002-15 - Resolution - Repealing Res 004-14 Establishing Fee Schedules for DCD and PWIntroduced by: Development Director
Requested by:
City Attorney
Drafted by:
City Attorney
Introduced:
February 24, 2015
Public Hearing:
February 24, 2015
Adopted:
February 24, 2015
RESOLUTION NO. 002-15
A RESOLUTION OF THE CITY OF PORT ORCHARD,
WASHINGTON REPEALING RESOLUTION NO.
004-14 AND ESTABLISHING FEE SCHEDULES FOR
THE DEPARTMENTS OF COMMUNITY
DEVELOPMENT AND PUBLIC WORKS
WHEREAS, the City of Port Orchard is responsible for implementing
land use regulations, planning and public works requirements, administering the
building code, and other administrative duties; and
WHEREAS, there are costs associated with the implementation of city
regulations and policies; and
WHEREAS, in 1999, the City of Port Orchard adopted Ordinance No.
1781 providing that fees for the Departments of Planning (aka Community
Development) and Public Works would be established by Council resolution; and
WHEREAS, the City updated its Planning and Public Works Department
administrative fees in July 2006 as set forth in Resolution No. 022-06; and
WHEREAS, the City's current Planning and Public Works Department
administrative fees were adopted in April 2014 as set forth in Resolution No. 004-14;
and
WHEREAS, the city's permitting system was upgraded in November
2014 and is expected to cost the city approximately $65,000 over the next four years;
and
WHEREAS, the city will continue to collect $10 technology fee surcharge
to be added to all permits to fund a portion of the costs associated with upgrading the
city's permitting system; and
WHEREAS, a technology fee surcharge is allowable under RCW
82.02.020(3); and
WHEREAS, the City Council will review the Departments of Community
Development and Public Works' technology costs and technology fee revenue
Resolution No. 002-15
Paiie 2 of 2
periodically to ensure that the fee is still necessary to fund the upgrade to the city's
permitting system; and
WHEREAS, the City Council deems it in the best interest of the City of
Port Orchard to periodically review and update the City's administrative fees; now,
therefore,
THE CITY COUNCIL OF THE CITY OF PORT ORCHARD,
WASHINGTON HEREBY RESOLVES AS FOLLOWS:
�. Resolution No. 004-14 is hereby repealed in its entirety.
2. The fees that will be charged by the Community Development and
Public Works Departments for the specified services are listed in
Exhibit "A".
3. Fees not listed in Exhibit "A" will be determined by the City
Council.
4. The fees listed in Exhibit "A" shall take effect on April 1, 2015.
PASSED by the City Council of the City of Port Orchard, APPROVED by
the Mayor and attested by the Clerk in authentication of such passage this 24th day of
February, 2015.
,,11i+i1r,,,, Timothy C. atthes, Mayor
ATTEST: ,'��� ORCyq%
Brandy Rinearson, CMC, City ClerkU
N'
qT� OF
111111„N,P��°
Exhibit A to Resolution 002-15
A. General
1. No permit shall be issued, application accepted, service provided, or appeal filed without
payment of the applicable fee set forth below.
2. References to the director refer to the director of the Department of Community Development
or his/her designee.
3. When an application includes the submittal of special reports and/or plans such as habitat
management plans, geotechnical reports, or traffic impact analyses requiring review beyond the
capabilities of city staff, the applicant shall be required to pay the actual cost of 3rd party review
by qualified consultants under contract with the city. Upon determining that P party review of
special reports or plans is required, the city will obtain a fee estimate from its consultant and
provide that estimate to the applicant and request payment to the city.
4. Some projects require more than one permit. In some cases a project will require the payment
of numerous fees from the tables below.
5. Each building, plumbing, mechanical, planning and land use, and public works
permit/department review fee shall be assessed a technology fee surcharge of $10.00 to cover
the cost of the purchase and ongoing maintenance of the City's SMARTGov permitting system
which was put into use in November of 2014.
