HomeMy WebLinkAbout09/16/2025 - Work Study - Additional Docs-General Sewer Plan Updateof Port Orchard
General Sewer Plan Update
City Council Meeting
September 16, 2025
4\ l'()Ilti()I'
.Y.V�+bt6�'°- +.rf.7oiio6i�—F__—,�.w`�a- _ir-7B,_T '.Y{' .•' rya
Consor Team Introductions
Erika Schuyler, PE, PMP
Project Manager
Adam Schuyler, PE, PMP
Principal -in -Charge, Technical
Advisor, Quality Management
General Sewer Plan Update
• Meets WAC 173-240-050
• General Overview
H T•••• • Next Steps
111111111
General Sewer Plan Update
WAC 173-240-050
• WAC 173-240-050
General sewer plan.
(1) All general sewer plans required of any governmental agency before providing sewer service are "plans" within the requirements of RCW 90.48.110. Three copies of the proposed general sewer plan and each amendment to it must be
submitted to and approved by the department before implementing the plan.
(2) The general sewer plan must be sufficiently complete so that engineering reports can be developed from it without substantial alterations of concept and basic considerations.
(3) The general sewer plan shall include the following information together with any other relevant data as requested by the department. To satisfy the requirements of the local government jurisdiction, additional information may be necessary.
(a) The purpose and need for the proposed plan.
(b) A discussion of who will own, operate, and maintain the systems.
(c) The existing and proposed service boundaries.
(d) Layout map including the following:
(i) Boundaries. The boundary lines of the municipality or special district to be sewered, including a vicinity map;
(ii) Existing sewers. The location, size, slope, capacity, direction of flow of all existing trunk sewers, and the boundaries of the areas served by each;
(iii) Proposed sewers. The location, size, slope, capacity, direction of flow of all proposed trunk sewers, and the boundaries of the areas to be served by each;
(iv) Existing and proposed pump stations and force mains. The location of all existing and proposed pumping stations and force mains, designated to distinguish between those existing and proposed;
(v) Topography and elevations. Topography showing pertinent ground elevations and surface drainage must be included, as well as proposed and existing streets;
(vi) Streams, lakes, and other bodies of water. The location and direction of flow of major streams, the high and low elevations of water surfaces at sewer outlets, and controlled overflows, if any. All existing and potential discharge locations should
I I be noted; and
(vii) Water systems. The location of wells or other sources of water supply, water storage reservoirs and treatment plants, and water transmission facilities.
(e) The population trend as indicated by available records, and the estimated future population for the stated design period. Briefly describe the method used to determine future population trends and the concurrence of any applicable local or
regional planning agencies.
(f) Any existing domestic or industrial wastewater facilities within twenty miles of the general plan area and within the same topographical drainage basin containing the general plan area.
(g) A discussion of any infiltration and inflow problems and a discussion of actions that will alleviate these problems in the future.
(h) A statement regarding provisions for treatment and discussion of the adequacy of the treatment.
(i) List of all establishments producing industrial wastewater, the quantity of wastewater and periods of production, and the character of the industrial wastewater insofar as it may affect the sewer system or treatment plant. Consideration must
be given to future industrial expansion.
(j) Discussion of the location of all existing private and public wells, or other sources of water supply, and distribution structures as they are related to both existing and proposed domestic wastewater treatment facilities.
(k)Discussion of the various alternatives evaluated, and a determination of the alternative chosen, if applicable.
(1) A discussion, including a table, that shows the cost per service in terms of both debt service and operation and maintenance costs, of all faciJities (existing and proposed) during the planning period.
(m) A statement regarding compliance with any adopted water quality management plan under the Federal Water Pollution Control Act as amended.
(n) A statement regarding compliance with the State Environmental Policy Act (SEPA) and the National Environmental Policy Act (NEPA), if applicable.
I'i'i'i
IiIiIiIiIi
ilililili General Sewer Plan Update
I I III I Overview
IlIlilIll
II I I Executive Summary
I I I f Introduction (Chapter 1)
111111111 Policies and Standards (Chapter 2)
111111111 Service Area Characteristics (Chapter 3)
11111111'
Population (Chapter 4)
Existing Sewer Facilities (Chapter 5)
ililililI Wastewater Flows (Chapter 6)
I 11111111 Sewer System Analysis (Chapter 7)
I I I I I I.. ' Capital Facilities Improvements (Chapter 8)
Financial Analysis (Chapter 9)
Operations and Maintenance (Chapter 10)
11111111 Reclaimed Water (Chapter 11)
111111111
'IllIllI'
k �Q
I
rynr nrl
dmonds
TiYFaC!
