081-16 - Resolution - Repaling Resolution 027-16 and Establishing Fee Schedules for DCD and PWRESOLUTION NO.081-16
A RESOLUTION OF THE CITY OF PORT ORCHARD, WASHINGTON
REPEALING RESOLUTION NO. 027-16 AND ESTABLISHING FEE
SCHEDULES FOR THE DEPARTMENTS OF COMMUNITY DEVELOPMENT
AND PUBLIC WORKS
WHEREAS, the City of Port Orchard is responsible for implementing land use
regulations, planning and public works requirements, administering the building code, and
other administrative duties; and
WHEREAS, there are costs associated with the implementation of city regulations and
policies; and
WHEREAS, the City's current Planning and Public Works Department administrative fees
were adopted in March 2016 as set forth in Resolution No. 027-16; and
WHEREAS, the City Council deems it in the best interest of the City of Port Orchard to
periodically review and update the City's administrative fees, now, therefore;
THE CITY COUNCIL OF THE CITY OF PORT ORCHARD, WASHINGTON HEREBY RESOLVES
AS FOLLOWS:
1. Resolution No. 027-16 is hereby repealed in its entirety.
2. The fees that will be charged by the City Community Development and Public Works
Departments and Clerk's Office for the specified services and permits are listed in
Exhibit "A".
3. Fees not listed in Exhibit "A" will be determined by the City Council.
4. The fees listed in Exhibit "A" shall take effect on January 1, 2017.
PASSED by the City Council of the City of Port Orchard, APPROVED by the Mayor and
attested by the Clerk in authentication of such passage this 13th day of December, 2016.
ATTEST:
Brandy Ifinearson, CIVIC, City Clerk
Robert Putaa suu, Mayor
0 A f
O R
°®o�P A
�;�'
aF0F\N-
�r%aunEn�+�°
Exhibit A to Resolution 081-16
A. General
1. No permit shall be issued, application accepted, service provided, or appeal filed without
payment of the applicable fee set forth below.
2. References to the director refer to the director of the Department of Community Development
or his/her designee.
3. When an application includes the submittal of special reports and/or plans such as habitat
management plans, geotechnical reports, or traffic impact analyses requiring review beyond the
capabilities of city staff, the applicant shall be required to pay the actual cost of 3rd party review
by qualified consultants under contract with the city. Upon determining that 3rd party review of
special reports or plans is required, the city will obtain a fee estimate from its consultant and
provide that estimate to the applicant and request payment to the city.
4. Some projects require more than one permit. In some cases a project will require the payment
of numerous fees from the tables below.
5. Each building, plumbing, mechanical, planning and land use, and public works
permit/department review fee shall be assessed a technology fee surcharge of $10.00 to cover
the cost of the purchase and ongoing maintenance of the City's SMARTGov permitting system
which was put into use in November of 2014.
6. No additional inspections, including final inspections, will be scheduled or performed until all
outstanding fees are paid.
7. Refunds: The hourly rate used to calculate a deduction to a refund shall be $75 per hour.
a. Building Permit fees:
Refunds shall be issued at an amount equal to the permit fee less actual time and
materials spent on the project; provided no refund shall exceed 80% of the initial
permit fee for a permit that was issued by the City. If the permit fee was paid and a
refund was requested prior to permit issuance, 100% of the permit fee may be
refunded.
b. Plan Review Fees:
If an application is withdrawn, cancelled or returned prior to issuing a building
permit, a refund shall be issued to an amount equal to the plan review fee less
actual time and materials spent on the project, provided no refund shall exceed 80%
of the plan review fee. Plan review fees are non-refundable once the plan review
has been completed or if the permit has been issued.
c. Other Permit/Application fees:
Refunds for Land Use permits and other permit application types may be authorized
by the director. Refunds shall be issued at an amount equal to the permit fee less
actual time and materials spent on the project; provided no refund shall exceed 80%
of the initial permit fee.
