HomeMy WebLinkAbout2026.01 Monthly Budget ReportMONTHLY BUDGET FINANCIAL STATUS UPDATE To: Mayor and Council members From: Noah Crocker, Finance Director Period: January 2026 OVERVIEW: The Finance Department is committed to providing clear information to the Mayor, council, and staff regarding the budget status of the city. We have prepared the following reports to keep you up to date on the current budget status of the city. 1) Budget Report 2) Detail Fund Summary Report BUDGET REPORT: The Budget report will first provide Operational Funds and follow up with Capital Projects Funds. This report does not include beginning fund balance. This report is designed to provide a high-level view of each fund reviewing total revenues and expenses. The report does provide expense information by department. The goal of the city is to pay all current budget year expenses with current budget year revenues. We are not quite there yet, and this will show in the Surplus (Deficit) line at the end of each fund. We expect that future budget cycles will smooth out revenues and expenditures The Budget Report provides information on current revenues and expenditures by fund including the following: • The original budgeted amount. • Current budget which would reflect any amendments that have been made. • Period activity which details the revenue and expense activity for the period in which the report was run. • Fiscal activity will provide the year-to-date expense and revenue amounts. • Variance Shows the difference between budgeted and actual. • The percentage remaining is the amount still needed to reach the budgeted amount. CASH AND INVESTMENT FUND SUMMARY The Cash and Investment Fund Summary provides information on current total cash & investment balances by Fund. POINTS OF INTEREST: Current Expense Fund 001 —The Current Expense Fund is used for the general governmental functions of the City. As of January 31, 2026, 8.4% of budgeted revenues were received The table provides budget versus actual (YTD) data by source of revenue. SALES TAX REVENUES SUMMARY • Total 2026 Budget: $7,665,000 • Total 2026 YTD Actuals: $580,925 • Year -to -Date Actual revenue collected is 5.68% lower when compared to Prior Year -to -Date Actuals • Year -to -Date Actual revenue collected is 1.38% lower when compared to Year -to -Date Budgeted The following tables provide additional sales tax information: Table 1: shows revenue received by month over a three-year period. • • yy {} g l { f i� 311 S S �� aSS c4�f ?4�'f{ �S7� � 1�ii if7, t£r l�e �;� i�tt`t r�f lts4 ttlf Table 2: provides current data for sales tax revenue collected Year-to-date. ENTERPRISE/UTILITY FUNDS OPERATIONS: Water operation - Water operations budgeted revenue in the amount of $4,510,815 for 2026. Through January, the city has received $317,372 or —8% of the 2026 budgeted revenues. Revenues for the water utility, in winter and spring, are typically lower with larger monthly revenues received during the warmer summer and fall months. Water Operations expended $197,486 through January, representing —5.5% of the 2026 budget. In addition, the water operational budget includes transfers which occur throughout the year. The City manages its transfers according to policy goals, cashflow needs, and realized expenses for water capital projects, stabilization targets, and debt service payments. The 2026 budget includes $615,500 for transfers. A total of $3,075 was transferred to tund 413 tor Capital Projects such as Well 11, Melcher Pump Station and SR166/Bay Street Recoi WAter Service Payments 6 0, :2024 202 S 2W,0 v r ( k 2026 p f t SSS