046-18 - Resolution - Realing Resolution 030-17 and Establishing Fee Scheduled for DCD and PWRESOLUTION NO. 045.18
A RESOLUT ON OF THE CITY OF PORT ORCHARD, WASHINGTON REPEALING
RESOLUTION NO. 030.17 AND ESTABLISHING FEE SCHEDULES FOR THE
DEPARTMENTS OF COMMUN TY DEVELOPMENT AND PUBLIC WORKS
WHEREAS, the City of Port Orchard is responsible for implementing land use regulations,
planning and public works requirements, administering the building code, and other
administrative duties; and
WHEREAS, there are costs associated with the implementation of city regulations and
policies; and
WHEREAS, the City's current Community Development and Public Works Departments
administrative fees were adopted in May 2OL7 as set forth in Resolution No. 030-17; and
WHEREAS, the City Council deems it in the best interest of the City of Port Orchard to
periodically review and update the City's administrative fees, now, therefore;
THE CITY COUNC L OF THE C TY OF PORT ORCHARD, WASH NGTON HEREBY RESOTVES
AS FOLLOWS:
1. Resolution No. 030-17 is hereby repealed in its entirety.
2. The fees that will be charged by the Community Development and Public
Works Departments for the specified services are listed in Exhibit"A".
3. Fees not listed in Exhibit "A" will be determined by the City Council.
4. The fees listed in Exhibit "A" shall take effect on October 15, 2018.
PASSED by the City Council of the City of Port Orchard, APPROVED by the Mayor and
attested by the Clerk in authentication of such passage this 25th day of September 2018.
Robert nsuu, Mayor
ATTEST:
Brandy Rinearsofl, MMC, City Clerk
1
Exhibit A to Resolution 046-18
A. General
1. No permit shall be issued, application accepted, service provided, or appeal filed without
payment of the applicable fee set forth below.
2. References to the director refer to the director of the Department of Community Development
or his/her designee.
3. When an application includes the submittal of special reports and/or plans such as habitat
management plans, geotechnical reports, or traffic impact analyses requiring review beyond the
capabilities of city staff, the applicant shall be required to pay the actual cost of 3rd party review
by qualified consultants under contract with the city. Upon determining that 3rd party review of
special reports or plans is required, the city will obtain a fee estimate from its consultant and
provide that estimate to the applicant and request payment to the city.
4. Some projects require more than one permit. In some cases a project will require the payment
of numerous fees from the tables below.
5. Each building, plumbing, mechanical, planning and land use, and public works
permit/department review fee shall be assessed a technology fee surcharge of $10.00 to cover
the cost of the purchase and ongoing maintenance of the City’s SMARTGov permitting system
which was put into use in November of 2014. No technology fee refund shall be issued once the
permit/review has been entered into the system.
6. No inspections, including final inspections, will be scheduled or performed until all outstanding
fees are paid.
7. Refunds: The hourly rate used to calculate a deduction to a refund shall be $75 per hour.
a. Building Permit fees:
Refunds shall be issued at an amount equal to the permit fee less actual time and
materials spent on the project; provided no refund shall exceed 80% of the initial
permit fee for a permit that was issued by the City. If the permit fee was paid and a
refund was requested prior to permit issuance, 100% of the permit fee may be
refunded.
b. Plan Review Fees:
If an application is withdrawn, cancelled or returned prior to issuing a building
permit, a refund shall be issued to an amount equal to the plan review fee less
actual time and materials spent on the project, provided no refund shall exceed 80%
of the plan review fee. Plan review fees are non-refundable once the plan review
has been completed or if the permit has been issued.
c. Other Permit/Application fees:
Refunds for Land Use permits and other permit application types may be authorized
by the director. Refunds shall be issued at an amount equal to the permit fee less
actual time and materials spent on the project; provided no refund shall exceed 80%
of the initial permit fee.
8. All recording fees for approvals issued by the city shall be paid by the applicant.
B. Building, Plumbing, and Mechanical Fee Policies
1. Failure to pay established fees may result in one or more of the following:
• Per Section 109.4 of the IBC, any person who commences any work on a building,
structure, electrical, gas, mechanical or plumbing system before obtaining the necessary
permits shall be subject to an additional fee equal to the required permit cost in
addition to the underlying permit costs.