8. All recording fees for approvals issued by the city shall be paid by the applicant.
B. Building, Plumbing, and Mechanical Fee Policies
1. Failure to pay established fees may result in one or more of the following:
Per Section 109.4 of the IBC, any person who commences any work on a building,
structure, electrical, gas, mechanical or plumbing system before obtaining the necessary
permits shall be subject to an additional fee equal to the required permit cost in
addition to the underlying permit costs.
No temporary or final certificate of occupancy will be approved or issued for a project
with any outstanding fees on any permit associated with the project.
2. Some signs require a building permit in addition to a land use (sign) permit. In these instances,
the permit fees are additive meaning that an applicant may be required to obtain a sign permit
and a building permit.
3. Minor revisions to plans which were previously reviewed and approved by the city shall be
reviewed at a cost of $75 per hour with a minimum of 1 hour billed.
4. Valuation for Table 1 shall be determined using the IBC Building Valuation Data Table (BVD)
(currently the June 2016 table as attached hereto) except as noted in the BVD Table and when
otherwise noted in Tables 2 and 3.
5. Per 2015 IBC 109.3, the applicant for a permit shall provide an estimated construction value at
the time of application. The amount shall include the fair market value of any donated,
contributed or found labor and/or materials.
6. Single family home builders who wish to reuse a plan set to construct more than one home
using the same plan set may do so by utilizing a "basic plan" review process. When an applicant
wishes to establish a basic plan set for reuse, the plans shall initially be reviewed upon payment
of the city's standard plan review fee. Once plan review is complete and if the City finds that the
plans conform to the requirements of the Building Code, the plans shall be approved as a basic
plan set and marked as such for reuse. For each use of the plan, the applicant shall pay a
reduced plan review fee as established in Table 3 in lieu of the full plan review fee. The use of
an approved basic plan set shall have no effect on the building permit fee (only the building
permit plan review fee). Plans may not be reused if the city's building code has been updated
unless the plans have been re -reviewed (upon payment of the full plan review fee) and
approved for conformance with the updated building code.
TABLE 1:
Total Valuation
FEES (Permit Fee = 100% Plan Review Fee = 65%)
$1 to $500
$26.00
$26.00 for the first $500 plus $3.00 for each additional $100,
$501 to $2,000
or fraction thereof, to and including $2,000
$69.00 for the first $2,000 plus $11.00 for each additional
$2,001 to $40,000
$1,000, or fraction thereof, to and including $40,000
$487.00 for the first $40,000 plus $9.00 for each additional
$40,001 to $100,000
$1,000, or fraction thereof, to and including $100,000
$1,027.00 for the first $100,000 plus $7.50 for each
additional $1000, or fraction thereof, to and including
$100,001 to $500,000
$500,000
$3,827.00 for the first $500,000 plus $5.00 for each
additional $1,000, or fraction thereof, to and including
$500,001 to $1,000,000
$1,000,000
$6,327.00 for the first $1,000,000 plus $3.00 for each
additional $1,000, or fraction thereof, to and including
$1,000,001 to $5,000,000
$5,000,000
$18,327.00 for the first $5,000,000 plus $1.00 for each
$5,000,001 and up
additional $1,000, or fraction thereof
2
TABLE 2:
Residential Single Family
Building Permit Type
Amount
Unit of
Measure
Finish an existing basement
$82.95
square foot
Conversion of an existing garage to residential space
$59.79
square foot
New, repair, or alteration or addition to deck, uncovered
$13.04
square foot
New Foundation only or under existing structure
$13.04
square foot
New garage, shed, barn, or pole building (attached or detached)
$38.16
square foot
Covered porch, covered deck; new, alteration, repair, or cover added
$21.07
square foot
