differences are discussed in detail in the rate design section.
•:;>FCS
.• - 'Y fcsgroup.com I bowman.com 23
City of Port Orchard
Sewer Rate Study
5. Rate Design
Background
August 2025
page 15
Rate design is the third and final technical step in utility rate setting. The first two technical steps (identifying the
total rate revenue needs and determining the proportional distribution of those revenue needs to the utility's
customer classes) provide the revenue targets for rate design. The principal objectives of rate design are to
implement rate structures that collect the appropriate level of revenue and that are reasonably aligned with cost -
of -service.
The City's existing sewer rate structure includes 20 different classes, many with distinct rate classifications
contained within those classes. There are a total of 55 different rate codes that could be used when calculating a
customer's bill. The City's existing sewer rate structure is shown in Appendix A. The complexity of this existing
schedule is one of the primary reasons the City was interested in developing a new rate design schedule.
Rate Design
The proposed rate structure simplifies the City's scheduling by basing the charge on the City's annual ERU count
performed for the Joint Agreement. Using this count ensures that the data is updated at least annually to reflect
changes in a customer's flow contributions. It also precludes the City from having to develop a new method of
measuring customer statistics or relying on the water usage data, which is not always available to the City.
Exhibit 13 summarizes the proposed rate design. As shown, the cost -of -service for each class is divided by the
number of ERUs and by six to produce a bi-monthly rate per ERU by class. As shown, the Residential rate per ERU
would drop to $151.67 per ERU (from $163), whereas Non -Residential customers would pay $234.56 per ERU.
Exhibit 13. Rate Design (2026)
Residential
$5,177,543
5,690
$151.67
Non -Residential
1,553,845
1,104
$234.56
Total
$6,731,388
6,794
$165.13
Exhibit 14 below provides the calculated bi-monthly rates per with annual rate increases of 3.50 percent.
Exhibit 14. Calculated Bi-Monthly Rates per ERU (2026-2030)
Residential
$151.67
$156.97
$162.47
$168.16
$174.04
Non -Residential
$234.56
$242.77
$251.26
$260.06
$269.16
•:;>FCS
.• - ,Y fcsgroup.com I bowman.com 24
City of Port Orchard
Sewer Rate Study
6. Summary
August 2025
page 16
Based on the results of the revenue requirement analysis, FCS recommends a 3.50 percent overall rate increase in
2026 to be implemented January 1, 2026. Additional 3.50 percent increases are recommended to be adopted on
January 1 of each year until 2030.
In addition, should the City wish to recover the cost -of -service for each class and implement a simplified rate
structure, FCS recommends that the City uses the proposed rate schedule provided in Exhibit 14, which is based
on the number of ERUs for each customer.
Updating This Study's Findings
It is recommended that the City revisit the study findings during the forecast period to check that the
assumptions used are still appropriate and that no significant changes have occurred that would alter the results
of the study. The City should use the study findings as a living document, comparing study outcomes to actual
revenues and expenses each year. Any significant or unexpected changes may require adjustments to the rate
strategy recommended in this report.
Absent the results of a recent rate study, we recommend that the City adopt a policy of applying annual
Consumer Price Index (CPI) -based adjustments to its sewer rates. This will help ensure that revenues keep pace
with inflation and reduce the need for periodic large rate increases.
Rate Comparisons
As a resource to the City and its customers, a rate survey of regional utilities was performed. Exhibit 15 below
shows each jurisdiction's estimated bi-monthly single-family sewer bills, assuming 10 CCF of sewer flow. Note
that each jurisdiction has a unique set of geographic traits, customers, and system characteristics that can have a
significant impact on rates.
Exhibit 15. Jurisdictional Survey - Bi-Monthly Single-family Rates (10 CCF of Sewer Flow)
Poulsbo
Gig Harbor
Kitsap County
Bremerton
Port Orchard - Existing
Port Orchard - Proposed
West Sound Utility District
$244.04
$209.79
$208.50
_ $193.96
' $163.00
$151.67
$148.52
$0 $50 $100 $150 $200 $250
$300
•:;>FCS
.• - ,Y fcsgroup.com I bowman.com 25
City of Port Orchard
Sewer Rate Study
Appendix A: Existing Rate Schedule
August 2025
page 17
•:;>FCS
•�-•� fcsgroup.com I bowman.com 26
13.04.020 Bimonthly sewer rates.
Effective January 1, 2016, and January 1st of each subsequent year shown, the sewer rates,
as calculated bimonthly, are shown as follows:
Sewer Rates
2016
2017
2018
2019
2020
Class
Class
Description
No.
Description
1
Single-family
For each dwelling
$111.00
$124.00
$137.00
$150.00
$163.00
residences and
unit
mobile home
on single
parcel
2
Business and
For each business
$111.00
$124.00
$137.00
$150.00
$163.00
professional
with a fixture
For each business
$22.20
$24.80
$27.40
$30.00
$32.60
with an employee
present, without a
fixture
For each floor of
$111.00
$124.00
$137.00
$150.00
$163.00
an office building
or retail complex
that has a public
or community
bathroom
Plus the following
surcharge, based
on the store/office
interior size:
Small, less than
$0.00
$0.00
$0.00
$0.00
$0.00
15,000 sf, or
Medium, 15,000 to
$111.00
$124.00
$137.00
$150.00
$163.00
30,000 sf, or
Large, more than
$222.00
$248.00
$274.00
$300.00
$326.00
30,000 sf
3
Churches
For the church,
$111.00
$124.00
$137.00
$150.00
$163.00
plus*
27
Sewer Rates
2016
2017
2018
2019
2020
Class
Class
Description
No.
Description
For the rectory,
$111.00
$124.00
$137.00
$150.00
$163.00
plus*
For the annex
$111.00
$124.00
$137.00
$150.00
$163.00
*Class 6 for
educational
parochial schools
4
Hotels and
Base fee, plus
$111.00
$124.00
$137.00
$150.00
$163.00
motels, rest
homes and
care centers,
and Kitsap
County jail
Per unit
$22.20
$24.80
$27.40
$30.00
$32.60
5
Apartments
Per dwelling unit
$111.00
$124.00
$137.00
$150.00
$163.00
and mobile
home parks
6
Schools
For each pupil,
$3.30
$3.70
$4.10
$4.50
$4.90
teacher,
maintenance and
administrative
person
7
Kitsap County
$4,329.00
$4,836.00
$5,343.00
$5,850.00
$6,357.00
courthouse
(main complex)
8
Restaurants
Based on the
seating capacity
as determined by
the building official
P
Sewer Rates
2016
2017
2018
2019
2020
Class
Class
Description
No.
Description
Espresso Bar
Seating not
$111.00
$124.00
$137.00
$150.00
$163.00
applicable.
Classification
includes similar
food preparation
businesses which
do not require the
cooking of food or
the maintenance
of kitchen
equipment.
Deli
No seating
$166.50
$186.00
$205.50
$225.00
$244.50
Small
Seating for 1 to 50
$333.00
$372.00
$411.00
$450.00
$489.00
Medium
Seating for 51 to
$499.50
$558.00
$616.50
$675.00
$733.50
150
Large
Seating for more
$666.00
$744.00
$822.00
$900.00
$978.00
than 150
9
Laundromats
Base fee, plus
$55.50
$62.00
$68.50
$75.00
$81.50
Per washing
$22.20
$24.80
$27.40
$30.00
$32.60
machine
Laundromats with
less than 4
washing machines
are considered
Class 2. Dry
cleaners without
washing machines
are Class 2.
10
Taverns
$277.50
$310.00
$342.50
$375.00
$407.50
11
Car
For sales and
$111.00
$124.00
$137.00
$150.00
$163.00
dealerships
administrative
office, plus
29
Sewer Rates
2016
2017
2018
2019
2020
Class
Class
Description
No.
Description
For service
$111.00
$124.00
$137.00
$150.00
$163.00
department, plus
For car washing
$111.00
$124.00
$137.00
$150.00
$163.00
when the water is
used to determine
cost sharing for
the sewer
treatment plant
12
Post office
$388.50
$434.00
$479.50
$525.00
$570.50
13
Grocery stores
Basic fee, plus the
$55.50
$62.00
$68.50
$75.00
$81.50
following
surcharges
Basic store
$55.50
$62.00
$68.50
$75.00
$81.50
Bakery
$55.50
$62.00
$68.50
$75.00
$81.50
Wetted -down
$111.00
$124.00
$137.00
$150.00
$163.00
produce
Food disposal
$111.00
$124.00
$137.00
$150.00
$163.00
Meat cutting area
$222.00
$248.00
$274.00
$300.00
$326.00
14
Bowling alley,
Base fee, plus
$55.50
$62.00
$68.50
$75.00
$81.50
boat marina,
health
maintenance
organizations
and work
release and
juvenile
facilities
30
Sewer Rates
2016
2017
2018
2019
2020
Class
Class
Description
No.
Description
For each
$55.50
$62.00
$68.50
$75.00
$81.50
equivalent
residential unit
(ERU) as
determined for the
cost -sharing
formula for the
sewer treatment
plant
15
Car washes
Base fee, plus
$55.50
$62.00
$68.50
$75.00
$81.50
Per car washing
$166.50
$186.00
$205.50
$225.00
$244.50
bay
16
Beauty shops
$111.00
$124.00
$137.00
$150.00
$163.00
and barber
shops
17
Day care
Basic fee, plus
$111.00
$124.00
$137.00
$150.00
$163.00
For less than or
$0.00
$0.00
$0.00
$0.00
$0.00
equal to 6 children
For 7 to 25
$222.00
$248.00
$274.00
$300.00
$326.00
children
For more than 25
children, use
Class 6 rates
18
Gas stations
For gasoline retail,
$111.00
$124.00
$137.00
$150.00
$163.00
which could
include service
bay
For nonautomotive
$111.00
$124.00
$137.00
$150.00
$163.00
retail
19
Assisted living Base fee, plus $111.00 $124.00 $137.00 $150.00 $163.00
units
Per unit with $111.00 $124.00 $137.00 $150.00 $163.00
private kitchen
31
Sewer Rates
2016
2017
2018
2019
2020
Class
Class
Description
No.
Description
Per unit without
$22.20
$24.80
$27.40
$30.00
$32.60
private kitchen or
studio apartment
20
Bed and
Base fee, plus
$111.00
$124.00
$137.00
$150.00
$163.00
breakfasts
Per rentable
$8.90
$9.90
$11.00
$12.00
$13.00
bedroom
21
Public market
Basic fee, plus the
$222.00
$248.00
$274.00
$300.00
$326.00
following
surcharges
Nonfood retail
$27.80
$31.00
$34.30
$37.50
$40.80
Nonfood service
$27.80
$31.00
$34.30
$37.50
$40.80
business
Juice/soda/ice
$111.00
$124.00
$137.00
$150.00
$163.00
cream/espresso
bar
Restaurant
$222.00
$248.00
$274.00
$300.00
$326.00
(consume and buy
on premises)
Delicatessen
$111.00
$124.00
$137.00
$150.00
$163.00
(counter sales
takeout ready -to -
eat food products)
Retail meat/
$111.00
$124.00
$137.00
$150.00
$163.00
seafood
Retail bakery
$111.00
$124.00
$137.00
$150.00
$163.00
Special notes:
a) Home occupations will not be charged additional sewer fees.
b) For a combination of classes in one business, the highest rate will be
selected.
c) In the event that an established rate class does not accurately reflect the
impact on the sewer system, the city engineer may determine the specific
monthly rate.
32
Sewer Rates
2016
2017
2018
2019
2020
Class Class
Description
No. Description
d) Water accounts which serve a marina pier and do not have a connection
to the sewer shall not be charged a sewer bill. A sewer bill will be charged
and based on winter consumption if the water meter serves both the marina
pier and any facility or pump station that is connected to the sewer system.
For billing purposes, live-aboards will not be considered as a dwelling unit.
e) Properties served which are outside the city limits shall have a 50 percent
surcharge on the bimonthly rates.
(Ord. 038-16 § 2; Ord. 020-15 § 2; Ord. 027-11 § 1; Ord. 016-10 § 2; Ord. 021-09 § 3; Ord. 027-08 § 2; Ord.
010-05 § 3; Ord. 1897 § 3, 2003; Ord. 1799 § 3, 2000).
33
IRCHARD
Sewer
Orcha
Study
•FCS
Bowman Company
34
) Agenda
Revenue requirement
"What revenue adjustments are needed to cover the
utility's costs?"
Study period: 2025-2030 ,.
Cost of service analysis (COSA)
"What is the cost to serve each of the City's
customer classes?"
Varies by class characteristics
Rate Design
"How should rates be set to collect the costs of
service?"
Rates can be also be set to meet other City
objectives
•FCS
'I:'
••.! '. :
Slide 2
35
Operations & Capital
Maintenance Expenditures Revenue
Fiscal Policies
Debt Requirement
Service
Class Functional _____Cost of Service
Characteristics I Costs Analysis (COSA)
City's Rate Design
Objectives
•) Rate Increase History
Rates have been $163.00 bi-monthly per dwelling unit since 2020
Sewer Rates
2016
2017
2018
2019
2020
Class
Class
Description
No.
Description
1
Single-family
For each dwelling
$111.00
$124.00
$137.00
$150 00
S163 00
residences and
unit
mobile home
on single
parcel
•FCS
Slide 4
37
•;) Bi-monthly Sewer Rates (SFRs) vs. Inflation
$250
$200.36
$200
$163.00
$150
$100
$50
•FCS
2020 2021 2022 2023 2024 2025
Bi-Monthly Bill (SFR) -Bill with Inflation (CPI -U West)
Slide 5
38
39
•>
Financial Policies
General Reserve
(per Resolution 053-20)
Stabilization Reserve
(per Resolution 053-20)
Debt Service Coverage
FCS
Accommodate variations in revenue &
expenses.
Used for emergency costs outside of
typical contingency planning.
Compliance with existing debt covenants;
Maintain credit worthiness
Policy
Assumptions
60-90 days of annual budgeted
revenues
25% (90 days) of annual
expenditures
Target 1.5 to 2+
Typical legal minimum of 1.25
Slide 7
40
•) Introduction to Ratemaking
Rates are set to recover the cost of providing service
EXAMPLE
Sewer programs incur two primary types of costs
Operating costs (regular! ongoing)
» Employee salaries and benefits
» Routine asset / equipment repair and maintenance
» Supplies and materials
» Regulatory compliance
Bill processing
Capital costs
Repair and replacement
Capital improvement projects
•:;>FCS
III
Year 1 Year 2 Year 3
■ Operating
Year 4 Year 5
Capital
irori
41
•�• Operations and Maintenance Cost Increases
[ITh Fli Es] ii -..
General Cost 3.00% Based on the Consumer Price Index for Urban Customers (West)
Construction Costs 3.50% 10 -year average of the Engineering News -Record's 20 -City Avg. CCI*
Labor Cost 3.00% Set to be no less than the General Cost inflation assumption
Benefits Cost 5.00% Set 2.00% higher than Labor Cost inflation
Account Growth 1.25% Growth estimates per Kitsap County Countywide Planning Policies
•:;>FCS
Slide 9
42
.) Capital Funding Philosophy (after Outside Funding)
Cash (pay-as-you-go)
» Higher near -term rates
» Existing customers pay 100% of costs
Debt
�y Lowest near -term rates... but interest cost
4' » Spreads cost between existing / future customers
p
» Execute projects sooner; reduce effects of inflation
Hybrid
ai » Cash fund repair and replacement projects
» Debt fund large expansion projects
•:;>FCS
Slide 10
43
•) Capital Improvement Program
6-1
Annual Preservation
$ 583,333
$ 583,333
$ 583,333 $ 583,333
$ 583,333 $ 583,333
6-2
Marina Pump Station Construction
8,611,000
-
- -
- -
6-3
Bay Street Pump Station Replacement
1,000,000
-
3,500,000 3,500,000
- -
6-4
Minor Lift Station Improvements
650,000
650,000
- -
- -
6-5
Port Orchard Boulevard Lift Station and Siphon
-
1,522,000
- 6,088,000
- -
6-6
Sidney Road SW 2nd Force Main
1,300,000
-
- -
- -
6-7
McCormick Woods Sewer Lift Station #3
-
1,000,000
- -
- -
6-8
Ruby Creek Lift Station
-
3,140,000
- -
- -
6-9
Sidney Road Gravity Sewer Main Extension
-
2,290,000
- -
- -
6-10
Bravo Terrace (Sedgwick) Lift Station
-
-
- -
2,500,000 -
6-11
Bravo Terrace (Sedgwick) Force Main
-
-
- -
4,860,000 -
6-12
Sewer Facility Capacity Upgrades (PWO)
-
-
- -
- 2,000,000
6-13
McCormick East/Glenwood Sewer Basin Improvements
-
-
- 7,600,000
- -
6-14
2029 General Sewer Plan and Sewer Rate Study
-
-
- 350,000
- -
Total
$ 12,144,333
$ 9,185,333
$ 4,083,333 $ 18,121,333
$ 7,943,333 $ 2,583,333
•:;>FCS
Slide 11
44
•>
$20,000,000
$18,000,000
$16,000,000
$14,000,000
$12,000,000
$10,000,000
$8,000,000
$6,000,000
$4,000,000
$2,000,000
$-
•FCS
Capital Spending Forecast
Capital Costs (2024$)
$12,100,000
$9,200,000
$4,100,000
2025 2026 2027
■ Outside Funding
Major projects include:
• Marina Pump Station Construction for $19.4 million in
2024-2026
• Bay Street Pump Station for $8.0 million in 2027-2028
• McCormick East/Glenwood Sewer Basin Improvements
for $8.7 million 2028
• Pipe replacement of $583,000 per year
$18,100,000
2028
■ City Costs
$7,900,000
2029
$2,600,000
2030
Slide 12
45
.) Capital Funding Strategy (2025-2030)
$3,600,000 Low -Cost Loans included:
Low -Cost Loans
6% Pottery Lift Station Repairs
Rate Revenue & $11,900,000 $253,000
Fund Balances Revenue
30% Bonds 0.94% interest
20% Sewer Lift Station
$200,000 » $825,000
Grants » 0.94% interest
0%
Bay Street Lift Station
» $850,000
$5,000,000 » 0.69% interest
CFCs $12,000,000
8% WSDOT/Kitsap Marina Pump Station
$9,800,000 20%
Developer Agreements $13 million (some already drawn)
2.60% interest
16%
>FCS Slide 13
46
•;�� Revenue Requirement Summary
$10,000,000
$9,000,000
$8,000,000
$7,000,000
$6,000,000
$5,000,000
$4,000,000
$3,000,000
$2,000,000
$1,000,000
3.50% 3.50%
3.50% 3.50%
$187.05 $193.59
2025 2026 2027 2028 2029 2030
=Operating & Maintenance = Debt Service Rate Funded Capital
• —Revenue @ 2025 Rates --Revenue with Increases
>FCS
Slide 14
47
48
•>
•:;>FCS
How Will Costs Be Equitably Distributed?
Existing Revenue Collection
Slide 16
49
•>
>FCS
Allocating the Costs of Service
$180,000 (3%)
Customer m
(Accounts)
94% of accounts,
$169,000
Flow
(Thousand gallons)
1 6% of accounts,
$11,000
Non -
Residential
Treatment
(ERUs*)
Customer
Accounts
*ERUs = equivalent residential units, as calculated per the City's joint treatment agreement
Slide 17
50
•) COSA Results
Typical results fall within +1- 5% of the cost -of -service
COSA indicates a need for a non-residential rate increase
% of Cost of Service
120%
100%
80%
60%
40%
20%
0%
•:;>FCS
107%
Residentia
76%
Non -Residential
Slide 18
51
52
•;) Current Rate Schedule
The current rate schedule is complex
It includes 21 different classes
Each class has multiple rates
Complex rate schedules have
disadvantages
Difficult for customers to understand
Administratively burdensome
Obscure relationship between costs
and services provided
City staff wants to simplify the rate
schedule
•FCS
Sewer Rates
2016
2017
2018
2019
2020
Class
Class
Description
No.
Description
1
Single-Tamily
For each dwelling
$111.00
$124.00
$137.00
$150.00
$16300
residences and
unit
mobile home
on single
parcel
2
Business and
For each business
$111.00
$124.00
$137.00
$150O0
$16300
professional
with a fixture
For each business
$22.20
$24.80
$27.40
$30.00
$32.60
with an employee
present, without a
fixture
For each floor of
$111.00
$124.00
$137.00
$150.00
$163.00
an office building
or retail complex
that has a public
or community
bathroom
Plus the following
surcharge, based
on the store/office
interior size:
Small, less than
$0.00
$000
$0.00
$0.00
50 Co
15.000 sf, or
Slide 20
53
••) South Kitsap Water Reclamation Facility (SKWRF) Contract
Port Orchard and West Sound Utility District share the SKWRF
Agreement began in 1983, last updated in 2014
Equivalent residential units (ERUs) are measured annually for
each utility to determine cost sharing
How an ERU is defined:
1 per residence
Flow / 700 CF (180 gpd) for non-residential
•:;>FCS
Slide 21
54
•;> ERU Update
Customer stats support an ERU of 117 gpd per residence
Contract determines how ERUs are counted (180 gpd)
Options to accurately collect cost of service:
Change agreement with SKWRF
Use different ERU definitions for different purposes
Use a weighting factor for commercial
•FCS
Slide 22
55
•,•) Rate Calculation
ERUs (counted as per SKWRF)
Residential
Non-residential
Total
Cost of Service
Residential
Non-residential
Total Cost of Service
Calculated Bi-Monthly Rate per ERU
Residential
Non-residential
•:;>FCS
5,690
1,104
6,794
$ 5,174, 666
1,556,721
$ 6,731,388
$151.58
$234.99
Slide 23
56
Current Units Rate per Bi-Monthly Annual • S
Method Unit Bill Total
Total
Total
$151.58
$151.58
•:;>FCS
1
1
$163.00
$163.00
$978.00
Slide 24
57
Current Units Rate per Bi-Month ly Annual •
Method Unit Bill Total
Billing Units 132 $4.90 $646.80 $3,880.80
Total $646.80 $3,880.80
Total
1 $234.99 $234.99 $1,409.94
•:;>FCS
Slide 25
58
•) Sample Bill — Large Restaurant (150 seats or more)
� . Bi-monthly rates would
increase by $1,606.89
Billing Units 1 $978.00 $978.00 $5,868.00
Total $978.00 $5,868.00
Total
11 $234.99 $2,584.89 $15,509.34
•:;>FCS
Slide 26
59
•) Sample Bill - County Jail
$163.00 $978.00
Base Charge 1 $163.00
Housing Units 284 $32.60
Total
Total
156 $234.99 $36,658.44 $219,950.64
•:;>FCS
$9,258.40 $55,550.40
$9,421.40 $56,528.40
• Bi-monthly rates would
increase by $27,237.04
The jail makes up 15%
of the City's non-
residential ERUs, but
currently pays just 3.5%
of the non-residential
costs
Slide 27
60
•) Sample Bill — Small Restaurant
_______ � . Bi-monthly rates would
decrease by only $19.02
Base Charge 1 $489.00 $489.00 $2,934.00
Total $489.00 $2,934.00
Total
2 $234.99 $469.98 $2,189.88
•:;>FCS
Slide 28
61
•) ERUs with Proposed Increases
Revenue Increases
n/a
3.50%
3.50%
3.50%
3.50%
3.50%
Rate per ERU
$163.00
$168.71
$ 174.61
$ 180.72
$ 187.05
$ 193.59
IL I4
Rate Design 2025 02 2030
Revenue Increases n/a 3.50% 3.50% 3.50% 3.50% 3.50%
Residential Rate per $163.00 $151.58 $156.89 $162.38 $168.06 $173.94
ERU
Non-residential Rate n/a $234.99 $243.22 $251.73 $260.54 $269.66
per ERU
•:;>FCS
Slide 29
•;> Rate Survey — Bi-Monthly SFR Bill, 10 CCF
$300.00
$250.00
$200.00
$163.00
$150.00
$100.00
$ 50.00
$-
$151.58
Poulsbo Gig Harbor Kitsap County Bremerton Port Orchard Port Orchard - West Sound Utility
Proposed District
>FCS Slide 30
63
•;> Summary
Revenue needs increase by 3.5%
Rate structure:
Continue with existing rate structure
Simplified and equitable ERU structure
•:;>FCS
Slide 31
64
Thank you! Questions?
Tage Aaker — Senior Project Manger
(425) 615-6487
TageA@fcsgroup.com
www.fcsgroup.com
•FCS
a Bowman company
Aj consor
City of Port Orchard
General Sewer Plan Update
September 2025
PREPARED BY:
Consor
Erika Schuyler, PE
600 University Street, Suite 300
Seattle, WA 98101
p: 206.462.7030
e: erika.schuyler@consoreng.com
PREPARED FOR:
City of Port Orchard
216 Prospect Street
Port Orchard, WA 98366
66
THIS PAGE INTENTIONALLY LEFT BLANK
67
General Sewer Plan Update
City of Port Orchard
July 2025
DRAFT
Consor
600 University Street
Suite 300
Seattle, WA 98101
THIS PAGE INTENTIONALLY LEFT BLANK
69
DRAFT
Table of Contents
General Sewer Plan Updatedate................................................... iii
ExecutiveSummary................................................................1
Introduction(Chapter 1)...........................................................................................................................1
Policies and Standards (Chapter 2)...........................................................................................................2
Service Area Characteristics (Chapter 3)...................................................................................................2
Population(Chapter 4)..............................................................................................................................
3
Existing Sewer Facilities (Chapter 5).........................................................................................................3
Wastewater Flows (Chapter 6).................................................................................................................3
Sewer System Analysis (Chapter 7)...........................................................................................................4
Capital Facilities Improvements (Chapter 8).............................................................................................4
FinancialAnalysis (Chapter 9)...................................................................................................................4
Operations and Maintenance (Chapter 10)..............................................................................................5
Reclaimed Water (Chapter 11).................................................................................................................5
Chapter1............................................................................... 1-1
Introduction......................................................................... 1-1
1.1 Introduction.....................................................................................................................................1-1
1.2 Purpose and Scope...........................................................................................................................1-3
1.3 Ownership and Management..........................................................................................................1-3
1.4 Sewer History...................................................................................................................................1-4
Chapter2.............................................................................. 2-1
Policies and Standards......................................................... 2-1
2.1 Introduction............................................................
2.2 Design Standards ....................................................
2.3 Construction Standards...........................................
2.4 Pretreatment..........................................................
2.5 Developer Sewer System Extensions and Upgrades
2.6 Grinder Systems......................................................
2.7 Septic to Sewer Conversion ....................................
..................................................................... 2-1
..................................................................... 2-1
..................................................................... 2-1
..................................................................... 2-2
..................................................................... 2-2
..................................................................... 2-2
..................................................................... 2-2
N223406WA.00 • July 2025 • General Sewer Plan Update • City of Port Orchard, WA
Page i 70
DRAFT
Chapter3.............................................................................. 3-1
Service Area Characteristicstics................................................. 3-1
3.1 Land Use and Zoning........................................................................................................................3-1
3.2 Topography......................................................................................................................................3-1
3.3 Geology............................................................................................................................................3-1
3.4 Streams and Water Bodies...............................................................................................................3-1
3.5 Critical Areas....................................................................................................................................
3-1
3.6 Endangered Species Habitat............................................................................................................3-1
3.7 Puget Sound Water Quality Management Plan...............................................................................3-2
3.8 Growth Management Act................................................................................................................3-7
3.9 Water Systems.................................................................................................................................3-7
3.9.1 City of Port Orchard..................................................................................................................3-7
3.9.2 Berry Lake Manors....................................................................................................................3-8
3.9.3 West Sound Utility District........................................................................................................3-8
Chapter4......................•••••••••••• •• •• •• •• •• •• •• •• •• •• •• •• •• •• •• •• •• •• •• •• •• •• • 4-1
Population............................................................................
4-1
4.1 General............................................................................................................................................4-1
4.2 Existing Population and Employment..............................................................................................4-1
4.2.1 Population.................................................................................................................................
4-1
4.2.2 Employment..............................................................................................................................4-1
4.3 Future Population and Employment................................................................................................4-1
4.3.1 Population.................................................................................................................................
4-2
4.3.2 Employment..............................................................................................................................4-2
4.4 Projection Summary.........................................................................................................................4-2
Chapter5.............................................................................. 5-1
Existing Sewer Facilities...................................................... 5-1
5.1
Introduction.....................................................................................................................................5-1
5.2
Existing and Planned Mini-Basins.....................................................................................................5-1
5.3
Existing Sewer Piping.......................................................................................................................5-1
5.4
Existing Lift Stations.........................................................................................................................5-2
5.5
McCormick Woods STEP System......................................................................................................5-7
5.6
West Sound Utility District Facilities................................................................................................5-7
N223406WA.00 • July 2025 • General Sewer Plan Update • City of Port Orchard, WA
Page ii
71
DRAFT
5.7 Pump Station Condition Assessment...............................................................................................5-7
Chapter6.............................................................................. 6-1
Wastewater Flows................................................................. 6-1
6.1 Introduction.....................................................................................................................................6-1
6.2 Existing Wastewater Flows..............................................................................................................6-1
6.3 Wastewater Unit Flows....................................................................................................................6-1
6.4 Infiltration and Inflow......................................................................................................................6-2
6.5 Peaking Factors................................................................................................................................6-3
6.6 Diurnal Curves..................................................................................................................................6-4
6.7 Industrial Connections.....................................................................................................................6-4
6.8 Projected Wastewater Flows...........................................................................................................6-5
Chapter7.............................................................................. 7-1
Conveyance System Analysis ...............................................
7-1
7.1 Introduction.....................................................................................................................................7-1
7.2 Model Software...............................................................................................................................7-1
7.3 Model Development........................................................................................................................7-1
7.3.1 Gravity Sewers..........................................................................................................................
7-1
7.3.2 Lift Stations...............................................................................................................................
7-1
7.4 Model Loading.................................................................................................................................7-2
7.4.1 Average Dry Weather Flow.......................................................................................................7-2
7.4.2 Infiltration and Inflow(I/I).........................................................................................................7-2
7.5 Model Calibration............................................................................................................................7-3
7.5.1 Calibration to Recorded Flow Data...........................................................................................
7-3
7.6 Future Sewer System Expansion......................................................................................................7-3
7.7 Modeling Scenarios..........................................................................................................................7-4
7.8 Hydraulic Modeling Analysis............................................................................................................7-4
7.8.1 Design Capacity.........................................................................................................................