2
• No temporary or final certificate of occupancy will be approved or issued for a project
with any outstanding fees on any permit associated with the project.
2. Some signs require a building permit in addition to a land use (sign) permit. In these instances,
the permit fees are additive meaning that an applicant may be required to obtain a sign permit
and a building permit.
3. Minor revisions to plans which were previously reviewed and approved by the city shall be
reviewed at a cost of $75 per hour with a minimum of 1 hour billed.
4. Valuation for Table 1 shall be determined using the IBC Building Valuation Data Table (BVD)
(currently the August 2016 table as attached hereto) except as noted in the BVD Table and when
otherwise noted in Tables 2 and 3.
5. Per 2015 IBC 109.3, the applicant for a permit shall provide an estimated construction value at
the time of application. The amount shall be rounded up to the next whole dollar. The amount
shall include the fair market value of any donated, contributed or found labor and/or materials.
Construction value calculated on 100 square feet shall be rounded up to the next 100 square
feet for any portion thereof.
6. Single family home builders who wish to reuse a plan set to construct more than one home
using the same plan set may do so by utilizing a “basic plan” review process. When an applicant
wishes to establish a basic plan set for reuse, the plans shall initially be reviewed upon payment
of the city’s standard plan review fee. Once plan review is complete and if the City finds that the
plans conform to the requirements of the Building Code, the plans shall be approved as a basic
plan set and marked as such for reuse. For each use of the plan, the applicant shall pay a
reduced plan review fee as established in Table 3 in lieu of the full plan review fee. The use of
an approved basic plan set shall have no effect on the building permit fee (only the building
permit plan review fee). Plans may not be reused if the city’s building code has been updated
unless the plans have been re-reviewed (upon payment of the full plan review fee) and
approved for conformance with the updated building code.
TABLE 1:
Total Valuation FEES (Permit Fee = 100% Plan Review Fee = 65%)
$1 to $500 $36.00
$501 to $2,000
$36.00 for the first $500 plus $4.00 for each additional $100,
or fraction thereof, to and including $2,000
$2,001 to $25,000
$96.00 for the first $2,000 plus $17.00 for each additional
$1,000, or fraction thereof, to and including $25,000
$25,001 to $50,000
$487.00 for the first $25,000 plus $12.00 for each additional
$1,000, or fraction thereof, to and including $25,000
$50,001 to $100,000
$787.00 for the first $50,000 plus $9.00 for each additional
$1,000, or fraction thereof, to and including $100,000
$100,001 to $500,000
$1,237.00 for the first $100,000 plus $7.00 for each
additional $1000, or fraction thereof, to and including
$500,000
$500,001 to $1,000,000
$4,037.00 for the first $500,000 plus $6.00 for each
additional $1,000, or fraction thereof, to and including
$1,000,000
$1,000,001 and up
$7,037.00 for the first $1,000,000 plus $5.00 for each
additional $1,000, or fraction thereof
TABLE 2:
3
Residential Single Family
Building Permit Type Amount
Unit of
Measure
Finish an existing basement $82.95 square foot
Conversion of an existing garage to residential space $59.79 square foot
New, repair, or alteration or addition to deck, uncovered $13.04 square foot
New Foundation only or under existing structure $13.04 square foot
New garage, shed, barn, or pole building (attached or detached) $38.16 square foot
Covered porch, covered deck; new, alteration, repair, or cover added $21.07 square foot
New, remodel, or repairs to freestanding roof structures and carports,
other than porch or deck $21.07 square foot
Residential Interior Remodel $19.67 square foot
TABLE 3:
Miscellaneous:
Building Permit Code Amount
Unit of
Measure
Shoreline bulkhead walls $118
Per Linear
Foot
Demolition $65 Each
Fences over 6 feet in height $11.74
Per Linear
Foot
Retaining walls $19.67
Per Linear
Foot
Re-inspection $65 Each
Fire Alarm, new or alterations to existing
Apply
Construction
Value to
Table 1
Construction
value
(contract
price or
materials x 2)
Fire Sprinkler, new or alterations to existing
Apply
Construction
Value to
Table 1
Construction
value
(contract
price or
materials x 2)
Fire Suppression System
Apply
Construction
Value to
Table 1
Construction
value
(contract
price or
materials x 2)
Tank: Underground or Above Ground, Installation or Removal
Apply
Construction
Value to
Table 1
Construction
value
(contract
price or
materials x 2)
Temporary Tent & Membrane Structures $65 Each
Pyrotechnics Special Effects $65 Each
4
Roof : Hot Mop/Cold Mop (flat roof)
Apply
Construction
Value to
Table 1
Calculate
construction
value at $90
per 100 SQ FT
Roof: Composition, Metal
Apply
Construction
Value to
Table 1
Calculate
construction
value at $70
per 100 SQ FT
Roof: Wood Shake
Apply
Construction
Value to
Table 1
Calculate
construction
value at $140
per 100 SQ FT
Roof: Concrete, Tile, Slate
Apply
Construction
Value to
Table 1
Calculate
construction
value at $140
per 100 SQ FT
Roof: Torch Down
Apply
Construction
Value to
Table 1
Calculate
construction
value at $90
per 100 SQ FT
Residential Misc.