New, remodel, or repairs to freestanding roof structures and carports,
other than porch or deck
$21.07
square foot
Residential Interior Remodel
$19.67
square foot
TABLE 3:
Miscellaneous:
Unit of
Building Permit Code
Amount
Measure
Per Linear
Shoreline bulkhead walls
$118
Foot
Demolition
$65
Each
Per Linear
Fences over 6 feet in height
$11.74
Foot
Per Linear
Retaining walls
$19.67
Foot
Re -inspection
$65
Each
Apply
Construction
Construction
value
Value to
(contract or
Fire Alarm, new or alterations to existing
Table 1
materials x 2)
Apply
Construction
Construction
value
Value to
(contract or
Fire Sprinkler, new or alterations to existing
Table 1
materials x 2)
Apply
Construction
Construction
value
Value to
(contract or
Fire Suppression System
Table 1
materials x 2)
Apply
Construction
Construction
value
Value to
(contract or
Tank: Underground or Above Ground, Installation or Removal
Table 1
materials x 2)
Temporary Tent & Membrane Structures
$65
Each
Pyrotechnics Special Effects
$65
Each
Roof: Hot Mop/Cold Mop (flat roof)
$90
Per 100 SQ FT
Roof: Composition, Metal
$70
1 Per 100 SQ FT
Roof: Wood Shake
$140
Per 100 SQ FT
Roof: Concrete, Tile, Slate
$140
Per 100 SQ FT
Roof: Torch Down
$90
Per 100 SQ FT
Apply
Construction
Construction
value
Value to
(contract or
Residential Misc.
Table 1
materials x 2)
Apply
Construction
Construction
value
Value to
(contract or
Commercial Tenant Improvement and Misc.
Table 1
materials x 2)
Certificate of Occupancy for new business only; All other C of O included in
building permit fee.
$65
Each
Manufactured or mobile home placed on lot or first time placement in MH park
$130
Each
Manufactured or mobile home replacement in MH park
$65
Each
50% of
Permit Renewal
original fee
Each
Posted Stop Work
$65
occurrence
Apply
Construction
Construction
value
Value to
(contract or
Sign (when a building permit is required)
Table 1
materials x 2)
Carport or Canopy, pre-fab kit installation
$100
Each
Siding or Re -siding
$70
per 100 SQ FT
Solar energy/photovoltaic panel system roof mounted install per WAC 51-51-
2300 Sec. M2302
$135
Each
Single Family Residential plan review using a basic plan on a site specific lot
$225
Each
Apply
Construction
Construction
value
Value to
(contract or
Windows or Doors
Table 1
materials x 2)
Plumbing Permit Fees
Plumbing permit fees shall be calculated using the commercial and residential schedules in Tables 4 and
5 below.
TABLE 4:
Commercial Plumbing Permit Fees
Commercial Plumbing Fixtures
Fee
Per
Base Fee Applied to All Plumbing Permits
$23.50
Flat
Fee
Backflow protective device 2 inches or less
$9.80
Each
Backflow protective device larger than 2
inches
$15.00
Each
Clothes Washing Machine
$9.80
Each
Dish Washer
$9.80
Each
Drainage Pipe or Vent Pipe Repair or
Alteration
$9.80
Each
Drinking Fountain
$9.80
Each
Floor Drain
$9.80
Each
Hose Bibbs, each
$1.00
Each
Industrial/Sand Oil Interceptor
$9.80
Each
Grease Interceptor
$9.80
Each
Lawn Sprinkler System with Backflow Device
$9.80
Each
Medical Equipment / Kidney Machine
$9.80
Each
Medical Gas, each additional outlet in excess
of first 5
$5.00
Each
Medical gas system up to 5 outlets
$50.00
Each
Misc. Plumbing fixtures on one trap
$9.80
Each
Roof Drain
$9.80
Each
Sink (Lavatory, Kitchen, Mop, or Bar Sink)
$9.80
Each
Floor Sink and /or Indirect Waste
$9.80
Each
Multi - Compartment Sink
$9.80
Each
Shampoo Sink w/interceptor
$9.80
Each
Toilet, Water Closet. Bidet, orUrinal
$9.80
Each
Tub and/or Shower
$9.80
Each
Water Heater
$9.80
Each
Water Pipe Repair and/or Alteration
$9.80
Each
TABLE 5:
Residential Plumbing Permit Fees
Residential Plumbing Fixtures
Fee
Per
Base Fee applied to all Plumbing Permits
$23.50
Flat Fee
Clothes Washer
$7.00
Each
Dishwasher
$7.00
Each
Floor Drain
$7.00
Each
Hose Bibb
$1.00
Each
Hot Tub
$14.80
Each
Lawn Sprinkler with backflow preventer
$7.00
Each
Sink (Lavatory, Kitchen, Mop)
$7.00
Each
Tub and/or shower
$7.00
Each
Toilet, Bidet or Urinal
$7.00
Each
Water Heater
$7.00
Each
Mechanical Permit Fees
Mechanical permit fees shall be calculated using the commercial and residential schedules in Tables 6
and 7 below.
