Loading...
HomeMy WebLinkAbout036-24 - Miles Resources, LLC - Supplement / Change Order 4Docusign Envelope ID: AB7015A8-9E1 D-43EB-B9FF-9A1 E03C21 E2E CITY OF PORT ORCHARD Authorization for Change Order No. 4 Date: 9/9/2025 Bethel Ave, Bethel Rd, Lincoln Project: Ave SE, Mitchell Rd SE Contract / Job # PW2024-003 Contractor: Miles Resources, LLC 400 Valley Avenue NE Puyallup, WA 98372 THIS CHANGE ORDER AUTHORIZES (add description). 1. The prepared excavations for the pedestrian lighting bases were reviewed by PSE and found to be of the incorrect diameter and depths to accommodate the direct bury poles. Contractor will re -excavate to the correct diameter and depths using a vactor truck, to include conduit, CDF and traffic control. Payment for the work shall be per lump sum, $15,290.00 Contract History Amount Sales Tax Total Date Appvd by Original Contract $1,089,176.20 $0.00 $1,089,176.20 Council Change Order 1 $10,080.00 $0.00 $10,080.00 29 -Jul -24 PW Director Change Order 2 -$87,248.25 $0.00 -$87,248.25 21 -Oct -24 PW Director Change Order 3 $45,313.45 $0.00 $45,313.45 21 -Oct -24 PW Director Change Order 4 $15,290.00 $0.00 $15,290.00 09 -Sep -25 Mayor Total Contract $1,072,611.40 $0.00 $1,072,611.40 I have reviewed the ange Order information above and cgrti�fiX tat to the best of my knowledge descriptions and costs are ue and ccurate. �oI, 1= Contractor Ap royal Signature Public Works Director Kim Rody, Project Manager Printed Name & Title Change Orders that do not exceed 10%, with a maximum of $50,000, of either legally authorized budget limit or contract amount established by City Council can be approved by the Public Works Director. Change Orders that do not exceed 10%, with a maximum of $100,000, of either legally authorized budget limit or contract amount established by City Council are to be approved by the Mayor. Change Orders over $100,000 or exceed a total of 10% require Council Action. Denis Ryan Printed fed by: Approved: Mayor ,�^/ /l,_"_I• Attest: yc4cARRnnrd1s City Clerk N/A Council Approval Date https://skillings-my.sharepoint.com/personal/ileeskillings_com/Documents/20155 Port Orchard RAB/Mitchell Construction/Change Orders/Change Order #4 Bethel Ave Bethel Rd Lincoln Ave SE Mitchell Rd SE.docx Page 1