Apply
Construction
Value to
Table 1
Construction
value
(contract
price or
materials x 2)
Commercial Tenant Improvement and Misc.
Apply
Construction
Value to
Table 1
Construction
value
(contract
price or
materials x 2)
Tenant Certificate of Occupancy for new business; All other C of O
included in building permit fee. $65 Each
Revised Certificate of Occupancy for business name or ownership change,
or property ownership change. $50 Each
Manufactured or mobile home placed on lot or first time placement in
MH park $130 Each
Manufactured or mobile home replacement in MH park $65 Each
Expired Permit Reactivation, no plan changes
50% of
original fee
Posted Stop Work $65
Each
occurrence
Sign (when a building permit is required)
Apply
Construction
Value to
Table 1
Construction
value
(contract
price or
materials x 2)
Carport or Canopy, pre-fab kit installation $100 Each
Siding or Re-siding
Apply
Construction
Calculate
construction
5
Value to
Table 1
value at $70
per 100 SQ FT
Solar energy/photovoltaic panel system roof mounted install per WAC 51-
51-2300 Sec. M2302 $135 Each
Single Family Residential plan review using a basic plan on a site specific
lot $225 Each
Windows or Doors
Apply
Construction
Value to
Table 1
Construction
value
(contract
price or
materials x 2)
Plumbing Permit Fees
Plumbing permit fees shall be calculated using the commercial and residential schedules in Tables 4 and
5 below.
TABLE 4:
Commercial Plumbing Permit Fees
Commercial Plumbing Fixtures Fee Per
Base Fee Applied to All Plumbing Permits $23.50 Flat Fee
Backflow protective device 2 inches or less $9.80 Each
Backflow protective device larger than 2 inches $15.00 Each
Clothes Washing Machine $9.80 Each
Dish Washer $9.80 Each
Drainage Pipe or Vent Pipe Repair or Alteration $9.80 Each
Drinking Fountain $9.80 Each
Floor Drain $9.80 Each
Hose Bibbs, each $1.00 Each
Industrial/Sand Oil Interceptor $9.80 Each
Grease Interceptor $9.80 Each
Lawn Sprinkler System with Backflow Device $9.80 Each
Medical Equipment / Kidney Machine $9.80 Each
Medical Gas, each additional outlet in excess of first 5 $5.00 Each
Medical gas system up to 5 outlets $50.00 Each
Misc. Plumbing fixtures on one trap $9.80 Each
Roof Drain $9.80 Each
Sink (Lavatory, Kitchen, Mop, or Bar Sink) $9.80 Each
Floor Sink and /or Indirect Waste $9.80 Each
Multi - Compartment Sink $9.80 Each
Shampoo Sink w/interceptor $9.80 Each
Toilet, Water Closet, Bidet, or Urinal $9.80 Each
Tub and/or Shower $9.80 Each
Water Heater $9.80 Each
Water Pipe Repair and/or Alteration $9.80 Each
Other $9.80 Each
Exterior underground water line, repair or replace $50.00 Each
Exterior underground sewer line, repair or replace $50.00 Each
6
TABLE 5:
Residential Plumbing Permit Fees
Residential Plumbing Fixtures Fee Per
Base Fee applied to all Plumbing Permits $23.50 Flat Fee
Clothes Washer $7.00 Each
Dishwasher $7.00 Each
Floor Drain $7.00 Each
Hose Bibb $1.00 Each
Hot Tub $14.80 Each
Lawn Sprinkler with backflow preventer $7.00 Each
Sink (Lavatory, Kitchen, Mop) $7.00 Each
Tub with or without shower, or shower $7.00 Each
Toilet, Bidet or Urinal $7.00 Each
Water Heater $7.00 Each
Other $7.00 Each
Exterior underground water line, repair or replace $50.00 Each
Exterior underground sewer line, repair or replace $50.00 Each
Mechanical Permit Fees
Mechanical permit fees shall be calculated using the commercial and residential schedules in Tables 6
and 7 below.