6. No additional inspections, including final inspections, will be scheduled or performed until all
outstanding fees are paid.
7. Refunds may be authorized by the building official or director. Refunds shall be issued at an
amount equal to the permit fee less actual time and materials spent on the project; provided no
refund shall exceed 80% of the initial permit fee. The hourly rate to be used to calculate a
refund value shall be $75 per hour. Plan check fees are non refundable once plan review has
been completed.
B. Building, Plumbing, and Mechanical Fee Policies
1. Failure to pay established fees may result in one or more of the following:
• Per Section 109.4 of the IBC, any person who commences any work on a building,
structure, electrical, gas, mechanical or plumbing system before obtaining the necessary
permits shall be subject to an additional fee equal to the required permit cost in
addition to the underlying permit costs.
• No temporary or final certificate of occupancy will be approved or issued for a project
with any outstanding fees on any permit associated with the project.
2. Some signs require a building permit in addition to a land use (sign) permit. In these instances,
the permit fees are additive meaning that an applicant may be required to obtain a sign permit
and a building permit.
3. Minor revisions to plans which were previously reviewed and approved by the city shall be
reviewed at a cost of $75 per hour with a minimum of 1 hour billed.
4. Valuation for Table 1 shall be determined using the current IBC Building Valuation Table
(currently the August 2014 table) except when otherwise noted in Tables 2 and 3.
TABLE 1:
Total Valuation
FEES (Permit Fee =100% Plan Review Fee = 65%)
$1 to $500
$26.00
$26.00 for the first $500 plus $3.00 for each additional $100,
$501 to $2,000
or fraction thereof, to and including $2,000
$69.00 for the first $2,000 plus $11.00 for each additional
$2,001 to $40,000
$1,000, or fraction thereof, to and including $40,000
$487.00 for the first $40,000 plus $9.00 for each additional
$40,001 to $100,000
$1,000, or fraction thereof, to and including $100,000
$1,027.00 for the first $100,000 plus $7.50 for each
additional $1000, or fraction thereof, to and including
$100,001 to $500,000
$500,000
$3,827.00 for the first $500,000 plus $5.00 for each
additional $1,000, or fraction thereof, to and including
$500,001 to $1,000,000
$1,000,000
$6,327.00 for the first $1,000,000 plus $3.00 for each
additional $1,000, or fraction thereof, to and including
$1,000,001 to $5,000,000
$5,000,000
$18,327.00 for the first $5,000,000 plus $1.00 for each
$5,000,001 and up
additional $1,000, or fraction thereof
TABLE 2:
Residential Single Family
Building Permit Type
Amount
Unit of
Measure
Finish an existing basement
$82.95
square foot
Conversion of an existing garage to residential space
$59.79
square foot
New, repair, or alteration or addition to deck, uncovered
$13.04
square foot
New Foundation only or under existing structure
$13.04
square foot
New garage, shed, barn, or pole building (attached or detached)
$38.16
square foot
Covered porch, covered deck; new, alteration, repair, or cover added
$21.07
square foot
New, remodel, or repairs to freestanding roof structures and carports,
other than porch or deck
$21.07
square foot
Residential Interior Remodel
$19.67
square foot
TABLE 3:
Miscellaneous:
Building Permit Code
Amount
Unit of
Measure
Shoreline bulkhead walls
$118.00
Per Linear
Foot
Demolition
$65.00
Each
Fences over 6 feet in height
$11.74
Per Linear
Foot
Retaining walls
$19.67
Re -inspection
$65.00
Fire Alarm, new or alterations to existing
Bid Price
Fire Sprinkler, new or alterations to existing
Bid Price
Fire Suppression System
Bid Price
Tank: Underground or Above Ground, Installation or Removal
Bid Price
Temporary Tent & Membrane Structures
$65.00
Each
Pyrotechnics Special Effects
$65.00
Each
Roof: Hot Mop/Cold Mop (flat roof)
$90.00
Per 100 SQ FT
Roof: Composition, Metal
$70.00
Per 100 SQ FT
Roof: Wood Shake
$140.00
Per 100 SQ FT
Roof: Concrete, Tile, Slate
$140.00
Per 100 SQ FT
Roof: Torch Down
$90.00
Per 100 SQ FT
Residential Misc.