TABLE 6:
Commercial Mechanical Permit Fees
Commercial Mechanical Fixtures
Fee
Per
Mechanical Permit Base Fee
$23.50
Flat
Fee
Air -Handling Unit < 10,000 CFM
$14.80
Each
Air -Handling Unit > 10,000 CFM
$18.10
Each
Class 1 Hood & Duct Systems
$10.65
Each
Class 2 Hood & Duct Systems
$10.65
Each
Clothes Dryer with exhaust
$10.65
Each
Compressors
$14.70
Each
Cook stove with exhaust
$10.65
Each
Ducting Change without New Furnace
$13.70
Each
Evaporative Coolers, permanently installed
$10.65
Each
Fan for Bath and/or Exhaust Fan
$7.25
Each
Commercial Furnace & Ducting < 100,000 btu
$14.80
Each
Commercial Furnace & Ducting > 100,000 btu
$18.20
Each
Combo Gaspipe / Water Heater / Furnace
$35.45
Each
Fuel System Outlets in excess of the first 4
$2.00
Each
Fuel Pipe System LPG, Natural Gas, OIL (first 4 outlets)
$10.65
Each
Miscellaneous Mechanical Equipment
$10.65
Each
Mechanical System Pumps (Misc)
$10.65
Each
Radiant Heat Units (wall, ceiling, floor, recessed, etc.)
$10.65
Each
Unit Heater Suspended or Floor Mount
$14.80
Each
Gas Water Heater Vent & Combustion Air
$10.65
Each
Propane tank over 2000 gallons
10.65
Each
TABLE 7:
Residential Mechanical Permit Fees
Residential Mechanical Fixtures
Fee
Per
Base Fee applied to all Mechanical Permits
$23.50
Flat
Fee
Bath Fan and or Exhaust Fan
$7.25
Each
Clothes Dryer w/exhaust
$10.65
Each
Cook Stove w/exhaust
$10.65
Each
Furnace Electric / Heat Pump/AC +/- ducting
$14.80
Each
Fireplace - Gas or Gas log inserts
$12.00
Each
Fireplace - Wood or Wood Stove
$12.00
Each
Furnace Propane +/-Ducting
$14.80
Each
Gas WH Vent and Combustion Air
$10.65
Each
Fuel Pipe System LPG, Natural Gas, Oil
$10.00
Each
Misc. Mechanical Equipment
$10.65
Each
Furnace Natural Gas +/- Ducting
$14.80
Each
Propane Furnace +/- Ducting
$14.80
Each
Propane Fuel Tank Under 2000 Gallons
$10.65
Each
C. Planning and Land Use Fees
The planning and land use permit fees listed in the tables below shall be paid at the time an application
is submitted to the city unless otherwise specified. Fees are based on an hourly rate of $75.00.
