HomeMy WebLinkAbout027-25 - General Mechanical, Inc. - Supplement / Change Order 1Authorization for Change Order No. 1 Date: 9/15/2024 Project: Melcher St. Pump Sta. Rehab Contract / Job # CO27-25 Contractor: General Mechanical, Inc. 2316 S State Street Tacoma, WA 98405 THIS CHANGE ORDER AUTHORIZES (add description). Additional Work/Constniction Change Directives: Work Change Directive 001- Asphaltic coaling on the exterior coaling of the DI pipe is directly buried. The DI pipe in the pump station will be in open and needs to be primed for the City to paint in the fixture. The cost of the CO is to change the exterior coating of the pipe. See Work Change Directive 001 for additional information. $2,100.00. Work Change Directive 002- Per RFI 002, the size of the service metering equipment and the generator connection box does not fit on the wall shown on E-201. Credit- Moving the generator connection cabinet to the new location will shorten the length of conduit and wire required. Addition- Moving the main fuse disconnect up above the pump station has increased the conduit and wire lengths, both cabinets will require additional strut stands to be built. See RFI 001 for additional information and COP for cost break out. $7,300.00. Change Order#1 1 Totals- $10,274.20 w/ tax. _•� ,v.,-.:ip'.:+eo"•S:ic ,L. s'3i• "';+a :v�+s�,l-stit:. :5••n'rF',:A :_�'... •g,.Y ..>,: CAr≥itr•act istor, ��r : ^. :.a:':?: E '.J•" =i.'1'�t Vii': �{ ': ��r�"• 'vp.S,, . ..i' "' ti�Y.� ', �i ��•e� yw, .\`� i.L -, •s.. j F,: ,yy;;{��,,.. :a .,' ;:73'3; ,p..,2 i.�.°' ,- A.:-sti �;�,::.F.:.:,.,.�•,�..: ,,..,':i::;;�:..;:�:: ;w.... unt :SalesTax" , ;� r: Total:� :;::..�r.. :�Da[e �-,:�;.d�. .f: _•s, ,�;.,;.,,;. Ap pvd=b .:., Original Contract $715,300.00 $66,522.90 $781,822.90 25 -Feb -25 Council Change Order 1 $9,400.00 $874.20 $10,274.20 16 -Sep -25 PW Director Total Contract $724,700.00 $67,397.10 $792,097.10 I have reviewed the Change Order information above and certify that to the best of my knowledge descriptions and costs are true and accurate. Contractor Approval Signature )JSo zruc- 7"4 Printed Name & Title Public Works Director j1 c Printed Name Change Orders that do not exceed 10%, with a maximum of $50,000, of either legally authorized budget limit or contract Approved: amount established by City Council can be approved by the Public Works Director. Change Orders that do not exceed 10%, with a maximum of Attest: $100,000, of either legally authorized budget limit or contract amount established by City Council are to be approved by the Mayor. Change Orders over $100,000 or exceed a total of 10% require Council Action. Mayor City Clerk Council Approval Date