HomeMy WebLinkAbout10/28/2025 - Regular - Additional Docs-SR and CO#10 for Marina Pump StationOng City of Port Orchard ORCHARD 216 Prospect Street, Port Orchard, WA 98366 1.. (360) 876-4407 • FAX (360) 895-9029 Agenda Staff Report Consent Agenda: Approval of Change Order No. 10 to Contact 059-23 with Stellar J Corporation for the Marina Pump Station Improvement Project. (Ryan) Meeting Date: October 28, 2025 Prepared By: Sayre Thompson, PW Procurement Specialist Presenter: Denis Ryan, CPWP-M, CPRP, Public Works Director Summary and Background: In 2020, the City initiated the Marina Pump Station Improvement Project to address capacity limitations and improve reliability at this critical facility, which conveys all of the City's wastewater to the South Kitsap Water Reclamation Facility. Following design and procurement, Contract No. C059-23 with Stellar J Corporation was executed on August 8, 2023, and construction has been underway since Winter 2023. This change order authorizes several scope adjustments necessary to maintain project progress and address field conditions encountered during construction. These include: • Replacement of an ineffective level transducer with a more suitable model (COR-029) • Concrete flatwork repairs with added rebar at structures (COR-031) • Demolition and replacement of an ADA ramp (COR-032) • Installation of additional air release valves (COR-035, estimated) • Addition of a backup pump fuel tank breather (COR-037) • A credit for the use of a diesel pump (COR-038) The total value of this change order is $300,107.79, inclusive of all applicable taxes, and it will extend the contract duration by 15 working days. Additional time may be required depending on the final installation schedule for the air release valves. With this change, the amended contract amount will be $15,861,587.99. The project team is currently targeting physical completion of the Marina Pump Station by November 6, 2025. Relationship to Comprenhensive Plan: Chapter 7 - Utilities Recommendation: Staff recommends the City Council authorize the Mayor to execute Change Order No. 10 to Contract No. C059-23 with Stellar J Corporation for the Marina Pump Station Improvement Project to increase the contract by $300,107.79, for a new contract total of $15,861,587.99 (applicable taxes included). Motion for Consideration: I move to authorize the Mayor to execute Change Order No. 10 to Contract No. C059-23 with Stellar J Corporation for the Marina Pump Station Improvement Project to increase the contract by by $300,107.79, for a new contract total of $15,861,587.99 (applicable taxes included). Has item been presented to Committee/Work Study? If so, which one: No Fiscal Impact: This change order will be funded from project contingency. The overall Marina Pump Station Project remains within budget, with sufficient authority provided in the adopted 2025-2026 biennial budget. Alternatives: Do not approve and provide further guidance. Attachments: C059-23-MarinaLS_CO#10 10.28.doc CITY OF PORT ORCHARD Authorization for Change Order No. 10 Date: 10/23/2025 Project: Marina Sewer Lift Station Contract / Job # C059-23 Contractor: Stellar J Corporation 1363 Downriver Drive Woodland, WA 98674 THIS CHANGE ORDER AUTHORIZES: A type of level transducer was found to be ineffective and will be replaced with a different type (COR29).Concrete flatwork repairs with added rebar at structures (COR-03 1), ADA ramp demo (COR-032), Added Air Release Valves (COR-035, Est.), Added backup pump fuel tank breather (COR-037), Credit for use of Deisel Pump (COR-038). $69,162.47 (COR-031) + $8,478.67 (COR-032) + 22, 939.67 (COR-035) + $165,680.34 (Est.) + $5,144.83 (COR-037) -$9,111.55 (COR-038) + $12,278.41 (COR029) _ $274,572.54 plus tax. 15 Working Days added. Additional days may be added for Air Release Valves. Also reflected is a reduction to Change Order No. 9, which has been finalized at a total cost of $66,693.03. Original Contract $13,621,175.00 $1,266,769.28 $14,887,944.28 08 -Aug -23 Council Change Order 1 $34,227.09 $3,183.12 $37,410.21 12 -Mar -24 PW Director Change Order 2 $64,253.03 $5,975.53 $70,228.56 12 -Mar -24 Council Change Order 3 $248,911.61 $23,148.78 $272,060.39 22 -Apr -24 Council Change Order 4 $69,072.20 $6,423.71 $75,495.91 12 -Nov -24 Council Change Order 5 $86,848.33 $8,076.89 $94,925.22 12 -Apr -25 Council Change Order 6 $13,097.30 $1,218.05 $14,315.35 14 -Apr -25 Director Change Order 7 $25,774.55 $2,397.03 $28,171.58 21 -Aug -25 Director Change Order 8 $13,024.40 $1,211.27 $14,235.67 26 -Aug -25 Mayor Change Order 9 61,018.33 $5,674.70 $66,693.03 09 -Sep -25 Council Change Order 10 274,572.54 $25,535.25 $300,107.79 23 -Oct -25 Council Total Contract $14,511,974.38 $1,349,613.61 $15,861,587.99 I have reviewed the Change Order information above and certify that to the best of my knowledge descriptions and costs are true and accurate. Contractor Approval Signature Printed Name & Title Public Works Director Denis Ryan Printed Name Change Orders that do not exceed 10%, with a maximum of $50,000, of either legally authorized budget limit or contract Approved: amount established by City Council can be approved by the Public Works Director. Change Orders that do not exceed 10%, with a maximum of Attest: $100,000, of either legally authorized budget limit or contract amount established by City Council are to be approved by the Mayor. Change Orders over $100,000 or exceed a total of 10% require Council Action. Mayor City Clerk Council Approval Date