7-4
7.8.2 Results.......................................................................................................................................
7-4
7.9 Capital Improvement Plan Model Runs............................................................................................7-6
Chapter8.............................................................................. 8-1
Collection Facilities Improvements .....................................8-1
8-1
8.1 Introduction.....................................................................................................................................8-1
N223406WA.00 • July 2025 • General Sewer Plan Update • City of Port Orchard, WA
Page iii 72
DRAFT
8.2 Opinions of Probable Project Cost...................................................................................................8-2
8.3 Six -Year Capital Improvement Program...........................................................................................8-2
8.3.1 Project Descriptions..................................................................................................................8-2
8.3.2 Summary...................................................................................................................................
8-4
8.4 20 -Year Capital Improvement Program...........................................................................................8-7
8.4.1 Project Descriptions..................................................................................................................8-7
8.4.2 Summary...................................................................................................................................
8-9
8.5 Sewer Extensions into Undeveloped Basins...................................................................................8-12
8.5.1 Ruby Creek Lift Station............................................................................................................8-12
Chapter9..............................................................................
9-1
Financial Program................................................................
9-1
9.1 Introduction.....................................................................................................................................9-1
9.2 Financial Background.......................................................................................................................9-1
9.3 Financial Policies..............................................................................................................................9-1
9.3.1 Sewer Enterprise Fund Accounting............................................................................................9-1
9.3.2 Sewer Reserves.........................................................................................................................9-2
9.4 Historical Financial Performance.....................................................................................................9-3
9.5 Outstanding Debt.............................................................................................................................9-4
9.6 Current Rates and Charges..............................................................................................................9-5
9.6.1 Bi-Monthly Sewer Rates............................................................................................................9-5
9.6.2 Sewer Capital Facility Charges..................................................................................................9-5
9.7 Capital Improvement Funding..........................................................................................................9-6
9.7.1 Funding Assistance Programs...................................................................................................9-6
9.7.2 Local Funding Sources...............................................................................................................9-8
9.7.3 Affordability..............................................................................................................................
9-8
9.8 Sewer Collection Facilities Improvement Funding...........................................................................9-9
9.8.1 Six -Year Capital Improvement Program....................................................................................9-9
9.8.2 Six -Year Capital Funding Plan..................................................................................................9-11
9.9 Six -Year Financial Plan....................................................................................................................9-12
9.9.1 Sewer Rate Adjustment Strategy............................................................................................9-13
9.9.2 Key Forecast Assumptions.......................................................................................................9-13
9.9.3 Sewer Operating Revenue.......................................................................................................9-13
9.9.4 Sewer Operating Expenses......................................................................................................9-13
9.9.5 Sewer Operating Cash Flow....................................................................................................9-14
N223406WA.00 • July 2025 • General Sewer Plan Update • City of Port Orchard, WA
Page iv
73
DRAFT
9.9.6 Sewer Enterprise Fund Combined Cash Flow..........................................................................9-14
9.10 Projected Sewer Rates and Customer Bill Impact........................................................................9-15
9.11 Financial Conclusion.....................................................................................................................9-16
Chapter10............................................................................10-1
Operations and Maintenance Program...............................10-1
10.1 Introduction.................................................................................................................................10-1
10.2 City Management and Personnel.................................................................................................10-1
10.3 Operations and Maintenance Activities.......................................................................................10-1
10.3.1 Lift Stations...........................................................................................................................10-1
10.3.2 Force Mains..........................................................................................................................10-1
10.3.3 Gravity Sewers and Manholes...............................................................................................10-1
10.3.4 Summary...............................................................................................................................10-2
10.4 Staffing Needs..............................................................................................................................10-2
10.5 Recommended Operation and Maintenance Improvements......................................................10-3
Chapter11............................................................................11-1
ReclaimedWater.................................................................11-1
11.1 Reclaimed Water..........................................................................................................................11-1
Appendix A SEPA Compliance...........................................11-1
Appendix B Interlocal Agreements.....................................11-2
Appendix C 2019 Public Works Engineering Standards
(Chapter 9) ................................... ........ ............. ...................11-3
Appendix D Population Projections...................................11-4
Appendix E Olympic View Sanitary Landfill Discharge
Permit..................................................................................11-5
Tables
Table E-1 I Comprehensive Sewer Plan Requirements per WAC 173-240-050 ........................................2
Table E-2 I Service Area Population and Employment Estimates.............................................................3
Table E-3 I Unit and Projected Flows........................................................................................................4
Table 1-1 I Comprehensive Sewer Plan Requirements per WAC 173-240-050.....................................1-3
Table 4-1 I Service Area Population and Employment Estimates..........................................................4-2
N223406WA.00 • July 2025 • General Sewer Plan Update • City of Port Orchard, WA
Page v 74
DRAFT
Table5-1 I Gravity Sewers.....................................................................................................................5-1
Table5-2 I Force Mains.........................................................................................................................5-2
Table 5-3 I Existing Pump Stations........................................................................................................5-6
Table 5-4 I Component Group Definitions............................................................................................5-8
Table 5-5 I Component Condition Scores Definitions............................................................................5-8
Table 5-6 I Lift Station Recommendations............................................................................................5-9
Table 6-1 I Wastewater Flow Summary................................................................................................6-1
Table 6-2 I Residential Unit Flow...........................................................................................................6-2
Table 6-3 I Employee Unit Flow.............................................................................................................6-2
Table 6-4 I Infiltration and Inflow..........................................................................................................6-2
Table 6-5 I EPA/Ecology Excessive I/I Criteria........................................................................................6-3
Table6-6 I Peak Day Factor...................................................................................................................6-3
Table6-7 I Peak Hour Factor.................................................................................................................6-3
Table 6-8 1 Projected Wastewater Flows...............................................................................................6-6
Table 7-1 1 Projected Wastewater Flows (mgd)....................................................................................7-4
Table 7-2 I Pipe and Manhole Capacity Criteria....................................................................................7-6
Table 7-3 I Lift Station Capacity and Peak Hour Inflows........................................................................7-6
Table8-1 I Six -Year CIP..........................................................................................................................8-5
Table 8-2 1 Project Funding Sources......................................................................................................8-7
Table8-3 120 -Year CIP........................................................................................................................8-10
Table 9-1 I Sewer System Financial History...........................................................................................9-3
Table 9-2 I Sewer System Cash and Investments..................................................................................9-4
Table 9-3 I Sewer System Outstanding Debt.........................................................................................9-5
Table 9-4 I Sewer System Capital Facility Charges................................................................................9-6
Table 9-5 I Sewer System Affordability Test..........................................................................................9-9
Table 9-6 I Six -Year Sewer Capital Improvement Program..................................................................9-10
Table 9-7 1 Identified Project Specific Capital Funding Sources...........................................................9-10
Table 9-8 I Six -Year Sewer Capital Funding Plan..................................................................................9-11
Table 9-9 I Six -Year Financial Plan.......................................................................................................9-12
Table 9-10 I Total Sewer Enterprise Fund Cash Flow..........................................................................9-14
Table 9-11 I Sewer System Projected Ending Cash and Investments..................................................9-15
Table 9-12 I Sewer System Current and Projected Bi-Monthly Sewer Rates and Customer Bills........9-15
Table 10-1 I Recommended Collection System Maintenance Standards............................................10-2
Table 10-2 I Sewer Utility Staffing Comparison per Total Length of Pipe............................................10-2
Table 10-3 I Sewer Utility Staffing Comparison per Lift Station..........................................................10-3
N223406WA.00 • July 2025 • General Sewer Plan Update • City of Port Orchard, WA
Page vi 75
DRAFT
Figures
Figure 1-1 Vicinity Map................................................................
Figure 3-1 Urban Growth Area .....................................................
Figure3-2 Zoning Map.................................................................
Figure 3-3 Topography Map.........................................................
Figure 3-4 FEMA Floodplain and Wetlands ..................................
Figure 3-5 Water System Map......................................................
Figure 5-1 Sewer System..............................................................
Figure 5-2 System Schematic.......................................................
Figure 6-1 Diurnal Curves.............................................................
Figure 7-1 System Deficiencies.....................................................
Figure 8-1 Six -Year CIP..................................................................
Figure 8-2 20 -Year CIP..................................................................
Figure 8-3 Future Sewer Extensions.............................................
Figure 11-1 1 Reclaimed Water.......................................................
Appendices
Appendix A SEPA Compliance
Appendix B Interlocal Agreements
Appendix C 2019 Public Works Engineering Standards (Chapter 9)
Appendix D Population Projections
Appendix E Olympic View Sanitary Landfill Discharge Permit
..1-2
..3-3
..3-4
..3-5
..3-6
..3-9
..5-3
..5-5
.. 6-4
..7-5
..8-6
8-11
8-13
11-2
N223406WA.00 • July 2025 • General Sewer Plan Update • City of Port Orchard, WA
Page vii 76
77
DRAFT
Executive Summary
Introduction (Chapter 1)
The City of Port Orchard's (City) General Sewer Plan Update (Plan) provides a summary of the City's current
sewage capacities, an analysis of the impact of projected growth on the City's sewage collection and
conveyance system, and proposes a Capital Improvement Program to mitigate system deficiencies. It also
documents the City's policies, operation and maintenance practices, and financial condition.
The City is in Kitsap County and is bounded to the north by Sinclair Inlet. The location is shown on Figure
1-1 The surrounding area is a combination of rural and suburban lands in unincorporated Kitsap County
and Bremerton.
The City was incorporated in 1890 as the Town of Sidney and was renamed in 1903 as the City of Port
Orchard. The City is primarily residential with some commercial areas and industrial activity. The current
population was estimated by the United States Census Bureau to be 17,089 in 2022. Approximately 13,253
are within the City's sewer service area. Residents outside of the City's service area are served by the West
Sound Utility District (WSUD) and individual septic tanks.
The City owns, operates, and maintains existing wastewater collection and conveyance facilities that
provide sewer service to the City's current service area of approximately 2,100 acres. The collection system
consists of gravity sewers, lift stations, force mains, Septic Tank Effluent Pump (STEP) systems in McCormick
Woods, and grinder pump systems that convey wastewater to the South Kitsap Water Reclamation Facility
(SKWRF). The SKWRF is owned jointly by the City and WSUD and operated and maintained by WSUD.
Over the next 20 years the population within the Urban Growth Area (UGA) in the City's sewer service area
is expected to grow to over 26,000 people. The City's sewer service area is expected to grow to
approximately 3,300 acres. This Plan proposes future facilities to accommodate both existing and future
wastewater collection and conveyance needs.
This Plan complies with the Washington State Department of Ecology (Ecology) regulations for a general
sewer plan (Washington Administrative Code [WAC] 173-240-050) as shown in Table E-1-1.
N223406WA.00 • July 2025 • General Sewer Plan Update • City of Port Orchard, WA
Executive Summary • 1 78
DRAFT
Table E-1-1 I Comprehensive Sewer Plan Requirements per WAC 173-240-050
3a
Purpose and need for proposed plan
Section 1.2
3b
Who owns, operates, and maintains system
Section 1.3
3c
Existing and proposed service boundaries
Chapter 5
Figure 3-3,
Figure 3-5,
Layout map showing boundaries; existing sewer facilities;
Error! R
3d
proposed sewers; topography and elevations; streams, lakes; and
eference
other water bodies; water systems
source not
found., and 8-
4
3e
Population trends
Chapter 4
Existing domestic and/or industrial wastewater facilities within 20
3f
miles
Figure 1-1
g
3g
Infiltration and inflow problems
Section 6.4
3h
Treatment systems and adequacy of such treatment
Section 5.7
3i
Identify industrial wastewater sources
Section 6.7
3j
Discussion of water systems
Section 3.9
3k
Discussion of collection alternatives
Chapter 7
31
Define construction cost and O&M costs
Chapter 8
3m
Compliance with water quality management plan
Section 3.7
3n
SEPA compliance
Appendix A
Policies and Standards (Chapter 2)
The City manages and operates their sewer system in accordance with state, local, and federal regulations.
The policies and standards described in the Plan provide a framework for the planning, design, operation,
and management of the system to maintain the desired level of service to sewer utility customers. These
policies are limited to the sewer system and its design and operation. The City's policies and criteria
summarized in Chapter 2 include the following:
➢ Design standards.
➢ Construction standards.
➢ Pretreatment.
➢ Developer sewer system extensions and upgrades.
➢ Septic to sewer conversion.
Service Area Characteristics (Chapter 3)
The City is located along the south shore of Sinclair Inlet, which is an arm of Puget Sound. The City provides
sewer service within the urban growth area (UGA) which is established in accordance with the State's
Growth Management Act. The service area is approximately 2,350 acres and is surrounded by a
combination of rural and suburban lands in unincorporated Kitsap County. The City has established zoning
within the City limits while zoning within the UGA outside of the City limits is defined by Kitsap County. The
City also provides water service for residents.
N223406WA.00 • July 2025 • General Sewer Plan Update • City of Port Orchard, WA
Executive Summary • 2
79
DRAFT
Population (Chapter 4)
Current population and population growth are critical factors when considering required sewer system
capacity and upgrades. The projected population for the City over the planning horizons of the Plan is
presented in Table E-1-2. Population and employment data broken down by mini -basin were provided by
the Puget Sound Regional Planning Council (PSRC) based on their VISION 2050 Regional Growth Strategy
(V2050 RGS) released in October 2020. The build -out scenario is for modeling purposes only and does not
reflect population growth goals. The City's service area is shown as Error! Reference source not found..
Note that the City recently updated population estimates as part of the update the Comprehensive Plan,
which was completed subsequent to the analysis presented in this Plan. The overall growth numbers for
2044 presented in the Plan are slightly more conservative than those included in the City's Comprehensive
Plan Update.
Table E-1-2 I Service Area Population and Employment Estimates
2022
-. �..
13,253
. .
7,102
2030
22,472
7,725
2034
25,317
8,037
2044
28,481
8,816
Build Out
30,693
10,678
Existing Sewer Facilities (Chapter 5)
The City, operates, and maintains approximately 70 miles of sewer pipes ranging from 2 -inch to 30 -inch
diameter including approximately 50 miles of gravity sewers, 12 miles of force mains, and 10 miles of Septic
Tank Effluent Pump (STEP) mains. There are 22 lift stations within the City's sewer system. 18 mini -basins
were defined within the City's sewer service area, shown as Error! Reference source not found..
Development of the collection system began in the 1960's and originally included a treatment plant located
by the marina. That plant was decommissioned in the 1980's and replaced with the Marina Pump Station,
which sends flow to the SKWRF.
Wastewater Flows (Chapter 6)
Flow data collected at the SKWRF was used to determine current and projected wastewater flow
characteristics. The analysis determined values for residential and employment unit flows, average annual
flow, infiltration and inflow (I/I), and peak flows. This information informs system analysis and development
of capital improvement projects. The unit and projected flows for the City's collection system are presented
as Table E-1-3.
N223406WA.00 • July 2025 • General Sewer Plan Update • City of Port Orchard, WA
Executive Summary • 3 80
DRAFT
Table E-1-3 I Unit and Projected Flows
2016
78
32
1.08
1,046
3.53
6.52
2022
78
32
1.22
1,046
3.92
7.26
2026
78
32
1.32
1,046
4.16
7.68
2036
78
32
1.56
1,046
4.75
8.74
Build Out
78
32
2.14
1,046
6.13
11.18
Notes:
1. Gallons per capita per day
2. Gallons per employee per day
Sewer System Analysis (Chapter 7)
Analysis of the City's wastewater conveyance system is a critical component in determining the ability of
the existing infrastructure to accommodate future growth. The existing wastewater conveyance system
was analyzed using a hydraulic and hydrologic (H/H) model representing the system. This model was
originally developed for the City's 2016 General Sewer Plan and has been updated to reflect changes to the
system since the original development. The model is truncated, meaning it only contains the major sewer
mains and lift stations. Model scenarios are created for the existing conditions and future planning horizons
incorporating the flow information determined from the SKWRF flow analysis.
The H/H model was used to determine existing and future system deficiencies. A deficiency is when the
capacity of a given asset is exceeded. The design capacity of the gravity mains is 100 percent depth (1.0
d/D ratio, where d is the flow depth and D is the pipe diameter). The maximum design capacity of STEP
mains and force mains are exceeded when flow velocities are greater than 8 feet per second. The firm
capacity of a lift station is defined as the capacity of the lift station with the largest pump out of service.
When model simulation results indicate that these capacities in piping or in lift stations are exceeded, they
are identified as deficient, and system improvements are identified to resolve them. Proposed system
improvements are sized to accommodate future flows that account for increased population and
employment.
Capital Facilities Improvements (Chapter 8)
A six -year capital improvement plan was developed. Capital improvement projects are derived primarily
from the system analysis and discussions with the City's operations and engineering staff. The projects are
categorized by seven drivers — replacement, upgrade, capacity, operations and maintenance,
obsolescence, general, and development. An opinion of probable project cost was developed for each
project. A long term 20 -year plan was also developed based on projected system needs beyond the six -
year planning horizon.
Financial Analysis (Chapter 9)
The financial analysis presents the financial program to demonstrate the financial capacity of the City to
recover the full cost to construct, operate, maintain, and manage the sewage collection and conveyance
system on an ongoing basis. The financial chapter presents the financial status of the sewer utility, potential
funding sources, and a plan for funding the recommended six -year capital improvement program (CIP). A
six -year financial plan is presented that evaluates revenues, expenses, reserve levels, and the impact on
N223406WA.00 • July 2025 • General Sewer Plan Update • City of Port Orchard, WA
Executive Summary • 4
81
DRAFT
sewer rates. An evaluation of the affordability of the City's sewer rates is summarized. This chapter was
prepared by KLJ Financial Consulting.
Operations and Maintenance (Chapter 10)
The City performs operation and maintenance activities to maintain the performance and reliability of the
wastewater collection and conveyance system. At the time of this Plan, the City has 26 full time equivalent
(FTE) employees. The City is similarly staffed to other sewer utilities in this region of similar size, however
it is recommended that the addition of two (2) FTEs would be beneficial. Operation and maintenance
activities cover lift stations, force mains, gravity mains, and manholes,
Reclaimed Water (Chapter 11)
The SKWRF is not currently permitted for reclaimed water. If water system demands increase to the point
that reclaimed water is necessary to adequately address water demands in the area, the reclaimed water
distribution system will be placed back into service.
N223406WA.00 • July 2025 • General Sewer Plan Update • City of Port Orchard, WA
Executive Summary • 5 82
DRAFT
THIS PAGE INTENTIONALLY LEFT BLANK
N223406WA.00 • July 2025 • General Sewer Plan Update • City of Port Orchard, WA
Executive Summary • 6
83
DRAFT
CHAPTER 1
Introduction
1.1 Introduction
The City of Port Orchard (City) is in Kitsap County and is bounded to the north by Sinclair Inlet. The location
is shown as Figure 1-1. The surrounding area is a combination of rural and suburban lands in unincorporated
Kitsap County and Bremerton.
The City was incorporated in 1890 as the Town of Sidney and was renamed in 1903 as the City of Port
Orchard. The City is primarily residential with some commercial areas and industrial activity. The current
population was estimated by the United States Census Bureau to be 17,089 in 2022. Approximately 13,253
are within the City's sewer service area. The remaining residents are served by the West Sound Utility
District (WSUD) and individual septic tanks.
The City owns, operates, and maintains existing wastewater collection and conveyance facilities that
provide sewer service to the City's current service area of approximately 2,350 acres. The collection and
conveyance system consists of gravity sewers, pump stations, force mains, septic tank effluent pump (STEP)
systems in McCormick Woods, and grinder pump systems that convey wastewater to the South Kitsap
Water Reclamation Facility (SKWRF). The SKWRF is owned jointly by the City and WSUD and operated and
maintained by WSUD.
Over the next twenty years the population within the Urban Growth Area (UGA) in the City's sewer service
area is expected to grow to over 26,000 people. The City's sewer service area is expected to grow to
approximately 3,300 acres. This Plan evaluates future facilities required to accommodate both existing and
future wastewater collection needs.
N223406WA.00 • July 2025 • General Sewer Plan Update • City of Port Orchard, WA
Introduction • 1-1 84
DRAFT
Figure 1-1 1 Vicinity Map
CIailam
Jefferson "�
1as
�I• rr1
oa q"
O
C
t pp
P!'J3t
—
r
Lynnwood
L
Edmonds
Mountlake
i
0
Terrace
Snohomish
oreiing
Bothell
\
/
l �
Suquamish
451NTP
\\
//
44VVTP 99 \\
/ oosewallips
I
State Park
/P
\
Kirkland
1Silverdale
f
Bainbridge sland
Jefferson
1 Bellev
Mason
Seattle
1r�
S
°
Green
Mountain State
Bremerton
0
1
i
VVWTP 1ANJfP
YMP
1
'L.)•
m°O y
t"
L
t6oEII1
II
I
Burien!
wvvrP
enton
�,
®
khan
P
Kitsap
Pierce
® j
DesMoin
\
3oz
/ Kent
♦
❑3
i t2Q
/ o
♦
h ♦♦(
m c
hig Har yor
/
® " Federal Way
0.2 vO)
Artondale
/ O Auburn
e`�
rri�.
N
---_---
Tacoma
p
CM E
0'
0 5
10 Miles
University Place
illlxin Isla d
® Wastewater Treatment Plants
_1 20 Mile Radius City of Port Orchard
County consor General Sewer Plan
Urban Growth Area
1 City Boundary
ORCHARD Vicinity Map
Data Sou roes: City Of Port Orchard. Kitoa p County. Service Layer Cled its: World TapCgraphic Map, County of Kit5op, W A State Parks GIS. Eon. To nTam. Connie. SufcOro ph, coo. tar I I/NASA. USGS, Bueeae Of
W Land Management.EPA.NPs, USFWS:World Hilis hade- Esri. NASA, NSA, U505
o Coordl nate.5ystem: NAD10035tatePlane Washington North FIPS4601 Feet
ViScla met Consor and the City of Pert Orchard make no representations, express or implied, as tottie accuracy. completeness and timeliness of the information displayed. This map is not suitable
for legal.engineering or surveying purposes. Notification of any errors is appreciated.
N223406WA.00 • July 2025 • General Sewer Plan Update • City of Port Orchard, WA
Introduction • 1-2
85
DRAFT
1.2 Purpose and Scope
This General Sewer Plan Update (Plan) is prepared for the City to fulfill the requirements of Chapter 173-
240-050 of the Washington Administrative Code (WAC), Chapter 90.48 of the Revised Code of Washington
(RCW), and RCW 36.70A (Growth Management Act). The Plan provides the City with a guide for managing
and operating the sewer system and coordinating expansions and upgrades to the infrastructure through
a 20 -year planning horizon. The Plan serves as a guide for policy development and decision -making
processes for the City. The WAC requirements are outlined in Table 1-1. This Plan is being updated
concurrently with the General Water Plan and General Transportation Plan in concurrence with update to
the City's Comprehensive Plan. The Plan provides the public and regulatory agencies with information on
the City's plans for sewer system extensions to areas designated as urban.
Table 1-1 1 Comprehensive Sewer Plan Requirements per WAC 173-240-050
3a Purpose and need for proposed plan Section 1.2
3b Who owns, operates, and maintains system Section 1.3
3c Existing and proposed service boundaries Section 5
Layout map showing boundaries; existing sewer facilities; proposed
Figures 3 3, 3-5,
3d sewers; topography and elevations; streams, lakes; and other water
bodies; water systems 5 1, and 8 4
3e Population trends Section 4
3f Existing domestic and/or industrial wastewater facilities within 20 Figure 1-1
miles g
3g
Infiltration and inflow problems
Section 6.4
3h
Treatment systems and adequacy of such treatment
Section 5.7
3i
Identify industrial wastewater sources
Section 6.7
3j
Discussion of water systems
Section 3.9
3k
Discussion of collection alternatives
Section 7
31
Define construction cost and O&M costs
Section 8
3m
Compliance with water quality management plan
Section 3.7
3n
SEPA compliance
Appendix A
The Plan is based on projections for a six -year period to 2030, a ten-year period to 2034, a twenty-year
period to 2044, and a build -out capacity scenario.
The existing and future capacities of the sewer system were evaluated based on current and anticipated
future wastewater flow rates. Future wastewater flow rates are estimated from existing flow data and
population and employment growth projected within the sewer service area by the Puget Sound Regional
Council (PSRC).
A capital improvement plan is provided that prioritizes improvements and provides opinions of probable
project costs.
1.3 Ownership and Management
The wastewater utility is owned by the City and funded through wastewater rates and general facility
charges. These revenues must provide for future capital improvements, and pay for current operating
N223406WA.00 • July 2025 • General Sewer Plan Update • City of Port Orchard, WA
Introduction • 1-3 86
DRAFT
expenses, maintenance of the system, replacement, and/or emergency repairs. Sewer collection in the
eastern part of the City is provided by WSUD and is not included in this Plan.
Management and administration of the wastewater utility is provided by the Public Works Department.
This support includes operation, repair, and maintenance of the collection system, major improvements
and development, engineering design and construction, administrative support, accounting and financial
services, billing, and collection.
The City has an interlocal agreement with WSUD to treat the City's sewage. WSUD operates and maintains
the SKWRF, which is owned jointly by the City and WSUD, and provides treatment of all sewage in the City's
sewer service area, except for on -site septic systems. A copy of the interlocal agreement between the City
and WSUD is included as Appendix B.
1.4 Sewer History
Construction of the wastewater collection system began in the early 1960's. This system included a network
of gravity pipes along Bay Street and a sewage treatment plant located by the marina. The treatment plant
was decommissioned in the early 1980's and replaced with the Marina Pump Station, which pumps the
sewage generated in the City's sewer service area to the SKWRF. In 2024 the City commenced a critical
infrastructure upgrade to the Marina Pump Station aimed at improving wastewater management and
supporting future growth along the waterfront. Scheduled for completion in Fall 2025, the project involves
replacing aging equipment with modern, energy -efficient systems to enhance reliability and environmental
protection. Once finished, the new lift station will provide safer and more effective sewage transport,
benefiting both residents and local businesses.
More detailed information about the existing sewer system can be found in Chapter 3. The reclaimed water
system is discussed in Chapter 10.
N223406WA.00 • July 2025 • General Sewer Plan Update • City of Port Orchard, WA
Introduction • 1-4
87
DRAFT
CHAPTER 2
Policies and Standards
2.1 Introduction
The City owns, operates, and maintains their sewer system in accordance with state, local and federal
regulations. The policies and standards described in the Plan provide a framework for the planning, design,
operation, and management of the system to maintain the desired level of service to sewer utility
customers. These policies are limited to the sewer system and its design and operation.
While the City has discretion in setting performance and design criteria and standards for its sewer system,
the criteria set must meet or exceed the minimum standards for public sewers as set forth by the
Washington State Department of Ecology (Ecology) through Chapters 90.48, 90.52, and 90.54 of the
Revised Code of Washington (RCW). The criteria focus on planning, design parameters, and other details
that have been developed to establish consistency and to make sure that adequate levels of service are
provided throughout the system. The criteria also provide the planning process with measuring tools to
identify any areas of the existing system that need to be improved to achieve the desired level of customer
service.
The City establishes the following goals for sewer service:
➢ Goal 1: Provide safe, reliable, and timely sewer service to its consumers at a fair and reasonable
price.
➢ Goal 2: Provide reliable levels of service and adequate capacity within the sewer system by
upgrading the system to protect the natural environment, as deemed necessary.
➢ Goal 3: Ensure that sewer system infrastructure expansion provides an adequate level of public
service to support new development consistent with the City's policies, criteria, and standards. In
addition, sewer system expansion should also be consistent with current land use plans and
development regulations of the State of Washington, Kitsap County, and appropriate local planning
agencies.
2.2 Design Standards
All sewer system improvements are designed in accordance with Ecology's Criteria for Sewage Works
Design, Port Orchard Municipal Code Chapter 13.04, and Chapter 9 of the City of Port Orchard 2019 Public
Works Engineering Standards (PWES) and meet or exceed the design standards required by WAC 173-240.
2.3 Construction Standards
Sewer system improvements are constructed in accordance with Ecology Criteria for Sewage Works Design,
Port Orchard Municipal Code Chapters 13.04, Section 7-08 through 7-15 of the Washington State
Department of Transportation/American Public Works Association (WSDOT/APWA) Standard
Specifications, and Chapter 9 of the PWES (provided as Appendix C) and meet or exceed the construction
standards required by WAC 173-240.
N223406WA.00 • July 2025 • General Sewer Plan Update • City of Port Orchard, WA
Policies and Standards • 2-1 88
DRAFT
2.4 Pretreatment
Pretreatment systems may be required by the City to reduce, eliminate, or alter the nature of a pollutant's
properties prior to discharging to the public sewer collection system. Pretreatment systems include grease
traps, interceptors, oil/water separators and other units to treat metals, solvents, fats, oils, grease,
excessive biological oxygen demand (BOD) or total suspended solids (TSS), and other constituents.
Pretreatment systems are to be installed in compliance with Chapter 9 of the PWES.
2.5 Developer Sewer System Extensions and Upgrades
Sewer system extensions are allowed to provide sewer service within the City's sewer service area and UGA
if the development is consistent with adopted development policies and all sewer utility policies and
criteria, including those described in 13.04.040 of the City's Municipal Code.
Developers are required to pay the City to analyze the impacts of the development on the existing sewer
system. If the City determines that the development's impact to the existing sewer system requires
upgrades, the upgrades may be made at the cost of the developer in exchange for a credit to the capital
facilities charge per 13.04.040 of the City Municipal Code. The developer may also recoup costs using
latecomers' agreements.
The City may require the developer to oversize new sewer infrastructure to accommodate future growth.
The developer may recoup the additional cost for the oversized infrastructure using latecomers'
agreements or other mechanisms, including contributions from the City, or discounts to their general
facility charges.
2.6 Grinder Systems
The use of grinder pumps within the City will be limited to locations where conventional gravity sewer
service is not feasible due to site -specific constraints such as topography, depth to sewer main, or distance
from the public system. Grinder pump systems will be used to convey wastewater from individual
properties into the public sewer system.
Grinder pump units, private force mains, and related components located on private property shall be
owned, operated, and maintained by the property owner. This includes the grinder pump basin, pump,
control panel, check valves, shut-off valves, and all force main piping up to and including the point of
connection to the City's sewer main or gravity lateral.