Bid Price
Commercial Tenant Improvement and Misc.
Bid Price
Certificate of Occupancy for new business only; All other C of O included in
building permit fee.
$65.00
Each
Manufactured or mobile home placed on lot or first time placement in MH
park
$130.00
Each
Manufactured or mobile home replacement in MH park
$65.00
Each
Permit Renewal
50% of
original
fee
Posted Stop Work
$65
Sign (when a building permit is required)
Bid Price
Carport or Canopy, pre-fab kit installation
$100.00
Each
Siding or Re -siding
Bid Price
Solar energy/photovoltaic panel system roof mounted install per WAC 51-51-
2300 Sec. M2302
$135
Each
Windows or Doors
I Bid Price
Plumbing Permit Fees
Plumbing permit fees shall be calculated using the commercial and residential schedules in Tables 4 and
5 below.
TABLE 4:
Commercial Plumbing Permit Fees
Fixture Type
Commercial Plumbing Fixtures
Fee
Per
Plumbing Issue Fee
Plumbing Permit Base Fee
$23.50
Flat
Fee
C-BACKFLOW PREV
Backflow protective device 2 inches or less
$9.80
Each
C-BACKFLOW PREY
Backflow protective device larger than 2
inches
$15.00
Each
C-CLOTHES WASHER
Clothes Washing Machine
$9.80 1
Each
C-DISH WASHER
Dish Washer
$9.80
Each
C-DRAIN PIPE CHA
Drainage Pipe or Vent Pipe Repair or
Alteration
$9.80
Each
C-DRINKING FOUNTAIN
Drinking Fountain
$9.80
Each
C-FLOOR DRAIN
Floor Drain
$9.80
Each
C-HOSE BIBBS
Hose Bibs, each
$1.00
Each
C-INTERCEPT-INDUSTRIAL
Industrial/Sand Oil Interceptor
$9.80
Each
C-INTER-GREASE
Grease Interceptor
$9.80
Each
C-LAWN SPRINKLER
Lawn Sprinkler System with Backflow Device
$9.80
Each
C-MED EQUIP
Medical Equipment/Kidney Machine
$9.80
Each
C-MED GAS ADD Outlet
Medical Gas, each additional outlet in excess
of first 5
$5.00
Each
C-MEDICAL GAS
Medical gas system up to 5 outlets
$50.00
1 Each
C-MISC PLUMBING
Misc. Plumbing fixtures on one trap
$9.80
Each
C-ROOF DRAIN
Roof Drain
$9.80
Each
C-SINK
Sink (Lavatory, Kitchen, Mop, or Bar Sink)
$9.80
Each
C-SINK FLOOR
Floor Sink and /or Indirect Waste
$9.80
Each
C-SINK COMPARTMENT
Multi - Compartment Sink
$9.80
Each
C-SINK SHAMPOO
Shampoo Sink w/interceptor
$9.80
Each
C-TOILET
Toilet/Water Closet/Bidet/Urinal
$9.80
Each
C-TUB/SHOWER
Tub and/or Shower
$9.80
Each
C-WATER HEATER
Water Heater
$9.80
Each
C-WATER PIPE CHA
Water Pipe Repair and/or Alteration
$9.80
Each
TABLE 5:
Residential Plumbing Permit Fees
Fixture Type
Residential Plumbing Fixtures
Fee
Per
Plumbing Issue Fee
Plumbing Permit Base Fee
$23.50
Flat Fee
Clothes Washer
Clothes Washer
$7.00
Each
Dishwasher
Dishwasher
$7.00
Each
Drain
Floor Drain
$7.00
Each
Hose Bibb
Hose Bibs
$1.00
Each
Hot Tub
Hot Tub
$14.80
Each
Lawn Sprinkler
Lawn Sprinkler w/backflow preventer
$7.00
Each
Sinks
Sink (Lavatory, Kitchen, Mop)
$7.00
Each
Tub/Shower
Tub with or without shower
$7.00
Each
Water Closet
Toilet; Bidet or Urinal
$7.00
Each
Water Heater
Water Heater
$7.00
Each
Mechanical Permit Fees
Mechanical permit fees shall be calculated using the commercial and residential schedules in Tables 6
and 7 below.