TABLE 6:
Commercial Mechanical Permit Fees
Commercial Mechanical Fixtures Fee Per
Mechanical Permit Base Fee $23.50 Flat Fee
Air-Handling Unit < 10,000 CFM $14.80 Each
Air-Handling Unit > 10,000 CFM $18.10 Each
Class 1 Hood & Duct Systems $10.65 Each
Class 2 Hood & Duct Systems $10.65 Each
Clothes Dryer with exhaust $10.65 Each
Compressors $14.70 Each
Cook stove with exhaust $10.65 Each
Ducting Change without New Furnace $13.70 Each
Evaporative Coolers, permanently installed $10.65 Each
Fan for Bath and/or Exhaust Fan $7.25 Each
Commercial Furnace & Ducting < 100,000 btu $14.80 Each
Commercial Furnace & Ducting > 100,000 btu $18.20 Each
Combo Gas pipe / Water Heater / Furnace $35.45 Each
Fuel System Outlets in excess of the first 4 $2.00 Each
Fuel Pipe System LPG, Natural Gas, OIL (first 4 outlets) $10.65 Each
Miscellaneous Mechanical Equipment $10.65 Each
Mechanical System Pumps (Misc.) $10.65 Each
Radiant Heat Units (wall, ceiling, floor, recessed, etc.) $10.65 Each
Unit Heater Suspended or Floor Mount $14.80 Each
Gas Water Heater Vent & Combustion Air $10.65 Each
7
Propane tank over 2000 gallons $10.65 Each
TABLE 7:
Residential Mechanical Permit Fees
Residential Mechanical Fixtures Fee Per
Base Fee applied to all Mechanical Permits $23.50 Flat Fee
Bath Fan and or Exhaust Fan $7.25 Each
Clothes Dryer w/exhaust $10.65 Each
Cook Stove w/exhaust $10.65 Each
Furnace Electric / Heat Pump/AC +/- ducting $14.80 Each
Fireplace - Gas or Gas log inserts $12.00 Each
Fireplace - Wood or Wood Stove $12.00 Each
Furnace Propane +/-Ducting $14.80 Each
Gas WH Vent and Combustion Air $10.65 Each
Fuel Pipe System LPG, Natural Gas, Oil $10.00 Each
Heater, Wall or Baseboard $10.65 Each
Misc. Mechanical Equipment $10.65 Each
Furnace Natural Gas +/- Ducting $14.80 Each
Propane Furnace +/- Ducting $14.80 Each
Propane Fuel Tank Under 2000 Gallons $10.65 Each
Generator $10.65 Each
C. Planning and Land Use Fees
The planning and land use permit fees listed in the tables below shall be paid at the time an application
is submitted to the city unless otherwise specified. Fees are based on an hourly rate of $75.00.