The property owner shall be solely responsible for inspection, maintenance, repair, and replacement of the
grinder pump system and associated force main on their property. Failure of a grinder pump or force main
that results in a sanitary sewer overflow or damage to the public sewer system shall be promptly addressed
by the property owner at their expense.
The City is responsible for the maintenance and repair of the public sewer mains and appurtenances located
within public rights -of -way or public easements. The City does not assume responsibility for the operation,
maintenance, or repair of privately owned grinder pump systems, private force mains, or service laterals
on private property.
2.7 Septic to Sewer Conversion
All homes and businesses within 200 feet of a sewer main that have failing on -site systems and are within
the UGA shall connect to that main in compliance with WAC 246-272A-0025.
N223406WA.00 • July 2025 • General Sewer Plan Update • City of Port Orchard, WA
Policies and Standards • 2-2
89
DRAFT
CHAPTER 3
Service Area Characteristics
3.1 Land Use and Zoning
The City is in Kitsap County along the south shore of Sinclair Inlet. The surrounding area is a combination
of rural and suburban lands in unincorporated Kitsap County.
The City Limits and UGA designated by Kitsap County are shown as Figure 3-1. City zoning within the City
Limits and County zoning within the UGA are shown as Figure 3-2.
3.2 Topography
Much of the area between Bay Street and Sinclair Inlet is built on fill. The City has many streams and ravines
that are generally unbuildable. The City generally slopes towards Sinclair Inlet from south to north, with a
maximum elevation of approximately 500 feet above sea level in the southwestern portion of the City. The
City's topography is shown as Figure 3-3.
3.3 Geology
The soils in the City consist primarily of glacial outwash, glacial till, glacial drift, volcanic ash, and
glaciomarine soil.
3.4 Streams and Water Bodies
Several streams flow north into Sinclair Inlet. The more prominent creeks within the City sewer service area
are Blackjack Creek, Ross Creek, and Anderson Creek. Many of the streams flowing through the City are
believed capable of supporting fish runs, though stream flows are often small. Several small ponds,
marshes, and wetlands also exist within the City sewer service area.
3.5 Critical Areas
A majority of the City area lies outside of the 100 -year floodplain. Areas within the 100 -year floodplain
include the area immediately adjacent to Blackjack Creek along Arnold Avenue E, and areas near Ruby Creek
near Highway 16. Several small ponds and wetlands exist within the City's UGA. Development will need to
be limited or carefully planned at these locations. Figure 3-4 shows floodplains and wetlands located within
the UGA.
3.6 Endangered Species Habitat
Critical Habitat in the City includes the Puget Sound Evolutionary Significant Unit (ESU) Chinook salmon,
which are known to inhabit the marine areas of Sinclair Inlet adjacent to the City. The Puget Sound ESU
Chinook is a State Candidate for endangered species and considered threatened by the Federal
Government. In addition, other species that are State Candidates for endangered species and considered
threatened by the Federal Government include bald eagle, marbled murrelet, Steller sea lion, and bull trout.
Coho salmon occur in most streams located in City and are considered threatened by the Federal
Government.
N223406WA.00 • July 2025 • General Sewer Plan Update • City of Port Orchard, WA
Service Area Characteristics • 3-1 90
DRAFT
3.7 Puget Sound Water Quality Management Plan
The Federal Water Pollution Control Act established the requirement for a Water Quality Management
Plan. In response to this requirement, RCW 90.71 established the need for a Puget Sound Water Quality
Management Plan. The stated objectives of these regulations are to recover the health of the Puget Sound
waters by the year 2020. This General Sewer Plan Update is consistent with the intended goals of the Water
Quality Management Plan. There has been no subsequent update to the Puget Sound Water Quality
Management Plan.
N223406WA.00 • July 2025 • General Sewer Plan Update • City of Port Orchard, WA
Service Area Characteristics • 3-2
91
L
Figure 3-1 1 Urban Growth Area
- 24/.- -- -AM
: 1R.1. .!!111g
■"'111
�,
_
_
■II II III
.i1�■IIIIiil
_L 1i 113`-_1
i ?-Lil:
■
`r„"+■r11��� i...r
,11II
111::
■
•!
`IlIIIII r
```... ii:i
11 � ■
■ ■!il
1111=' �,
.:u ,� _.•:a -. =lll:::• ..1=
III.
!1;_�>= �ii1l:;unnrne _I Irr-,=
"• ' "'':
■
■ +rr,
r�rf�►
-
!� .11l •,IIIIrIHl:L11
`r■III■— ■■r
..fi
_
1=
r•,1■ .••":-11111:
■
:I f 1 1
Ii'!tkiJf:!49I!I.!,—�<.
f `,
a� ■�f1/fir
��' 1..■.��
�YCiT.
1. .JC:M
�■tf �i
/rir, _
_�� �CII i .�� RI�I5 � ■-.._
®il„1■■1111��C1�� L f �!
�=.,,.1111_'
�1�
�_■
�
■1>_I`�r:,•,: � II 11 �� rr
�1-`==_
I���
■ rl.
1c111�1 : r��;'���Ilil� I; .,
..�1 �>\ �
'
��r , =
� .I�E�
1.1TjU
111 1111 ��,♦ _ �I
==1,:11
llllli
+��I
::hiil►
11 a��"
i1�1:-slhi '�■--
i
° ■�■r r1 1111■ _ ■■..■.1..■i r■ �__
.,,,.
F,
..
ff �il'JJI" it
-lIIPL_J!Jij,;.:
,. .._11
r 'J
' :,. C:■1�:.:1111���I:: �_� 1 p
111■■■ ��
_�
■C:,':
'+
■■..,. • :1 ■111-- : ■1■■ _. I I
1■��:,
�1111�■■
,i_`.� �I�CII
!,■■11.1;•�■
i�1�11•_�_■rr
r 11 I�__
. _�11■'I.■1111 ■, 1.
�������■■�
1111
;�
�■■■.11■—
;�■■■.■
L
= _III
■IIII:11�__
■■_ �I�-
„ ���:� ili1r. _
—M—! %arc\; ■
'iiru
hlI
Ir■�
!ir:" •/uunruGlllllllm
r
rtr
...
1�■11■!=lIB_
!}!�I
�,... ...�
�'�'^',�►�i�� ■r■i
��Uiiii
�,,,�,..
IIIIItl1■-==����
�
r .Tarr,--
■��I�III— rr.. '�la•■■
! •rinr__6�■�: ■■ ■ iii
L•fiel's�:A . Ir. -r-_ ■.II■r�1 I
•'
'irlI
�
�-"
_
1!L
1111!lLI:_i1-- ■ ■■ ■
�1nul.ruml:ip_
�■■1__■■■■7
I!lIIIIh•�Tr■
rli7lini'_
I
Rh�.;::� -11i• ■i■■11■
_ -
li■
■1 :_:�■._
- ■■■■
�
j�l
—
�.■■iW1f■
r,■...���L
`
■
ul' ■
1. ■ri•lr■r■■Lrrr..._ _
■� iii
� _11■■!
r ■
• r
1 111
i • l r f••
•■
April 2024 22-34046
N223406WA.00 • July 2025 • General Sewer Plan Update • City of Port Orchard, WA
Service Area Characteristics • 3-3 92
�:•�i�.::■.AI■fs:-n -1■.Ilfirllli :-I�'- I I
j
�, � 'tom '' , ��i�`:■■■ -
�� Ka !s'¢� ■IAA ■ ill 1 —�.
��1�■.II'll'i:I,IE j... ILf. �� ��+...r'. �` i:c-, �ti�l
.i- f 111111{{{ Dui
�` a�1111�; 1. �tt _ 1= �ir;ri�" ■ !��
■[ill � p i�=� .' ��' III,III� �'�
� � 111■r.�'��►�� _ �._�=pl•. /r;.•-: Ill ra+. �!!'rrliis`aiiln u R
. ■ter .• f • ► �� �± r .,iaR!!� ■■ Ili_C
r�r rl.`i � l,• �jE�c l��-a1r i �y ��fl: '_�111111[IIl��All�
II11'lill1 % P r:.. _
■ ■■F� h�Lt� .•ham:.■`V,i.. _ .f11�f`. �
_ !R fie• 1 _
I iif� �" rg1!i Al a FFFFif��� i� ■ ��i 1�Ir �
art M
j.ii!
r -� 1IImi�I■IL
i! �- ,�l■ ■ kIri! 11! Iw �' _ �` :.'.r.?•::':•.: ; r;,,:, 'S;,r'.•.:: �. s ,11■IiIC��
w� rr F=1Filll� � t♦ti tlli
i 111■iF % �� _� i = - i \��I•i ■■� .
_,,t■11�� i �� I ",111 ;t:::`: � 11��l���1�:
►, :±■■__
11 NN:111141
! : E'v�a
/;F=
�. .�� \ i .\ \ t�' �% �. i � � • )� /i�3��i��Il!/►fir_ - I; ?
!,
marl:=����� ■`__`-'���
1111 X11 _i Il rli / \ - i■`: =a 101, .:r`a���
11111
a,ll�iia-�,� •' '� _I;�IRIIf��l�;li11111! i� � ��I�II
■� . �—11lll:dlllllll 1 ■
_ / �/ � f Iii• ���■■,!�
1 lIIIA\ ■'-'e te rr '
■■1■I iii.i'■
I�� `+ IlCill�a�■J'
• AW ( __ U
::�:r,T/. I �• Sri~ � � _ ��
AN , !�■ ` �■, 1 �1"■ , ■■_u �� u,i IIA ■ill■ -. 11
rt;,i 1 gal■,— + ir,� -r�.�: u: �■ ■ ■ a~,�;
/ ■�.. A -Tr.:■ 11,1 ii' Iam
:�,' iii— 1■l i Ialllllf: � \ �C I-`' ■
:::� ■III 11 _� ■�.�
',, "-� `r' = mil ��■N•- alias=_= ����:r ' ��`+
��� .. ' -,1 '::i-Illllrq ►1111 �n= �i�r10� ."■'�a� � ��".1,St ;1161!+1+'
�iti'"%�'•�'==; n.,aGlllllfl� II�AIU1=q►/ Illlla� 1i' �'•;,�;•�. ,�
.`.� � pu_.Ilnunumlu.-.�� , ualli ,.. ■a�- }(!� Illlu[
■■�■lrarrii�'`_ `iu�smalnllll��� ....... ��;:. �:='•:ate:.-. =�Ira�
!!!
DRAFT
3.8 Growth Management Act
The State of Washington adopted the Growth Management Act with the intent of concentrating most new
development and population gains within the urban areas of the more populous and rapidly growing
counties and cities. State and local governments are required to define an urban growth area boundary
within which urban services like sewers are provided, and any new parcels created outside that boundary
must be at a very low density with sufficient acreage to support on -site sewage disposal systems
conforming to State Department of Health regulations.
Only two exceptions to the prohibitions of sewers outside the urban growth boundary are recognized under
state law:
➢ Public schools outside the urban growth boundary can be served by sewers but are not required
to be served.
➢ Areas of existing development outside the urban growth boundary where sufficient on -site sewage
disposal systems have failed as to create a "severe public health hazard" can be served by sewers.
Sewers provided in either of these cases can be satellite system limited to serving just the qualified and
defined parcels, or a sewer extension can be 'tight -lined' to convey wastewater from the qualified and
defined parcels into the urban growth area for connection to an existing sewer system.
3.9 Water Systems
Three water purveyors provide water service within the City and the sewer service area: the City, the City
of Bremerton, and WSUD.
3.9.1 City of Port Orchard
The City provides water to customers within the City limits and various adjacent areas as shown on Figure
3-5. The system is supplied by six active wells into a Low Zone with a hydraulic grade line (HGL) of 260 feet,
an Intermediate Zone at HGL 336, and a High Zone at HGL 391. Five reservoirs provide 4,200,000 gallons in
storage. There is an intertie with the City of Bremerton HGL 256 Zone and a second to the WSUD. Two
booster pump stations can move water from the Low Zone through the Intermediate Zone to the High
Zone. The pipe system totals over 350,000 feet of pipe ranging from 4- to 18 -inches diameter.
The McCormick Woods Water Company is owned and operated by the City and Serves McCormick
Woods. The existing system has two pressure zones: the 580 pressure zone and the 660 pressure
zone. The 580 pressure zone include a 1.0 MG floating reservoir and a supply well consisting of a well, two
ground level reservoirs totaling 0.12 MG, and a booster pump station. The 660 pressure zone is served by
a 0.9 MG floating reservoir and a booster pump station supplied from the 580 pressure zone. Pipe sizes
range from 6 to 12 -inches in diameter.
N223406WA.00 • July 2025 • General Sewer Plan Update • City of Port Orchard, WA
Service Area Characteristics • 3-7 96
DRAFT
3.9.2 Berry Lake Manors
Berry Lake Manors purchases water from the City and serves a 30 -unit mobile home park.
3.9.3 West Sound Utility District
WSUD serves properties east of Blackjack Creek and generally outside the City sewer service area.
N223406WA.00 • July 2025 • General Sewer Plan Update • City of Port Orchard, WA
Service Area Characteristics • 3-8
97
DRAFT
Figure 3-5 1 Water System Map
H:\E4I
r �■
1
t
LINT
■
-
..
.I :, ,
�..
_..=«•x•11_
■. .
III.
�� �
{{LLr
r
II\1�11�illlil�l!Illl�i
�� ■II II
:�-
III'I;Iflli' '1'"
�
��=ii=l��;}
■■.__�I ■+ ■
��
_ .
'1=
■
1 rte■.■n11�L�';'
l:=� ,,� �1iJ i�,unllln-111
nd5cIIP:_.. iildurnnl_L
P
�'rr`�
3J�■�
� �
�;iflrlllllll�illl
■
I
,
• 1 r
it
�iy
III.
■■■■'-
a�■� i..■.■.ISM
` �rw GII�!"
-
.__�_•■_I.I�:_=
�r•� •�=___..`._C-111111::-
►�■r 1� -��:---..__
� �
� � � .
: � -
.111 I�:�/I�
�
���Illlt
='.,
•
�
•--
-milli
��
�"
r
�
•�
� .. -, /
�
�
_,■.+11-
�
� --
-I� ■
_
�
■I
+
� ,
/ I
11111• ..::.`,'�
Illll,.w:^I.r. I-_
-■�. I.IIII 1 ■Y■■■■
`.■
■■-'-■��■f�■�■■III♦-1.
iL. �L■
•_■>�
����
,,.
-_._ILL
■i1.1.
�•■111,■illll�l�l�
■L
__ ��
-..fl.��
_!• .■==:��■•
1
� �=��,,�
� _■ � �-
�
,-.:��
_,=■11;1..
--+�,I
�,
'III11�:,1■�_. II_�=_��!_
!■,��
�:.,.
�I�f■I��■;�1ri��_11
C� ` �
1111 �/
`��.■.
:111
��m--.■-
I_1�= _ :,. _ --.�:�
�� ��-
=
1
-
;�� _ - •:,
ul,�`rIIIIIIIIII■-C
,11;,_.Irlllrlrlrlrlll.—.
- _�_ai�--./i��a■
II!: ►ill
�-`:+,.._�ti'
"" L
II■
,• ■rte
I-■.
-■
,• ^__IIr■li,llllli:
.. "ylrFllllirrlllll .
ll�lll��
�■II■r`
:II[III� 1nai\\
Afil�
:� c
_ -.- �.: IIIIIILh_�,L=_
■wrx� ��t ",rp�• :21r
\:11..- _RA ° =_==
• .■�.
■�■■r■■Illl
-■:-_.
:31..
..■■I�illa
r ■
• ■
1
111 -
April 2024 22-34046
N223406WA.00 • July 2025 • General Sewer Plan Update • City of Port Orchard, WA
Service Area Characteristics • 3-9 98
DRAFT
THIS PAGE INTENTIONALLY LEFT BLANK
N223406WA.00 • July 2025 • General Sewer Plan Update • City of Port Orchard, WA
Service Area Characteristics • 3-10
99
DRAFT
CHAPTER 4
Population
4.1 General
Population estimates for the City's service area have been established for each sewer mini -basin for 2022,
2030, 2034, 2044, and build -out. Sewage quantities are projected and analyzed for two categories:
population and employment. The methodology used various available resources to establish population
estimates and projections for the purpose of sewer modeling and CIP identification. Years 2030 and 2044
are used for 6- and 20- year CIP planning purposes, respectively.
The service area consists of 18 sewer mini -basins. Since these mini -basins do not include the portion of the
City served by West Sound Utility District (WSUD), the service area population and employment totals do
not reflect City-wide population and employment totals.
Note that the City recently updated population estimates as part of the update the Comprehensive Plan,
which was completed subsequent to the analysis presented in this plan. The overall growth numbers for
2044 presented in the Plan are slightly more conservative than those included in the City's Comprehensive
Plan Update.
4.2 Existing Population and Employment
Population and employment data broken down by mini -basin were provided the Puget Sound Regional
Planning Council (PSRC) based on their VISION 2050 Regional Growth Strategy released (V2050 RGS) in
October 2020.
4.2.1 Population
The PSRC data was interpolated to 2022 and compared with existing sewer connections assuming 2.4
people per sewer connection. The estimates were similar in most of the basins; however, there were
differences in Mini -Basins 2 and 6 due to recent construction resulting in sewer connections to homes
without people currently living in them, and in Mini -Basins 8, 9, and 12, with multifamily units with a single
sewer connection resulting in an underestimate of population in the basin. Therefore, PSRC data was used
as the baseline population.
4.2.2 Employment
2022 served as the baseline year for the employment analysis. The PSRC provided 2022 Covered
Employment custom estimates per mini -basin. Covered employment refers to positions covered by the
Washington Unemployment Insurance Act, and accounts for approximately 85-90 percent of all
employment. Covered employment is used in document to allocate flows in the sewer system.
4.3 Future Population and Employment
The target years for the population and employment analyses are 2030 (used for six -year CIP), 2034, 2044
(used for 20 -year CIP), and build out. Assuming a constant growth rate, population and employment
N223406WA.00 • July 2025 • General Sewer Plan Update • City of Port Orchard, WA
Population • 4-1 100
DRAFT
estimates for target years were interpolated between the baseline and 2050 projected population provided
by PSRC. A land capacity analysis was provided by the City to determine projected build out population.
4.3.1 Population
Residential population estimates were interpolated for 2030 and 2034 for each mini -basin. These
projections were then adjusted using information from the City on proposed developments in Mini -Basins
5, 7, and 7a. For the purposes of this plan, it is assumed these developments will occur by 2029.
Additionally, A land capacity analysis was provided by the City to determine projected build out residential
population. The population per mini -basin is included as Appendix D.
4.3.2 Employment
Employment estimates were interpolated for 2030, 2034, and 2044 for each mini -basin based on data from
PSRC. A land capacity analysis was provided by the City to determine projected build out employment. The
employment population per mini -basin is included as Appendix D.
4.4 Projection Summary
Population estimates are summarized in Table 4-1.
Table 4-1 1 Service Area Population and Employment Estimates
..
2022 13,253
. .
7,102
2030 22,472
7,725
2034 25,317
8,037
2044 28,481
8,816
N223406WA.00 • July 2025 • General Sewer Plan Update • City of Port Orchard, WA
Population • 4-2
101
DRAFT
CHAPTER 5
Existing Sewer Facilities
5.1 Introduction
Construction of the wastewater collection system began in the early 1960's and included a network of
gravity pipes along Bay Street and a sewage treatment plant located by the marina. The treatment plant
was decommissioned in the early 1980's and replaced with the Marina Lift Station that pumps the sewage
in the City's sewer service area to the SKWRF. The City has continued to expand the sewer collection system
to support growth.
The existing City sewer system is shown as Figure 5-lError! Reference source not found., which is
assembled from the historic geographic information system (GIS) files maintained by the City and
supplemented with data from Kitsap County and as-builts from the City. The City has its own GIS system
maintained and updated regularly.
5.2 Existing and Planned Mini -Basins
A mini -basin is defined as an area from which the collection system drains to a specified discharge point.
Delineations of mini -basins are based on existing sewer service and topography. Mini -basins were
delineated with approval from the City and are shown in Figure 5-1 The mini -basins and lift stations are
shown schematically in Figure 5-2.
5.3 Existing Sewer Piping
The City owns, operates, and maintains approximately 72 miles of sewer pipes ranging from 2 -inches to 30 -
inches in diameter. This includes approximately 50 miles of gravity sewers, 12 miles of force mains, and 10
miles of STEP mains. The gravity sewers and force mains are summarized in Table 5-1 and Table 5-2. For
additional modeling information, see Chapter 7. The hydraulic model of the system only includes trunk
lines. The length of modeled gravity mains is shown in Table 5-1.
Table 5-1 1 Gravity Sewers
.-1JrnTiT..-
8
-.
I 12,400 I 175,700
10
11,200
20,900
12
11,600
12,300
15
20,500
22,700
16
3,300
1,800
18
2,800
3,000
24
1,200
1,900
30
200
200
Total Gravity Sewers
63,200 (^'12 miles)
262,400 (^'50 miles)2
Notes:
1. Only trunk sewers and portions of 8 -inch diameter are included in the model.
2. Total includes pipes less than 8 inches in diameter.
N223406WA.00 • July 2025 • General Sewer Plan Update • City of Port Orchard, WA
Existing Sewer Facilities • 5-1 102
DRAFT
Table 5-2 I Force Mains
�.irnTi
4
I 16,300
6
21,100
8
1,900
10
600
15
2,200
16
3,200
18
7,800
Total Force Mains
116,600 ("22miles)2
Notes:
1. All force mains 4 inches and greater are included in the model.
2. Total includes force mains less than 4 inches in diateter.
5.4 Existing Lift Stations
The City's lift stations locations are shown on Figure 5-1 with general information regarding each station
listed in Table 5-3. Station firm capacities are defined as the total pump capacity with the largest pumps
out of service.
N223406WA.00 • July 2025 • General Sewer Plan Update • City of Port Orchard, WA
Existing Sewer Facilities • 5-2
103
L
a
■■N
—"'�1111U1111 "'� lus.� ��7t■■;`�lif�■■��� �!•���ati+Li:StI ..I1� rwir'llFu -n ♦ UIII�h11� :-111117/ _ 1 1�F�1 IIIIIra► 111 1,. 11■� ��_ i +r+yl:��. ��I
11111 rr—�,�•,���� f �I�Ih�l1�' 11'►� ♦ ♦:: 'r.+ 1r. v ■ `■■
1 , 1 r tr�I li�� rl_��r I...x� +• y11.1� '� ■i�■■
III IIIIIII[l C��it� �� r■�hir�11.�=S1►�I���� +- rr, a*1:.—�* ■■ �
1111 fllll 111 11 ilFi. �� .r��!lll 7.: Ifi;= t•: °:: 1�::_ -•• Is - 11■f- ■■ I.
:1uullupl:=- ` tuwllrh
1111 111 2 11111 11=1' Ill l,li•�, m■■■= —rte �.,
ri■■■ ■r1■. 1R1111���1�`��• ■`1�►— r�°.::- _GIB i■�■
fir: 111111` ■--1. ` �'=s•�^ � lilln Fq leo■■■
DRAFT
THIS PAGE INTENTIONALLY LEFT BLANK
N223406WA.00 • July 2025 • General Sewer Plan Update • City of Port Orchard, WA
Existing Sewer Facilities • 5-4
105
DRAFT
Figure 5-2 1 System Schematic
Wastewater
Treatment Plant
CDLift Station
Basin
Gravity Main
— — ► Force Main
— — STEP Main
2
4 1 Ridge 1 & 2
cCorm i ck T
Meadows Ridge 3
McCormick
Woods 2
ilcCormic
Woods 1
Haven _}
partment
7 7a Albertson.
WWTP
lLIIHL
— — 5edgwick
8
Lowe.
N223406WA.00 • July 2025 • General Sewer Plan Update • City of Port Orchard, WA
Existing Sewer Facilities • 5-5 106
DRAFT
Table 5-3 1 Existing Pump Stations
s . .
Albertsons 350 SW Sedgwick Road
... l51P•
176 100
30
...
176
2
. inIUD
6
Bay Street(')
1207 Bay Street
730
22
7.5
730
2
10
Canyon Court
512 Cedar Canyon Court
50
150
7.5
75(2)
3
4(3)
Cedar Heights
2220 Pottery Avenue
50
150
7.5
50
2
4
Eagle Crest
1091 Eagle Crest Place
100
35
5
100
2
4(31
Flower Meadows
345 Flower Meadows Street
200
91
7.5
360
3
6
Golden Pond
385 Golden Pond Road
137
78
7.5
137
2
4(31
Harrison Hospital
444 South Kitsap Boulevard
280
110
40
280
2
6/8
Haven Apartments
4943 SW Hovde Road
560
-
-
50
-
-
Library
Lowes
150 SW Sedgwick Road
470
-
-
470
-
-
Marina
700 Sidney Parkway
5,200
125
200
10,400
3
18
McCormick Meadows
4151 Lone Bear Lane SW
-
-
-
200
-
-
McCormick Village
154
77
15
154
2
4
Eldon Trails
4888 Castleton Rd SW
-
-
-
100
-
-
McCormick Woods #1
1190 Old Clifton Road
2,100
122
75
3,600
2
16
McCormick Woods #2
2200 Old Clifton Road
1,900
60
30
3,200
2
16
Pottery
2014 Pottery Avenue
1,800
75
60
1,800
2
12
Sedgwick
505 Sedgwick Road
180
165
25
180
2
6
Tremont Place
281 Tremont Place
60
23
3
60
2
4
Ridge 1&2
2476 SW Siskin Circle
200
90
15
200
2
6
Ridge 3
4383 Riflebird Place
690
95
30
690
2
4
Notes:
1. Bay Street PS has an overflow into Sinclair Inlet.
2. Firm capacity at Canyon Court is estimated based on two pumps operating in parallel.
3. Record drawings were unavailable, so a 4 -inch force main size was assumed.
N223406WA.00 • July 2025 • General Sewer Plan Update • City of Port Orchard, WA
Existing Sewer Facilities • 5-6
107
DRAFT
5.5 McCormick Woods STEP System
Sewer service to McCormick Woods is provided with a STEP system. These operate like an on -site septic
system by collecting sewage into a septic tank and settling out solids. However, instead of discharging the
effluent to a drain field, it is pumped into a force main which discharges to gravity conveyance piping. The
septic tanks need periodical cleaning to remove grease and accumulated solids.
Under Utility Local Improvement District (ULID) #6, the City agreed to provide sewer service and to assume
some maintenance responsibility for the STEP units. McCormick Woods Lift Station #1, McCormick Woods
Lift Station #2, and associated piping were built to convey sewage to the City's sewer collection system.
5.6 West Sound Utility District Facilities
The WSUD is to the east of the City's service area and extends to the north along Sinclair Inlet. The majority
of the WSUD is in the Port Orchard UGA while the portion along Sinclair Inlet is outside of the UGA. WSUD
owns a collection system and the SKWRF is jointly owned by the City and WSUD. WSUD operates the facility
under National Pollutant Discharge Elimination System (NPDES) Permit WA -002034-6 from the Washington
State Department of Ecology. The City and WSUD have an operating agreement that was initiated in 1982
and extended for an additional 25 years in 2014. The City sewer system formerly included a wastewater
treatment facility adjacent to the Port Orchard Marina and the trunk sewers conveyed all flow to that
location. However, in 1983, the City's treatment facility was replaced with the Marina Lift Station which
was built to convey flow to the SKWRF. The SKWRF consists of three interrelated and complementary
systems:
➢ Activated sludge secondary treatment system
➢ Membrane bioreactor secondary treatment system production reclaimed water
➢ Ballasted clarifier for advanced primary treatment system for peak storm flows
The SKWRF has a current rated maximum month average capacity of 4.2 million gallons per day (mgd) and
a peak day capacity of 16 mgd. Flows exceeding 16 mgd may be treated through the ballasted clarifier to
achieve a blended effluent meeting the effluent requirements defined in the NPDES permit. The City and
WSUD have agreed that this capacity is to be shared equally.
The sewer service area boundary has not been defined by formal agreement but has evolved as various
properties have developed and needed sewer service based on topography and guidance from the Sewer
Advisory Committee, which is a committee comprised of City and WSUD staff. WSUD serves east of
Blackjack Creek except for the SR 16 intersection. Eventually, the City expects to annex the entire UGA.
5.7 Pump Station Condition Assessment
Consor staff visited thirteen of the City's lift stations and conducted condition assessments. Lift stations
that were rebuilt within the past two years, and stations that are currently under design or construction,
were not visited. During the site visits, Consor staff performed visual observation of each lift station's
current components and systems. Additionally, Consor conducted informal interviews with City staff
regarding station conditions and performance. TSI, the electrical engineering subconsultant, documented
electrical equipment conditions and potential code violations. An assessment form was filled out for each
lift station visited.
To better organize the assessment results, the equipment and systems at the lift stations were arranged in
several categories presented in Table 5-4. While no two pump stations are identical, they can be
N223406WA.00 • July 2025 • General Sewer Plan Update • City of Port Orchard, WA
Existing Sewer Facilities • 5-7 108
DRAFT
characterized by a standardized set of component groupings. Each component grouping was assigned a
condition rating shown in Table 5-5 based on the condition assessment site visits. These condition ratings
are used to make recommendations for lift station improvements in Table 5-6.
Table 5-4 1 Component Group Definitions
Component. .
Civil
. . . ..
Site, roadways, sidewalks, fencing
Buildings, vaults, wet wells, equipment pads
Structural
Pumping Systems
Pumps
Motors
Motors associated with pumps
Piping Systems
Suction piping, discharge headers, drain lines, segments of on -site force main
Valve Systems or Assemblies
Isolation valves, check valves
Support Systems
Compressed air systems, potable water, fire suppression, HVAC
Instrumentation
Level indicators, flow meters, pressure gauges, supervisory control and data
acquisition (SCADA) systems, network hardware, panel views
Electrical and Power
Distribution
Electrical systems between MCC and main power disconnect, standby
generators, transfer switches, lighting
Table 5-5 1 Component Condition Scores Definitions
.
�-
1
Very good, well maintained, expected to remain reliable for more than 90% of the expected
life.
2
Good, some degradation but performance and reliability are not significantly affected.
Performance and reliability expected to remain satisfactory for 50-90% of the expected life.
3
Fair, performance and reliability are still acceptable, but some rehabilitation or replacement
will be needed in the 50% +/- of the expected life.