TABLE 6:
Commercial Mechanical Permit Fees
Fixture Type
Commercial Mechanical Fixtures
Fee
Per
Mechanical Issue Fee
Mechanical Permit Base Fee
$23.50
Flat
Fee
C-AIR HANDLING
Air -Handling Unit < 10,000 CFM
$14.80
Each
C-AIR-HANDLING
Air -Handling Unit > 10,000 CFM
$18.10
Each
C-CLASS 1 HOOD
Class 1 Hood & Duct Systems
$10.65
Each
C-CLASS 2 HOOD
Class 2 Hood & Duct Systems
$10.65
Each
C-CLOTHES DRYER
Clothes Dryer w/exhaust
$10.65
Each
C-COMPRESSORS
Compressors
$14.70
Each
C-COOK STOVE
Cook stove w/exhaust
$10.65
Each
C-DUCT CHANGE
Ducting Change without New Furnace
$13.70
Each
C-EVAPORATIVE
Evaporative Coolers, permanently installed
$10.65
Each
C-FAN
Fan for Bath and/or Exhaust Fan
$7.25
1 Each
C-FURNACE
Commercial Furnace & Ducting < 100,000 btu
$14.80
Each
C-FURNACE>100K
Commercial Furnace & Ducting > 100,000 btu
$18.20
Each
C-
GAS/H20/FURNACE
Combo Gaspipe/H20HTR/Furnace
$35.45
Each
C-GAS OUTLETS
Gas Outlets in excess of the first 4
$2.00
Each
C-GAS PIPE SYSTEM
Gas Pipe System LPG/NATL/OIL (first 4 outlets)
$10.65
Each
C-MECH EQUIP
Miscellaneous Mechanical Equipment
$10.65
Each
C-MECH PUMPS
Mechanical System Pumps (Misc)
$10.65
Each
C-RADIANT HEATER
Radiant Heat Units (wall, ceiling, floor, recessed, etc.)
$10.65
Each
C-UNIT HEAT
Unit Heater Suspended or Floor Mount
$14.80
Each
C-WATER HEATER
Gas Water Heater Vent & Combustion Air
$10.65
Each
TABLE 7:
Residential Mechanical Permit Fees
Fixture Type
Residential Mechanical Fixtures
Fee
Per
Mechanical Issue Fee
Mechanical Permit Base Fee
$23.50
Flat
Fee
Fan
Bath Fan and or Exhaust Fan
$7.25
Each
Clothes Dryer
Clothes Dryer w/exhaust
$10.65
Each
Cook Stove
Cook Stove w/exhaust
$10.65
Each
Elec. Furnace/AC
Furnace Electric / Heat Pump/AC +/- ducting
$14.80
Each
Fireplace - Gas
Fireplace - Gas or Gas log inserts
$12.00
Each
Fireplace - Wood
Fireplace - Wood or Wood Stove
$12.00
Each
LP Gas Furnace
Furnace Propane +/-Ducting
$14.80
Each
Water Heater Gas
Gas WH Vent and Combustion Air
$10.65
Each
Gas Pipe System
Gas Pipe System LPG/Natural/Oil
$10.00
Each
Other
Misc. Mechanical Equipment
$10.65
Each
Nat. Gas Furnace
Furnace Natural Gas +/- Ducting
$14.80
Each
Propane Furnace
Propane Furnace +/- Ducting
$14.80
Each
LP Tank
Propane Fuel Tank Under 2000 Gallons
$10.65
Each
C. Planning and Land Use Fees
The planning and land use permit fees listed in the tables below shall be paid at the time an application
is submitted to the city unless otherwise specified. Fees are based on an hourly rate of $75.00.