TABLE 8:
Subdivision POMC Title 26
Short Subdivision Application
$1,100
Short Subdivision - Submission of Final Short
Subdivision for Review and Approval
$600
Short Subdivision Amendment
$500
Final Short Subdivision Alteration
$500
Preliminary Subdivision Plats 5-20 lots
$2,000 plus Hearing Examiner Fee
11
Preliminary Subdivisions Plats 21+ Lots
$2,000 + $50 Per Lot plus Hearing Examiner Fee
Planned Residential Development Review per
POMC 16.13.190
$500 plus associated Preliminary Subdivision
Plat Fee
Minor Revisions to a Preliminary Plat
$500
Boundary Line Adjustment
$200
Final Plat
$1,000 + 50 Per Lot
Preliminary Binding Site Plan
$1,100
Binding Site Plan Alteration
$500
Final Binding Site Plan
$600
Vacation and Alteration of Final Plats and
Final Binding Site Plans
$2,000 plus Hearing Examiner Fee
TABLE 9:
SEPA
Project Checklist Review and Threshold
Determination
$300
Non -Project Checklist Review and Threshold
Determination
$300
Environmental Impact Statement Preparation
Actual Cost, See SEPA Ord.
Environmental Impact Statement Review
Actual Cost, See SEPA Ord.
SEPA Appeal Fee*
$450
TABLE 10:
Shoreline Permits
Administrative Shoreline Substantial
Development Permit
$600
Shoreline Substantial Development Permit
$900 plus Hearing Examiner Fee
Shoreline Exemption (Letter)
$150
Shoreline Conditional Use Permit
$1,275 plus Hearing Examiner Fee
Administrative Shoreline Conditional Use
Permit
$600
Shoreline Variance
$1,275 plus Hearing Examiner Fee
Administrative Shoreline Variance
$600
TABLE 11:
Land Use Permits
Administrative Conditional Use Permit
$600
Conditional Use Permit
$1,275 plus Hearing Examiner Fee
Temporary Use Permit
$150
Temporary Use Permit Extension
$150
Variance Administrative
$600
Variance
$1,275 plus Hearing Examiner Fee
Variance, View Protection Overlay District
$1,275 plus Hearing Examiner fee
View Protection Overlay District Exemption
$100
Rezone (without Comp Plan Amendment)
$1,275plus Hearing Examiner fee
TABLE 12:
Other Review
Request for a statement of restrictions per
RCW 35.21.475
$75
$75 minimum, an additional deposit may
be required if city attorney review is
required, any city attorney expenses
related to an application for an
Administrative Interpretation (POMC
administrative application shall be paid by
23.40.030)
the applicant prior to issuance of a decision
$150 (100% is credited to a land use
Pre -Application Meeting
application if filed within 12 months)
$1,000 Deposit, which will be applied to the
city's costs including city attorney fees
regardless of whether a development
Development Agreements
agreement is approved
Comp Plan Amendment (Text)
$500
Comp Plan Amendment (Map)
$1,875
Forest Practices Application (Local Approval)
$300
Landscape Plan Review Minor
$225
Landscape Plan Review Major (Subdivisions
with more than 20 lots, Developments larger
than 20,000 square feet in area)
$600
Other Appeal Fee*
$450
* Any appeal statement must be filed on the deadline established in the City's code relating to the
specific appeal, together with a certified check in the amount of the appeal fee (which shall include the
fee set forth in the fee Resolution, plus the hearing examiner's fees charged to the City on the appeal),
which appeal fee shall be returned to the appellant if the decision of the City is not sustained by the
hearing examiner. If the hearing examiner sustains the decision, the appeal fee will be applied to any
fees charged by the hearing examiner on the decision or appeal. If the City Council is the decision -
maker on the appeal, only the appeal fee shall be charged. If any appellant believes that the payment of
the appeal fee creates a financial hardship, it shall submit a request for an appeal waiver with the appeal
statement on or before the deadline established in the City's code relating to the specific appeal. This
request for an appeal waiver shall describe the appellant's financial situation and why payment of the
appeal fee creates a financial hardship. As an example, the appellant may provide evidence that the
appellant resides in a low-income household, which would include a single person, family or unrelated
persons living together, whose adjusted income is less than eighty percent of the median family income,
adjusted for household size, for Kitsap County.