��� Sn#horrt�sny�_
[ IMF atf1 V
/ • Se 5Llgtlarnish %
Nn
Josewalllpe
Stslr park
•+ 14rr-WI7d
1l,{x 5�rdla 6alnbrl
!elf rgon
% Bell
M r.
Seattle
47
t
�
S
GrkP+
MnuiNeln 5[aw
8remertan
4
'
Faresr
n
dL �
116L
f
y
r r l
L f
ril
�Llr'Gn ®
Ilfl[8ri
yhon
•N .I
Pierce
oLioir
3pJl
Kent
II
a.
- Frrir..d Mn
—rt T�[ortla
i
O ED
C 5
i,;iln iii
10Mile6
ulrrersxyPla[a
Wgst"nterTreatment Plants
: 1 20 MiIa Ra4ius City of Port Orchard
IM County Consul General Scw-r Marl
Urba n C rowt h Area
L 7 City Boundary fir'}t
ARP Vicinity Map
General Sewer Plan Update
Overview — Introduction (Ch. 1)
Table 1-1 I Co piehensive Suer Pion R.ecl ements per WAC 173-240-1150
3a
Purpose and need for proposed plan
Section 1.2
3b
Who OWnsr operatesr and maintains system
Section 1.3
air
ExisCitrg and proposed servic=e boundaries
SeG-tipn S
Layout map showing boundaries; existing sewer facilities, proposed
1 3-3 3-5 - , ,
3d
sewers; topography and elevations; strearns, lakes: and other water
5 -lr and &
bodies; water systems
3e
Populationrrends
Sectiper4
•E
iistin$ domestic and/or industrial wastewater fail titles ithin 20
Fi ure 1-1
g
miles
3g
Infiltrators and inflow problems
Section 6.4
3h
Treatment systems and adequacy of such treatment
Section 5.7
31
Identify industrial wastewater sources
3j
Discussion of water systems
3k
Discussion of collection alternatives
31
Define construction cast and O&M costs
3m
ComplianeE with water quality rrra rragerltthnt plan
3n
$EPA Compliance
5ectJort 6.7
Section 3.9
Section 7
5e€tiosn 8
5426M 3.7
Aaaendix A
rrr
r. Oai.i .wmwi :Sr^fo1Rtr{h;m .i.yprn,inry.inn..l.,.rcrr,rsrrw.IR".MC"Ph.[ trip {,I.nlYarrlrrro.varmv P.Nr. s r,,k rnmmm.rn.m.n rrrnr.m1n r.r4Mrfln�Yh U+ .ohir...S
La..d M—AWn,0L LPJ hlJ. J5I W9:w..1d Hirs,..e .. 4irh&..t i -JM:`J
O G4id •r I. #}uwn' a1+P gr47 Sfi?, - Ic I.4tpn 11p nPf ✓•K11 r.Yi
R nyw—1,CPn.WLrd lhb CrlVUM1! orrhnra ].Nrlrin. Ph lPv ..pin. Y in r-rr Irq I,. ml P0 nee f. r.mpnlr.nel rr d Ir.rr.. ni Ph. rhlrrn.F"_n lnyr.TFrd-Pn. h.np i. heF.u.ln'Jlr
IrM 1 (efq+mhnrj '!a hri ?'p-'.rt.r!d 'trillrnlr!w nr P4-owy . 1111}.'KM
General Sewer Plan Update
Overview — Policies and Standards (Ch. 2)
1. City Goals for Sewer Service
2. Design Standards
3. Construction Standard
4. Pretreatment
5. Developer Sewer System Extensions and Upgrades
6. Grinder Systems
7. Septic to Sewer Conversion
G"ieral Sewer Plan Update
Overview — Service Area Characteristics (Ch. 3)
Fft hways
joa
nr Rods
y$ln ndary
oan G.nwt1 Arear€els
'L L4J1/ ... T -
/11111 --fir L._;
•t�
� � I
/J -.
.........