Poor, performance and/or reliability has significantly decreased, maintenance rehabilitation
4
or replacement needed to restore performance or reliability to acceptable levels. Failure (no
longer functions) is likely in 10-50% of the expected life if not rehabilitated or replaced.
Very poor, performance and/or reliability has significantly decreased, and failure is probable
5
within 10% of the expected life if rehabilitation or replacement is not performed.
N223406WA.00 • July 2025 • General Sewer Plan Update • City of Port Orchard, WA
Existing Sewer Facilities • 5-8
109
DRAFT
Table 5-6 I Lift Station Recommendations
Ilicc.iiComponent-
. .. .
Albertsons Assessment Not Performed
-
Bay Street
Assessment Not Performed
-
➢ Replace lift station (station under design at the time of this plan).
Canyon Court
Overall
2
2000
➢ Ensure regular service logs are established and maintained for the generator. This
should include conducting an annual load bank test to verify the reliability of the
equipment.
➢ Upgrade existing PLCs and OlTs with manufacture supported units.
➢ Create backup of PLC programs and store spare parts at maintenance shop.
➢ Upgrade to wired/wireless SCADA technologies.
Cedar Heights
Overall
2
1987
➢ Replace failing pump rails with 316 stainless steel rails
Relocate valves to a valve vault.
Eagle Crest
Overall
5
-
➢ Install a flow meter if feasible.
Flower Meadows
Overall
2
➢ Install a manual transfer switch and pig tail for portable generator set.
➢ Install a vault around the isolation and check valves.
➢ Replace pumps.
➢ Install flow meter.
Golden Pond
Overall
5
➢ Study feasibility of pumping to Eagle Crest lift station.
➢ Install light pole.
Harrison Hospital
Overall
2
1994
➢ Upgrade existing PLCs and OlTs with manufacture supported units.
➢ Create backup of PLC programs and store spare parts at maintenance shop.
➢ Upgrade to wired/wireless SCADA technologies.
➢ Upgrade generator and ATS.
➢ Install amp reader.
Haven Apartments
Assessment Not Performed
-
Lowes
Overall
5
2008
➢ Install flow meter.
➢ Install 2" water service..
➢ Install site lighting.
➢ Ensure regular service logs are established and maintained for the generator. This
should include conducting an annual load bank test to verify the reliability of the
equipment.
➢ Upgrade existing PLCs and OlTs with manufacture supported units.
➢ Create backup of PLC programs and store spare parts at maintenance shop.
➢ Upgrade to wired/wireless technologies.
Marina
Assessment Not Performed
-
McCormick Meadows
Overall
5
2008
➢ Ensure regular service logs are established and maintained for the generator. This
should include conducting an annual load bank test to verify the reliability of the
equipment.
N223406WA.00 • July 2025 • General Sewer Plan Update • City of Port Orchard, WA
Existing Sewer Facilities • 5-9 110
DRAFT
. ..
...
➢ Upgrade existing PLCs and OlTs with manufacture supported units.
➢ Create backup of PLC programs and store spare parts at maintenance shop.
➢ Upgrade to wired/wireless SCADA technologies.
➢ Install permanent diesel bypass pump.
McCormick Village
Assessment Not Performed
-
McCormick Woods #1
Assessment Not Performed
-
McCormick Woods #2
Assessment Not Performed
-
Pottery
Overall
5
2015
➢ Monitor site settling to determine if improvements are needed for soil stability or
stormwater runoff.
➢ Install on -site backup diesel pump and/or increase storage capacity.
➢ Ensure regular service logs are established and maintained for the generator. This
should include conducting an annual load bank test to verify the reliability of the
equipment.
➢ Upgrade existing PLCs and OlTs with manufacture supported units.
➢ Create backup of PLC programs and store spare parts at maintenance shop.
Sedgwick
Overall
5
➢ Install sump pump in valve vault.
➢ Raise light for the alarm and fix buttons.
➢ Install flow meter.
➢ Install explosion proof seal off.
➢ Eventually decommission lift station and install gravity sewer to Golden Pond or
Tremont Place
Overall
5
Eagle Crest.
Ridge 1&2
Overall
5
2007
➢ Ensure regular service logs are established and maintained for the generator. This
should include conducting an annual load bank test to verify the reliability of the
equipment.
➢ Upgrade existing PLCs and OlTs with manufacture supported units.
➢ Create backup of PLC programs and store spare parts at maintenance shop.
➢ Upgrade to wired/wireless technologies.
Ridge 3
Overall
5
2008
➢ Ensure regular service logs are established and maintained for the generator. This
should include conducting an annual load bank test to verify the reliability of the
equipment.
➢ Upgrade existing PLCs and OlTs with manufacture supported units.
➢ Create backup of PLC programs and store spare parts at maintenance shop.
➢ Upgrade to wired/wireless technologies.
Note:
1 CoF = Consequence of Failure from 1 to 5. A higher number indicates the station is more critical to system operation.
N223406WA.00 • July 2025 • General Sewer Plan Update • City of Port Orchard, WA
Existing Sewer Facilities • 5-10
111
DRAFT
CHAPTER 6
Wastewater Flows
6.1 Introduction
Wastewater flow data recorded at the SKWRF for the years of 2018 through 2022 were analyzed to
determine current wastewater flow characteristics.
6.2 Existing Wastewater Flows
Wastewater from the City sewer collection system is pumped through the Marina Lift Station to the SKWRF.
Flow at the Marina Lift Station is recorded daily using a low flow meter and a high flow meter. There is a
third flow meter at the SKWRF that records data on a one -minute interval basis.
The SKWRF flows were used for the purpose of unit sewer flow calculations. Selected flow records are
summarized in Table 6-1.
Table 6-1 1 Wastewater Flow Summary
Average Annual Flow (mgd)
1.076
1.008
1.048
1.081
1.09911)
Minimum Day Flow (mgd)
1.042
0.983
1.017
1.042
0.887
Peak Day Flow (mgd)
2.086
3.492
2.417
3.284
3.639
Peak Day Flow Date
11/27/2018
12/21/2019
1/24/2020
1/13/2021
1/7/2022
Peak Day Rainfa11121 (inches)
2.11
3.00
1.38
1.53
2.9
Peak Hour Flow131 (mgd)
-----
-----
-----
-----
5.58
Notes:
1. Data for 2022 is through 3/28/2022.
2. Peak Day Rainfall is recorded for the day before the Peak Day Flow Date
3. Peak hour flow was only available for 2022.
6.3 Wastewater Unit Flows
Total residential sewer flow was estimated by taking annual average sewer flows measured at the SKWRF
and multiplying by the percentage of residential to total wet weather water demands. This percentage is
85 percent based on historical City water usage. Wet weather water usage does not include irrigation and
is used to approximate average annual sewer flows.
Total residential sewer flow was then divided by total estimated residential population to determine unit
per capita flow rates as summarized in Table 6-2.
N223406WA.00 • July 2025 • General Sewer Plan Update • City of Port Orchard, WA
Wastewater Flows • 6-1 112
DRAFT
Table 6-2 1 Residential Unit Flow
•
Average Annual Flow (mgd)
1.076
1.008
ILI
1.048
lii
1.081
1.099
Percentage of Residential Water Usage
85%
85%
85%
85%
85%
Estimated Residential Sewer Flow (mgd)
0.915
0.857
0.891
0.919
0.934
Population
12,075
12,369
12,664
12,958
13,253
Gallons per Capita per Day (gpcd)
76
69
70
71
70
A residential sewer rate of 70 gpcd is used for planning purposes. This is similar to other communities in
the Puget Sound area.
The remainder of the average annual flow is estimated to be from commercial, industrial, and
governmental sources. Per employee wastewater rates are summarized in Table 6-3. A per employee sewer
rate of 22 gallons per employee per day (gped) will be used for planning purposes.
Table 6-3 1 Employee Unit Flow
6.4 Infiltration and Inflow
Infiltration and inflow (I/I) is the wastewater component consisting of stormwater surface runoff entering
the sewer system and infiltration from storm -saturated ground conditions. Inflow is runoff entering the
sewer directly, typically from storm sewer connections, basement sump pumps, roof drains and submerged
manholes. Infiltration occurs as groundwater leaks into the sewer system through cracked or broken pipes
and manholes, or through loose joints and connections.
Quantifying I/I is important in determining the peak day and peak hour flows through the system. They can
vary significantly due to changes in groundwater tables, intensity of rainfall, duration of rainfall, and when
the peak of the rain event occurs during the day.
Calculated I/I rates are presented in Table 6-4. A slightly more conservative I/I rate of 1,100 gallons per day
per acre (gpd/acre) is used for planning purposes.
Table 6-4 I Infiltration and Inflow
iriiiri
Peak Day Flow (mgd)
2O1:
2.086
3.492
•.4I
2.417
AI
3.284
3.639
Average Annual Flow (mgd)
1.076
1.008
1.048
1.081
1.099
Peak Day Infiltration and Inflow111 (mgd)
1.009
2.484
1.369
2.203
2.540
Sewered Area12 (acres)
2,349
2,349
2,349
2,349
2,349
Infiltration and Inflow (gpd/acre)
430
1,057
583
938
1,081
Notes:
1. Peak day infiltration and inflow was calculated by subtracting the average annual flow from the peak day flow.
2. Sewered area is the area of all parcels and right-of-way adjacent to a sewer line.
N223406WA.00 • July 2025 • General Sewer Plan Update • City of Port Orchard, WA
Wastewater Flows • 6-2
113
DRAFT
The Environmental Protection Agency (EPA) publication 'Infiltration/Inflow — I/I Analysis and Project
Certification' dated May 1985 was reissued by the Department of Ecology as Ecology Publication No. 97-
03. This publication established the following thresholds for possibly excessive infiltration and inflow:
➢ If average dry weather flow is less than 120 gpcd, infiltration is non -excessive.
➢ If average wet weather flow is less than 275 gpcd, inflow is non -excessive.
The average dry weather and wet weather flows are summarized in Table 6-5. The average dry weather
flows indicate that infiltration is non -excessive. The average wet weather flows indicate that inflow is non -
excessive.
Table 6-5 1 EPA/Ecology Excessive I/I Criteria
•1.11:
Population
12,075
21W
12,369
1IAI
12,664
AI1
12,958
AI
13,253
Average Dry Weather Flow (mgd)
1.02
0.90
0.96
0.88
0.88
Average Dry Weather Flow (gpcd)
84
73
76
68
66
Average Dry Weather Dates111
3/9-3/12
2/25-3/5
3/31-4/4
11/30-12/3
1/21-1/27
Average Wet Weather Flow121 (mgd)
1.86
2.02
2.07
2.37
2.62
Average Wet Weather Flow (gpcd)
154
164
163
183
197
Notes:
1. Dry weather flows are the average flow on days where no rainfall has occurred during a season of high groundwater.
2. Wet weather flows are the average of the seven highest flow events per year.
6.5 Peaking Factors
Comparison of the maximum day events recorded in recent years defines the peak day factors experienced
by the City sewer system summarized in Table 6-6.
Table 6-6 1 Peak Day Factor
Peak hour flows based on flow meter data at the SKWRF are summarized in Table 6-7. Hourly data was only
available for 2022.
Table 6-7 I Peak Hour Factor
N223406WA.00 • July 2025 • General Sewer Plan Update • City of Port Orchard, WA
Wastewater Flows • 6-3 114
DRAFT
6.6 Diurnal Curves
Typically, sewer flows are lowest at night and highest during the morning and evening. This distribution of
flow throughout the day is described by a diurnal curve. These curves are used by the computer model to
simulate flow variations throughout the period being modeled.
Two curves are used to vary flow throughout the day: one for the sanitary sewer component, and one for
the I/I component. The sanitary sewer diurnal curve was calculated by normalizing hourly flow on a day
with a similar flow to the average annual flow. The I/I curve was calculated by taking peak day flow on an
hourly basis, subtracting the average annual flow, and normalizing the results. The sanitary and I/I diurnal
curves are presented as Figure 6-1.
For future model runs, the I/I curve was shifted to align peak sanitary and peak I/I flows to simulate peak
flows to the system. The shift increases the peak hour factor to approximately 6.037. This is a conservative
approach since a major storm flow may occur at any time of the day. Existing model runs were used for
calibration purposes and do not utilize the shifted I/I curve.
Figure 6-1 1 Diurnal Curves
2.50
2.00
0 1.50
LL
N
N
E
O 1.00
0.50
0.00
OOP OOP OOP OOP OOe� OOe� OO�� OO�� OOP
°)
Dry Weather Sewer --- Infiltration/Inflow Infiltration/Inflow (Shifted)
6.7 Industrial Connections
The former Kitsap County Landfill, located within the South Kitsap Industrial Area (SKIA), has been closed
and capped. Leachate from the facility is trucked to the City sewer system and discharged into a manhole
N223406WA.00 • July 2025 • General Sewer Plan Update • City of Port Orchard, WA
Wastewater Flows • 6-4
115
DRAFT
in Bay Street and SW Wilkins Drive. The State Waste Discharge Permit No. 5T0007271 is included as
Appendix E.
6.8 Projected Wastewater Flows
Wastewater flows are projected to future conditions based on the land uses established by current zoning
for the future service area. Existing unit flows documented in the previous sections are assumed to remain
constant throughout the planning horizon. A summary of unit flows and projected flows for the planning
horizon are shown as Table 6-8. A breakdown per basin is included as Appendix D.
N223406WA.00 • July 2025 • General Sewer Plan Update • City of Port Orchard, WA
Wastewater Flows • 6-5 116
DRAFT
Table 6-8 1 Projected Wastewater Flows
fr
I
.,
2022
13,253
70
7,102
22
1.08(2)
1,100
2,334
3.65
6.79
2030
22,472
70
7,725
22
1.22
1,100
2,810
4.83
8.79
2034
25,317
70
8,037
22
1.32
1,100
2,991
5.24
9.49
2044
28,481
70
8,816
22
1.56
1,100
3,195
5.70
10.29
Build Out
30,693
70
10,678
22
2.14
1,100
3,282
5.99
10.76
Notes:
1. Peak hour flows were calculated by shifting the I/I curve to maximize peak hour flows as described in Section 6.5. This results in a more conservative peak hour factor than calculated in Table 6-6
2. 2022 Average annual flow in this table is calculated from residential and employment numbers and respective per capita flows. This results in a value that is slightly different than the recorded
flows documented in previous tables.
N223406WA.00 • July 2025 • General Sewer Plan Update • City of Port Orchard, WA
Wastewater Flows • 6-6
117
DRAFT
CHAPTER 7
Conveyance System Analysis
7.1 Introduction
Analysis of the City's wastewater conveyance system is a critical component in determining the ability of
the existing infrastructure to accommodate future growth. This chapter describes the analysis necessary
for strategic, long-term infrastructure planning and development of the Capital Improvement Plan (CIP).
The system was analyzed for existing conditions (2022), a six -year planning horizon (2030), a 10 -year
planning horizon (2034), a 20 -year planning horizon (2044), and the theoretical build -out conditions.
7.2 Model Software
InfoSWMM 15.0 by Innovyze was the hydraulic modeling software used to model the City sewer system.
InfoSWMM 15.0 is a dynamic hydraulic model that uses the EPA Stormwater Management Model (SWMM)
version 5.1 computer program for the hydraulic analysis calculations. The model is designed specifically for
modeling urban sanitary and combined sewer systems. The current version operates within an ArcGIS
(ArcMap) platform.
7.3 Model Development
The original model was developed as part of the 2016 General Sewer Plan update. This model has been
updated to reflect changes to the system using GIS data and as -built drawings.
The City's conveyance system was analyzed using a truncated model, simulating only trunk and interceptor
gravity mains and all pump stations. This allows for an accurate representation of the most critical
components of the City's conveyance system, and the simultaneous analysis of both gravity and pressure
systems.
The following information was used in developing the hydraulic model of the existing sewer collection
system. Additional details on the existing sewer system are included in Chapter 5.
7.3.1 Gravity Sewers
The original model invert elevations were obtained using light detection and ranging (LIDAR) information
for rim elevations and depth to invert provided by the City. Record drawings were used to suplement
evaluate pipe invert elevations in areas where abnormal or adverse grades were present. Engineering
judgement was used to estimate elevations based on adjacent pipe slopes and depths in the event no other
information was available.
Additions to the sewer system since 2016 have been added to the model using GIS data and as -built
drawings.
7.3.2 Lift Stations
In the original model, nodes representing lift station wet wells were added to the model from the
information provided by the City. Pump curves were added to simulate pump operation. Wet well
N223406WA.00 • July 2025 • General Sewer Plan Update • City of Port Orchard, WA
Conveyance System Analysis • 7-1 118
DRAFT
dimensions are modeled based on lift station data sheets maintained by O&M staff. Modeled pumping
rates were compared against factory pump curve data when available so that the model outputs were
within a range of reasonably expected values.
Data for some of the smaller lift stations was unavailable. Engineering judgement was used to estimate
depth, wet well size, and pump curves. Because these smaller lift stations represent a fraction of the flows,
this does not significantly impact the results of the model.
Model scenarios for 2030, 2034, 2044, and build -out are assumed to have a new Marina Lift Station and
Sidney South Lift Station constructed.
7.4 Model Loading
Wastewater flow is represented in the model by two separate elements: average dry weather flow (DWF)
and I/I. All flow is loaded to model nodes which represent manholes in the gravity system.
7.4.1 Average Dry Weather Flow
Existing and projected DWF flow rates were developed for each basin on a gpd/acre basis using the
following information:
➢ Population and employment data and projections (described in Chapter 4)
➢ Existing measured flow rates (described in Chapter 6)
➢ Unit sewer flows (described in Chapter 6)
➢ Diurnal curves (described in Chapter 6)
➢ Mini -basin areas (described in Chapter 5)
The total DWF for each mini -basin is distributed among each node in the mini -basin on a flow per unit area
basis for nodes identified in each basin. The contributing area for each node is determined using Thiessen
polygons. The size of each polygon is determined by the mini -basin boundary and the distribution of nodes
in the mini -basin.
7.4.2 Infiltration and Inflow (I/I)
Existing and projected I/I rates were developed on a gallons/acre basis using the following information:
➢ I/I (described in Chapter 6))
➢ Diurnal curves (described in Chapter 6))
➢ Mini -basin areas (described in Chapter 6)
➢ Sewered areas (described below Chapter 5)
Total I/I for each basin was calculated using the unit I/I rates described in Chapter 6 and approximate area
contributing to the sewer system. The existing sewered area was derived from the area of parcels and
rights -of -way adjacent to existing sewers and was adjusted based on engineering judgment and knowledge
of the sewer system. Build -out sewered area was calculated by taking the existing sewered area and adding
the net developable area from the Kitsap County Updated Land Capacity Analysis (ULCA) plus 54 percent
for right-of-way and public and quasi -public facilities based on assumptions in the ULCA. Sewered areas for
2030, 2034, and 2044 were interpolated between existing and build -out sewered areas by calculating the
change in sewered area divided by the change in population between existing conditions and build -out
conditions, which is approximately 3,300 sf per person and includes parcels, right-of-way, and other public
facilities.
N223406WA.00 • July 2025 • General Sewer Plan Update • City of Port Orchard, WA
Conveyance System Analysis • 7-2
119
DRAFT
Similar to DWF loading, model I/I loading was assigned to nodes based on a flow per unit area basis for
each node using the Thiessen polygon method.
Determining how I/I is projected into the future as the collection system expands and ages is a key issue.
Based on the King County Regional Infiltration/Inflow Control Program, a widely accepted assumption in
Western Washington is to increase the I/I component of sewer flow by 7 percent per decade, up to a
maximum of 28 percent. Much of the City's existing sewer collection system was built 40 years ago or more
and has reached the maximum I/I rate. Newer infrastructure typically has lower rates of I/I. As the sewer
system expands with new construction, it is likely that the I/I rate will remain the same or drop due to
improved materials and construction. Therefore, a constant I/I rate was assumed for future I/I projections.
For future model runs, the I/I curve is shifted to align with the peak of the DWF diurnal pattern to maximize
flows to the system, effectively increasing the peak hour factor (see Figure 6-1). This is a conservative
approach since a major storm flow may occur at any time of the day. Existing model runs were used for
calibration purposes and do not utilize the shifted I/I curve.
7.5 Model Calibration
Model calibration is the process of adjusting model parameters so that simulated flows adequately match
observed flow. The model was calibrated using the flow meters at the SKWRF and Marina Lift Station.
7.5.1 Calibration to Recorded Flow Data
7.5.1.1 Average Annual Flow Calibration
The first step in calibrating the model was to compare simulated DWF to measured average annual flow
data. After the modeled DWF volumes were verified, diurnal flow patterns developed from measured flow
data were loaded and adjusted until the variations in simulated flow throughout the day reasonably
matched the measured average annual flow conditions. The model was calibrated to within 3 percent of
the observed average annual DWF which is within acceptable tolerance for modeling analysis.
7.5.1.2 Peak Day Flow Calibration
Peak day I/I was loaded into the model and simulation results were compared with the peak day flow at
the Marina Lift Station. The simulated flow volume was compared with the measured flow volume during
peak days to assess if model loading reasonably matched the field data. The model was calibrated to within
2 percent of the observed peak day flows which is within acceptable tolerance for modeling analysis.
7.5.1.3 Peak Hour Flow Calibration
The peak day flow occurred on January 7, 2022. The model was calibrated to within 4 percent of the daily
flow, and 10 percent in the peak hour flow for this event. This is within acceptable tolerance and the model
is suitable to use for system analysis.
7.6 Future Sewer System Expansion
Future sewer system expansion was modeled by adding flow from future population growth into the
existing system model. Future sewer pipes and lift stations, with the exception of the Sidney South lift
station, were not modeled, and future flows were loaded to the existing system. It is recommended that
the City model future planned infrastructure subsequent to the plan to gain an understanding of sizing
requirements.
N223406WA.00 • July 2025 • General Sewer Plan Update • City of Port Orchard, WA
Conveyance System Analysis • 7-3 120
DRAFT
It is anticipated that most of the future infrastructure into unsewered areas will be constructed by
developers. Due to the topography, some new developments may require lift stations. These were not
modeled, but are shown in Chapter 8.
7.7 Modeling Scenarios
Five scenarios were developed to analyze the City's wastewater conveyance system utilizing the population
and unit flow projections described in Chapter 4 and Chapter 6 and are summarized in Table 7-1.
Table 7-1 1 Projected Wastewater Flows (mgd)
Average Annual
1.08
1.74
1.95
2.19
2.37
Peak Day
3.65
4.83
5.24
5.70
5.98
Peak Hour
6.79
8.79
9.49
10.29
10.74
7.8 Hydraulic Modeling Analysis
7.8.1 Design Capacity
The design capacity of the gravity mains is 100 percent depth (1.0 d/D ratio, where d is the flow depth and
D is the pipe diameter). The maximum design capacity of STEP mains and force mains are exceeded when
flow velocities are greater than 8 feet per second (fps). The firm capacity of a lift station is defined as the
capacity of the lift station with the largest pump out of service. When model simulation results exceed
these design capacities in piping or in lift stations, they are identified as deficient and system improvements
are identified to resolve them.
7.8.2 Results
The results of the modeling analysis are summarized in this section. Assets that were modeled as failing the
criteria for the planning horizons are shown in Figure 7-1. Additionally, the total counts of simulated
sanitary sewer overflows (SSOs) and surcharged gravity pipes are included in Table 7-2. The pipe surcharge
shown in Table 7-3 and Figure 7-1 flags any gravity pipe whose end node has a water surface elevation
greater than the crown of the pipe at that node connection. Force mains are only considered under capacity
if they fail the velocity criteria.
N223406WA.00 • July 2025 • General Sewer Plan Update • City of Port Orchard, WA
Conveyance System Analysis • 7-4
121
■!t■
I NINE
iEIuII
___ ilJj1ui ' *.u!j
.1l
ii
•r11 -II-'�� E■ Ill i►rill
uuri-�11 IIIIIIIf■—� _� gE11 III!
nle,_
,I„_E1R flllllflll lli.�� 71111;,11[
�` IIII!■1111111
=Lill■III■nw ��-1��■ 7J11C IIII!
IIIN:r11NI
DRAFT
Table 7-2 1 Pipe and Manhole Capacity Criteria
2022 0 0 0
2030 0 2 0
2034 0 2 0
2044 0 16 0
Build -Out 5 29 1
The model simulated peak hour flow for each lift station is shown in Table 7-3. These results indicate that
the Flower Meadows Lift Station exceeds capacity in the 2044 planning horizon. A Capital improvement
project is recommended to increase the capacity at this station.
Table 7-3 1 Lift Station Capacity and Peak Hour Inflows
Albertsons
176
108
10
10
10
10
Bay Street
730
514
531
544
572
607
Canyon Court
105
76
101
98
105
100
Cedar Heights
50
15
16
16
17
22
Eagle Crest
100
27
28
30
34
54
Flower Meadows
360
300
328
340
[370]
[383]
Golden Pond
137
56
59
60
64
64
Harrison Hospital
280
80
87
90
98
99
Haven Apartments
560
103
121
121
121
117
Lowes
470
181
185
225
231
201
Marina
10,400
4,754
5,300
5,397
6,127
6,533
McCormick Meadows
200
65
67
68
70
70
Eldon Trails
100
40
46
49
57
57
McCormick Woods #1
3,600
2,195
2,602
2,654
2,764
2,766
McCormick Woods #2
3,200
907
1,433
1,760
1,887
1,888
Pottery
1,800
828
1,393
1,342
1,663
1,655
Sedgwick
180
54
71
97
113
114
Tremont Place
70
49
67
69
69
69
Ridge 1&2
200
84
87
88
92
92
Ridge 3
690
75
77
78
81
81
Note:
Flows exceeding the firm capacity are bracketed and in bold italics.
7.9 Capital Improvement Plan Model Runs
Model runs were performed with improvements to both lift stations and pipe sizes to remove minor flow
restrictions and to size improvements. These improvements are described in Chapter 8.
N223406WA.00 • July 2025 • General Sewer Plan Update • City of Port Orchard, WA
Conveyance System Analysis • 7-6
123
DRAFT
CHAPTER 8
Collection Facilities
Improvements
8.1 Introduction
This chapter provides a compilation of specific projects, improvements, and programs the City should
implement to alleviate the deficiencies identified in Chapter 7. These projects are derived primarily from
the system analysis and discussions with the City's C&M and engineering staff. Each project is accompanied
by a planning level opinion of probable project cost (OPPC) and a schedule identifying when the project is
anticipated to begin and end. The City should review the CIP periodically to adjust for significant changes
in the priority of each project, its cost, and scope.
Collection facilities improvement projects for the City wastewater system are categorized into the following
seven categories:
➢ Replacement: Improvements replace existing infrastructure.
➢ Upgrade: Improvements upgrade or add to existing infrastructure but do not replace existing
infrastructure.
➢ Capacity: Improvements classified as insufficient in capacity are determined based on whether or
not the infrastructure can effectively convey the incoming flow. Gravity sewer pipes are considered
to have insufficient capacity when the pipe is full or surcharged. Force mains are considered to
have insufficient capacity when the velocities exceed 8 feet per second. Lift stations are considered
to have insufficient capacity when inflow exceeds the flow produced by the lift station with the
largest pump out of service. As described in Chapter 7, the conveyance system was evaluated using
existing flows and flows projected for 2022, 2026, 2036, and build -out conditions. The evaluations
determined system deficiencies when subjected to these existing and future flow conditions.
Following identification of system deficiencies, the H/H model was used to evaluate and select
system improvements to alleviate the system deficiencies.
➢ Operations & Maintenance (O&M): O&M projects will rehabilitate or replace facilities identified by
the City O&M staff as having unacceptably high maintenance requirements, both in terms of
frequency and magnitude.
➢ Obsolescence: Improvements classified as obsolete are based on the age of the infrastructure.
Mechanical and electrical equipment is expected to have a typical usable life of 25 years. Structures
are expected to have a typical usable life of 50 years. Pipes are expected to have a typical usable
life of 100 years.
➢ General: General improvement projects are those identified by City staff for various reasons that
do not fall within any of the remaining four categories. These projects may be needed to simplify
system operation, ease O&M efforts and reduce O&M costs, consolidate and/or eliminate
N223406WA.00 • July 2025 • General Sewer Plan Update • City of Port Orchard, WA
Collection Facilities Improvements • 8-1 124
DRAFT
redundant facilities, reduce, or eliminate non -critical O&M concerns, or meet ongoing sewer
system management needs.
➢ Developer: Projects identified as developer dependent are needed to serve new developments but
are not needed to provide continuation of service to existing customers.
When possible, system improvement projects should be coordinated with other utilities to minimize
disruption and reduce associated costs such as road and surface restoration.
8.2 Opinions of Probable Project Cost
Opinions of probable project costs (OPPCs) for the CIP projects have been defined only to a preliminary
level of design with approximate dimensions. All projects will require further definition and design
refinement as part of the design process.
Construction costs were estimated from bid results for similar projects in the Puget Sound area and RS
Means cost data for 2023. The OPPC includes construction costs comprised of the costs to build the various
components, sales tax, and contingency. The OPPC also includes "soft costs" comprised of costs for
planning, surveying, engineering services, permitting, bid advertisement, contract award, and services
during construction. No costs are included for financing, easements, right-of-way, or property acquisition
(except for the Bay Street Lift Station).
Actual costs can and will differ from the OPPC. Volatility in the bidding climate, the number of contractors
bidding on a project, and their approach to bidding and completing the work will all impact actual project
costs.
Additional improvements required as development occurs will be funded by developers under a less
definite time frame. Some further sewer extensions from the existing system will also be required to serve
specific parcels within the various developments. These extensions are not included in the CIP and cannot
be identified until the development plan is defined, which may occur in several phases.
8.3 Six -Year Capital Improvement Program
The six -year Capital Improvement Program includes projects specifically identified due to capacity
limitations or maintenance considerations.
8.3.1 Project Descriptions
8.3.1.1 CIP 6-1 Annual Preservation
Replace aging and deteriorated pipes as needed to maintain integrity of the sewer system.
8.3.1.2 CIP 6-2 Marina Lift Station Construction
This project is to replace the Marina Lift Station. It is under construction as of 2024 and is scheduled for
completion in fall of 2025.