W
Signs Permits
Signs may also require a building permit. See B.4 and Table 3.
TABLE 13:
Sign Permits
A -Board Sign
$25
Permanent Sign
$50
Comprehensive Sign Plan (Sign Program)
$500
Placement of WSDOT directional sign
$75
Books/Maps/Optical Discs/Other
TABLE 14:
Books/Maps/Optical Discs/Other
Copies of Codes and Standards on Disc
$5
Photocopies 11x17 and smaller (in house copying);
Refer to POMC 1.18.070 for public records requests
$0.15 per page black and white or $1 per
page color
Map Scanning if above 11x17
$3
Print Jobs on Plotter
$3 per linear foot or portion thereof (36"
width)
In house binding of documents (plastic spine)
(which are also printed in house)
$15
In house binding of documents (3 ring binder)
(which are also printed in house)
$10
GIS Data and Custom Maps
$75 per hour to produce, minimum 1 hour
Public Notice signs
Actual cost + 25%
D. Public Works Department Fees
The Public Works Department permit fees listed in the tables below shall be paid at the time an
application is submitted to the city unless otherwise specified.
TABLE 15:
Public Works Department
Permits and Fees
Public Works
Cost
Note
$100 for the first acre of
(Paid at the time of
disturbance + $50 for each
application submittal —
Land Disturbing Activity Permit Plan
additional acre of
covers plan review
Review
Disturbance above 1 acre
costs)
$100 for the first acre of
disturbance + $50 for each
(Paid at time of permit
additional acre of
issuance — covers
Land Disturbing Activity Permit
Disturbance above 1 acre
inspection costs)
$100 for the first 3,000
square feet of hard surface
(Paid at the time of
to be constructed + $100
application submittal —
for each additional 3,000
covers plan review
Stormwater Drainage Permit Plan Review
square feet of hard surface
costs)
0
to be constructed
$100 for the first 3,000
square feet of hard surface
Stormwater Drainage
to be constructed + $100
Permit (Paid at time of
for each additional 3,000
permit issuance —
square feet of hard surface
covers inspection
Stormwater Drainage Permit
to be constructed
costs)
Street Use Permit Application Fee
$50
Street Signs (provided by the city)
Actual Cost +25%
Plan Revision Review to Approved Permit
Per hour of required
Drawings
$100
plan review.
The applicant shall pay
the actual fee,
including city attorney
costs, for preparing the
Latecomer Agreement Review Fee
$500 Deposit
latecomer agreement
ROW Permit, first 100 Linear Feet
$50
ROW Permit, every 300 Feet thereafter
$10
Violator must obtain
the required permit
and pay twice the
Work without a Permit - Penalty
Permit fee is doubled
normal permit fee
TABLE 16:
Street Vacations
Street Vacation Petition Fee
$120
Street Vacation Appraisal Fee (Refundable
Deposit)
$500 Deposit, Petitioner shall pay the actual cost
of the appraisal.
TABLE 17:
Impact Fee Deferrals (POMC 16.70.110 D)
Application for Impact Fee Deferral $300
TABLE 18:
Residential Parking Permits
Residential Parking Permit
$10
Replacement Parking Permit
$5
Temporary Residential Parking Permit
$10
Bed and Breakfast Parking Permit
$10
10
Table 19:
Concurrency Review (POMC 16.71)
1. Concurrency (Capacity Reservation Certificate) applications fees shall be based on the following table.
Each type of application (Transportation, Water, or Sewer) shall include payment of an application fee
(A) plus any consultant fees charged to the city (B or C) for concurrency review as applicable.