TABLE 8:
Subdivision and Binding Site Plans
Short Plat Preliminary
$1,100
Short Plat Final
$600
Short Plat Amendment
$500
Final Short Plat Alternation
$500
Preliminary Plat 5-20 lots
$2000 Plus Hearing Examiner Fee
Preliminary Plat 21+ Lots
$2,000 + $50 Per Lot plus Hearing Examiner Fee
Preliminary Plat Amendment (Minor)
$500
Preliminary Plat Amendment (Major)
$2,000 Plus Hearing examiner Fee
Final Plat
$1,000 + 50 Per Lot
Final Plat Amendment
$500 Plus Hearing Examiner Fee
Binding Site Plan
$1,275
Binding Site Plan Alteration
$500
Binding Site Plan Final
$350
TABLE 9:
SEPA
Project Checklist Review and Threshold
Determination
$300
Non -Project Checklist Review and Threshold
Determination
$300
Environmental Impact Statement Preparation
Actual Cost, See SEPA Ord.
Environmental Impact Statement Review
Actual Cost, See SEPA Ord.
SEPA Appeal Fee
$450
TABLE 10:
Shoreline Permit
Administrative Shoreline Substantial
Development Permit
$600
Full Shoreline Substantial Development
Permit
$900 Plus Hearing Examiner Fee
Shoreline Exemption Letter
$100
Shoreline Conditional Use Permit
$1275 Plus Hearing Examiner Fee
Shoreline Variance
$1275 Plus Hearing Examiner Fee
TABLE 11:
Land Use Permits
Administrative Conditional Use Permit
$600.00
Conditional Use Permit (full)
$1275 Plus Hearing Examiner Fee
Temporary Use Permit
$150.00
Temporary Use Permit Extension
$150.00
Variance Administrative
$600.00
Variance - Full
$1275 Plus Hearing Examiner Fee
Variance, View Protection Overlay District
$1275 plus Hearing Examiner fee
View Protection Overlay District Exemption
$100
Rezone (without Comp Plan Amendment)
$1,275.00 plus Hearing Examiner fee
TABLE 12:
Other Review
Land Use Interpretation Letter
$75.00
Pre -Application Meeting
$150 (100% is credited to a land use
application if filed within 12 months)
Development Agreements
$1000 Deposit. Fee equal to actual city
cost to be included in terms of agreement
Comp Plan Amendment (Text)
$500.00
Comp Plan Amendment (Map)
$1,875.00
Forest Practices Application (Local Approval)
$300.00
Landscape Plan Review Minor
$225.00
Landscape Plan Review Major (Subdivisions
with more than 20 lots, Developments larger
than 20,000 square feet in area)
$600.00
Other Appeal Fee
$450.00
Signs Permits
Signs may also require a building permit. See B.4 and Table 3.
TABLE 13:
Sign Permits
A -Board Sign
$25.00
Permanent Sign
$50.00
Comprehensive Sign Plan (Sign Program)
$500.00
Books/Maps/Optical Discs/Other
TABLE 14:
Books/Maps/Optical Discs/Other
Copies of Codes and Standards on Disc
$5.00
Photocopies 11x17 and smaller (in house copying)
$0.15 per page black and white or $1.00 per
page color
Map Scanning if above 11x17
$3.00
Print Jobs on Plotter
$3.00 per linear foot or portion thereof (36"
width)
In house binding of documents (plastic spine)
(which are also printed in house)
$15
In house binding of documents (3 ring binder)
(which are also printed in house)
$10
GIS Data and Custom Maps
$75 per hour to produce, minimum 1 hour
Public Notice signs
Actual cost+ 25%
D. Public Works Department Fees
The Public Works Department permit fees listed in the tables below shall be paid at the time an
application is submitted to the city unless otherwise specified.