N223406WA.00 • July 2025 • General Sewer Plan Update • City of Port Orchard, WA
Collection Facilities Improvements • 8-2
125
DRAFT
8.3.1.3 CIP 6-3 Bay Street Lift Station Replacement
The Bay Street lift station is aging and has frequent maintenance call outs. The City is planning on acquiring
property on the south side of Bay Street to construct a new lift station. The existing station will be
decommissioned.
8.3.1.4 CIP 6-4 Minor Lift Station Improvements
This CIP is for minor improvements required at eight of the other lift stations not covered by the other
projects. It is anticipated that this will be performed under Small Works contracts or by City staff. In general,
minor improvements include items such as upgrading programmable logic controllers (PLCs) and operator
interface terminals (OlTs), upgrading SCADA systems, installing flow meters, etc.
8.3.1.5 CIP 6-5 Port Orchard Boulevard Lift Station and Siphon
Install a new siphon and lift station at Port Orchard Boulevard and Bay Street. This project is required by a
culvert replacement and estuary project currently under design and development by WSDOT. This project
is expected to be funded entirely by WSDOT.
8.3.1.6 CIP 6-6 Sidney Road SW Second Force Main
Install 4,500 linear feet (If) of 10 -inch force main in Sidney Road SW to serve the proposed Ruby Creek Lift
Station.
8.3.1.7 CIP 6-7 McCormick Woods Sewer Lift Station #3
Construct a new lift station to serve the McCormick Woods development. This project will be built and paid
for by a developer.
8.3.1.8 CIP 6-8 Ruby Creek Lift Station
Construct a new lift station to serve the area of Basin 7 and 7a south of Ruby Creek. This project will be
located on property owned by Kitsap Transit. It is currently in the preliminary design phase and is
anticipated to be funded partially by Kitsap Transit.
8.3.1.9 CIP 6-9 Sidney Road Gravity Sewer Main Extension
Construct 1,600 If of 15 -inch gravity sewer to convey sewage to the Ruby Creek Lift Station and divert flow
from the Albertsons Lift Station.
8.3.1.10 CIP 6-10 Bravo Terrace (Sedgwick) Lift Station
Replace the Bravo Terrace lift station to accommodate future flows and replace aging infrastructure.
8.3.1.11 CIP 6-11 Bravo Terrace (Sedgwick) Force Main
Replace the Bravo Terrace force main to accommodate future flows and replace aging infrastructure.
8.3.1.12 CIP 6-12 Sewer Facility Capacity Upgrades
Pay the sewer utilities portion of commonly owned public works facilities that need to be upgraded due to
City growth.
N223406WA.00 • July 2025 • General Sewer Plan Update • City of Port Orchard, WA
Collection Facilities Improvements • 8-3 126
DRAFT
8.3.1.13 CIP 6-13 McCormick East/Glenwood Sewer Basin Improvements
Construct a new sewer to serve the Glenwood area. Sewers may include both gravity sewer and a lift station
and force main. This project is anticipated to be constructed by a developer.
8.3.1.14 CIP 6-14 2029 General Sewer Plan and Sewer Rate Study
Update the sewer plan in 2029 to facilitate continued planning for growth and aging infrastructure.
8.3.2 Summary
The projects recommended for the six -year Capital Improvement Program (CIP) are described in Table 8-1
and illustrated on Figure 8-1. Funding sources for each CIP are shown in Table 8-2. The City has four
potential funding sources: customer rates, capital facilities charges (CFCs), developer funded, and WSDOT.
N223406WA.00 • July 2025 • General Sewer Plan Update • City of Port Orchard, WA
Collection Facilities Improvements • 8-4
127
DRAFT
Table 8-1 I Six -Year CIP
�.
6-1 Annual Preservation
I
X
$4,000,000
> The City has budgeted up to $4,000,000 for the six -year CIP for annual pipe replacement and rehab.
6-2
Marina Lift Station Construction
X
X
X
X
X
$19,400,000
> Replace Marina Pump Station. This project is currently under construction at the time of this plan.
> Construct new 730 gpm lift station on new parcel
> Install diesel generator with sound attenuating enclosure
6-3 Bay Street Lift Station Replacement
X
X
$8,000,000
> Screw sucker pump
➢ Decommission existing lift station
> Property Acquisition
> Currently in design at the time of this plan
> Tremont Place
o Upgrade existing PLCs and OlTs with manufacture supported units
➢ Canyon Court
o Upgrade existing PLCs and OlTs with manufacture supported units
o Create backup of PLC programs and store spare parts at maintenance shop
o Upgrade to wired/wireless SCADA technologies
> Cedar Heights
o Replace failing fiberglass pump rails with 316 stainless steel rails
o Relocate valves to a valve vault
> Eagle Crest
o Install flow meter
> McCormick Meadows
o Upgrade existing PLCs and OlTs with manufacture supported units
6-4 Minor Lift Station Improvements
X
X
$1,300,000
o Create backup of PLC programs and store spare parts at maintenance shop
o Upgrade to wired/wireless SCADA technologies
> Sedgwick
o Install sump pump in valve vault
o Raise light for the alarm and fix buttons
o Install flow meter
o Install explosion proof seal off
> Ridge 1&2
o Upgrade existing PLCs and OlTs with manufacture supported units
o Create backup of PLC programs and store spare parts at maintenance shop
o Upgrade to wired/wireless SCADA technologies
➢ Ridge 3
o Upgrade existing PLCs and OlTs with manufacture supported units
o Create backup of PLC programs and store spare parts at maintenance shop
o Upgrade to wired/wireless SCADA technologies
6-5
Port Orchard Boulevard Lift Station and Siphon
X
$7,610,000
> Assumes 500 gpm lift station and siphon. WSDOT is assumed to be paying for the project.
6-6
Sidney Road SW Second Force Main
X
$1,300,000
> 4,500 If of 10 -inch force main for Ruby Creek Lift Station.
6-7
McCormick Woods Sewer Lift Station #3
X
$1,000,000
> Construct new lift station. Located on Kitsap Tax Parcel No. 092301-4-005-2006
6-8
Ruby Creek Lift Station
X
X
$3,275,000
> Construct new lift station. Project is entering design phase. 100% CFC funded.
6-9
Sidney Road Gravity Sewer Main Extension
X
X
$2,290,000
> 1,600 If of 15 -inch gravity sewer in Sidney Road
6-10
Bravo Terrace (Sedgwick) Lift Station
X
X
$2,500,000
> Replace lift station
6-11
Bravo Terrace (Sedgwick) Force Main
X
X
$4,860,000
> Replace 8,400 LF of force main.
6-12
Sewer Facility Capacity Upgrades (PWO)
X
$2,000,000
> Pay for the sewer utility's share to upgrade the Public Works and Utility Billing City facility buildings.
6-13
McCormick East/Glenwood Sewer Basin Improvements
X
X
$7,600,000
> Developer to provide lift station force main and/or gravity sewer to serve Glenwood Sewer Basin, also include pavement restoration.
City to determine funding split between developer funded and CFCs.
6-14
2029 General Sewer Plan and Sewer Rate Study
$350,000
> Update the sewer plan and rate study.
Total
$65,485,000
➢ City portion is estimated at $54,735,000.
N223406WA.00 • July 2025 • General Sewer Plan Update • City of Port Orchard, WA
Collection Facilities Improvements • 8-5 128
F '
jJI
I
Ill!i!I_ILII'
1U1111L j
1111U1■''
■■
.;... efElll1,1
::It'- �- 1 X 11■ ■
s ■
■! 11 ff■flll� ■ i
IIII.EII�ff�ri�ftll�
_� :111 _-'1.1:: ■■ 1i��1�-
111111'emu• ■«__r�
�1�I�
wAnm�nt •�. rr1�l,ltlr_:i ff■1�
�Illll�i� � rl=+ 11►
�..u.+a lilllh 111 r=�� lllllf�
fll II IllI11l CC, i�ff■ Ilrfill.4=;i►11i !i t.
111anlrnnully. � � il�lnl,���l• ��. .���EIlis�=
II`.'111�1111�I�- ..Ill llli■IE t�..`
L
��..... 111 rills:
DRAFT
Table 8-2 1 Project Funding Sources
Annual Preservation
Marina Lift Station Construction
Bay Street Lift Station Replacement
Minor Lift Station Improvements
Port Orchard Boulevard Lift Station and Siphon
Sindey Road SW 2nd Force Main
McCormick Woods Sewer Lift Station #3
Ruby Creek Lift Station
Sidney Road Gravity Sewer Main Extension
Bravo Terrace (Sedgwick) Lift Station
Bravo Terrace (Sedgwick) Force Main
Sewer Facility Capacity Upgrades
McCormick East/Glenwood Sewer Basin Improvements
2029 General Sewer Plan and Sewer Rate Study
6-1 100%
6-2
35%
65%
6-3
87%
13%
6-4
40%
60%
6-5
100%
6-6
100%
6-7
100%
6-8
4%
6-9
100%
6-10
100%
6-11
100%
6-12
100%
6-13
100%
6-14
100%
8.4 20 -Year Capital Improvement Program
96%
The 20 -year CIP includes projects identified to have capacity limitations after the six -year CIPs have been
completed, as well as projects anticipated to be needed due to age.
8.4.1 Project Descriptions
8.4.1.1 CIP 20-1 Flower Meadows Lift Station Upgrade
The Flow Meadows lift station does not have a connection for a generator. The valves are directly buried
and difficult to access. The pumps are aging. The station does not have a flow meter.
This project will install a manual transfer switch and pig tail for portable generator set, construct a vault
around the isolation and check valves, replace the pumps for a capacity of 400 gpm to accommodate build -
out flows, and install a flow meter.
8.4.1.2 CIP 20-2 Harrison Hospital Lift Station Upgrade
The Harrison Hospital Lift Station needs some electrical upgrades, including PLCs and operator interface
terminal (OIT). Create backup of PLC programs and store spare parts at maintenance shop. Upgrade to
wired/wireless SCADA technologies. Upgrade generator and automatic transfer switch (ATS). Install amp
reader. This CIP should be planned for early in the 20 -year planning horizon.
8.4.1.3 CIP 20-3 Pottery Lift Station Upgrade
The Pottery Lift Station does not have adequate storage in the wet well, resulting in minimal time for
operations staff to get to the site in an emergency. Install additional storage and a permanent diesel bypass
pump.
N223406WA.00 • July 2025 • General Sewer Plan Update • City of Port Orchard, WA
Collection Facilities Improvements • 8-7 130
DRAFT
The site also has some soil stability issues that have resulted in some differential settlement. The site should
be monitored to determine if a new retaining wall or stormwater management is required to stabilize the
site.
8.4.1.4 CIP 20-4 Infiltration and Inflow Study
Install 10 flow meters for 6 months to locate high rates of I/I in the collection system.
8.4.1.5 CIP 20-5 Bay Street West Sewer Main Replacement
Install 1,200 If of 30 -inch gravity sewer in Bay Street between Frederick Avenue and Kitsap Street
8.4.1.6 CIP 20-6 2034 General Sewer Plan and Sewer Rate Study
Update the sewer plan in 2034 to facilitate continued planning for growth and aging infrastructure.
8.4.1.7 CIP 20-7: Port Orchard Boulevard Replacement
Replace 5,900 If of 12 -inch gravity sewer with 18 -inch gravity sewer in Port Orchard Boulevard. Replace 500
If of 24 -inch pipe with 30 -inch pipe from Port Orchard Boulevard to Kitsap Street.
8.4.1.8 CIP 20-8 McCormick Woods Drive SW Replacement
Replace 1,600 If of 12 -inch pipe with 18 -inch gravity sewer pipe between Marymac Drive SW and SW Old
Clifton Road to reduce surcharging during peak hours.
8.4.1.9 CIP 20-9 SW Old Clifton Road
Replace 250 If of 12 -inch gravity sewer pipe with 18 -inch gravity sewer pipe between Chanting Circle SW
and McCormick Woods Drive SW to reduce surcharging during peak hours.
8.4.1.10 CIP 20-10 Marina Force Main
Replace 7,900 If of 18 -inch force main with 24 -inch force main.
8.4.1.11 CIP 20-11 Canyon Court Lift Station Replacement
The existing Canyon Court pump station should be replaced as the equipment ages.
8.4.1.12 CIP 20-12 Cedar Heights Lift Station Replacement
The existing Cedar Heights pump station should be replaced as the equipment ages.
8.4.1.13 CIP 20-13 Eagle Crest Lift Station Replacement
The existing Eagle Crest pump station should be replaced as the equipment ages.
8.4.1.14 CIP 20-14 Harrison Hospital Lift Station Replacement
The Harrison Hospital pump station should be replaced as the equipment ages. This CIP should be planned
for later in the 20 -year planning horizon.
N223406WA.00 • July 2025 • General Sewer Plan Update • City of Port Orchard, WA
Collection Facilities Improvements • 8-8
131
DRAFT
8.4.1.15 CIP 20-15 Lowes Lift Station Replacement
The Lowes pump station should be replaced as the equipment ages.
8.4.1.16 CIP 20-16 McCormick Meadows Lift Station Replacement
The McCormick Meadows pump station should be replaced as the equipment ages.
8.4.1.17 CIP 20-17 Ridge 1&2 Lift Station Replacement
The Ridge 1&2 pump station should be replaced as the equipment ages
8.4.1.18 CIP 20-18 Ridge 3 Lift Station Replacement
The Ridge 3 pump station should be replaced as the equipment ages.
8.4.1.19 CIP 20-19 Ravine Line Rehabilitation
Replace or rehabilitate the existing gravity sewer located in the ravine between Lippert Drive and Tremont
Street. The pipe is aging and is suspected to be a source of high levels of infiltration and inflow.
8.4.1.20 CIP 20-20 Annual Preservation
Replace aging and deteriorated pipes as needed to maintain integrity of the sewer system.
8.4.2 Summary
The projects recommended for the 20 -year Capital Improvement Program (CIP) are described in Table 8-3
and illustrated on Figure 8-2.
N223406WA.00 • July 2025 • General Sewer Plan Update • City of Port Orchard, WA
Collection Facilities Improvements • 8-9 132
DRAFT
Table 8-3 1 20 -Year CIP
➢ Install manual transfer switch (MTS) and pig tail for portable generator set
20-1 Flower Meadows Lift Station Upgrade X X X $500,000
➢ Install valve vault around the isolation and check valves
➢ Replace pumps to accommodate future flows
➢ Install flow meter
➢ Upgrade existing PLCs and OlTs with manufacturer supported units.
20-2 Harrison Hospital Lift Station Upgrade X X $248,000
➢ Create backup of PLC programs and store spare parts at maintenance shop,
➢ Upgrade generator and ATS
➢ Install storage tank for diesel fuel
20-3 Pottery Lift Station Upgrade X X $496,000
➢ Upgrade existing PLCs and OlTs with manufacturer supported units.
➢ Create backup of PLC programs and store spare parts at maintenance shop.
20-4
Infiltration and Inflow Study
X
X
$120,000
> Install flow meters to support I/I analysis. Assumes 10 meters for 6 months at $2,000/meter/month
20-5
Bay Street West Sewer Main Replacement
X
$2,600,000
➢ Install 1,200 If of 30 -inch pipe in Bay Street between Frederick Avenue and Kitsap Street
20-6
2034 General Sewer Plan and Sewer Rate Study
$350,000
> Update the sewer plan and rate study
20-7
Port Orchard Boulevard Replacement
X
X
$10,300,000
> Replace 5,900 LF of 12 -inch pipe with 18 -inch pipe in Port Orchard Boulevard
Replace 500 LF of 24 -inch pipe with 30 -inch pipe from Port Orchard Boulevard to Kitsap Street
20-8
McCormick Woods Drive SW Replacement
X
X
$3,500,000
➢ Replace 1,150 LF of 12 -inch pipe with 18 -inch pipe from manhole 13-7-01 to manhole 15-7-01
Replace 450 LF of 12 -inch pipe with 18 -inch pipe from manhole 14-7-01 to manhole 25-7-01
20-9
SW Old Clifton Road Replacement
X
X
$900,000
➢ Replace 250 LF of 12 -inch pipe with 18 -inch pipe from manhole 738 to manhole 26-7-01
20-10
Marina Force Main Replacement
X
X
$13,600,000
> Replace 7,900 LF of 18 -inch pipe with 24 -inch pipe from the Marina lift station to WSUD WWTP
20-11
Canyon Court Lift Station Replacement
X
X
$2,200,000
> Replace aging lift station
20-12
Cedar Heights Lift Station Replacement
X
X
$2,000,000
> Replace aging lift station
20-13
Eagle Crest Lift Station Replacement
X
X
$2,000,000
> Replace aging lift station
20-14
Harrison Hospital Lift Station Replacement
X
X
$3,300,000
> Replace aging lift station
20-15
Lowes Lift Station Replacement
X
X
$3,300,000
> Replace aging lift station
20-16
McCormick Meadows Lift Station Replacement
X
X
$3,300,000
> Replace aging lift station
20-17
Ridge 1&2 Lift Station Replacement
X
X
$3,300,000
> Replace aging lift station
20-18
Ridge 3 Lift Station Replacement
X
X
$3,300,000
> Replace aging lift station
20-19
Ravine Line Rehabilitation
X
X
X
$3,900,000
> Rehabilitate or replace 2,800 If of pipe
20-20
Annual Pipe Replacement
X
$11,200,000
> Annual expenditure is assumed to be $800,000. $5,600,000 will be spent over 14 years.
Total
$ 70,414,000
N223406WA.00 • July 2025 • General Sewer Plan Update • City of Port Orchard, WA
Collection Facilities Improvements • 8-10
133
Fj r 7 r-1��::��lEl�■?= =?IA' ��:a��T�•• �� fir- �a�-����.'
I��jlll'■,Ii:II1k�I�::IEII �== `�v_!'l+ 7�1�
� 111■ ■ II II II I' I:�II I II'- �. '1'-' �_ `tea i -.'r■ w�'l�:
1 �iI]�I��II'I('i!IIE�I-.-lrll:• I� wii!!' -1t. '�■
i � i ='AI■ate-.liz- `'
■ � til��ll'�1�'�' ,�' I"'1r" f;=r°.I;ISff�.,l_;IHHHHEMEN
111 IIi:
I
-1
IlllRlll.1�•I
��.niiymu III t rte.
----: llli
■.m.+•.IulII I1_ rim
frl IIuIIli■CC -
-I•11 i1111 in Ii liz tits
I1111N: L1,41
DRAFT
8.5 Sewer Extensions into Undeveloped Basins
New sewer extensions will be needed to serve new developments expected in unsewered areas of the City
as shown on Figure 8-3. Specific plans for the sewer extensions have not been prepared and will be the
responsibility of the developer. Some of the developments shown will require local lift stations.
Major land developers will be preparing site -specific plans for street layouts, residential lot distribution,
commercial parcels, sensitive area delineations, required setbacks with buffers, and other land use
intentions for approval by the permitting authorities. These land use decisions, and the timing of when
specific parcels are developed will influence the sewer collection facilities within these basins. The City has
decided that no additional STEP units will be allowed.
Coordination between the City and the West Sound Utility District will be required as properties are
developed along the fringes of their two sewer service areas to establish which agency will serve which
properties. These sewer extensions are not expected to require significant financial investment by the City.
8.5.1 Ruby Creek Lift Station
The Ruby Creek Lift Station (RCLS) and associated force main will be constructed by a developer to serve
Basin 7 and the south part of Basin 7a. Consor is working on the preliminary design under a contract with
the City. Flows from these basins will be diverted from the Albertsons Lift Station to the RCLS.
N223406WA.00 • July 2025 • General Sewer Plan Update • City of Port Orchard, WA
Collection Facilities Improvements • 8-12
135
III
■� __ _=
C11i1�'i'l•=aft --f
is • sIi■'_� =h
ilI-..i��i
i f11111fa•i'1 �" '•1
- a+."!Iii,III��!Rlll'7 II111H11 _ :C:_- „1 1111-_:,c
;,.,Iti�,= ■III■— •
r`■■ M� -�__
■ �:Ifnuun ��1 - --
II'!j1!I!j IMII ..
mo_■=-_=
X14?,...._��, I>`rr; ■ ■���■ I Rti f:i:..-C��
I
11 11 L.11111j
'II� .1111- � 1.II1� pfri
■,411■II:L
IIIII:IIIrut,. iiiiiiiiiUI ••
1�� IIiP r:. �Ir■�'
:111 klllliti 1� :=1a
ru
liunull
1111111111. �--
■■
• 1i 11111 �- ■!�'.
11■11����sAp
rte'■■■■�li � -:ll:. ■.:1r.u,r..
I =ITn=.
DRAFT
THIS PAGE INTENTIONALLY LEFT BLANK
N223406WA.00 • July 2025 • General Sewer Plan Update • City of Port Orchard, WA
Collection Facilities Improvements • 8-14
137
DRAFT
CHAPTER 9
Financial Program
9.1 Introduction
This chapter presents the financial program to demonstrate the financial capacity of the City to fund the
full cost to construct, operate, maintain, and manage the sewage collection and conveyance system on an
ongoing basis. The following sections present the financial status of the sewer utility, potential funding
sources and a plan for funding the recommended six -year capital improvement program (CIP). A six -year
financial plan is presented that evaluates revenues, expenses, reserve levels, and the impact on sewer
rates. An evaluation of the affordability of the City's sewer rates is summarized. This chapter was prepared
by KLJ Financial Consulting.
9.2 Financial Background
The City owns, operates, and maintains existing wastewater collection and conveyance facilities that serve
residential and commercial customers within its current sewer service area. Residents outside of the City's
service area are served by the West Sound Utility District (WSUD) or by individual septic tanks. Wastewater
treatment is provided by the South Kitsap Water Reclamation Facility (SKWRF) owned jointly by the City
and WSUD and operated and maintained by WSUD.
The 7 -Member elected City Council governs the City and sets the utility rates, fees, and charges. The Mayor
administers policy and day-to-day operations with the support of Department Management and staff. The
City strives to provide high quality, reliable wastewater services at fair and reasonable rates to meet the
current and future needs of its ratepayers.
To establish adequate sewer rates, it is essential that the City define its benchmarks for financial
performance. Per Resolution No. 053-20, the City adopted financial policies to provide the foundation and
framework for sound financial management. These policies promote financial integrity and stability for the
City and provide guidance and consistency for decision -making over time.
Key excerpts from the City's financial policies are included to provide context in reviewing the City's
historical financial performance and the Financial Program presented herein.
9.3 Financial Policies
Financial policies and goals considered in the development of the Financial Program are summarized below.
9.3.1 Sewer Enterprise Fund Accounting
The sewer utility is a self-supporting enterprise fund. Charges for sewer service are to be sufficient to
finance all operating, capital, and debt service expenses of the sewer enterprise fund, including maintaining
prudent cash reserves. The City maintains four separate funds to account for the financial activities of the
N223406WA.00 • July 2025 • General Sewer Plan Update • City of Port Orchard, WA
Financial Program • 9-1 138
DRAFT
sewer utility. Each fund has its own purpose and monies are deposited, transferred, or used according to
the purpose:
➢ Sewer Operating Fund (431): Serves as the utility's primary operating account for depositing rate
revenue and other operating revenues and for paying ongoing operating and maintenance
expenses (salaries, benefits, supplies, and services), and routine capital outlay. Maintains working
capital for day-to-day operating cash flow needs.
➢ Sewer Stabilization Fund (432): Serves as a cash reserve to fund a qualifying event when no
reasonable budget adjustments are available to continue to provide essential services. Funding
may come from one-time sewer revenues, monthly budgeted amounts from operation reserves,
and transfers from ending operating fund balances as authorized by Council. Authorization for use
of this reserve requires a simple majority vote of Council.
➢ Sewer Capital Fund (433): Used to pay for capital purchases and fund capital replacement and
improvement projects. Monies are transferred from the operating fund on an annual basis to
support funding of capital replacement projects. The City's general facility fees (GFFs) collected
from new or upsized sewer connections are directly deposited into this fund. The City pursues
grants and other outside funding sources, and issues debt as needed to fund the remaining project
needs.
➢ Sewer Debt Service Fund (434): Serves as a holding account to collect monies throughout the year
to make semi-annual or annual debt service payments and holds a restricted reserve when required
by debt covenant for final payment.
9.3.2 Sewer Reserves
Reserves are a necessary component of the overall financial management strategy for the City. These cash
balances are maintained to 1) ensure adequate resources for cash flow, 2) mitigate short-term effects of
revenue shortages, 3) leverage beneficial opportunities, and 4) address unforeseen emergencies or
changes in condition. The City has established a two -tiered reserve structure for the sewer utility that
includes a Working Capital Reserve and Stabilization Reserve. Additional financial policies and cash reserves
recommended in this Financial Program are provided below:
➢ Working Capital (Fund 431): (per City policy) The City's goal is to maintain a minimum unreserved
ending sewer operating fund balance of at least 60 days of annual budgeted operating revenues
with the intent to move toward an ending fund balance target of 90 days as funding allows. Ending
fund balance is considered the working capital of the operating fund and may be used to cover
operating cash flow needs.
The working capital target should be as of January 1 of each year, with the balance expected to
vary during the year. The working capital target is established for this Financial Program to range
between 60 and 90 days of annual operating and maintenance (O&M) expense, consistent with
the City's comprehensive sewer rate study. Any excess funds at year end in the operating fund are
planned to be transferred to the capital fund.
➢ Stabilization Reserve (432): (per City policy) A sewer stabilization reserve of 90 days (25%) of annual
budgeted sewer expenditures may be maintained annually as resources allow. The reserve target
is established for this Financial Program at 90 days of annual (O&M) expense.
N223406WA.00 • July 2025 • General Sewer Plan Update • City of Port Orchard, WA
Financial Program • 9-2
139
DRAFT
➢ Capital Reserve (433): (Recommended) In addition to protecting against variations in operating
costs and revenues, it is prudent to maintain a capital reserve to manage the variability of annual
capital spending needs and protect against emergency repairs. A capital reserve is a method of
attempting to level out the capital funding requirements, thereby eliminating peaks and valleys in
the overall revenue requirement. This reserve can vary from year to year depending upon projects
anticipated and funding sources. The target for the capital reserve incorporated for this Financial
Program is assumed at 2.0% of the original cost of sewer infrastructure assets.
9.4 Historical Financial Performance
The sewer system's recent financial performance, as documented by the City's financial reports, is
presented as a reference point for future years projections. Table 9-1 summarizes the financial history for
the roll up of the four separate funds accounted for within the Sewer Enterprise Fund for the years 2021
through 2024.
Table 9-1 1 Sewer System Financial History
-.LI LIP AI�
Beginning Cash & Investments I $5,855,242 $8,940,871 $13,696,580 $17,597,919
Revenues
Rate Revenues
$5,652,602
$5,860,221
$6,184,861
$6,584,744
Other Operating Revenue
$137,564
$170,543
$108,377
$148,383
Investment Interest
$14,617
$162,219
$655,417
$831,596
Subtotal Operating Revenues
$5,804,783
$6,192,983
$6,948,655
$7,564,723
General Facility Fees (GFFs)
$2,201,092
$2,753,245
$2,562,187
$3,315,443
Intergovernmental Revenue
$-
$-
$592,630
$71,787
Intergovernmental / Other Loan Proceeds
$-
$253,153
$-
$10,604,468
Total Revenues and Other Resources
$8,005,875
$9,199,381
$10,103,472
$21,556,422
Expenditures and Other Uses
Operating & Maintenance Expense
$4,263,592
$3,763,666
$4,402,500
$5,112,782
Debt Service (Principal + Interest)
$-
$342
$17,346
$83,485
Capital Outlay /Expenditures
$656,654
$679,664
$1,782,287
$11,778,539
Total Expenditures and Other Uses
$4,920,246
$4,443,672
$6,202,133
$16,974,806
Net Sources: Annual Addition to/(use) of Reserves
$3,085,629
$4,755,709
$3,901,339
$4,581,616
Ending Cash & Investments $8,940,871
$13,696,580
$17,597,919
$22,179,535
The sewer utility has been in balance for each of the four years with positive annual net revenues (revenues
minus expenditures) ranging from $3.1 million to $4.8 million a year. The net sources translate into annual
additions to reserves or (use) of reserves to meet expenditures. When revenues are greater than
expenditures, the reserves are increased. When revenues are less than expenditures, reserves are used to
balance the budget for the given year. Annual revenues from rates, other operating revenues, and interest
earnings have been sufficient to recover operating and maintenance (O&M) expenses, meet debt service
payments, fund operating reserves, and provide funding toward capital expenditures. General facilities fees
and loan proceeds were used to fund the remaining capital expenditures.
Sewer service charges are the primary source of ongoing revenue for the sewer utility. Sewer rates were
last increased in 2020; however, rate revenues have increased from $5.7 million to $6.6 million (an average
N223406WA.00 • July 2025 • General Sewer Plan Update • City of Port Orchard, WA
Financial Program • 9-3 140
DRAFT
of 5.2%) over the past four years due to new customer connections. Other operating revenues include
miscellaneous fees and charges, penalties, miscellaneous revenues, and interest income. Due to the
variable nature of these revenues, these sources should not be overly relied on to pay ongoing O&M costs
and debt service obligations. GFF collections from new connections ranged from $2.2 million to $3.3 million
per year. GFF revenues vary from year to year depending on development activity.
Total operating revenues increased from $5.8 million to $7.6 million over the 4 -year period, about a 9.2%
average annual increase. Total O&M expenses increased at an average annual rate of 6.2%, ranging from
$3.8 million to $5.1 million. New debt service began in 2022 based on loan draws and ranged from $342 to
$83,485. Capital spending ranged from $656,654 in 2021 to $11.8 million in 2024, primarily for the Marina
Lift Station project. Average annual capital spending over the past 4 years was $3.7 million.
The City has kept reserves in line with best practice and established financial policies to manage
emergencies and unforeseen changes in revenues and expenditures without affecting system sustainability
or customer rates. Table 9-2 presents the sewer system cash balances as of December 31 for each of the
past 4 years compared to cash reserve policies. The surplus shown at year end represents cash resources
available to fund capital projects and/or build reserves for future capital spending.