Type of Review
A
B
C
Application Fee (also
Review Performed by
Review Performed by
the total review fee for
Consultant—
Consultant —Application
applications reviewed in
Application submitted
submitted prior to
house by the City)
after a scope and fee
obtaining scope and fee
has been obtained
(Deposit)
Transportation
$150
The applicant shall pay
$1000 Deposit, the actual
the amount shown in
fee for concurrency
the scope and fee
review to be paid by the
provided by the City's
applicant
Consultant.
Water
$150
The applicant shall pay
$1000 Deposit, the actual
the amount shown in
fee for concurrency
the scope and fee
review to be paid by the
provided by the City's
applicant
Consultant.
Sewer
$150
The applicant shall pay
$1000 Deposit, the actual
the amount shown in
fee for concurrency
the scope and fee
review to be paid by the
provided by the City's
applicant
Consultant.
2. The Director of Public Works shall make all determinations as to whether an application be reviewed
by the city or be sent to the consultant for review.
3. When a deposit is required pursuant to the above table, the deposit shall be applied to the actual fee
incurred by the city. Any balance owed shall be paid prior to the issuance of a concurrency certificate.
11
E. Fire District Review and Inspection Fees.
A surcharge on the permit types identified in Tables 20 - 24 shall be collected if Fire District review
and/or inspections take place. The minimum fee shall be $100 except where specified in the tables. The
fee shall be paid at the time the permit is issued unless otherwise specified.
TABLE 20:
BUILDING PERMITS
Type
Amount
Commercial Addition
$150
New Commercial Building
$400
Tenant Certificate of Occupancy
$75
New Cell Tower
$150
Commercial or Government Miscellaneous
$150
Tenant Improvement
$250
Demolition
$75
Commercial Waterfront
$150
New Residential: Single family, ADU, Duplex
$100
New Multi -family: Triplex and above
$250
Residential Certificate of Occupancy
$75
Other Permit Types with Flat Fees
$100
TABLE 21:
FIRE CODE PERMITS
Type
Amount
Fire Alarm
$400
Fire Sprinkler
$400
Fire Suppression System
$400
Temporary Tent or Membrane Structure
$400
Tank Install
$400
Tank Decommission
$400
High Pile Storage
$400
Fire Code permit projects which are identified as highly complex shall be reviewed by a consultant under
contract services. In addition to the fee listed above, the consultant fee shall be paid by the applicant
and is due when the permit is issued.
12
TABLE 22:
LAND USE PERMITS
Type
Amount
Boundary Line Adjustment
$250
Conditional Use Permit
$250
Preliminary Plat or alteration of
$250
Final Plat or alteration of
$250
Final Binding Site Plan or alteration of
$250
Shoreline: Substantial Development, Conditional
Use, Variance
$250
Short Plat: Preliminary or Final
$250
Variance
$250
Comprehensive Plan Amendment
$250
Zone Reclassification (Rezone)
$250
TABLE 23:
PUBLIC WORKS PERMITS
Type
Amount
Land Disturbance Activity Permit and/or
Stormwater Drainage Permit (This fee shall not be
charged more than once per project if the permits
are issued simultaneously)
$250
Right -of -Way
$75
Other Permit Types with flat fees
$100
TABLE 24:
OTHER
Type
Amount
Formal Pre -Application Conference
(not credited towards a future application fee)
$150
Cabaret License
$100
Carnival License
$100
Liquor or Marijuana License
$100
Pawn Broker
$100
Street Use Permit Application fee
$50
13
Building Valuation Data - June 2016
Important Points
• The BVD is not intended to apply to alterations or repairs to existing buildings. Because the scope of alterations or
repairs to an existing building varies so greatly, the Square Foot Construction Costs table does not reflect accurate
values for that purpose. However, the Square Foot Construction Costs table can be used to determine the cost of an
addition that is basically a stand-alone building which happens to be attached to an existing building. In the case of
such additions, the only alterations to the existing building would involve the attachment of the addition to the existing
building and the openings between the addition and the existing building.