TABLE 15:
Public Works Department
Permits and Fees
Public Works
Cost
Note
Concurrency Roads
$50
Concurrency Sewer
$50
Concurrency Water
$50
Stormwater Permit, Major (SDAP)
$300
In addition to other
applicable charges
Stormwater Permit, Minor
$0
In addition to other
applicable charges
Stormwater Review Major (Subdivisions
and Short Plats)
$1,000 plus $50 per lot
Stormwater Review Major, All other new
permits
$1,000
Stormwater Review Major, Review
Application from County
$500
Stormwater Review Minor, New Permit
$250
Stormwater Review Minor, Application
from County
$150
Street Signs
Actual Cost +25%
Plan Revision Review to Approved Permit
Drawings
$100
Latecomer Agreement Review Fee
$500
ROW Permit, first 100 Linear Feet
$50
ROW Permit, every 300 Feet thereafter
$10
Work without a Permit - Penalty
An amount equal to the
underlying permit cost
Violator must obtain
I permit and pay penalty
TABLE 16:
Excavation/Grading Permits (Including
Clearing and Grubbing)
Cost
Review Fees
50 cubic yards or less
No Fee
51 to 100 cubic yards
$23.50
101 to 500 cubic yards (SEPA
required beyond this point)
$37.00
501 to 1,000 cubic yards
$43.00
1,001 to 10,000 cubic yards
$49.25
10,001 to 100,000 cubic yards
$49.25 for the first 10,000 cubic yards, plus $24.50 for
each additional 10,000 cubic yards or fraction thereof
100,001 to 200,000 cubic yards
$269.75 for the first 10,000 cubic yards, plus $13.25 for
each additional 10,000 cubic yards or fraction thereof
200,001 cubic yards or more
$402.25 for the first 200,000 cubic yards, plus $7.25 for
each additional 10,000 cubic yards or fraction thereof
Permit Fees
50 cubic yards or less
$0
51 to 100 cubic yards
$37.00
101 to 500 cubic yards (SEPA
required beyond this point)
$37.00 for the first 100 cubic yards, plus $17.50 for each
additional 100 cubic yards or fraction thereof
501 to 1,000 cubic yards
$107.00 for the first 100 cubic yards, plus $17.50 for each
additional 100 cubic yards or fraction thereof
1,001 to 10,000 cubic yards
$194.50 for the first 1,000 cubic yards, plus $14.50 for
each additional 1,000 cubic yards or fraction thereof
10,001 to 100,000 cubic yards
$325.00 for the first 10,000 cubic yards, plus $66.00 for
each additional 10,000 cubic yards or fraction thereof
100,001 cubic yards or more
$919.00 for the first 100,000 cubic yards, plus $36.50 for
each additional 10,000 cubic yards or fraction thereof
Building Valuation Data - August 2014
Important Points
The BVD is not intended to apply to alterations or repairs to existing buildings. Because the scope of alterations or
repairs to an existing building varies so greatly, the Square Foot Construction Costs table does not reflect accurate values
for that purpose. However, the Square Foot Construction Costs table can be used to determine the cost of an addition
that is basically a stand-alone building which happens to be attached to an existing building. In the case of such additions,
the only alterations to the existing building would involve the attachment of the addition to the existing building and the
openings between the addition and the existing building.
• The Square Foot Construction Cost does not include the price of the land on which the building is built. The Square Foot
Construction Cost takes into account everything from foundation work to the roof structure and coverings but does not
include the price of the land. The cost of the land does not affect the cost of related code enforcement activities and is not
included in the Square Foot Construction Cost.