Jars Fein Mar Apr May Jtsr Jri Arrg Sep Oct iov Dec istruction. Storm Drainage operations- Storm Operations budgeted revenue in the amount of $3,891,000 for 2026. Through January, the city has received $305,216 or —8% of its annual budgeted revenue. Storm Drainage Operations expended $126,731 through January, representing "'5.5% of the 2026 operating budget. The storm drainage operational budget includes transfers which occur throughout the year. The City manages its transfers according to policy goals, cashflow needs, and realized expenses for storm capital projects, stabilization targets, and debt service payments. The 2026 budget includes $1,037,442 for transfers. A total of $282 was transferred to fund 423 for Capital Projects for the SR166/Bay Street Reconstruction. A total of $8,262 was transferred to fund 424 for Debt Service Payments for Decant Station Storm Drainage Utility. St r Drainage Payments 350,000 j 200,01 a 2024 y t 150,000 4 2025 `,. m. e did 20.21 50,000 Jan F b Mar Apr M<y Bury Jul Aug Set Oct Nov Dec Sewer operation — Sewer operations budgeted revenue in the amount of $6,372,750 is budgeted for 2026. Through January, the city has received $534,060 or -8.4% of the 2026 budgeted revenues. Sewer Operations expended $385,822 through January representing '6% of the 2026 budget. The sewer operational expense budget includes transfers which occur throughout the year. The City manages its transfers according to policy goals, cashflow needs, and realized expenses for sewer capital projects, stabilization targets, and debt service payments. The 2026 budget includes $735,944 for transfers. A total of $2,592 was transferred to fund 433 for Marina Pump Station, Sewer Lift Station Controls and 5R166/Bay Street Reconstruction. Sewer Service Paymentsts 80Q000 6OO,0O 0o, 4l,ola 3 0,00c 200,0O 100,000• Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Real Estate Excise Tax (REET) Fund 109 and Impact Mitigation Fee Fund 111 2024 k 2025 2026 The City's Real Estate Excise Tax receipts fluctuate monthly. January 2026 receipts are Lower than January 2025 by 77%. Total Real estate Excise Tax revenues have a YTD growth rate of -77%. The table below shows balances through January for REET 1 & 2 and Impact fees. These restricted funds are used as a local funding source for capital projects that have been documented in the City's comprehensive plans. REET funds are also used for debt payments. The table above shows 2026 beginning fund balances, biennial revenue received to date, expenses budgeted for the biennium and expenses which are obligated for future projects but have not yet been officially budgeted. The intent of this table is to snapshot and illustrate available balances and what is projected for the end of the biennium. Impact Fees received forJanuary 2026 are as follows: o Parks $27,144 o Transportation $32,401 o School District Impact $8,752 REET revenues received in January: o REET1$24,057 $24,057 o REET 2 $24,057 CAPITAL CONSTRUCTION BUDGET PROGRESS Capital Construction Fund 302: The following General capital projects are in progress: 1) Project Account #15 -City Hall Remodel a. —COMPLETED 2) Project Account #18 -South Kitsap Community Events Center including Plaza a. City Staff Time, Design Consulting Services 3) Project Account #53 -Givens Park Sport Court Remodel a. —COMPLETED Street Capital Construction Fund 304: The following Street capital projects are in progress: 1) Project Account #11 -TIP 1.1 Bay St Pedestrian Path ROW a. City Staff Time, Right of Way Consulting Services 2) Project Account #45 -TIP 1.14 Sidney non -motorized a. City