TABLE 8:
Subdivision
Short Subdivision, Preliminary $1,100
Short Subdivision, Final $600
Short Subdivision, Preliminary Amendment or
Alteration $500
Short Subdivision, Final, Vacation or
Alteration $500
Preliminary Subdivision Plats 5-20 lots $2,000 plus Hearing Examiner Fee
Preliminary Subdivisions Plats 21+ Lots $2,000 + $50 Per Lot plus Hearing Examiner Fee
Planned Residential Development Review per
POMC 20.34.200
$500 plus associated Preliminary Subdivision
Plat Fee
Minor Modifications to a Preliminary Plat $500
Major Modifications to a Preliminary Plat, 5-
20 lots $2,000 plus Hearing Examiner fees
Major Modifications to a Preliminary Plat,
21+ lots $2,000 + $50 per lot plus Hearing Examiner fees
Boundary Line Adjustment $200
Final Plat $1,000 + 50 Per Lot
8
Final Plat, vacation or alteration $1,000 + $50 per lot plus Hearing Examiner fees
Preliminary Binding Site Plan $1,100
Preliminary Binding Site Plan, Alteration $500
Final Binding Site Plan $600
Final Binding Site Plan, Alteration or Vacation $500
TABLE 9:
SEPA
Project Checklist Review and Threshold
Determination $300
Non-Project Checklist Review and Threshold
Determination $300
Environmental Impact Statement Preparation Actual Cost, See SEPA Ord.
Environmental Impact Statement Review Actual Cost, See SEPA Ord.
SEPA Appeal Fee* $450
TABLE 10:
Shoreline Permits
Administrative Shoreline Substantial
Development Permit $600
Shoreline Substantial Development Permit $900 plus Hearing Examiner Fee
Shoreline Exemption (Letter) $150
Shoreline Conditional Use Permit $1,275 plus Hearing Examiner Fee
Administrative Shoreline Conditional Use
Permit $600
Shoreline Variance $1,275 plus Hearing Examiner Fee
Administrative Shoreline Variance $600
TABLE 11:
Land Use Permits
Administrative Conditional Use Permit $600
Conditional Use Permit $1,275 plus Hearing Examiner Fee
Critical Areas Exemption Request $75
Rezone (without Comp Plan Amendment) $1,275plus Hearing Examiner fee
Temporary Use Permit $150
Temporary Use Permit Extension $150
Variance Administrative $600
9
Variance $1,275 plus Hearing Examiner Fee
Variance, View Protection Overlay District $1,275 plus Hearing Examiner fee
View Protection Overlay District Exemption $100
TABLE 12:
Other Review
Request for a statement of restrictions per
RCW 35.21.475 $75
Administrative Interpretation (POMC
23.40.030)
$75 minimum, an additional deposit may
be required if city attorney review is
required, any city attorney expenses
related to an application for an
administrative application shall be paid by
the applicant prior to issuance of a decision
Pre-Application Meeting
$150 (100% is credited to a land use
application if filed within 12 months)
Development Agreements
$1,000 Deposit, which will be applied to the
city’s costs including city attorney fees
regardless of whether a development
agreement is approved
Comp Plan Amendment (Text) $500
Comp Plan Amendment (Map) $1,875
Forest Practices Application (Local Approval) $300
Landscape Plan Review Minor $225
Landscape Plan Review Major (Subdivisions
with more than 20 lots, Developments larger
than 20,000 square feet in area) $600
Other Appeal Fee* $450
Tax Abatement Exemption Application $1,500.00
Zoning Verification Letter $75
* Any appeal statement must be filed on the deadline established in the City's code relating to the
specific appeal, together with a certified check in the amount of the appeal fee (which shall include the
fee set forth in the fee Resolution, plus the hearing examiner's fees charged to the City on the appeal),
which appeal fee shall be returned to the appellant if the decision of the City is not sustained by the
hearing examiner. If the hearing examiner sustains the decision, the appeal fee will be applied to any
fees charged by the hearing examiner on the decision or appeal. If the City Council is the decision-
maker on the appeal, only the appeal fee shall be charged. If any appellant believes that the payment of
the appeal fee creates a financial hardship, it shall submit a request for an appeal waiver with the appeal
statement on or before the deadline established in the City's code relating to the specific appeal. This
request for an appeal waiver shall describe the appellant's financial situation and why payment of the
appeal fee creates a financial hardship. As an example, the appellant may provide evidence that the
appellant resides in a low-income household, which would include a single person, family or unrelated
persons living together, whose adjusted income is less than eighty percent of the median family income,
adjusted for household size, for Kitsap County.