Table 9-2 1 Sewer System Cash and Investments
Ending Cash & Investments
Sewer Operating (431) $3,971,754 $5,908,675 $7,766,166 $8,744,083
Sewer Stabilization (432)
$987,534
$1,446,270
$1,521,909
$1,703,655
Sewer Capital (433)
$3,706,582
$5,782,756
$7,446,696
$10,204,969
Sewer Debt Service (434)
$275,001
$558,878
$863,148
$1,526,829
Total Ending Cash & Investments
$8,940,871
$13,696,580
$17,597,919
$22,179,535
Target Minimum Cash Balance
Sewer Operating Reserves (90 days of O&M)
$1,051,297
$928,027
$1,085,548
$1,260,686
Sewer Stabilization Reserve (90 days of O&M)
$1,051,297
$928,027
$1,085,548
$1,260,686
Sewer Capital Reserves (Stated $ Amount)
$500,000
$500,000
$500,000
$967,622
Total Target Minimum Cash Balance
$2,602,593
$2,356,055
$2,671,096
$3,488,994
Surplus (Deficiency) Compared to Target
$6,338,278
$11,340,525
$14,926,824
$18,690,541
9.5 Outstanding Debt
The sewer utility has three approved Public Works Board (PWB) loans and one Department of Ecology (DOE)
loan. Covenants for these loans do not require a separate restricted reserve to be held for final payment.
The sewer utility has a Debt Service Fund (434) that holds deposits from the operating and capital funds for
payment of annual principal and interest amounts. Table 9-3 summarizes the existing debt issues and
current outstanding debt.
N223406WA.00 • July 2025 • General Sewer Plan Update • City of Port Orchard, WA
Financial Program • 9-4
141
DRAFT
Table 9-3 1 Sewer System Outstanding Debt
Loan Debt
Public Works Board - Pottery Lift Station Repairs (085-21)
$253,153
0.94%
20 yrs
Public Works Board - Sewer Lift Station (090-21)
$825,000
0.94%
20 yrs
Public Works Board - Bay Street Lift Station Preconstruction
$850,000
0.69%
5 yrs
Department of Ecology - Marina Pump Station (068-21)
$13,000,000
2.60%
30 yrs
Total Loans
$14,928,153
General Obligation (GO) Bonds
Sewer Share of City Hall Remodel (7%)
$750,050
5.00%
20 yrs
Total GO Bonds
$750,050
Total Debt Issues
$15,678,203
Outstanding Debt Principal
Drawn Proceeds
$12,272,088
Debt Principal Paid
$(56,571)
Outstanding Balance on Drawn Proceeds
$12,215,517
Outstanding Balance on Total Debt Issues
$15,621,632
By year-end 2024, $15.7 million in new debt was approved, with $12.3 million drawn. The outstanding
balance on drawn funds is $12.2 million, and the outstanding debt for all issues is $15.6 million.
9.6 Current Rates and Charges
9.6.1 Bi-Monthly Sewer Rates
The City bills customers every two months (bi-monthly) for sewer service. The treatment services costs are
included as a line item within the sewer operating expenses budget and included in the City's sewer rates
to customers. The wastewater treatment costs are based on an equivalent residential unit (ERU). The City's
sewer rate schedule includes 21 classes of customers with definitions and charges based on ERUs or
portions thereof. Sewer rates were last adjusted on January 1, 2020. The bi-monthly sewer rate and
customer bill for single-family residential customers is $163.00 every two months.
A comprehensive sewer rate study is underway that includes an evaluation of the existing sewer rate
structure to determine if modifications to the structure are warranted based on current customer
demographics and usage characteristics.
9.6.2 Sewer Capital Facility Charges
The sewer capital facility charges (CFC) are designed to mitigate the impact of new demands on the existing
sewer system and to require new users to pay their fair share of the cost of the sewer collection and
conveyance system and wastewater treatment facility. The charge applies to new construction, changes in
use, and building modifications that increase the total number of ERUs. An ERU is defined as 180 gallons
per day for nonresidential connections. An ERU for residential connections is one single-family residential
unit, whether detached or attached and configured as an apartment unit, condominium unit, townhouse
unit or any other configuration. The ERU consumption is based upon metered winter period water
consumption. The sewer CFCs include two components:
N223406WA.00 • July 2025 • General Sewer Plan Update • City of Port Orchard, WA
Financial Program • 9-5 142
DRAFT
➢ Sewer General Facility Fee (GFF): A charge per ERU intended to recover the cost of the City -
owned collection and conveyance facilities. This fee is established and collected by the City for
deposit into the capital fund.
➢ Wastewater Treatment Facility Fee (WTFF): A charge per ERU intended to recover the cost of the
wastewater treatment facilities Jointly owned by the City and West Sound Utility District (WSUD).
This fee is established jointly by the City and WSUD and collected by the City as a pass through to
the WSUD.
Table 9-4 presents the current schedule of capital facilities fees.
Table 9-4 1 Sewer System Capital Facility Charges
In addition to the GFF, inspection and other connection -related fees are assessed as required by the City
code.
City Ordinance No. 027-20 relating to water and sewer capital facility charges includes a provision for
updating the charges to reflect annual changes within the All -Urban Consumers Price Index (CPI) for the
Seattle -Tacoma -Bremerton area, provided that the charges have not been adjusted by the City Council
during the previous six-month period. This provision applies to the sewer GFF and not the WTFF. A study
of the sewer GFF is underway to review the methodology used to derive the current fee and to incorporate
the recommended collection system capital improvement projects identified in this Plan.
9.7 Capital Improvement Funding
The City has used a variety of capital funding sources over the years including Utility Local Improvement
Districts (ULIDs), Public Works Board and Department of Ecology loans, rates, charges, and reserves. The
following programs and sources are described for potential funding of sewer collection system
improvements identified in this Plan.
9.7.1 Funding Assistance Programs
With the Coronavirus Covid-19 pandemic, there have been several federal aid programs with funding
available to support sewer infrastructure, such as the coronavirus state recovery fund, American Rescue
Plan Act (ARPA)and Bipartisan Infrastructure Law (BIL). This federal aid is a 5 -year infrastructure spending
plan (2022-26) targeted to existing funding programs, such as the Clean Water State Revolving Fund
managed by the Department of Ecology. The Association of Washington Cities (AWC) is tracking
opportunities for cities with the BIL. See www.wacities.org for more information.
The primary capital funding source for sewer systems includes grants and mostly loans from the
Washington State Department of Ecology (Ecology) Water Quality Combined Program. This program is an
integrated funding program for projects that improve and protect water quality throughout the state.
Projects include wastewater, stormwater, nonpoint source activities, and on -site sewage systems. There is
an annual single -application process to award funding from multiple sources all at once, through a
N223406WA.00 • July 2025 • General Sewer Plan Update • City of Port Orchard, WA
Financial Program • 9-6
143
DRAFT
competitive ranking system. The amount of funding available varies based on the state budget ranging from
$100 million to $200 million per year. Award limits vary depending on the funding source and project type.
Types of funding that make up the program include:
➢ Clean Water Section 319 Grants
➢ Centennial Clean Water Program Grants
➢ Clean Water State Revolving Fund (CWSRF)
➢ Bipartisan Infrastructure Law (BIL), including Emerging Contaminants
➢ Sewer Overflow and Stormwater Reuse Municipal Grants (OSG)
➢ Stormwater Financial Assistance Program Grants (SFAP)
➢ Stormwater Community -Based Public -Private Partnerships (CBP3)
➢ Stormwater Grants of State Significance (GROSS)
State fiscal year 2027 funding applications will open earlier than usual, on July 22, 2025, and close on
September 3, 2025. Final funding offers will be made July 2026. Due to the change in application timing,
DOE will allow prerequisite documents to be submitted until October 10, 2025, but encourage submission
of documents with the application. To find current program details, see www.ecology.wa.gov and search
grants and loans for Water Quality Combined Funding Program.
The Public Works Board Traditional (PWB) Program offers competitive pre -construction, construction, and
emergency loans with low interest rates. This Program is available for funding drinking water, sanitary
sewer, and stormwater capital projects. The 2025-2027 biennium begins July 1, 2025 and ends on June 30,
2027. The maximum amount of funding for any jurisdiction is $10 million per biennium across all three
funding programs. Jurisdictions who experience emergencies during the biennium may receive up to $2
million in emergency construction funding beyond the $10 million cap. Current availability, application
dates, amounts and terms should be verified prior to seeking funding. For additional programs details,
interest rates, and affordability criteria see www.pwb.wa.gov.
PWB pre -construction activities include, but are not limited to, capital facilities planning, design
engineering, bid -document preparation, environmental studies, and right-of-way acquisition. The pre -
construction funding program has approximately $7.5 million available for FY26 and $7.5 million for FY27.
Pre -construction applications are open continuously, and pooled and awarded quarterly until all funds are
expended. Funding cycles for Summer 2025 include review of application received May 9, 2025 to August
8, 2025, with award anticipated in October 2025. Pre -construction loans have a maximum of $1 million per
jurisdiction per biennium.
The PWB construction funding program focuses on projects that repair, replace, or construct a facility. A
construction project may comprise any combination of pre -construction and construction elements. The
construction funding program has about $100 million available for FY26. The funding cycle for FY 26 is open
from May 9, 2025 to August 8, 2025. Construction loans have a maximum of $10 million per jurisdiction
per biennium.
The PWB emergency funding program focuses on the projects that repair, replace, and/or reconstruct a
facility that will restore essential services and are made available by a natural disaster, or an immediate and
emergent threat to the public health and safety due to unforeseen or unavoidable circumstances. Funding
may include low -interest or free loans or grants to emergency public works projects. The emergency
funding program has approximately $7.5 million available for FY26 and $7.5 million for FY27. Applications
are open continuously until all funds are expended on a first -come, first -serve basis. Emergency loans have
a maximum of $1 million per jurisdiction per biennium, except in catastrophic conditions.
N223406WA.00 • July 2025 • General Sewer Plan Update • City of Port Orchard, WA
Financial Program • 9-7 144
DRAFT
Other funding sources include the Washington State Department of Commerce energy efficiency grants,
and the Community Economic Revitalization Board (CERB) program geared to infrastructure improvements
for job creation.
On the federal assistance side, there is the United States Department of Agriculture -Rural Development
Program (USDA -RD) that provides low -interest loans with potential grant subsidy for sewer systems in
communities up to 25,000. There is also a United States Economic Development Administration (USEDA)
with a Public Works grant and loan program available. Community Development Block Grant (CDBG) is
another federal program, managed at the State Department of Commerce, with limited grants for
improvements that benefit low to moderate income customers.
There is an infrastructure funding program database provided by the Infrastructure Assistance Coordinating
Council (IACC). This can be accessed on the web directly at www.infrafunding.wa.gov. This database is
helpful in determining which funding assistance programs may be available at the time the City is
considering a project and how to contact the agencies.
9.7.2 Local Funding Sources
Sewer rates may provide an ongoing level of funds for planned capital repairs, rehabilitation, and
replacements. The use of rate revenue is appropriate for repair and replacement (R&R) of the sewer system
to serve existing customers. GFFs from new connections may be used to fund capital R&R, upgrades, and
expansions to the sewer system. The City can borrow from the above -mentioned financial assistance
programs and/or issue revenue bonds. The resulting debt service would be paid by rates, and in some cases,
by the GFF. The City's practice has been to assign a percentage of the debt service to be funded by the GFFs
for the growth -related portion of certain projects funded by debt.
The City has the option to complete area -specific capital projects with reimbursement as new development
occurs in that area through a special connection charge. The City also has the option to establish a ULID
where the properties specially benefiting from an infrastructure investment pay their share through an
assessment.
Certain capital projects might be the responsibility of developers to connect their property to the sewer
system. When developers complete approved infrastructure projects the infrastructure is deeded to the
City. The developer can negotiate a latecomer agreement with the City for reimbursement by new
development making use of the facilities constructed by the developer for a specified period allowed by
state law. In certain instances, on a case -by -case basis, such as when additional capacity is provided by a
developer -funded project, the City may opt to participate in a cost sharing mechanism. Other outside
funding sources may be available for specific projects such as funding from the Washington State
Department of Transportation (WSDOT) or Kitsap Transit for projects completed in conjunction with these
agencies.
9.7.3 Affordability
The affordability measure for sewer systems in Washington State is based on the ratio of monthly sewer
cost compared to the median household income (MHI) for the area served. The Ecology water quality
programs and the Public Works Board (PWB) Traditional Program are the primary funding assistance
agencies for sewer. Both agencies define the sewer affordability index as 2.0% of MHI. These programs are
typically targeted toward residential customers. If the cost of sewer service is higher than the 2.0%
threshold, the community would be considered in hardship and could be eligible for financial assistance in
the offer, resulting in a grant (subsidy), a lower interest rate loan, or a combination of the two.
N223406WA.00 • July 2025 • General Sewer Plan Update • City of Port Orchard, WA
Financial Program • 9-8
145
DRAFT
Ecology includes an appendix each year in the Combined Water Quality Funding Assistance Program
Guidelines with the median household income (MHI), population, and hardship eligibility (Appendix M for
State Fiscal Year 2026, published August 2024). The estimated MHI for the City of Port Orchard is $82,650.
The threshold for hardship at 2.0% of monthly MHI would be sewer rates of $137.75 per month ($275.50
per 2 -month period).
As illustrated in Table 9-5, the City's current single-family residential bi-monthly sewer bills are well within
the range of affordability and would not be considered in hardship. Note that the hardship calculation for
any future loan would include the anticipated new debt payments and the sewer rates in effect at the time
of application.
Table 9-5 1 Sewer System Affordability Test
Affordability Test Criteria
Annual Medium Household Income (MHI)
$82,650
Bi-Monthly MHI
$13,775
Bi-Monthly Sewer Bill Hardship Threshold at 2.00%
$275.50
Affordability Test Results
Single Family Residential Bi-Monthly Sewer Bill
$163.00
Percentage of Bi-Monthly MHI
1.18%
Affordability Hardship Designation
Non -Hardship
Ecology provides a separate determination of hardship for pre -construction activities. This is pre-
determined by Ecology based on population and MHI and published in the same Appendix M. The August
2024 funding guidelines show the City of Port Orchard as "ineligible" for pre -construction hardship funding.
9.8 Sewer Collection Facilities Improvement Funding
Chapter 8 of this Plan identifies the recommended capital improvement projects for the sewer collection
system for the six -year CIP (2025-2030) and the 20 -year CIP. The Financial Program addresses the six- year
CIP together with the projected capital funding plan and sewer rate outlook.
9.8.1 Six -Year Capital Improvement Program
Table 9-6 displays the $54.1 million (2024$) in capital projects identified to be funded over the six -year
period. The individual project cost estimates are escalated from 2024 dollars at 3.5% per year to the
scheduled year of construction as shown at the bottom of the table. The total estimated planning level
costs over the planned period is $60.3 million including construction cost escalation. The average annual
cost is $10.1 million.
During the development of this Plan, specific funding sources were identified for several of the projects
listed in Table 9-6. Table 9-7 summarizes the specific sources and identifies the remaining CIP costs
assumed to be funded by a combination of rates, GFFs, cash reserves, and new revenue bond issues.
N223406WA.00 • July 2025 • General Sewer Plan Update • City of Port Orchard, WA
Financial Program • 9-9 146
DRAFT
Table 9-6 1 Six -Year Sewer Capital Improvement Program
6-1
Annual Preservation
Marina Pump Station Construction
$4,000,000
$500,000
$583,333
$583,333
$583,333
$583,333 $583,333
si
$583,333
' '
$3,500,000
6-2
$19,400,000
$10,789,000
$8,611,000
$-
$-
$- $-
$-
$8,611,000
6-3
Bay Street Pump Station Replacement
$8,000,000
$1,000,000
$-
$3,500,000
$3,500,000 $-
$-
$8,000,000
6-4
Minor Lift Station Improvements
$1,300,000
$650,000
$650,000
$-
$- $-
$-
$1,300,000
6-5
Port Orchard Boulevard Lift Station and Siphon
$7,610,000
$-
$1,522,000
$-
$6,088,000 $-
$-
$7,610,000
6-6
Sidney Road SW 2nd Force Main
$1,300,000
$1,300,000
$-
$-
$- $-
$-
$1,300,000
6-7
McCormick Woods Sewer Lift Station #3
$1,000,000
$-
$1,000,000
$-
$- $-
$-
$1,000,000
6-8
Ruby Creek Lift Station
$3,275,000
$135,000
$-
$3,140,000
$-
$- $-
$-
$3,140,000
6-9
Sidney Road Gravity Sewer Main Extension
$2,290,000
$-
$2,290,000
$-
$- $-
$-
$2,290,000
6-10
Bravo Terrace (Sedgwick) Lift Station
$2,500,000
$-
$-
$-
$- $2,500,000
$-
$2,500,000
6-11
Bravo Terrace (Sedgwick) Force Main
$4,860,000
$-
$-
$-
$- $4,860,000
$-
$4,860,000
6-12
Sewer Facility Capacity Upgrades (PWO)
$2,000,000
$-
$-
$-
$- $-
$2,000,000
$2,000,000
6-13
McCormick East/Glenwood Sewer Basin Improvements
$7,600,000
$-
$-
$-
$7,600,000 $-
$-
$7,600,000
6-14
2029 General Sewer Plan and Sewer Rate Study
$350,000
$-
$-
$-
$350,000 $-
$-
$350,000
Total (2024$)
$65,485,000
$11,424,000
$12,144,333
$9,185,333
$4,083,333
$18,121,333 $7,943,333
$2,583,333
$54,061,000
Total Escalated $
$12,569,385
$9,839,559
$4,527,265
$20,794,647 $9,434,188
$3,175,576
$60,340,620
Table 9-7 1 Identified Project Specific Capital Funding Sources
6-2
Marina Pump Station Construction
DOE Loan
$13,000,000
$150,000
$850,000
$11,064,327
$1,935,673
$412,500
PuP I I
$1,935,673
$150,000
$850,000
$825,000
6-3
Bay Street Pump Station Replacement
DOE Grant
$150,000
6-3
Bay Street Pump Station Replacement
PWB Loan
$850,000
$412,500
6-4
Minor Lift Station Improvements
PWB Loan
$825,000
6-5
Port Orchard Boulevard Lift Station and Siphon
WSDOT/Kitsap
$7,610,000
$1,522,000
$6,088,000
$7,610,000
6-7
McCormick Woods Sewer Lift Station #3
Developer
$1,000,000
$1,000,000
$1,000,000
6-8
Ruby Creek Lift Station
WSDOT/Kitsap
$3,140,000
$3,140,000
$3,140,000
6-13
McCormick East/Glenwood Sewer Basin Improvements
Developer
$7,600,000
$7,600,000
$7,600,000
Total (2024$)
Identified
$34,175,000
$11,064,327
$3,348,173
$6,074,500
$-
$13,688,000
$-
$-
$23,110,673
All Other Funding (2024$)
Total Funding (2024$)
Utility/New Debt
Total
$31,310,000
$65,485,000
$359,673
$11,424,000
$8,796,160
$12,144,333
$3,110,833
$9,185,333
$4,083,333
$4,083,333
$4,433,333
$18,121,333
$7,943,333
$2,583,333
$2,583,333
$30,950,327
$54,061,000
$7,943,333
N223406WA.00 • July 2025 • General Sewer Plan Update • City of Port Orchard, WA
Financial Program • 9-10
147
DRAFT
9.8.2 Six -Year Capital Funding Plan
The capital funding plan develops the strategy to fund the annual project costs identified for the six -year
CIP. The total funding need, including cost escalation, is $60.3 million. Project costs funded in prior years
for certain CIP projects are not included in the six -year Capital Funding Plan. The costs and funding sources
for those projects are included in the summary tables shown in Section 9.4, Historical Financial
Performance.
Table 9-8 summarizes the capital funding plan anticipated to support the execution of the CIP.
Table 9-8 1 Six -Year Sewer Capital Funding Plan
11t Es] I
.. l. D.
Beginning Cash & $10,194,669 $11,206,303 $9,021,055 $5,760,099 $11,460,449 $2,826,248
Investments
Cash Resources
Grants / Other Outside $150,000 $6,065,276 $- $15,707,295 $-
Funding
Approved Loan Proceeds
$3,198,173
$412,500
$-
$-
$-
$-
Projected Revenue Bond
$_
$-
$_
$10,000,000
$-
$1,900,000
Proceeds
Investment Interest
$453,663
$336,189
$180,421
$115,202
$114,604
$28,262
General Facility Fees (GFFs)
$1,978,500
$1,005,304
$1,017,871
$1,030,594
$1,043,477
$1,056,520
Transfer In from Operating
$8,158,777
$193,136
$426,111
$-
$-
$-
Fund(431)
Total Cash Resources
$13,939,112
$8,012,405
$1,624,403
$26,853,091
$1,158,081
$2,984,782
Cash Uses
Capital Expenditures
$12,569,385
$9,839,559
$4,527,265
$20,794,647
$9,434,188
$3,175,576
GFF Share of Debt Service
$358,094
$358,094
$358,094
$358,094
$358,094
$314,710
Total Cash Uses
$12,927,479
$10,197,653
$4,885,359
$21,152,741
$9,792,282
$3,490,286
Net Revenue: Annual
Additions to / (Use) of
$1,011,633
$(2,185,247)
$(3,260,956)
$5,700,350 $(8,634,201)
$(505,504)
Reserves
Ending Cash & Investments
$11,206,303
$9,021,055
$5,760,099
$11,460,449
$2,826,248
$2,320,744
Minimum Capital Reserve
$1,219,009
$1,415,800
$1,506,346
$1,922,239
$2,110,922
$2,174,434
Target
Surplus (Deficiency)
$9,987,293
$7,605,255 $4,253,753 $9,538,211 $715,326
$146,310
Compared to Target
Consistent with the City's comprehensive sewer rate Study, the Financial Program includes an estimate for
customer growth of 1.25% per year and conservative GFF collections averaging about $1.2 million per year.
These assumptions may vary from actual performance depending on development activity. As a point of
reference, GFF collections have averaged $2.7 million over the past four years. Other sources of capital
revenue include interest earnings on capital fund cash balances and transfers of surplus operating reserves.
GFF revenues are planned to pay a share of the debt service for the growth -related portion of the PWB
loan for the Bay Street Lift Station Preconstruction project (25%) and the DOE loan for the Marina Lift
Station project (50%). The total share of debt service to be paid by GFFs is $358,100 per year (2025-2029)
reducing to $314,700 in 2030 after the PWB loan matures. The capital funding plan assumes
N223406WA.00 • July 2025 • General Sewer Plan Update • City of Port Orchard, WA
Financial Program • 9-11 148
DRAFT
implementation of the recommended annual sewer rate increases as presented in Section 9.9, Six -Year
Financial Plan.
9.9 Six -Year Financial Plan
Key objectives of the financial plan are to ensure that rates are sufficient to sustain ongoing O&M, pay
existing debt service obligations, fund the six -year CIP recommended in this Plan, and maintain stable cash
reserves. The financial plan evaluates the sufficiency of current utility revenues in meeting the forecasted
operating and capital -related expenses and designs a sewer rate adjustment strategy to close any revenue
shortfall over the planned period. Table 9-9 summarizes the six -year financial plan.
Table 9-9 I Six -Year Financial Plan
•.
iiit [.11
0 ••
Projected Rate Increases I 0.00% I 3.50% I 3.50% I 3.50% I 3.50% I 3.50%
Beginning Cash & Investments $8,754,383 $1,386,530 $1,489,838 $1,522,952 $1,301,585 $1,206,362
Cash Resources
Rate Revenues
$6,423,463
$6,731,388
$7,054,074
$7,392,228
$7,746,593
$8,117,946
Other Operating Revenue
$97,813
$99,917
$102,098
$104,357
$106,697
$109,123
Investment Interest (431 and 434)
$457,514
$87,401
$60,333
$60,996
$36,507
$35,555
Transfer from Capital Fund (433)
$358,094
$358,094
$358,094
$358,094
$358,094
$314,710
for Share of Debt Service
Total Cash Resources
$7,336,884
$7,276,800
$7,574,599
$7,915,675
$8,247,892
$8,577,333
Cash Uses
Operating & Maintenance (O&M)
$5,623,148
$6,057,552
$6,192,780
$6,392,088
$6,598,144
$6,811,949
Expense
Capital Outlay
$-
$-
$-
$-
$-
$-
Existing Debt Service
$922,812
$922,804
$922,594
$922,681
$922,699
$749,111
Projected Debt Service
$-
$-
$-
$822,272
$822,272
$978,504
Transfer to Stabilization Fund
$
$
$
$
$
$-
(432)
Transfer to Capital (433)
$
$
$
$
$
$
Total Cash Uses
$6,545,960
$6,980,356
$7,115,374
$8,137,042
$8,343,115
$8,539,564
Net Revenue: Annual Additions to
$790,924
$296,444
$459,225
$(221,367)
$(95,223)
$37,769
/ (Use) of Reserves
Ending Cash & Investments
$9,545,306
$1,682,974
$1,949,063
$1,301,585
$1,206,362
$1,244,130
Minimum Operating Balance
$1,386,530
$1,489,838
$1,522,952
$1,571,855
$1,622,409
$1,674,862
Target
Surplus (Deficiency) Compared to
$8,158,777
$193,136
$426,111
$(270,270)
$(416,048)
$(430,731)
Target
Transfer of Surplus Reserves to
$(8,158,777)
$(193,136)
$(426,111)
$-
$-
$-
Capital Fund
Net Ending Cash & Investments
$1,386,530
$1,489,838
$1,522,952
$1,301,585
$1,206,362
$1,244,130
N223406WA.00 • July 2025 • General Sewer Plan Update • City of Port Orchard, WA
Financial Program • 9-12
149
DRAFT
9.9.1 Sewer Rate Adjustment Strategy
The annual additions to /(use) of reserves shown in the table demonstrate that the projected revenues and
expenditures can be balanced with the use of cash reserves in the years 2028 and 2029 and annual rate
increases of 3.50 percent for the years 2026-2030.
9.9.2 Key Forecast Assumptions
The operating forecast relies on the City's adopted 2025-2026 budgeted revenues and expenditures and
estimated cost escalation for future years. Key economic assumptions are in line with the City's
comprehensive sewer rate study based on discussion with City staff:
➢ Customer growth of 1.25% per year
➢ Interest earnings rate on cash balances assumed to decline over time at 4.5% (2025); 3.0% (2026);
2.0% (2027-2028); and 1.0% (2029-2030)
➢ Other operating revenues for 2026 stay at budgeted amounts, except for the FOG Program. Its
revenues match estimated expenses, which increase by about 3.5% annually due to labor, benefits,
and general cost escalation
➢ General cost escalated at 3.0% per year
➢ Treatment cost escalated at 1.63% (2027) and 2.74% thereafter
➢ Labor costs escalated at 3.0% per year
➢ Benefits cost escalated at 5.0% per year
9.9.3 Sewer Operating Revenue
Rate revenues are the primary source to fund operating activities. The 2025 revenues were based on the
customer data analysis performed for the comprehensive sewer rate study and projected for future years
at the assumed 1.25% annual growth rate. These revenues are projected to increase from $6.4 million to
$8.1 million over the six -year period. Other operating revenues include miscellaneous fees and charges,
and FOG Program revenues. Interest earnings are projected based on annual cash balances and the
assumed annual interest earning rate. The annual transfer from the capital fund to the operating fund is
based on the share of debt service for certain growth -related projects to be paid from GFF collections. For
purposes of the Financial Program, total debt service costs are modeled in the operating fund (rather than
the debt service fund) to ensure adequate rate -setting to meet these obligations. Total cash resources are
projected to increase from $7.3 million to $8.6 million over the six -year period.
9.9.4 Sewer Operating Expenses
Operating and maintenance (O&M) costs are projected to increase from $5.6 million to $6.8 million over
the six -year period. Existing debt service for the approved debt issues is estimated at about $923,000 per
year (2025-2029) reducing to $749,100 in 2030. The actual amortization schedules may vary depending on
actual project completion and the timing of loan draws. Projected new revenue bond debt service is
estimated at $823,000 beginning in 2028 and increasing to $978,500 in 2030. Total cash uses are projected
to increase from $6.5 million to $8.5 million over the six -year period.
N223406WA.00 • July 2025 • General Sewer Plan Update • City of Port Orchard, WA
Financial Program • 9-13 150
DRAFT
9.9.5 Sewer Operating Cash Flow
The net revenue line shown in Table 9-9 represents the annual additions to / (use) of operating reserves to
balance annual revenues and expenditures. The transfer of surplus operating reserves to the capital fund
represents available reserves above the minimum operating balance target (90 days of O&M). These
surplus operating revenues may be used to fund near -term capital projects and/or build reserves for future
capital spending.
9.9.6 Sewer Enterprise Fund Combined Cash Flow
Table 9-10 combines the revenues and expenditures of the operating fund, rate stabilization fund, debt
service fund, and capital fund and summarizes the total annual cash flows and ending cash balances over
the six -year period.
Table 9-10 1 Total Sewer Enterprise Fund Cash Flow
•.
Beginning Cash & $22,179,535 $15,823,315 $13,741,376 $10,513,535 $16,814,790 $8,085,365
Investments
Cash Resources
Rate Revenues
$6,423,463
$6,731,388
$7,054,074
$7,392,228
$7,746,593
$8,117,946
Other Operating Revenue
$97,813
$99,917
$102,098
$104,357
$106,697
$109,123
Investment Interest
$911,177
$423,590
$240,754
$176,198
$151,111
$63,817
General Facility Fees (GFFs)
$1,978,500
$1,005,304
$1,017,871
$1,030,594
$1,043,477
$1,056,520
Intergovernmental / Other
$3,198,173
$412,500
$
$
$
$
Loan Proceeds
Grant Proceeds / Other
$150,000
$6,065,276
$
$15,707,295
$
$
Outside Funding
New Revenue Bond
$_
$_
$_
$10,000,000
$-
$1,900,000
Proceeds
Reserve Funding for
$-
$_
$-
$822,272
$-
$156,232
Revenue Bonds
Total Cash Resources
$12,759,125
$14,737,975
$8,414,797
$35,232,944
$9,047,879
$11,403,637
Cash Uses
Operating & Maintenance
$5,623,148
$6,057,552
$6,192,780
$6,392,088
$6,598,144
$6,811,949
Expense
Debt Service (Principal +
$922,812
$922,804
$922,594
$1,744,954
$1,744,971
$1,727,615
Interest)
Capital Outlay
/Expenditures
$12,569,385
$9,839,559
$4,527,265
$20,794,647
$9,434,188
$3,175,576
Total Cash Uses
$19,115,345
$16,819,914
$11,642,639
$28,931,689
$17,777,303
$11,715,141
Net Revenue: Annual
Additions to / (Use) of
$(6,356,220) $(2,081,939) $(3,227,842) $6,301,255 $(8,729,424) $(311,504)
Reserves
Ending Cash & Investments
$15,823,315 $13,741,376 $10,513,535 $16,814,790 $8,085,365 $7,773,862
Table 9-11 summarizes the ending cash balances compared to targets over the six -year period.