Square Foot Construction Costs a, b, C, d
Group (2012 International Building Code)
IA
113
IIA
118
IIIA
1116
IV
VA
VB
A-1 Assembly, theaters, with stage
226.76
219.31
213.96
205.01
192.75
187.20
198.12
176.19
169.52
A-1 Assembly, theaters, without stage
207.79
200.35
194.99
186.04
173.88
168.33
179.15
157.32
150.65
A-2 Assembly, nightclubs
176.13
171.14
166.41
159.90
150.48
146.32
154.26
136.32
131.68
A-2 Assembly, restaurants, bars, banquet halls
175.13
170.14
164.41
158.90
148.48
145.32
153.26
134.32
130.68
A-3 Assembly, churches
209.84
202.40
197.04
188.09
176.18
170.63
181.20
159.62
152.95
A-3 Assembly, general, community halls, libraries, museums
175.12
167.68
161.32
153.37
140.31
135.76
146..48
123.75
118.08
A-4 Assembly, arenas
206.79
199.35
192.99
185.04
171.88
167.33
178.15
155.32
149.65
B Business
181.09
174.44
168.64
160.29
146.09
140.60
153.96
128.21
122.54
E Educational
193.98
187.30
181.81
173.58
161.65
153.10
167.59
141.27
136.67
F-1 Factory and industrial, moderate hazard
107.90
102.96
96.85
93.24
83.53
79.76
89.27
68.81
64.80
F-2 Factory and industrial, low hazard
106.90
101.96
96.85
92.24
83.53
78.76
88.27
68.81
63.80
H-1 High Hazard, explosives
101.01
96.07
90.96
86.35
77.83
73.07
82.38
63.11
N.P.
H234 High Hazard
101.01
96.07
90.96
86.35
77.83
73.07
82.38
63.11
58.10
H-5 HPM
181.09
174.44
168.64
160.29
146.09
140.60
153.96
128.21
122.54
1-1 Institutional, supervised environment
179.48
173.17
1 168.13
160.99
147.72
143.83
160.67
132.55
127.94
1-2 Institutional, hospitals
305.47
298.82
293.02
284.67
269.47
N.P.
278.34
251.59
N.P.
1-2 Institutional, nursing homes
211.47
204.82
199.02
190.67
177.47
1 N.P.
184.34
159.59
N.P.
1-3 Institutional, restrained
206.32
199.67
193.87
185.52
172.82
166.33
179.19
154.94
147.27
1-4 Institutional, day care facilities
179.48
173.17
168.13
160.99
147.72
143.83
160.67
132.55
127.94
M Mercantile
131.29
126.30
120.57
115.06
105.29
102.13
109.42
91.13
87.49
R-1 Residential, hotels
180.89
174.58
169.54
162.40
149.39
145.50
162.08
134.22
129.61
R-2 Residential, multiple family
151.70
145.39
140.35
133.21
120.92
117.03
132.89
105.75
101.14
R-3 Residential, one- and two-family
143.18
139.24
135.76
132.27
127.10
123.91
129.53
118.85
111.36
R-4 Residential, care/assisted living facilities
179.48
173.17
168.13
160.99
147.72
143.83
160.67
132.55
127.94
S-1 Storage, moderate hazard
100.01
95.07
88.96
85.35
75.83
72.07
81.38
61.11
57.10
S-2 Storage, low hazard
99.01
94.07
88.96
84.35
75.83
71.07
80.38
61.11
56.10
U Utility, miscellaneous
76.35
71.93
67.45
64.00
1 57.56
1 53.75
1 61.01
1 45.05
42.90
a. Private Garages use Utility, miscellaneous
b. Unfinished basements (all use group) = $15.00 per sq. ft.
c. For shell only buildings deduct 20 percent
d. N.P. = not permitted