Signs Permits
10
Signs may also require a building permit. See B.4 and Table 3.
TABLE 13:
Sign Permits
A-Board Sign $25
Permanent Sign $50
Comprehensive Sign Plan (Sign Program) $500
Placement of WSDOT directional sign $75
Books/Maps/Optical Discs/Other
TABLE 14:
Books/Maps/Optical Discs/Other
Copies of Codes and Standards on Disc $5
Photocopies 11x17 and smaller (in house copying);
Refer to POMC 1.18.070 for public records requests
$0.15 per page black and white or $1 per
page color
Map Scanning if above 11x17 $3
Print Jobs on Plotter
$3 per linear foot or portion thereof (36"
width)
In house binding of documents (plastic spine)
(which are also printed in house) $15
In house binding of documents (3 ring binder)
(which are also printed in house) $10
GIS Data and Custom Maps $75 per hour to produce, minimum 1 hour
Public Notice signs Actual cost + 25%
Mailing fee for Developer’s issued permit package USPS Priority Flat Rate + 25%
D. Public Works Department Fees
The Public Works Department permit fees listed in the tables below shall be paid at the time an
application is submitted to the city unless otherwise specified.
TABLE 15:
Public Works Department Permits and Fees
Public Works Cost Note
Minor Land Disturbing Activity Review and
Permit (disturbances of less than 1,000
square feet) $50
No more than one
minor LDAP may be
issued for the same
property (parcel
and/or address) in any
365 day period.
Land Disturbing Activity Permit Plan
Review
$100 for the first acre of
disturbance + $25 for each
additional acre of
Disturbance above 1 acre.
Area to be rounded up to
(Paid at the time of
application submittal –
covers Land Disturbing
Activity plan review
costs). Acres of
11
the next higher acre. $100
minimum fee.
disturbance should be
rounded to the nearest
acre.
Land Disturbing Activity Permit
$100 for the first acre of
disturbance + $50 for each
additional acre of
Disturbance above 1 acre.
Area to be rounded up to
the next higher acre. $100
minimum fee.
(Paid at time of permit
issuance – covers Land
Disturbing inspection
costs). Acres of
disturbance rounded to
the nearest acre.
Stormwater Drainage Permit Plan Review
$100 for the first 3,000
square feet of new and
replaced hard surface to be
constructed + $25 for each
additional 3,000 square feet
or fraction thereof of hard
surface to be constructed.
$100 minimum fee.
(Paid at the time of
application submittal –
covers hard surface
and stormwater
improvement plan
review costs).
Stormwater Drainage Permit
$100 for the first 3,000
square feet of new and
replaced hard surface to be
constructed + $50 for each
additional 3,000 square feet
or fraction thereof of hard
surface to be constructed.
$100 minimum fee.
Stormwater Drainage
Permit (Paid at time of
permit issuance –
covers hard surface
and stormwater
inspection costs)
Street Use Permit Application Fee $50
Street Signs (provided by the city) Actual Cost +25%
Plan Revision Review to Approved Permit
Drawings $100
Per hour of required
plan review.
Latecomer Agreement Review Fee $500 Deposit
The applicant shall pay
the actual fee,
including city attorney
costs, for preparing the
latecomer agreement
ROW Permit (Includes the first 100 Linear
Feet of excavation / trenching) $50 ROW excavation / trenching, for every 300
Linear Feet or portion thereof after the
first 100 Lin. Ft. $10
Work without a Permit - Penalty Permit fee is doubled
Violator must obtain
the required permit
and pay twice the
normal permit fee
TABLE 16:
Street Vacations
Street Vacation Petition Fee $120
12
Street Vacation Appraisal Fee (Refundable
Deposit)
$500 Deposit, Petitioner shall pay the actual cost
of the appraisal.
TABLE 17:
Impact Fee Deferrals (POMC 20.182.110(4))
Application for Impact Fee Deferral $300 minimum
Lien release for Impact Fee Deferral $300 minimum
TABLE 18:
Residential Parking Permits
Residential Parking Permit $10
Replacement Parking Permit $5
Temporary Residential Parking Permit $10
Bed and Breakfast Parking Permit $10
TABLE 19: Concurrency Review (POMC 20.180)
1. Concurrency (Capacity Reservation Certificate) applications fees shall be based on the following table.
Each type of application (Transportation, Water, or Sewer) shall include payment of an application fee
(A) plus any consultant fees charged to the city (B or C) for concurrency review as applicable.