Staff Time, Design Consulting Services 3) Project Account #41 -TIP 1.15 Pottery Ave Non -Motorized a. -COMPLETED 4) Project Account #42 -TIP 1.16 SR166/Bay Street Re -Construction a. City Staff Time, Design Consulting Services 5) Project Account #47 -TIP 1.18 Tremont Phase 2 &3 a. City Staff Time, Design Consulting Services 6) Project Account #27 -TIP 1.2 Bay St Pedestrian Path Construction a. City Staff Time, Design Consulting Services 7) Project Account #22 -TIP 1.7 Bethel Phase 5a -Mitchel Roundabout a. City Staff Time, Construction Mgmt. Services, Construction 8) Project Account #38 -TIP 1.8 & 1.9 Blueberry & Salmonberry a. City Staff Time, Design Consulting Services 9) Project Account #65 -TIE 1.4 Anderson Hill RAB a. City Staff Time, Design Consulting Services 10) Project Account #66 -TIP 1.19 SB 160 2A a. City Staff Time, Water Capital Construction Fund 413: The following Water capital projects are in progress: 1) Project Account #16 -Water CIP #3 -Well 11 Treatment and Pumping Site Improvements a. City Staff Time, Design Services, Construction -Nearly complete 2) Project Account #36 -Water CIP #10-Melcher Pump Station Rehab a. City Staff Time, Design Services, 3) Project Account #41 -Pottery Ave Non -Motorized (Water) a. -COMPLETED 4) Project Account #42 -Water CIP#19a Water Main- SR166Bay Water Re -Construction a. City Staff Time, Design Services 5) Project Account #60 -Well #7 a. Nothing at this time 6) Project Account #67 -Water CIP #22 Foster Mitigation a. City Staff Time, 7) Project Account #70 -Water CIP #08 Old Clifton Water Main 390-580 Intertie a. City Staff Time, Design Service Storm Drainage Capital Construction Fund 423: The following Storm Capital projects are in progress: 1) Project Account #41- Pottery Ave Non -Motorized (Storm) a. -COMPLETED 2) Project Account #42 -TIP 1.16 SR166/Bay Street Re -Construction a. City Staff Time, Design Services 3) Project Account #68 -South Sidney Regional Stormwater Facility a. City Staff Time, Design Services 4) Project Account #72 -Ruby Creek Culvert Replacement a. City Staff Time, Design Services Sewer Capital Construction Fund 433: The following Sewer capital projects are in progress: 1) Project Account #04 -Sewer CIP #1 -Marina SW Pump Station a. City Staff Time, Design Services, Construction —Completed 2) Project Account #37 -Sewer Lift Station Controls Upgrade a. City Staff Time, Design Services 3) Project Account #41 -Pottery Ave Non -Motorized (Sewer) a. COMPLETED 4) Project Account #42 -TIP 1.16 SR166/Bay Street Re -Construction a. City Staff Time, Design Services 5) Project Account #43-SWCIP # SB South Sidney Lift Station (Ruby Creek) a. City Staff Time, Design Services 6) Project Account #45 -2nd Sidney Force Main a. City Staff Time, Design Services 7) Project Account #58 -Bay Street Sewer Lift Station Design a. City Staff Time, Design Services Budget Report OPERATIONS BUDGET For Fiscal: 2026 Period Ending: 01/31/2026 Group Summary Variance Original Current Period Fiscal Favorable Percent Department Total Budget Total Budget Activity Activity (Unfavorable) Remaining Fund: 001- Current Expense Revenue 00 - Revenues 15,030,820.00 15,166,020.00 1,272,150.63 1,272,150.63 -13,893,869.37 91.61% Revenue Total: 15,030,820.00 15,166,020.00 1,272,150.63 1,272,150.63 -13,893,869.37 91.61% Expense 01- Finance 1,256,230.38 1,349,830.38 137,043.90 137,043.90 1,212,786.48 89.85% 02 - Court 707,184.44 707,184.44 55,090.24 55,090.24 652,094.20 92.21% 03 - Law Enforcement 7,164,130.80 7,471,980.80 604,989.70 604,989.70 6,866,991.10 91.90% 04 - Community Development 3,028,949.44 3,351,103.44 306,929.04 