I- I `fir
Iii('
i r
� ri'�v. Yr.t �wro�raev�rv�ari xs.t �•_..�..�t'�.¢ _ { }M1 �F
•
v - ii
City of Port Orchsard
tills 1f -9- ? - [general Sewer Wan
h... I )'. •a
Urban Growth Arab
G S•000 Feet
L .J - ..I .1 .1 1
T:
- I
1. Land Use and Zoning
2. Topography
3. Geology
4. Streams and Water Bodies
5. Critical Areas
6. Endangered Species Habitat
7. Puget Sound Water Quality
Management Plan
8. Growth Management Act
9. Water Systems
General Sewer Plan Update
Overview — Population (Ch. 4)
1. Existing Population and Employment
2. Future Population and Employment
3. Projection Summary
General Sewer Plan Update
Overview — Existing Sewer Facilities (Ch. 5)
1. Existing and Planned Mini -
Basins
2. Existing Sewer Piping
3. Existing Lift Stations
4. Lift Station Condition
Assessment
i'I 1111111
''''I'll'
General Sewer Plan Update
Overview — Wastewater Flows (Ch. 6)
2.50
2.00 1. Existing Wastewater Flows
;'I 2. Wastewater Unit Flows
0 1.50 -I
3` • `
LL 3. Infiltration and Inflow
i \
'
1.00 4. Peaking Factors
5. Diurnal Curves
0.50 6. Industrial Connections
0.00 I I I I 7. Projected Wastewater Flows
OOP OOP OOP OOP Ope� .OO�� OO�� OO�� OOP
Dry Weather Sewer Infiltration/Inflow Infiltration/Inflow (Shifted)
iIiIiIiIi -oral Sewer Plan Update
' u I i I i I ! Overview —Conveyance System Analysis (Ch. 7)
1. Sewer Model Update &
Calibration
2. Future Sewer System
Expansion
3. Modeling Scenarios
4. Hydraulic Modeling Analysis
5. Capital Improvement Plan
Model Runs
.IiIiIiIi
''''I'll'
G"ieral Sewer Plan Update
Overview — Conveyance System Analysis (Ch. 7)
—
Highways
—
MajorRoads
[ }
Urban Growth Area
L
City Boundary
Parma E$
®WWTP
•
Lift Station
N
2044 DefiCrerlcy
Sewer Pipe
2044 Dehcie+icy
Buildout Dehcrerticy
LL
• w* J., rIM '77 r -%..', '•+... •..rr rp Ah ,..l
-I,.an fl +.
w ti wr.YY M S --
•
consor
ra.,..,-t. sn.
• hiefiorin ck Ylkage
I Ll f
J
M C rmlck r
Meanows J
MCC niiFtk
Woods #1
xfik
° �' library ii
!1 fir ,, — - P4arI r
- EdC}F2
Golder, pond
Tramom flare
Canyon CU r _______
I McCormick Pokfery
______
1 & 2 Woods 1 J__J Cedar Heights
H irr Icnn
Hospital
Eldon Trails
I r,
a)
City of Port Orchard
General Sewer Plan
! Meadows
Seagw�ck
Lodes •- +�___
System Deficiencies
it
Fs' •�`R ■�r�RiaR-if i
d •I1.iu:
wtrlrrnTI�#�sf ■ ■i 1
G"ieral Sewer Plan Update
Overview — Collection Facilities Improvements (Ch. 8)
— Highways I� l � # — -
Major Rpads J .
�' Urban Cirpvnh AreEj1
a r 4 f
City Bounda rV :: ' y I I
�— Sewer rams i _ I
Sewer CIP G 5
a lift Station - 7 -,
�1 lift Station CI P ✓` -S• - R;f
__ ___
i' .
..
!I7 j r'\L-_ 4' JA
a n G 51 16-11 I.^' Fs.
7
ll 6 1C
6- B i
_ G-9 I
Arty*Xwwrr6a.01 ii — —
•• K.*4'fiori5-06 )
. li .InuKan :..n .ca ..n.rrcn-� •4ru w yar COflSO • til rt...a •, �nrl i, .Hurt lrr�kt
1 t.cncM
City of Port Orchard 0 5=0 Feet
H&�P General Sewer Plan Six -Year CIPs I ,}
6 & 20 -Year CIPs
Categories:
• Replacement
• Upgrade
• Capacity
• O&M
• Obsolescence
• General
• Developer
G"ieral Sewer Plan Update
Overview — Collection Facilities Improvements (Ch. 8)
EFRiIWi!t
5-31Jy
'111111fr1q pfIII
ir'ir1j
!-- " ___
k irr__■■ter .,� --=
i ail:,;
__ r ___
# 111' ILL-�'
:
'I.: �.Is■ ?I_&Is ` �■ it
■ ; � Mme'=
I7 [rl l=mar ■II�.�
I711�v III - f ■�++++r i
I,Iuc��•M• 1LT�, ff.Er++ +1I ' __* 1111411iy�1 y y —
-Yusa✓___�—
General Sewer Plan Update
Overview — Collection Facilities Improvements (Ch. 8)
Vii+ �� ,■
,Iluuuiw iFf
�� lJrHFr
'!L1
a i1
- __
_ ■7 # aRual �=�
s -s ` "Li
1 _
___
ii
SCI.