• The Square Foot Construction Cost does not include the price of the land on which the building is built. The Square
Foot Construction Cost takes into account everything from foundation work to the roof structure and coverings but does
not include the price of the land. The cost of the land does not affect the cost of related code enforcement activities and is
not included in the Square Foot Construction Cost.
Square Foot Construction Costs a, a, c, d
Group (2012 International Building Code)
IA
IB
IIA
1113
IIIA
11113
IV
VA
VB
A-1 Assembly, theaters, with stage
226.92
219.10
213.80
205.04
192.95
187.36
198.56
176.18
169.73
A-1 Assembly, theaters, without stage
207.97
200.15
194.85
186.09
174.15
168.55
179.61
157.38
150.92
A-2 Assembly, nightclubs
177.89
172.85
168.07
161.49
151.98
147.78
155.80
137.68
132.99
A-2 Assembly, restaurants, bars, banquet halls
176.89
171.85
166.07
160.49
149.98
146.78
154.80
135.68
131.99
A-3 Assembly, churches
209.94
202.13
196.83
188.07
176.32
170.72
181.59
159.54
153.09
A-3 Assembly, general, community halls, libraries,
museums
175.12
167.31
161.01
153.25
140.50
135.90
146.77
123.72
118.27
A-4 Assembly, arenas
206.97
199.15
192.85
185.09
172.15
167.55
178.61
155.38
149.92
B Business
181.12
174.43
168.67
160.26
146.18
140.70
153.97
128.34
122.72
E Educational
192.29
185.47
180.15
172.12
160.72
152.55
166.18
140.46
136.18
F-1 Factory and industrial, moderate hazard
108.98
103.99
97.83
94.17
84.37
80.56
90.16
69.50
65.44
F-2 Factory and industrial, low hazard
107.98
102.99
97.83
93.17
84.37
79.56
89.16
69.50
64.44
H-1 High Hazard, explosives
102.01
97.02
91.86
87.20
78.60
73.79
83.19
63.73
N.P.
H234 High Hazard
102.01
97.02
91.86
87.20
78.60
73.79
83.19
63.73
58.67
H-5 HPM
181.12
174.43
168.67
160.26
146.18
140.70
153.97
128.34
122.72
1-1 Institutional, supervised environment
180.72
174.14
169.28
161.12
149.06
145.04
161.12
133.69
129.43
1-2 Institutional, hospitals
304.80
298.11
292.36
283.95
268.92
N.P.
277.65
251.09
N.P.
1-2 Institutional, nursing homes
211.20
204.51
198.75
190.34
177.26
N.P.
184.05
159.42
N.P.
1-3 Institutional, restrained
206.08
199.38
193.63
185.22
172.62
166.14
178.93
154.78
147.16
1-4 Institutional, day care facilities
180.72
174.14
169.28
161.12
149.06
145.04
161.12
133.69
129.43
M Mercantile
132.61
127.57
121.79
116.21
106.35
103.15
110.52
92.05
88.36
R-1 Residential, hotels
182.28
175.70
170.83
162.68
150.87
146.84
162.68
135.49
131.23
R-2 Residential, multiple family
152.86
146.27
141.41
133.25
122.04
118.01
133.25
106.66
102.41
R-3 Residential, one- and two-family
143.93
139.97
136.51
132.83
127.95
124.61
130.57
119.73
112.65
R-4 Residential, care/assisted living facilities
180.72
174.14
169.28
161.12
149.06
145.04
161.12
133.69
129.43
S-1 Storage, moderate hazard
101.01
96.02
89.86
86.20
76.60
72.79
82.19
61.73
57.67
S-2 Storage, low hazard
100.01
95.02
89.86
85.20
76.60
71.79
81.19
61.73
56.67
U Utility, miscellaneous
77.82
73.48
69.04
65.52
59.23
55.31
62.58
46.83
44.63
a. Private Garages use Utility, miscellaneous
b. Unfinished basements (all use group) = $15.00 per sq. ft.
c. For shell only buildings deduct 20 percent
d. N.P. = not permitted
14