N223406WA.00 • July 2025 • General Sewer Plan Update • City of Port Orchard, WA
Financial Program • 9-14
151
DRAFT
Table 9-11 1 Sewer System Projected Ending Cash and Investments
0 • 11
Ending Cash & Investments
Sewer Operating (431)
$1,386,530
$1,489,838
$1,522,952
$1,301,585
$1,206,362
$1,244,130
Sewer Stabilization (432)
$1,703,655
$1,703,655
$1,703,655
$1,703,655
$1,703,655
$1,703,655
Sewer Capital (433)
$11,206,303
$9,021,055
$5,760,099
$11,460,449
$2,826,248
$2,320,744
Sewer Debt Service (434)
$1,526,829
$1,526,829
$1,526,829
$2,349,101
$2,349,101
$2,505,333
Total Ending Cash &
$15,823,315 $13,741,376 $10,513,535
$16,814,790
$8,085,365 $7,773,862
Investments
Target Minimum Cash Balance
$1,571,855
Sewer Operating Reserves (90
$1,386,530
$1,489,838
$1,522,952
$1,622,409
$1,674,862
days of O&M)
Sewer Stabilization Reserves (90
$1,386,530
$1,489,838
$1,522,952
$1,571,855
$1,622,409
$1,674,862
days of O&M Expense)
Sewer Capital Reserves (2.0% of
$1,219,009
$1,415,800
$1,506,346
$1,922,239
$2,110,922
$2,174,434
Fixed Assets)
Sewer Debt Fund Reserves (1
Year Revenue Bond Debt
$-
$-
$-
$822,272 $822,272
$978,504
Service)
Total Target Minimum Cash
$3,992,068
$4,395,476
$4,552,250
$5,888,221
$6,178,013
$6,502,662
Balance
Surplus (Deficiency) Compared
$11,831,247 $9,345,900 $5,961,285 $10,926,569
$1,907,352
$1,271,200
to Target
9.10 Projected Sewer Rates and Customer Bill Impact
Table 9-12 shows the current and projected sewer rates and bill impact for single-family residential
customers, assuming a 3.5% annual increase from 2026 to 2030. Rates for all other customer class
categories would be applied at the same level of increases.
Table 9-12 1 Sewer System Current and Projected Bi-Monthly Sewer Rates and Customer Bills
The single-family residential bill is currently $163.00 per two -month cycle, and it is expected to rise to
$193.59 by 2030. This represents an increase of $30.59 (or ($15.30 per month) over the six -year period.
This is an average annual increase of $6.12 per two -month bill (or $3.06 per month). Based on the
affordability index described previously, the projected sewer rates continue to be affordable under the
2.0% of median household income metric.
N223406WA.00 • July 2025 • General Sewer Plan Update • City of Port Orchard, WA
Financial Program • 9-15 152
DRAFT
9.11 Financial Conclusion
The Financial Program demonstrates how the sewer operations and recommended six -year capital
improvements are planned to be funded and the impact on bi-monthly sewer rates. The City prepares
annual budgets and conducts periodic rate studies to plan for the next six years to ensure financial viability
in the delivery of reliable sewer service at affordable rates.
This plan was developed with reasonable and conservative assumptions based on current knowledge and
cost estimates. As with all projections, actual performance will likely vary. The City will monitor the plan
through the annual budget process and update as necessary to achieve balance between operations and
maintenance, executing the necessary capital improvements, and maintaining affordable rates.
N223406WA.00 • July 2025 • General Sewer Plan Update • City of Port Orchard, WA
Financial Program • 9-16
153
DRAFT
CHAPTER 10
Operations and Maintenance
Program
10.1 Introduction
The operation and maintenance activities performed by the City to maintain performance and reliability of
the wastewater collection system are summarized in this chapter. City personnel maintain approximately
50 miles of gravity sewers, 22 miles of force mains, 22 lift stations, and a Supervisory Control and Data
Acquisition (SCADA) telemetry system.
10.2 City Management and Personnel
The City's Public Works Operations and Maintenance Department is composed of 24 full-time employees
(FTE) that comprise a combined crew for road, water, sewer, stormwater, parks, facility and fleet
maintenance. Of these, 4.5 are dedicated to sewer operations and maintenance.
The City is governed by a City Council and Mayor, and the Public Works Director oversees the Public Works
Department. This department is responsible for the operation and maintenance of the City's road, water,
sewer, stormwater, parks, facility and fleet assets maintenace.
10.3 Operations and Maintenance Activities
10.3.1 Lift Stations
City staff currently visits and inspects each lift station daily and should continue maintenance at this level
until all lift stations are connected to the City's SCADA system. Once all lift stations are on SCADA,
inspections may be reduced to twice a week. The wet wells should be pumped out and cleaned on a bi-
annual basis or as needed. The pumps should be cleaned out as needed to continue operating at or near
their design point.
The City implemented an asset management program in 2024 to plan, schedule, and track maintenance
activities.
10.3.2 Force Mains
City staff should exercise all force main valves on an annual basis. Force mains should be inspected on an
annual basis and should be flushed when pressure increases.
10.3.3 Gravity Sewers and Manholes
Preventive maintenance for gravity sewer lines includes programs for inspection and cleaning. Inspections
should include visual observation of manholes and a program of closed-circuit television (CCTV) inspection
of sewer pipes. Gravity lines will be cleaned by flushing or jetting when the inspection identifies an asset
needs maintenance. The cleaning and inspection programs should identify most problems so that they may
N223406WA.00 • July 2025 • General Sewer Plan Update • City of Port Orchard, WA
Operations and Maintenance Program • 10-1 154
DRAFT
be repaired in the maintenance or capital improvement programs, instead of resulting in a failure or
overflow.
10.3.4 Summary
A summary of the sewer collection system recommended maintenance standards is provided as Table 10-1.
Table 10-1 1 Recommended Collection System Maintenance Standards
Pump Station Inspections
20
Gravity Sewer CCTV
253,455LF
Inspections
Gravity Sewer Cleaning
253,455 LF
Force Main Flushing
115,658LF
0.1 FTE per station per year(�1
85,000 LF per year
50,000 LF per year
Annual inspection; flushing if force main
pressure increases121
Notes:
1. FTE is full time equivalent and is equal to 1,768 hours per year (85 percent of a full year).
2. Recommendation based on EPA 832-F-00-071, Wastewater Technology Fact Sheet, Sewers, Force Main, September 2000.
10.4 Staffing Needs
The City employs 24 field operation FTE's. There are 4.5 staff members in the maintenance and operations
division who work solely on the sewer system.
One metric to compare staffing rates among sewer utilities is employees per 100,000 LF of pipe. While this
does not account for utility system variations, e.g. the number of pump stations and customers served, it
is a useful way to compare approximate staffing efficiency with similar utilities. A summary of the sewer
utility staffing for some utilities in the Puget Sound region and the City is presented as Table 10-2. Note
that the information in this table was last updated in 2024.
Table 10-2 1 Sewer Utility Staffing Comparison per Total Length of Pipe
City of Port Orchard 4.5
19
369,000
1.05
City of Bellevue
25
2,745,600
0.91
City of Enumclaw
4
749,760
0.53
City of Kent
13
1,114,080
1.17
City of Kirkland
24
649,440
3.70
City of Lacey
14
1,246,080
1.12
Silver Lake Water and Sewer District
33
1,092,960
3.02
West Sound Utility District
15
237,600
6.31
Alderwood Water and Wastewater District
11
2,323,200
0.47
Average Employee per 100,000 LF of Pipe
2.11
Median Employee per 100,000 LF of Pipe 1.17
N223406WA.00 • July 2025 • General Sewer Plan Update • City of Port Orchard, WA
Operations and Maintenance Program • 10-2
155
DRAFT
Table 10-3 1 Sewer Utility Staffing Comparison per Lift Station
City of Port Orchard 4.5
City of Bellevue 25
22
.20
0.69
0.24
36
7
City of Enumclaw
4
City of Kent
13
7
1.86
City of Kirkland
24
6
4.00
City of Lacey
14
48
0.29
Silver Lake Water and Sewer District
33
22
1.50
West Sound Utility District
15
12
1.25
Alderwood Water and Wastewater District
11
12
0.92
Average Employee per Pump Station
1.23
Median Employee per Pump Station
0.92
Based on the results of the poll, the City is below the average and the median in the number of employees
per 100,000 linear feet of pipe, and below the average and the median in number of employees per lift
station.
10.5 Recommended Operation and Maintenance
Improvements
The City has been proactive in taking steps to solve the most critical maintenance issues. The City has been
responsive to these improvements and has incorporated them into the CIP. Two additional FTE would
enable more efficient and effective operations and maintenance of the sewer collection system.
THIS PAGE INTENTIONALLY LEFT BLANK
N223406WA.00 • July 2025 • General Sewer Plan Update • City of Port Orchard, WA
Operations and Maintenance Program • 10-3 156
157
DRAFT
CHAPTER 11
Reclaimed Water
11.1 Reclaimed Water
In 2006, WSUD received a grant to assist in the planning, permitting, and engineering design of a reclaimed
water distribution system. The intent of such a system was to aid in optimizing wastewater management
and environmental stewardship by reducing the South Kitsap Water Reclamation Facilities marine
discharge and beneficially reusing a precious water resource and reducing potable water demand.
In 2011, approximately one mile of reclaimed water distribution piping was constructed by the City and the
WSUD. The distribution system piping is shown as Figure 11-1. In 2013, a hydrogeologic study was
performed for WSUD which is part of Water Resource Inventory Area 15 (WRIA 15). This study determined
that the existing aquifer and recharge have sufficient capacity to meet demand for the next 20 to 50 years.
Per capita water demand has also been decreasing due to lower flow water fixtures and conservation.
N223406WA.00 • July 2025 • General Sewer Plan Update • City of Port Orchard, WA
Reclaimed Water • 11-1 158
DRAFT
Figure 11-1 1 Reclaimed Water
11th St
BREMERTON
Puget Sound 2d�
W Werner Rd Naval Shipyard �e
NAVY I
YARD
CfTY _ r
I
I
—
I P
! OR(
m
m
= GORST
I r—�
F
1
Eton Rd
- I
McCormick I
Woods i
!I
Golf
r
Course
nH17
—
L —
�Squate Lake I'
T.
(ter Creek
'toga Par'
State Park
0
Camp
rn
Ceivinwood
Trophy
Lake Golf
N And
Casting
E club
WILDW00D
0 2,000 4,000 Feet
s I 1
® South Kitsap Water Reuse Facility
Water Reuse Mains
Urban Growth Area
L1 City Boundary
fol
SE I Nllenix Rd SE Mullerlix Rd
consor
OCHARD
Collins Ru:
Mile Hill
r
City of Port Orchard
General Sewer Plan
Reclaimed Water
s
m
Q
U data Sources: City of Port Orchard. Kitsap County. Service Layer Credits: world tfavigation Map: CeuntyefKitsap, WA State ParksGIS. Esri. Ton -Corn, Garmin, SafeGraph.GeoTechnologies. Inc.METIINn5rt.
USGS. Bureau of land Management. EPA, MPS, USDA. USFWS
O Coord_ to Svstem: NAD 1983 StatePlene Washington North FIPS 4601 Feet
thaslaimcr. Censor and theCity of Port Orchard make no representations.anpress orimplied, as to the accuracy. completeness and timeliness of the information dinplayed.This map is not suitable
for legal, engineering, or surveying purposes. Notification or any errors IONppreciated.
N223406WA.00 • July 2025 • General Sewer Plan Update • City of Port Orchard, WA
Reclaimed Water • 11-2
159
APPENDIX A
consor
SEPA COMPLIANCE
160
DRAFT
APPENDIX B
consor
INTERLOCAL AGREEMENTS
161
APPENDIX C
2019 PUBLIC WORKS ENGINEERING
COIISOY STANDARDS (CHAPTER 9)
162
DRAFT
APPENDIX D
consor
POPULATION PROJECTIONS
163
APPENDIX E
OLYMPIC VIEW SANITARY LANDFILL
COIISOY DISCHARGE PERMIT
164
DRAFT
consor
APPENDIX F
165
Ong City of Port Orchard
ORCHARD 216 Prospect Street, Port Orchard, WA 98366
1.. (360) 876-4407 • FAX (360) 895-9029
Agenda Staff Report
Discussion Items: Multifamily Tax Exemption (MFTE) (Bond)
Estimated Time: 40 Minutes
Meeting Date: September 16, 2025
Prepared By: Nick Bond, AICP, Community Development Director
Presenter: Nick Bond, AICP, Community Development Director
Summary and Background:
Discussion
In 2024, the City Council requested that a discussion of the Multi -Family Tax Exemption (MFTE)
program be placed on a future agenda for discussion. This discussion was on hold pending completion
of the City's Comprehensive Plan Update and Middle Housing ordinance. After completing work on
the Comprehensive Plan in June, staff prepared a discussion item on MFTE at the July 2025 work study
meeting. Based on the direction at that meeting and at subsequent Land Use Committee and
Economic Development Tourism Committee meetings, staff has prepared a new MFTE ordinance and
target area map for discussion.
The new ordinance is based on the ordinance that was repealed in 2023. The ordinance is revised in
several ways. Most notably, the old ordinance had three different maps that corresponded to
different MFTE approval criteria while the new ordinance has a single map. Now, to qualify for MFTE,
a project would have to meet one of four criteria listed in section 3.48.060 (6). For the 12 -year
affordable housing MFTE, the project would have to meet one of these four criteria and provide
affordable housing at lower rents than required in the 2023 ordinance.
The four criteria listed in proposed section Port Orchard Municipal Code (POMC) 3.48.060 (6) are as
follows:
(a) The multi -family housing project must be in a mixed -use shopfront building containing commercial
ground floor uses measuring at least 4,000 square feet or 40% of the building's footprint, whichever is
less; or
(b) The multi -family housing project must be in a building containing at least 4 stories of residential
units and achieving at least 40 units per net acre (gross acreage, less critical areas and associated
buffers). All portions of buildings must contain 4 -stories of multi -family units. Where buildings step
down following topography, each portion of the building must contain 4 -stories of multi -family units;
166
(c) The multi -family project must provide middle housing and be on a parcel/lot measuring less than
15,000 square feet with between 4-12 multi -family units; or
(d) Projects that will provide 100% of any on -site parking below grade.
The affordability criteria for a 12 -year MFTE project as proposed in POMC 3.48.060 (7) changed the
required rent for affordable units from 10% below HUD fair market rent to 25% below HUD fair
market rent.
Background
The State of Washington has authorized cities to adopt Multi -Family Tax Exemption (MFTE) programs
since 1995, pursuant to RCW 84.14. These programs are intended to support the development of
multifamily housing and, in some cases, affordable housing in urban areas experiencing growth
pressures. Port Orchard adopted its MFTE program in 2016 to incentivize the construction of new
multifamily housing, including affordable units, by providing a limited property tax exemption on the
value of residential improvements for a period of eight or twelve years.
Since 2016, the City entered seven MFTE agreements supporting the construction of 442 apartment
units, with two projects (totaling 97 units) reserving 20% of units as affordable housing in exchange for
a 12 -year exemption. Several other multi -family projects have been constructed since 2016 without
participating in the MFTE program.
Under the repealed framework, there were two types of 8 -year exemptions and a 12 -year exemption.
The 8 -year exemptions targeted redevelopment and encouraging projects with structured parking.
The 12 -year exemption required that 20% of units be rented at 10% below HUD fair market rent for
the duration of the MFTE approval.
Increasing housing supply has been shown to be effective in combatting rent increases. As many new
apartments became available in 2021 and 2022, data shows that vacancy rates climbed above 5% and
rents in Port Orchard stopped increasing at the rates seen between 2014 and 2021 when vacancy
rates were below 5%. MFTE does not significantly impact the property tax revenues received by the
City or junior taxing districts. Instead, the savings that go to developers is shifted to other properties
in Port Orchard resulting in very small property tax increases for the duration of the MFTE approval.
(See the attached "What is Tax Shift" document produced by Commerce.) At the same time, the City
receives numerous one-time revenues such as impact fees, connection charges, permit fees, and a
boost in Sales Tax and REET revenue related to the construction and sale of new housing units.
In October 2023, the City Council repealed POMC Chapter 3.48, eliminating the City's previously
adopted MFTE program. This decision followed extensive policy review and deliberation, including
ongoing discussions at the Land Use Committee and during the City's Housing Action Plan (HAP)
development.
In June 2023, the City adopted its Housing Action Plan, which included recommendations for
expanding the MFTE program tailored to local housing, affordability goals and allowing middle housing
167
projects to qualify for MFTE. The City's 2024 Comprehensive Plan, adopted after the repeal of Chapter
3.48, reaffirms support for MFTE as a policy tool to address housing needs, directing staff to evaluate
options for reimplementation.
For additional MFTE resources, please visit the following Department of Commerce website:
https://www.commerce.wa.gov/growth-management/housing-planning/mfte/
Relationship to Comprenhensive Plan: Use of the MFTE tool is supported in the Comprehensive Plan
and Housing Action Plan.
Recommendation: Discuss the draft ordinance and residential target area maps and provide staff with
direction for next steps.
Alternatives: The City Council may wish to continue revising the ordinance and map or may wish to
schedule a public hearing on the proposed ordinance.
Attachments:
MFTE Ordinance Draft 081225 with underline and comments.docx
Draft MFTE Map Committee Recommendations 20250909.pdf
Draft MFTE Map Committee Recommendations w Zoning 20250909.pdf
Factsheet - What is MFTE.pdf
Commerce MFTE - FACTSHEET What is Tax Shift - 2023 0126.pdf
MFTE Sept Presentation.pdf
168
ORDINANCE NO. _ -25
AN ORDINANCE OF THE CITY OF PORT ORCHARD, WASHINGTON, ADOPTING A NEW
CHAPTER 3.48 (MULTIFAMILY PROPERTY TAX EXEMPTION) OF THE PORT ORCHARD
MUNICIPAL CODE; PROVIDING FOR SEVERABILITY AND CORRECTIONS; AND
ESTABLISHING AN EFFECTIVE DATE.
WHEREAS, the city previously offered a Multifamily Tax Exemption (MFTE) program as
codified in POMC 3.48 but repealed the program in 2023 by passing ordinance 026-23;
WHEREAS, after studying the options for providing tax incentives to encourage the
development of multi -family housing, the City Council wishes to adopt a new and revised MFTE
code; and
WHEREAS, the City Council wishes to encourage increased residential opportunities,
within those areas of the city designated as residential targeted areas in Figure 1 of the
proposed POMC 3.48; and
WHEREAS, the City Council wishes to further the City's goals of redevelopment and
additional, affordable residential units within the City's downtown area, which is likely to have
higher costs for development and redevelopment due to the nature of building below -grade
parking and building on shoreline fill; and
WHEREAS, the City Council wishes to stimulate rehabilitation and redevelopment of
existing vacant and underutilized buildings and properties for multifamily housing in
designated residential targeted areas and centers, to increase and improve housing
opportunities, including affordable housing; and
WHEREAS, the City Council wishes to encourage the development of higher value
residential projects than those currently being constructed by providing incentives with the
aim of increasing long term property tax revenues; and
WHEREAS, the City Council wishes to adopt requirements for 12 -year tax exemptions
to establish standards to be met and to obtain a greater percentage of housing that is more
affordable than previously required, in order to maximize public benefit; and
WHEREAS, the City Council wishes to adopt requirements for 8 -year tax exemptions
to establish certain performance and project value standards, in order to maximize public
benefit; and
11092614.2 - 366922 - 0021
169
Ordinance No. _-25
Page 2 of 15
WHEREAS, on July 6, 2020, the City Council's Land Use Committee reviewed the
amendments to Chapter POMC 3.48, and recommended that they be forwarded to the full
City Council for review and approval; and
WHEREAS, on July 8, 2020, the City submitted the proposed amendments to POMC
Chapter 3.48 to the Department of Commerce along with a 60 -day request for review; and
WHEREAS, on July 17, 2020, the City's SEPA official issued a determination of non -
significance for the proposed amendments to POMC Chapter 3.48, and there have been no
appeals; and
WHEREAS, on September 15, 2020, the City Council reviewed the amendments at its
work-study meeting, and directed staff to bring the amendments forward for Council
adoption with certain changes; and
WHEREAS, the City Council, after careful consideration of all public comment and of
the Ordinance, finds that this Ordinance is consistent with the City's Comprehensive Plan and
development regulations, the Growth Management Act, Chapter 36.70A RCW, and that the
amendments herein are in the best interests of the residents of the City; NOW, THEREFORE,
THE CITY COUNCIL OF THE CITY OF PORT ORCHARD, WASHINGTON, DO ORDAIN AS
111119 ►YiTE�
SECTION 1. Findings and Recitals. The recitals set forth above are hereby adopted and
incorporated as findings in support of this Ordinance.
SECTION 2. A new Chapter 3.48 of the Port Orchard Municipal Code is hereby adopted
to read as follows:
Sections:
3.48.010 Purpose.
3.48.020 Definitions.
3.48.030 Residential targeted areas — Criteria — Designation.
3.48.040 Residential targeted areas — Types 1 through 3
3.48.040 Terms of the tax exemption.
3.48.050 Project eligibility.
3.48.060 Application procedure.
3.48.070 Application review — Issuance of conditional certificate — Denial — Appeal.
11092614.2 - 366922 - 0021
170
Ordinance No. _-25
Page 3 of 15
3.48.080
Extension of conditional certificate.
3.48.090
Application for final certificate.
3.48.100
Issuance of final certificate.
3.48.110
Annual compliance review — Reporting.
3.48.120
Cancellation of tax exemption.
3.48.130
Conflict of provisions.
3.48.010 Purpose.
As provided for in Chapter 84.14 RCW, the purpose of this chapter is to provide limited
exemptions from ad valorem property taxation for multifamily housing in designated residential
targeted areas to:
(1) Encourage increased housing opportunities in residential and mixed -use projects, including
affordable housing units, middle housing, infill housing, mixed -use shopfront buildings containing
housing, and apartments [reference density and or height], within areas of the city designated
by the city council as residential targeted areas; and/or
(2) Stimulate new construction or rehabilitation of existing vacant and underutilized buildings for
multifamily housing in designated residential targeted areas to increase and improve housing
opportunities, including affordable housing; and/or
(3) Accomplish the planning goals required under the Growth Management Act, Chapter 36.70A
RCW, as implemented by the city's comprehensive plan.
3.48.020 Definitions.
When used in this chapter, the following terms shall have the following meanings, unless the
context indicates otherwise:
(1) "Affordable housing" means the definition provided for in RCW 84.14.010.
(2) "Department" means the city department of community development.
(3) "Director" means the director of the department of community development, or designee.
(4) "Fair market rent" means the federal department of housing and urban development's
estimate of what a household seeking a modest rental home in a short amount of time can expect
to pay for rent and utilities in the current market, as updated annually.
(5) "Household" means the definition provided for in RCW 84.14.010.
(6) "Median family income" means the median family income for the Bremerton -Silverdale
Metropolitan Statistical Area, as calculated by the federal department of housing and urban
11092614.2 - 366922 - 0021
171
Ordinance No. _-25
Page 4 of 15
development and updated annually.
(7) "Middle Housing" means the definition provided for in POMC 20.12 for buildings consisting
of at least four (4) dwelling units.
(8) "Mixed -use shopfront building" means the definition provided in POMC 20.32.
(9) "Multifamily housing" (for the purposes of this chapter) means a building having 4 or more
dwelling units not designed or used as transient accommodations and not including hotels and
motels. Multifamily units may result from new construction or rehabilitated or conversion of
vacant, underutilized, or substandard buildings to multifamily housing.
(10) "Owner" means the definition provided for in RCW 84.14.010.
(11) "Permanent residential occupancy" means the definition provided for in RCW 84.14.010.
(12) "Rehabilitation improvements" means the definition provided for in RCW 84.14.010.
(13) "Residential targeted area" means the definition provided for in RCW 84.14.010 and the
area(s) that have been so designated by the city council pursuant to this chapter.
(14) "Substantial compliance" means the definition provided for in RCW 84.14.010.
(15) "Urban center" means the definition provided for in RCW 84.14.010.
3.48.030 Residential targeted areas — Criteria — Designation.
(1) Following notice and public hearing as prescribed in RCW 84.14.040 of the city council's
intention of designating a residential targeted area, the city council may, in its sole discretion,
designate one or more residential targeted areas. Each residential targeted area must meet the
following criteria, as determined by the city council:
(a) The area is within an urban center; and
(b) The area lacks sufficient available, desirable, and convenient residential housing,
including affordable housing, to meet the needs of the public who would be likely to live in
the urban center if affordable, desirable, attractive, and livable residences were available;
and
(c) Providing additional housing opportunities in the area will assist in achieving one or
more of the purposes of this chapter.
(2) In designating a residential targeted area, the city council may also consider other factors
including, but not limited to:
11092614.2 - 366922 - 0021
172
Ordinance No. -25
Page 5 of 15
(a) Additional housing in the residential targeted area will attract and maintain an increase
in the number of permanent residents;
(b) An increased permanent residential population in the residential targeted area will help
to achieve the planning goals mandated by the Growth Management Act under Chapter
36.70A RCW, as implemented through the city's current and future comprehensive plans;
(c) Encouraging additional housing in the residential targeted area is consistent with public
transportation plans; or
(d) Additional housing may contribute to revitalization of a distressed neighborhood or area
within the city.
(3) At any time the city council may, by ordinance, and in its sole discretion, amend or rescind
the designation of a residential targeted area pursuant to the same procedural requirements as
set forth in this chapter for original designation.
3.48.040 Designated residential targeted areas.
In accordance with section 3.48.030, the City Council has designated a residential targeted area,
as provided below and as shown on Figure 1. Figure 1 is provided for planning purposes only, and
all development that is proposed to qualify for tax exemption within these areas must meet the
criteria of this chapter, as well as all other relevant City standards, including but not limited to:
the comprehensive plan, Unified Development Code, building code, public works standards,
critical areas regulations and the shoreline master program. The project must also comply with
any other standards and guidelines adopted by the city council, including but not limited to those
listed in POMC 3.48.060. Inclusion within the residential targeted areas does not guarantee the
ability to obtain approval under this chapter. Property within the residential targeted areas that
does not have the zoning or comprehensive plan designation that allows a project to satisfy the
minimum reauirements of this chanter. orthat does not otherwise meet the reauirements of this
chapter, may not utilize this program.
Figure 1. Residential Target Areas.
[Insert new map once finalized]
3.48.050 Terms of the tax exemption.
(1) Duration of Exemption. The value of new housing construction, conversion, and rehabilitation
improvements qualifying under this chapter is exempt from ad valorem property taxation, as
11092614.2 - 366922 - 0021
173
Ordinance No. _-25
Page 6 of 15
follows:
(a) For both 8 -year and 12 -year exemptions, the exemption begins on January 1st of the year
immediately following the calendar year of issuance of the tax exemption certificate.
(b) For 12 -year exemptions, the number of residential units identified to meet the
requirements for an affordable housing component per 3.48.040(1)(c) shall continue to be made
available for the length of the exemption period.
(iii) The mix and configuration of housing units (e.g., studio, one -bedroom, two -
bedroom) used to meet the requirement for affordable units shall be substantially
proportional to the mix and configuration of the total housing units in the project.
(iv) When a project includes more than one building with multifamily housing units, all
of the affordable housing units required in this subsection must not be located in the
same building.
(2) Limits on Exemption. The exemption does not apply:
(a) To the value of land or to the value of non -housing -related improvements not qualifying
under this chapter.
(b) In the case of rehabilitation of existing buildings, to the value of improvements
constructed prior to submission of the completed application required under this chapter.
(c) To increases in assessed valuation made by the Kitsap County Assessor on nonqualifying
portions of building or other improvements and value of land nor to increases made by lawful
order of a county board of equalization, the Department of Revenue, or Kitsap County, to a
class of property throughout the county or specific area of the county to achieve the
uniformity of assessment or appraisal required by law.
(3) Conclusion of Exemption. At the conclusion of the exemption period, the new or rehabilitated
housing cost shall be considered as new construction for the purposes of Chapter 84.55 RCW.
3.48.060 Project eligibility.
A proposed multifamily housing project must meet all of the following requirements for
consideration for a property tax exemption:
(1) Location. The project must be located within a residential targeted area as provided in POMC
3.48.040.
(2) Tenant Displacement Prohibited. The project must not displace existing residential tenants of
11092614.2 - 366922 - 0021
174
Ordinance No. -25
Page 7 of 15
structures that are proposed for redevelopment. If the property proposed to be rehabilitated is
not vacant, an applicant shall provide each existing tenant housing of comparable size, quality,
and price and a reasonable opportunity to relocate.
(3) Noncompliance with Building Codes. Existing dwelling units proposed for rehabilitation must
fail to comply with one or more standards of the applicable state or city building codes.
(4) Size of Project. The new, converted, or rehabilitated multiple -unit housing must provide for a
minimum of 50 percent of the space (excluding structured parking) for permanent residential
occupancy. The project, whether new, converted, or rehabilitated multiple -unit housing, must
include at least 10 units of multifamily housing within a residential structure or as part of an
urban development, with an exception for middle housing located on lots of less than 15,000
square feet consistent with subsection 6(c) below. In the case of existing multifamily housing that
is occupied or which has not been vacant for 12 months or more, the multifamily housing project
must also provide for a minimum of four additional multifamily units for a total project of at least
10 units including the four additional units. Existing multifamily housing that has been vacant for
12 months or more does not have to provide additional units.
(5) Proposed Completion Date. New construction of multifamily housing and rehabilitation
improvements must be completed within three years from the date of approval of the
application. "Completed" for this purpose means that a certificate of occupancy has been issued
for all of the improvements prior to the expiration of the three-year period or prior to expiration
of any extension period granted in accordance with POMC 3.48.090.
(6) Project performance standards and form. To qualify for a limited exemption from ad valorem
property taxation pursuant to this chapter, the proposed project must meet one of the following
performance standards and forms in addition to meeting all other reauirements of this chaster.