Type of Review A
Application Fee (also
the total review fee for
applications reviewed
in house by the City)
B
Review Performed by
Consultant –
Application submitted
after a scope and fee
has been obtained
C
Review Performed by
Consultant –
Application submitted
prior to obtaining
scope and fee (Deposit)
Transportation $150 The applicant shall pay
the amount shown in
the scope and fee
provided by the City’s
Consultant.
$1000 Deposit, the
actual fee for
concurrency review to
be paid by the
applicant
Water $150 The applicant shall pay
the amount shown in
the scope and fee
provided by the City’s
Consultant.
$1000 Deposit, the
actual fee for
concurrency review to
be paid by the
applicant
Sewer $150 The applicant shall pay
the amount shown in
the scope and fee
provided by the City’s
Consultant.
$1000 Deposit, the
actual fee for
concurrency review to
be paid by the
applicant
2. The Director of Public Works shall make all determinations as to whether an application be reviewed
by the city or be sent to the consultant for review.
3. When a deposit is required pursuant to the above table, the deposit shall be applied to the actual fee
incurred by the city. Any balance owed shall be paid prior to the issuance of a concurrency certificate.
E. Fire District Review and Inspection Fees.
13
A surcharge on the permit types identified in Tables 20 - 24 shall be collected if Fire District review
and/or inspections take place. The minimum fee shall be $100 except where specified in the tables. The
fee shall be paid at the time the permit is issued unless otherwise specified.
TABLE 20:
BUILDING PERMITS
Type Amount
Commercial Addition $150
New Commercial Building $400
Tenant Certificate of Occupancy $75
New Cell Tower $150
Commercial or Government Miscellaneous $150
Minor Tenant Improvement: for projects with a
construction value under $6,000
$75
Major Tenant Improvement: for projects with a
construction value of $6,000 or higher
$250
Demolition $75
Commercial Waterfront $150
New Residential: Single family, ADU, Duplex $100
New Multi-family: Triplex and above $250
Residential Certificate of Occupancy $75
Other Permit Types with Flat Fees $100
TABLE 21:
FIRE CODE PERMITS
Type Amount
Fire Alarm $400
Fire Sprinkler $400
Fire Suppression System $400
Temporary Tent or Membrane Structure $400
Tank Install $400
Tank Decommission $400
High Pile Storage $400
Fire Code permit projects which are identified as highly complex shall be reviewed by a consultant
under contract services. In addition to the fee listed above, the consultant fee shall be paid by the
applicant and is due when the permit is issued.
TABLE 22:
14
LAND USE PERMITS
Type Amount
Boundary Line Adjustment $250
Conditional Use Permit $250
Preliminary Plat or alteration of $250
Final Plat or alteration of $250
Final Binding Site Plan or alteration of $250
Shoreline: Substantial Development, Conditional
Use, Variance
$250
Short Plat: Preliminary or Final $250
Variance $250
Comprehensive Plan Amendment $250
Zone Reclassification (Rezone) $250
TABLE 23:
PUBLIC WORKS PERMITS
Type Amount
Land Disturbance Activity Permit and/or
Stormwater Drainage Permit (This fee shall not be
charged more than once per project if the
permits are issued simultaneously)
$250
Right-of-Way $75
Other Permit Types with flat fees $100
TABLE 24:
OTHER
Type Amount
Formal Pre-Application Conference
(not credited towards a future application fee)
$150
Cabaret License $100
Carnival License $100
Event Permit $100
Liquor or Marijuana License $100
Pawn Broker $100
Street Use Permit Application fee $50
15
Building Valuation Data – February 2018
Important Points
• The BVD is not intended to apply to alterations or repairs to existing buildings. Because the scope of alterations
or repairs to an existing building varies so greatly, the Square Foot Construction Costs table does not reflect
accurate values for that purpose. However, the Square Foot Construction Costs table can be used to determine
the cost of an addition that is basically a stand-alone building which happens to be attached to an existing
building. In the case of such additions, the only alterations to the existing building would involve the attachment
of the addition to the existing building and the openings between the addition and the existing building.
