Loading...
001-16 - Resolution - Approving Contract with PND Engineers, Inc for the 2016 Dekalb Pier-Phase 2 Construction Admin.RESOLUTION NO.001-16 A RESOLUTION OF THE CITY OF PORT ORCHARD, WASHINGTON APPROVING CONTRACT NO. C002-16 WITH PND ENGINEERS, INC. FOR THE 2016 DEKALB PIER - PHASE 2 CONSTRUCTION ADMINISTRATION AND DOCUMENTING THE ARCHITECTURAL AND ENGINEERING SERVICES PROCUREMENT CONSULTANT SELECTION PROCEDURES WHEREAS, pursuant to RCW 39.80, the City of Port Orchard's Public Works Department annually publishes the general Request for Qualifications (RFQ) for professional engineering, surveying, architecture, structural design and related services for the Professional Services Roster; and WHEREAS, in January of 2012, having selected from the City's 2012 Professional Services Roster, the City of Port Orchard issued a Contract to PND Engineers, Inc. (No. 003-12) for the Deka.lb Pier Existing Conditions Assessment; and WHEREAS, in March of 2012, based upon the Existing Conditions Assessment work product previously developed by PND Engineers, Inc., the City again selected PND Engineers, Inc. for the Final Design, Environmental Approvals and Construction Management of the Dekalb Pier Repair, Replacement and Renovation Project (Contract No. CO27-12); and WHEREAS, in 2013, the City of Port Orchard transitioned to the MRSC Professional Services Roster; and WHEREAS, having initially secured partial construction funding for the Project, the City only completed the Phase 1 construction activity in 2013; and WHEREAS, having now secured all construction funding needed for Project completion in 2016, and needing to reinitiate the Dekalb Pier Project by updating previously approved plans and environmental approvals, the City issued Contract No. CO25-15 to PND Engineers, Inc.; and WHEREAS, for 2016, the City will need PND Engineers, Inc. to perform the Phase 2 Construction Management for the Project, and having reviewed the 2015 MRSC Consultant Roster for firms under the main categories of "Environmental Consulting, Design and Planning and Engineering Services" and under the sub -categories of "Civil Engineering, Geotechnical Engineering, Structural Engineering, Roadway, Bikeway and Walkway Design, Pedestrian Path/Facilities Planning and Design, Erosion Control/Streambank Stabilization, Bridge Consulting, Waterfront Planning, Stormwater Permitting, Parking Analysis and Design, Pavement Design and Analysis and Marina and Costal Engineering", and found 7 firms (as Ordinance No. 001-16 Page 2 of 2 shown on the list attached hereto as Exhibit A) qualified to perform the required services in these categories, with PND Engineers, Inc. listed; and WHEREAS, upon verification of the 2015 MRSC Professional Services Roster, pursuant to RCW 39.80, Port Orchard's Public Works Department determined that of the 7 firms listed on the Roster, PND Engineers, Inc. the most qualified engineering firm; and WHEREAS, the City Council, at the recommendation of the State Auditor's Office in 2015, wishes to document their Professional Services Consultant Selection Process for all Projects by Resolution; Now, Therefore, THE CITY COUNCIL OF THE CITY OF PORT ORCHARD, WASHINGTON, HEREBY RESOLVES AS FOLLOWS: THAT: The City Council approves Contract No. C002-16 with PND Engineers, Inc. for the Dekalb Pier - Phase 2 Construction Management and adopts the "Whereas" statements contained herein as findings in support of the City's consultant selection procurement procedures. PASSED by the City Council of the City of Port Orchard, SIGNED by the Mayor and attested by the City Clerk in authentication of such passage on this 12th day of January, 2016. :D=� Robert Putaansuu, Mayor ATTEST: fit City CleK, Brandy Rinearson, CMC Public Agency Name: City of Port Orchard Roster Type: Consultant Roster Date: 12/07/2015 Time: 03:38 pm Main -Category: Design and Planning, Engineering Services, Environmental Consulting Sub -Category: Parking Analysis and Design, Roadway, Bikeway and Walkway Design, Stormwater Permitting, Waterfront Planning, Bridge Consulting, Civil Engineering, Geotechnical Engineering, Marina and Coastal Engineering, Pavement Design and Analysis, Pedestrian Path/Facilities Planning and Design, Structural Engineering, Erosion Control/Stream bank Stabilization Business Name Primary Contact Address Line 1 Address Line 2 City State Zip Phone Emails Gray and Osborne, Inc. Thomas Zerkel, P.E. 701 Dexter Avenue North, Ste. 200 Seattle WA 98109 206-284-0860 tzerkel@g-o.com; dpolley@g-o.com Herrera Environmental Consultants, Jill Patterson 2200 Sixth Avenue, Suite 1100 Seattle WA 98121 206 441-9080 ccassidy@herrerainc.com, Inc. jpatterson@herrerainc.com, mbuttin@herrerainc.com PND Engineers, Inc. Kaitlin Ingalls 1736 Fourth Avenue S Seattle WA 98134 206 624-1387 kingalls@pndengineers.com SCJ Alliance/Shea Carr Jewell Cathy McKay 8730 Tallon Lane NE, Suite 200 Lacey WA 98516 360-352-1465 cathym@scjalliance.com Skagit Surveyors & Engineers John Abenroth, PLS 806 Metcalf Street Sedro-Woolley WA 98284 360 855-2121 louisr@sseconsultants.com, johna @sseconsultants.com; louisr@sseconsultants.com, mma@sseconsultants.com Stantec Bill Holladay 11130 NE 33rd Place, Suite 200 Mailing Address 2 Bellevue WA 98004-1465 425-289-7345 bill.holladay@stantec.com Tetra Tech, Inc. Amy Fattore 400 112th Ave. NE, Ste. 400 Bellevue WA 98004 425-625-1000 Amy.Fattore@tetratech.com, irene.wall@tetratech.com, jill.goodnight@tetratech.com