(a) The multi -family housing project must be in a mixed -use shopfront building containing
commercial ground floor uses measuring at least 4,000 square feet or 40% of the building's
footprint, whichever is less; or
(b) The multi -family housing project must be in a building containing at least 4 stories of
residential units and achieving at least 40 units per net acre (gross acreage, less critical areas and
associated buffers). All portions of buildings must contain 4 -stories of multi -family units. Where
buildings step down following topography, each portion of the building must contain 4 -stories of
multi -family units; or
(c) The multi -family project must provide middle housing and be on a parcel/lot measuring less
than 15,000 square feet with between 4-12 multi -family units; or
11092614.2 - 366922 - 0021
175
Ordinance No. _-25
Page 8 of 15
d) Projects that will provide 100% of any on -site parking below grade.
(7) Additional performance standards for 12 -year tax exemption. To qualify for a 12 -year
limited exemption from ad valorem property taxation, and affordable housing component is
required:
(a) A minimum of 20 percent of all residential units in the development shall be rented for at
least 25 percent below fair market rent for 12 years. to tenants whose household annual
I.Tg.,.:T L
• At or below 40% of median family income, for housing units in con
residences or small efficiency dwelling units;
• At or below 65% of median family income for one -bedroom units;
• At or below 75% of median family income for two -bedroom units: and
• At or below 80% of median family income for three -bedroom and larger
units.
(b) If calculations for the minimum 20 percent of the residential units required under subsection
1 of this section result in a fraction, then the minimum number of residential units required to
meet the affordable housing requirement shall be rounded up to the next whole number.
(c) For the purpose of administering this chapter, the Department of Community Development
shall publish annual rent limits and a utility allowance which may be subtracted from the rent
limits required by this chapter. This annual allowance shall be published by July 1 annually,
provided that all relevant data is made available by the Department of Housing and Urban
Development (HUD). If publication of HUD data is delayed, the prior year's limits shall remain in
effect until new data is released. Project owners may choose to include utilities (other than
telephone) in the rent charged or may deduct the annually released utility allowance from the
maximum allowed rent.
3.48.070 Application procedure.
A property owner who wishes to propose a project for a tax exemption shall complete the
following procedures:
(1) The exemption application provided by the city shall be completed and filed with the
department prior to issuance of a building permit for the project. The completed application shall
11092614.2 - 366922 - 0021
176
Ordinance No. -25
Page 9 of 15
be accompanied by the application fee as authorized by RCW 84.14.080 and as set forth in the
city's current fee resolution.
(2) The exemption application shall contain and require such information as deemed necessary
by the director, including:
(a) A brief written description of the project, including timing and construction schedule,
setting forth the grounds for the exemption.
(b) Floor and site plans of the proposed project, which may be revised by the owner, provided
such revisions are made and presented to the director prior to the city's final action on the
exemption application.
(c) For rehabilitation projects, the applicant shall provide a report prepared by a registered
architect identifying property noncompliance with current building codes. This report shall
identify specific code violations and must include supporting data that satisfactorily explains
and proves the presence of a violation. Supporting data must include a narrative and such
graphic materials as needed to support this application. Graphic materials may include, but
are not limited to, building plans, building details, and photographs.
(d) If applying for a 12 -year exemption, it shall include information describing how the
applicant will comply with the affordability requirements set forth in POMC 3.48.040(1)(c).
(e) A statement from the owner acknowledging the potential tax liability when the project
ceases to be eligible under this chapter.
(f) An affidavit signed by the owner stating the occupancy record of the property for a period
of 12 months prior to filing the application.
(g) Verification of the correctness of the information submitted by the owner's signature and
affirmation made under penalty of perjury under the laws of the state of Washington.
3.48.080 Application review — Issuance of conditional certificate — Denial — Appeal.
(1) Director's Decision. The director may certify as eligible an application which is determined to
comply with all applicable requirements of this chapter. A decision to approve or deny an
application shall be made within 90 calendar days of receipt of a complete application.
(2) Approval of Application — Contract Required. If an application is approved, the applicant shall
enter into a contract with the city, regarding the terms and conditions of implementation of the
project, and pursuant to the following:
(a) The contract shall be subject to approval by the city council, in the form of a resolution,
11092614.2 - 366922 - 0021
177
Ordinance No. _-25
Page 10 of 15
regarding the terms and conditions of the project and eligibility for exemption under this
chapter. This contract shall be recorded against the property and will constitute a covenant
running with the land and shall be binding on the assigns, heirs, and successors of the
applicant.
(b) For any development project including owner -occupied units, the contract with the city
shall also require that an owners' association organized under RCW 64.34.300 be formed for
all owner -occupied units within the development, for at least the length of the exemption
period granted, to assume the responsibility for collecting from all individual unit owners the
information and documents required to complete the annual reporting requirements and for
filing the required annual report with the city for each of the individual homeowners
pursuant to POMC 3.48.120.
(c) Amendment of Contract. Within three years of the date from the city council's approval
of the contract, an owner may request an amendment(s) to the contract by submitting a
request in writing to the director. The fee for an amendment is as set forth in the city's
current fee resolution. The director shall have authority to approve minor changes to the
contract that are reasonably within the scope and intent of the contract approved by the city
council, as solely determined by the director. Amendments that are not reasonably within
the scope and intent of the approved contract, as solely determined by the director, shall be
submitted to the city council for review and approval. The date for expiration of the
conditional certificate shall not be extended by contract amendment unless all the conditions
for extension set forth in POMC 3.48.090 are met.
(3) Issuance of Conditional Certificate. Upon city council approval of the contract required under
subsection (2) of this section, the director shall issue a conditional certificate of acceptance of tax
exemption. The conditional certificate shall expire three years from the date of city council
approval unless an extension is granted as provided in this chapter.
(4) Denial of Application. If an application is denied, the director shall state in writing the reasons
for denial and shall send notice to the applicant at the applicant's last known address within 10
calendar days of issuance of the denial.
(5) Appeal. Per RCW 84.14.070, an applicant may appeal a denial to the city council within 30
calendar days of receipt of the denial by filing a complete appeal application and fee, as set forth
in the city's current fee resolution, with the director. The appeal before the city council will be
based on the record made before the director. The director's decision shall be upheld unless the
applicant can show that there is no substantial evidence on the record to support the director's
decision. The city council's decision on appeal will be final.
11092614.2 - 366922 - 0021
178
Ordinance No. _-25
Page 11 of 15
3.48.090 Extension of conditional certificate.
(1) Extension. The conditional certificate and time for completion of the project may be extended
by the director for a period not to exceed a total of 24 consecutive months. To obtain an
extension, the applicant must submit a written request with a fee, as set forth in the city's current
fee resolution, stating the grounds for the extension. An extension may be granted if the director
determines that:
(a) The anticipated failure to complete construction or rehabilitation within the required time
period is due to circumstances beyond the control of the owner; provided, that financial
hardship, regardless of the cause or reason, shall not be considered by the director as a
circumstance beyond the control of the owner in order to grant an extension;
(b) The owner has been acting and could reasonably be expected to continue to act in good
faith and with due diligence; and
(c) All the conditions of the original contract (and as amended) between the applicant and
the city will be satisfied upon completion of the project.
(2) Denial of Extension. If an extension is denied, the director shall state in writing the reason for
denial and shall send notice to the applicant's last known address within 10 calendar days of
issuance of the denial.
(3) Appeal. An applicant may appeal the denial of an extension to the hearing examiner within
14 calendar days of receipt of the denial by filing a complete appeal application and appeal fee
with the director. The appeal before the hearing examiner shall be processed as a closed record
hearing. No appeal to the city council is provided from the hearing examiner's decision.
3.48.100 Application for final certificate.
Upon completion of the improvements agreed upon in the contract between the applicant and
the city and upon issuance of a temporary or permanent certificate of occupancy, the applicant
may request a final certificate of tax exemption by filing with the director such information as
the director may deem necessary or useful to evaluate the eligibility for the final certificate,
including the following:
(1) A statement of expenditures made with respect to each multifamily housing unit and the total
expenditures made with respect to the entire property;
(2) A description of the completed work and a statement of qualification for the exemption;
(3) The total monthly rent or total sale amount of each multifamily housing unit rented or sold to
date;
11092614.2 - 366922 - 0021
179
Ordinance No. _-25
Page 12 of 15
(4) A statement that the work was completed within the required three-year period or any
authorized extension;
(5) If a 12 -year exemption, information on the applicant's compliance with the affordability
requirements of this chapter; and
(6) Any additional information requested by the city pursuant to meeting any reporting
requirements under Chapter 84.14 RCW.
3.48.110 Issuance of final certificate.
(1) Director's Decision. Within 30 calendar days of receipt of all materials required for a final
certificate, the director shall determine whether the specific improvements satisfy the
requirements of the contract, application, and this chapter.
(2) Granting of Final Certificate. If the director determines that the project has been completed
in accordance with this chapter and the contract between the applicant and the city, and has
been completed within the authorized time period, the city shall, within 10 calendar days of the
expiration of the 30 -day review period above, file a final certificate of tax exemption with the
Kitsap County assessor. The director is authorized to cause to be recorded, at the owner's
expense, in the real property records of the Kitsap County department of records, the contract
with the city, as amended if applicable, and such other document(s) as will identify such terms
and conditions of eligibility for exemption under this chapter as the director deems appropriate
for recording, including requirements under this chapter relating to affordability of units.
(3) Denial of Final Certificate. The director shall notify the applicant in writing that a final
certificate will not be filed if the director determines that:
(a) The improvements were not completed within the authorized time period;
(b) The improvements were not completed in accordance with the contract between the
applicant and the city; or
(c) The owner's property is otherwise not qualified under this chapter.
(4) Appeal. An applicant may appeal a denial of a final certificate to the hearing examiner within
14 calendar days of issuance of the denial of a final certificate by filing a complete appeal
application and appeal fee with the director. The appeal before the hearing examiner shall be
processed as a closed record hearing. No appeal to the city council is provided from the hearing
examiner's decision.
11092614.2 - 366922 - 0021
180
Ordinance No. _-25
Page 13 of 15
3.48.120 Annual compliance review — Reporting.
(1) Within 30 calendar days after the first anniversary of the date of filing the final certificate of
tax exemption and each year for the tax exemption period, the property owner shall be required
to file a notarized declaration with the director indicating the following:
(a) A statement of occupancy and vacancy of the multifamily units during the previous 12
months;
(b) A certification by the owner that the property has not changed use and continues to be
in compliance with the contract with the city and the applicable requirements of this chapter;
(c) A description of changes or improvements to the property made after the city's issuance
of the final certificate of tax exemption;
(d) The total monthly rent of each multifamily housing unit rented or the total sale amount
of each unit sold during the 12 months ending with the anniversary date;
(e) A breakdown of the number, type, and specific multifamily housing units rented or sold
during the 12 months ending with the anniversary date;
(f) If granted a 12 -year exemption, information demonstrating the owner's compliance with
the affordability requirements of this chapter, including, but not limited to, the income of
each renter household at the time of initial occupancy or the income of each purchaser of
owner -occupied units at the time of purchase;
(g) The value of the tax exemption for the project; and
(h) Any additional information requested by the city pursuant to meeting any reporting
requirements under Chapter 84.14 RCW.
(2) City staff may also conduct on -site verification of the declaration and reporting required under
this section. Failure to submit the annual declaration and report may result in cancellation of the
tax exemption pursuant to this chapter and shall result in a review of the exemption per RCW
84.14.110.
(3) If the city issues final tax exemption certificates pursuant to this chapter, the director shall
submit the report required by RCW 84.14.100 to the state Department of Commerce by
December 31st of each year.
3.48.130 Cancellation of tax exemption.
(1) The director may cancel a tax exemption on a property if he/she determines any of the
following:
11092614.2 - 366922 - 0021
181
Ordinance No. _-25
Page 14 of 15
(a) The owner is not complying with the terms of the contract or this chapter;
(b) The use of the property is changed or will be changed to a use that is other than
residential;
(c) The project violates applicable zoning requirements, land use regulations, building, or fire
code requirements; or
(d) The owner fails to submit the annual declaration and report specified in POMC 3.48.120.
(2) If the owner intends to convert the multifamily housing to another use, the owner shall notify
the director and the Kitsap County assessor in writing within 60 calendar days of the change in
use.
(3) Cancellation may occur in conjunction with the annual review or at any such time
noncompliance has been determined.
(4) Upon cancellation of the tax exemption, additional taxes, interest, and penalties shall be
imposed on the property, and a priority lien may be placed on the land, pursuant to state law.
(5) Notice of Cancellation. Upon determining that a tax exemption is to be canceled, pursuant to
RCW 84.14.110(2), the director shall notify the owner by mail, return receipt requested.
(6) Appeal of Cancellation. The owner may appeal the determination of cancellation to the
hearing examiner by filing a notice of appeal and appeal fee with the city clerk within 30 calendar
days of the date of the notice of cancellation, specifying the factual and legal basis for the appeal.
The appeal shall be heard by the hearing examiner as a closed record hearing. No appeal to the
city council is provided from the hearing examiner's decision.
3.48.140 Conflict of provisions.
If any provision of this chapter is in legal conflict with the provisions of Chapter 84.14 RCW, as
currently adopted or hereafter amended, the provisions of Chapter 84.14 RCW shall apply as if
set forth in this chapter.
SECTION 3. Corrections. Upon the approval of the city attorney, the city clerk and/or
code publisher is authorized to make any necessary technical corrections to this ordinance,
including but not limited to the correction of scrivener's/clerical errors, references, ordinance
numbering, section/subsection numbers, and any reference thereto.
SECTION 4. Severability. If any section, subsection, paragraph, sentence, clause, or
phrase of this ordinance is declared unconstitutional or invalid for any reason, such decision shall
11092614.2 - 366922 - 0021
182
Ordinance No. _-25
Page 15 of 15
not affect the validity of the remaining parts of this ordinance.
SECTION 5. Effective Date. This ordinance shall be published in the official newspaper of
the city and shall take full force and effect five (5) days after the date of publication. A summary
of this ordinance in the form of the ordinance title may be published in lieu of publishing the
ordinance in its entirety.
PASSED by the City Council of the City of Port Orchard, APPROVED by the Mayor and
attested by the City Clerk in authentication of such passage this day of
202
Robert Putaansuu, Mayor
1119X.119
Brandy Wallace, MMC, City Clerk
APPROVED AS TO FORM: Sponsored by:
Charlotte A. Archer, City Attorney
PUBLISHED:
EFFECTIVE DATE:
11092614.2 - 366922 - 0021
Scott Diener, Council Member
183
LII h j
muIHH lull I1:' Q=
IIII!i!iI:.IIii:=!m
�a
w ,♦v- ' unnnnnnl��
�,O�,,`�I�IIo -- �IIII >• a- ,
Q�O ��IP.1111111�
����jID 1111111
.• �I�Ij ���, ' �p1111111P �IIIII
11� 111111►� ��
annnnm `;
'F III��I -�
IMIlU
1111111
■ `■:■ IIIIIIUI1-
rI����w�IQ�� ��p'�■111
�� � �`� ` '�� ■111111:
' ► I�: •�.�� �,r ■111 �■1��:
____ I'll!
ra■■■■�
:i iiii
•♦i
'till
■'
--w
mm
lii
B
HARD
City of Port Orchard
Draft
Multi -Family Tax Exemption
Residential Targeted Areas
Map
Land Use Recommendation
EDT Recommendation
MFTE Original
_____ MFTE Original
Effective Date of Ordinance XXX-24
N
0 0.10.2 0.4 0.6 0.8
Miles
184
LII h j
muIHH lull I1:' Q=
II II !i I I:.I Iii:=!m
�a
w ,♦��- ' unnnnnnl��
� ',�Ij�•� ���,�,�OIIIIIIIII�� ��
iiii���i��i?�� ,�OQ��`,��I�IIo =_ .1111 : >•��a ,
���IQ,�� � �► Q�i1�ID 1111111
,Mp1111111P X1111/
�iumlunp�
annnnm o.
111
n
11 'i1iij111w N
A
P (1! -
ILE n�
■■1JiWLUN_
fit. U= =-_==
pr I■��-IIwi1
•- =_� •== ■.•�
INN
�1111111
iIiiiiI
•� �•� � `� ` '�� ■111111:
•- J
. ` ;� ■111
ii
ra■■■■�
"Iii
:i iiii
'till
k
■'
--w
mm
liiu
B
0 CHARD
City of Port Orchard
Draft
Multi -Family Tax Exemption
Residential Targeted Areas
Map
Land Use Recommendation
EDT Recommendation
2024 ZONE
BPMU
CC
CH
CI
CMU
i4 DMU
GB
i4 GMU
IF
LI
NMU
PF
PR
R1
R2
R3
R4
Effective Date of Ordinance XXX-24
a
00.126.25 0.5 0.75 1
Mi
0
1851
GROWTH MANAGEMENT
SERVICES
SHORT GUIDE FOR COUNCILS AND STAKEHOLDERS
What is MFTE?
METE (Multifamily Housing Tax Exemption) programs are
property tax waiver programs enacted by cities and counties to
support local housing goals. Under Chapter 84.14 RCW, local
governments can give exemptions for new construction,
conversion, and rehabilitation of multifamily residential
improvements with at least four units.
Under these exemptions, a property owner does not have to
pay property taxes on the residential improvements for a given
number of years. The property owner still pays tax on the land
and on non-residential improvements like the commercial
portion of a mixed -use building.
For the annual property taxes collected on a development...
Commercial Residential
Land Improvements Improvements
1
7'
... an exemption under MFTE removes the residential portion of
property value from taxation for an eight- to 20 year period.
Advantages
o Cities and counties can give financial incentives to meet
housing goals without the need for direct funding. This can
support affordable housing but can also incentivize
market -rate housing in a way that complies with state
constitutional requirements.
o Requirements in state law can be flexible and let cities and
counties tailor programs to meet policies. Some programs
consider on -site improvements, building requirements, or
mandates for services.
o MFTEs are commonly used by developers across
Washington, who are often familiar with how they operate
and how to use them with projects.
.1►' Washington State
Deartment of
!i j Commercep
V3.0
Types of MFTE
MFTE programs are usually divided according to the For an 8 -year MFTE... tax exemptions are provided as
length of the program: a general incentive for new residential investment.
For an 8 -year MFTE program, there are no
requirements for affordable housing, although some ❑ ❑ ❑ ❑ ❑ ❑ ❑
cities provide their own requirements. Many o ❑ o a ❑ o ❑
communities use this to promote market -rate
housing construction in neighborhoods where new New multifamily development
(rental or homeownership)
housing investment is needed.
Tax exemption for 8 years
A 12 -year MFTE program must set aside at least 20%
of housing units for low- and moderate -income
households. Under the statute, household income is For a 12 -year MFTE... tax exemptions are provided in
based on Area Median Income (AMI), with households exchange for at least 20% of units being set aside as
with incomes at 80% of AMI or less considered "low affordable for 12 years (rentals or units for sale).
income", and households at 115% of AMI or lower
"moderate income". This MFTE is used for providing
affordable rental housing options, including choices
in market -rate private housing projects.
A 20 -year MFTE program requires that 25% of units
be sold as permanent affordable housing for
households at 80% AMI or below, with a nonprofit or
government agency sponsoring the sale and
restrictions in place for resale to ensure long-term
affordability. This is a new option implemented in
2021 and is intended to be used to encourage
affordable housing homeownership. There is an
option for permanent affordable rentals (20% of units
for 99 years at 80% AMI or less) but a deadline for
passing this program restricts new programs.
Note that communities can also choose to impose
higher affordability requirements and include other
requirements for MFTE projects as well.
Considerations
O MFTEs can result in either a loss of tax revenue
to the community, or a tax shift where other
property owners will pay more in taxes.
O MFTE programs require staff time to conduct
regular monitoring, oversight, and reporting.
O Regular updates can be necessary to make sure
the program provides a sufficient incentive to
maximize public benefits.
WHAT IS MFTE?
Tax exemption for 20 years
Affordable rents for 12 years
(20% of units, tow -/moderate -income)
Affordable units for sale
(20% of units, short-term restrictions)
For a 20 -year MFTE... tax exemptions are provided in
exchange for permanently affordable rental housing
homeownership.
Affordable rents for 99 years
(20% of units for low-income HH)
OR
rc❑❑❑❑ ❑ ❑ o ❑ o
Affordable units for sale
(25% of units, permanently affordable)
2
187
GROWTH MANAGEMENT
SERVICES
SHORT GUIDE FOR COUNCILS AND STAKEHOLDERS
What is Tax Shift?
MFTE (Multifamily Housing Tax Exemption) programs can be
an effective way of incentivizing market -rate and affordable
housing options. To understand how it works stakeholders
often ask, "Where does the money come from to pay for the
exemption?"
This question can be hard to answer because of how property
taxes work in Washington State. When making decisions about
an MFTE program, it is important to consider possible tax and
revenue impacts.
Generally, these impacts can be distributed in two ways:
o Foregone tax revenues that are not collected, which reduce
total revenues for a city and other taxing districts (e.g., the
port, county, school district, state, etc.).
O A shift of tax obligations to all other payers of property
taxes in these districts, where there is an increase in taxes
collected to offset the losses from the exemption.
How these costs are distributed depends on two things:
O Levy limits provided under RCW 84.55.010 mean that
property tax levies are restricted to no more than a 1%
increase in revenue from the assessed value from the
previous year. This restricts how much cities and other
districts can raise property taxes on these properties to
make up this difference and can mean that deferred taxes
will be foregone revenue for these jurisdictions.
O However, projects that receive MFTEs could still increase
that total levy. Under WAC 458-12-342, county assessors
must assess building value during construction and add it
to these levy limits, which may not be removed from the
total levy amount before the final certificate for exemption
is received and the exemption begins.
The amount of tax shift versus deferred revenue depends in
part on the practices of the county assessor. However, there
are currently no requirements for assessors to consider MFTE
in these levy limits. If cities do not consider these effects, an
MFTE can shift most or even all of the exempted tax
obligations to other properties.
Washington State
Department of
!j Commerce
Tax Shift Considerations
If an MFTE is supported through tax shifts, there are
some important policy considerations:
O Communities may be less likely to support
incentives for market -rate development that use
property tax increases, especially for high -end
projects that do not seem to provide public
benefits.
O Shifted tax obligations are not usually calculated,
meaning that the full impacts of this program may
not be transparent, especially to affected property
owners.
O Depending on the popularity of the program, the
total increases in property taxes could be
equivalent in magnitude to affordable housing
levies that would require voter approval and have
tighter requirements (ROW 84.55.150).
Foregone Revenue Considerations
On the other hand, if a city foregoes tax revenue to
support MFTEs, there may be other policy concerns:
O Communities will have reduced long-term tax
revenues from the MFTE program, especially if
they will be foregoing most or all of the exempted
tax revenue. This can have a significant fiscal
impact on local budgets.
O Other taxing districts may be impacted by tax
exemptions but are not in a position under the
statute to object to a community's MFTE program
This can have some significant effects on special
districts that cannot make up for this lost revenue
in other ways.
O The total budget impacts may be more
unpredictable, especially without limitations on
the number of exemptions issued by the
community. However, placing limits on the
number and value of exemptions could affect the
ability of the MFTE program to meet housing
goals.
Under typical situations, total property tax levies will
increase by 1 % over the previous year (plus new
development):
New construction is added to the
total tax base by the assessor... Total Tax Levy Amount
El
Encreaseiyea
r
2
a ...increasing the value
o f of the tax base.
a
as°oB oo°o°uoo ` g°og°og°ooa
Year
If new construction value is added to the levy limit but
exempted from property taxes through the MFTE,
property tax obligations will be shifted to the rest of
the tax base:
Tax exempted properties add to the
property tax levy limit...
2
...but these tax obligations will be
covered by non-exempt properties.
IoIoIIoI
Year
However, if exempted value is taken out of the levy
limit in some way, the tax levy amount will decrease.
This will reduce tax revenue, but note that this is not
usually done by assessors in practice.
Tax exempted properties that do not
contribute to the levy lid...
X
Q ... would not shift tax obligations
o but will result in foregone revenue.
Q o 0 0 0 0 0 0
Year
189
■
City Council Work Study
September 16, 2025
190
Case Study
017-03 001.00
00� "
027-00
024-00
oo7-on
1123-00
!
022-00
. 1
011-00
- z.
2-008
is
h.015 -00,
Overlook Apartments (The Charleston) vs. Peyseno Apartments
191
2025 WEB TAX STATEMENT
2025 WEB TAX STATEMENT
Peter J Boissonneau
w, Peter J Boissonneau
Ritsap County Treasurer
Kitsap County Treasurer
PO Box 169
Printed: 0 710 1120 25
PO Box 169
Printed0710112025
Port Orchard, 35A90366
Port Orchard, WA 90366
ccount Number
312402-2-022-2009
tecount Number
302402-3-062-2009
First Half
$0.00
First Half
Dun April 30th
Due April 30th
$0.00
PAYSENO LANE II LLC
Second Half
$63,374.34
FAC PORT ORCHARD LLC
Second Half
7533 CLOVER VALLEY RD SE
Due October 31st
2302 N 77TH ST
Duo October 31st
$1,000.54
PORT ORCHARD, WA 90367
Total Due 2025
SEATTLE, WA98103
RrindludN�,rdu..maR1a
$63,374.34
Totai Due 2025
$1,444.54
roll
Past Due Amounts
$0.00
Past Due Amou nts
$0.00
hoperty Desrnplion: REsuLTANraARrxxnor uoJsr RvurF nnursrernr RE➢cv➢muuDERwmoos PILE IS Land Value5426,500
0211 D1000et, AND AO DEPICTED CN 511 RVEY RECORDED UNnFR AIMOR'S FlFM1 Xfi1101tl0a2,
IN—UNIF R60F
dy Eescnpfon: RESNLTAM PARCEL IOF RONNOMYLINEasJLrsn rrr REWRomllrl EliAlloRIXi5 FILE NO. Land Val us: 5329,2t
005055, PAGES 104 ThNOLGHIO&INCLLPSIVE, PECLFOS OF NLrsw COUNrl', WA4K
Budding Value: $14,105,846
Fu TILI. 9FlP1 LIOl O, E0
1810270137. BEING A PpirION OF LOTGO AND D OFTIE GIY OP PORT ORCHM➢3Ni PLATN0. PQ7dR-l(S10LdR-2t
ccm atiAdshss: Multiple addresses utiie
Personal Properly Value: so
Ec ORDEDUNRERwTSARcoUNrrAUDnoas—No. mmdeTrma,REINGu1,wEND1ENrxmll�so�Rr Euilding Va.: $8,341,500
ahon Address: Multiple addresses m He
Personal Properly Value: 50
Distribution of Your 2025 Taxes
Current Year (2025) Details
0.5% PUD
$645.80
Taxable Value $14,532,340
Distribution of Your 2025 Taxes
Current Year (2025) Details
2.2% PORT
$283800
Tax Code Area 0810
0.5% PUD
$10.20
Taxable Value $229,200
3.1% REGIONAL LIBRARY
$3987 s0
Levy Rate 0721692
22% PORT
54450
Tax Code Area 0810
General Property Tax $97,392.07
Levy Rate 0.721692
7.4% COUNTY
$9,409.30
VoterApproved Rate 23.16%
39% REGIONAL LIBRARY
General Property Tax $1,536.05
12.9% CITY
$16,292.10
VoterApprovedTax $29,354.51
7.4% COUNTY
5148.40
VoterApprovedRate 23.16%
22.3% FIRE
$2824520
Noxious Weed $2.10
129% CITY
6257.00
VoterApprovedTax $46297
232% LOCAL SCHOOL
$26,34560
Total 2025 Charges $126,748.68
22.3% FIRE
5445$0
Noxious Weed $2.06
20.4% STATE GENERAL
$35,952.90
Past Due Unpaid Amounts
P
23.2% LOCAL SCHOOL
546290.
Total 2025 Charges $2,001.08
Year I
Principal
Int/PenlFees
ITatal
20.4% STATE GENERAL
5567.50
Past Due Unpaid Amounts
2024 130.00
100.00
10000
Year I
Principal
Int/Pen/Fees
Total
2023
$0.00
$0A0
$0.00
2024
$0.00
50.00
$0.00
To view details of each levy change, go to
2022+ Prior
$0.00
$0.00
$0.00
2023 I
$0.00
50.00 100.00
wow. kitsap.govftreasurer
To view details of each levy change, go to
2022 -1 Prior
$0.00
$0.00
$0.00
192
• Overlook Apartments (12 -year MFTE):
• Total Units: 39
• Affordable Units: 8 Units with reduced rent
• Annual property tax bill: $2,001.08
• Estimated annual tax savings is $84,722. (prorated based on Payseno tax bill per unit)
• Estimated 12 -year tax savings to developer/operator is $1,016,665.
• Estimated annual value of rent relief to qualified tenants based on 10% below HUD fair market
rent is $19,747 ($2,468.40 per unit).
• Estimated annual value of rent relief to qualified tenants based on proposed 25% below
HUD fair market rent is $49,368 ($6,171 per unit).
• Estimated 12 -year value of rent relief to qualified tenants based on 10% below HUD fair market
rent is $236,996 ($29,620.80 per unit).
• Estimated 12 -year value of rent relief to qualified tenants based on 25% below HUD fair
market rent is $592,416 ($74,052 per unit).
• Payseno Apartments (no MFTE):
• Total Units: 57
• Annual property tax bill: $126,748.68
193
• Pre -application meeting for a 3 -story 24 -unit Garden Apartment
• Zoning currently allows 4 -stories, developer choosing to build 3 -stories due to
increased cost of taller building.
• A new MFTE program, assuming that the developer opts for a 4 -story building to
receive MFTE, would result in 32 units instead of 24 and would result in an increased
building valuation.
• Total 2025 assessed value if constructed:
• 3 Stories 24 -units: $6,118,880
• 4 Stories 32 -units: $8,158,500
• Total Annual Tax Paid 24 -units: $53,367.87
• Total Annual Tax Paid 32 -units (shifted for 8-12 years): $71,157.15
194
Cumulative Property Tax Revenue
$35,000,000.00
$30,000,000.00
$25,000,000.00
$20,000,000.00
$15,000,000.00
$10,000,000.00
$5,000,000.00
$0.00
1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 43 45 47 49 51 53 55 57 59 61 63 65 67 69 71 73 75 77 79 81 83 85 87 89
-Without MFTE 3 -Stories (Cumulative) -With MFTE Tax Shift 4 -Stories (cumulative)
• Port Orchard Gains $7,886,857 Over 90 Years with MFTE and 4 -Story Project
• Cost of tax shaft for average property value is $10.36 per year for 8-12 years.