I'IW.
i_ll ■
err rein= ��
■ -.. II —pow *R■■P■
ETI�.TSVlSi■JF:1iilITF.
iA
•
p: .- aflRli
�L S. Iite, ME
.� I1 " I Mill :
LIB I !:' ' IY:IINI-�I:IFIIrll
mis _
� �Jl� r� IIII� r•� j■ IIIIIIIT
��±rf+Ywur,n•�•-rl�l� ilt �-. ■{ Fly ` ,ry4;
] 'teas
yV411Y111�I�.=� �iJ•�11��pli I,iIYY ",�: yY4-�.y5
rnY�111J1re=` 1�■1i5�?:Cll�i� _ �:�.��•-'d'�r
_wUI1W11i11F IIZ'� WIFICogp ``h Ui ''; �. mkJ��
=1FJ41R1111111�=' � rllJ h�li. Hfl+� I }�Yi � _' IIYI I�
�y,Y 'ilY■14.liwl a�� �i�'. IIYrJMllhl�#�{ , � -frr ��.. -••�-
ur�� � �1� � uuua141 #U��Ya•si s 1 _ _ :� �� _ I!�
7RL HaRI]
General Sewer Plan Update
Overview — Financial Program (Ch. 9)
1. Financial Background
2. Financial Policies
3. Historical Financial Performance
4. Outstanding Debt
5. Current Rates and Charges
6. Capital Improvement Funding
7. Sewer Collection Facilities Improvement Funding
8. Six -Year Financial Plan
9. Projected Sewer Rates and Customer Bill Impact
Table 9-12 1 Sewer System Current and Projected Bi-Monthly Sewer Rates and Customer Bills
Effective date
Projected Rate Increase
Bi-Monthly Rate per Dwelling
Bi-Monthly Increase
1 -Jan -25 1 -Jan -26 1 -Jan -27 1 -Jan -28 1 -Jan -29 1 -Jan -30
3.50% 3.50% 3.50% 3.50% 3.50%
$163.00 $168.71 $174.61 $150.72 $187.05 $193.59
$5.70 $5.90 $6.11 $6.33 $6.55
Go*-%&*Nera1 Sewer Plan Update
Overview — Operations and Maintenance Program (Ch. 10)
1. City Management and Personnel
2. Operations and Maintenance Activities
3. Staffing Needs
4. Recommended O&M Improvements
I1kR3+.
OREMERTOr,,
�
�yprr S'aan[ ~x
Vf Wernar Rd .••
NPYE. 5hipyl,-I 4�.ti
lI V `( �• s1 F, i )
4
te'
r
I
FORT as
I0•F�CHARQ
a'E1 `L�_�
e
twoon 5EMurWI!I
GO5r
I—
r
r
I
0CHARD }�
Il
L
If
R
1II
an
y jr
III
rl
—
fir.
J ..
yi
.4
W
Vi
oC
.'r
D
9E I'.liiII n,r RG SE Uull.n,: It,.
1
F D
I
WFL P W OOD
2 `J00 L, '00 Fe t
i J
1°
I I ILLJFt
rcltap vraterReusc P$cllrty'
— wtui Reuso M2ir,S f City of Port Orchard
', UrbanGramthArea consor General Sewer Plan
r;,IY 3DUnd3ry
I I i HARD Declaimed Water
'-...'yJ_StJ i'} ar p tr .-,huul, Ru.ip i'IlI. 5-rir Uir[i '• '. ... .. llIFW--.tk •',+
' •
,,. i1I Ldr10110-Uqr l,r�5L JV 'WkVr6+.V$FY+5
MADE l 3 51.IMra W.,fii: Im Nnyh IP54® rmI
�a .�':,.." .u"wr,IW 7h,t,IxVh:A4rwla'rwti,r„•,rlw"'yll„1. IrewlN „'uar Y'd IIIfMIIRfLi 4r lhv 11116miilll+5tlLLp"ov, 7Fa I"vvo- ��w1 w'I„,•
General Sewer Plan Update
Overview — Reclaimed Water (Ch. 11)
One Mile of Reclaimed Water Distribution
Piping Constructed by the City and West Sound
Utility District in 2011.