• The Square Foot Construction Cost does not include the price of the land on which the building is built. The
Square Foot Construction Cost takes into account everything from foundation work to the roof structure and
coverings but does not include the price of the land. The cost of the land does not affect the cost of related code
enforcement activities and is not included in the Square Foot Construction Cost.
Square Foot Construction Costs a, b, c, d
Group (2015 International Building Code) IA IB IIA IIB IIIA IIIB IV VA VB
A-1 Assembly, theaters, with stage 239.41 231.54 226.03 216.67 203.74 197.86 209.82 186.11 179.13
A-1 Assembly, theaters, without stage 219.07 211.20 205.68 196.33 183.65 177.76 189.48 166.01 159.03
A-2 Assembly, nightclubs 188.23 182.77 178.14 170.93 161.13 156.68 164.92 145.88 140.94
A-2 Assembly, restaurants, bars, banquet halls 187.23 181.77 176.14 169.93 159.13 155.68 163.92 143.88 139.94
A-3 Assembly, churches 220.05 212.18 206.66 197.31 185.99 180.11 190.46 168.36 161.38
A-3 Assembly, general, community halls, libraries,
185.05 177.18 170.67 162.31 148.58 143.75 155.46 131.00 125.02
A-4 Assembly, arenas 218.07 210.20 203.68 195.33 181.65 176.76 188.48 164.01 158.03
B Business 192.02 185.04 179.30 170.56 155.93 150.11 164.01 137.00 131.05
E Educational 197.52 190.73 185.77 177.32 165.32 156.97 171.23 144.39 140.26
F-1 Factory and industrial, moderate hazard 114.08 108.82 102.59 98.59 88.51 84.45 94.44 74.21 69.43
F-2 Factory and industrial, low hazard 113.08 107.82 102.59 97.59 88.51 83.45 93.44 74.21 68.43
H-1 High Hazard, explosives 106.73 101.48 96.25 91.25 82.38 77.32 87.10 68.08 0.00
H234 High Hazard 106.73 101.48 96.25 91.25 82.38 77.32 87.10 68.08 62.30
H-5 HPM 192.02 185.04 179.30 170.56 155.93 150.11 164.01 137.00 131.05
I-1 Institutional, supervised environment 191.30 184.81 179.46 171.90 158.36 154.06 171.99 141.86 137.45
I-2 Institutional, hospitals 321.25 314.27 308.52 299.78 284.17 0.00 293.24 265.24 0.00
I-2 Institutional, nursing homes 222.99 216.01 210.27 201.52 187.89 0.00 194.98 168.96 0.00
I-3 Institutional, restrained 218.28 211.30 205.55 196.81 183.43 176.62 190.27 164.50 156.55
I-4 Institutional, day care facilities 191.30 184.81 179.46 171.90 158.36 154.06 171.99 141.86 137.45
M Mercantile 140.27 134.81 129.18 122.96 112.68 109.23 116.95 97.44 93.50
R-1 Residential, hotels 193.08 186.60 181.24 173.68 159.89 155.58 173.77 143.39 138.97
R-2 Residential, multiple family 161.95 155.46 150.10 142.54 129.52 125.22 142.64 113.02 108.61
R-3 Residential, one- and two-family 151.10 146.99 143.20 139.61 134.50 130.95 137.27 125.85 118.45
R-4 Residential, care/assisted living facilities 191.30 184.81 179.46 171.90 158.36 154.06 171.99 141.86 137.45
S-1 Storage, moderate hazard 105.73 100.48 94.25 90.25 80.38 76.32 86.10 66.08 61.30
S-2 Storage, low hazard 104.73 99.48 94.25 89.25 80.38 75.32 85.10 66.08 60.30
U Utility, miscellaneous 83.66 79.00 74.06 70.37 63.47 59.32 67.24 50.19 47.80
a. Private Garages use Utility, miscellaneous
b. Unfinished basements (all use group) = $15.00 per sq. ft.
16
c. For shell only buildings deduct 20 percent
d. N.P. = not permitted