306,929.04 3,044,174.40 90.84% 05 - Public Works 2,337,559.32 3,047,523.61 127,826.19 127,826.19 2,919,697.42 95.81% 06 - Miscellaneous 900,000.00 1,284,464.00 1,835.79 1,835.79 1,282,628.21 99.86% 07 - Administration 2,133,515.62 2,476,740.62 131,983.78 131,983.78 2,344,756.84 94.67% Expense Total: 17,527,570.00 19,688,827.29 1,365,698.64 1,365,698.64 18,323,128.65 93.06% Fund: 001- Current Expense Surplus (Deficit): -2,496,750.00 -4,522,807.29 -93,548.01 -93,548.01 4,429,259.28 97.93% Fund: 002 - City Street Fund Revenue 00 - Revenues 3,617,534.00 3,760,934.00 154,555.73 154,555.73 -3,606,378.27 95.89% Revenue Total: 3,617,534.00 3,760,934.00 154,555.73 154,555.73 -3,606,378.27 95.89% Expense 05 - Public Works 2,829,534.00 3,201,088.00 165,864.45 165,864.45 3,035,223.55 94.82% 06 - Miscellaneous 750,000.00 750,000.00 0.00 0.00 750,000.00 100.00% Expense Total: 3,579,534.00 3,951,088.00 165,864.45 165,864.45 3,785,223.55 95.80% Fund: 002 - City Street Fund Surplus (Deficit): 38,000.00 -190,154.00 -11,308.72 -11,308.72 178,845.28 94.05% Fund: 003 - Stabilization Fund Revenue 00 - Revenues 0.00 0.00 11,163.44 11,163.44 11,163.44 0.00% Revenue Total: 0.00 0.00 11,163.44 11,163.44 11,163.44 0.00% Fund: 003 - Stabilization Fund Total: 0.00 0.00 11,163.44 11,163.44 11,163.44 0.00% Fund: 103 - Criminal Justice Revenue 00 - Revenues 438,500.00 388,500.00 47,376.50 47,376.50-341,123.5087.81% Revenue Total: 438,500.00 388,500.00 47,376.50 47,376.50 -341,123.50 87.81% Expense 03 - Law Enforcement 555,540.00 669,540.00 17,073.94 17,073.94 652,466.06 97.45% Expense Total: 555,540.00 669,540.00 17,073.94 17,073.94 652,466.06 97.45% Fund: 103 - Criminal Justice Surplus (Deficit): -117,040.00 -281,040.00 30,302.56 30,302.56 311,342.56 110.78% Fund: 104 - Special Investigative Unit Revenue 00 - Revenues 0.00000364.04364.04364.040.00% Revenue Total: 0.00 0.00 364.04 364.04 364.04 0.00% Expense 03 - Law Enforcement 4,000.00 4,000.00 0.00 0.00 4,000.00 100.00% Expense Total: 4,000.00 4,000.00 0.00 0.00 4,000.00 100.00% Fund: 104 - Special Investigative Unit Surplus (Deficit): -4,000.00 -4,000.00 364.04 364.04 4,364.04 109.10% Fund: 107 - Community Events Revenue 00 - Revenues 102,200.00 102,200.00 14,270.16 14,270.16 -87,929.84 86.04% Revenue Total: 102,200.00 102,200.00 14,270.16 14,270.16 -87,929.84 86.04% Expense 07 - Administration 102,200.00 137,200.00 281.06 281.06 136,918.94 99.80% 3/17/2826 10:25:33 AM Page 13 of 17 Budget Report For Fiscal: 2026 Period Ending: 01/31/2026 Variance Original Current Period Fiscal Favorable Percent Department Total Budget Total Budget Activity Activity (Unfavorable) Remaining Expense Total: 102,200.00 137,200.00 281.06 281.06 136,918.94 99.80% Fund: 107 - Community Events Surplus (Deficit): 0.00 -35,000.00 13,989.10 13,989.10 48,989.10 139.97% Fund: 108 - Paths & Trails Revenue 00 - Revenues 1,000.00 1,000.00 207.43 207.43 -792.57 79.26% Revenue Total: 1,000.00 1,000.00 207.43 207.43 -792.57 79.26% Fund: 108 - Paths & Trails Total: 1,000.00 1,000.00 207.43 207.43 -792.57 79.26% Fund: 109 - Real Estate Excise Tax Revenue 00 - Revenues 1,600,000.00 1,600,000.00 70,790.70 70,790.70 -1,529,209.30 95.58% Revenue Total: 1,600,000.00 1,600,000.00 70,790.70 70,790.70 -1,529,209.30 95.58% Expense 06 - Miscellaneous 1,245,400.00 1,245,400.00 1,929.72 1,929.72 1,243,470.28 99.85% Expense Total: 1,245,400.00 1,245,400.00 1,929.72 1,929.72 1,243,470.28 99.85% Fund: 109 - Real Estate Excise Tax Surplus (Deficit): 354,600.00 354,600.00 68,860.98 68,860.98 -285,739.02 80.58% Fund: 111 - Impact Mitigation Fee Revenue 00 - Revenues 3,668,462.00 3,668,462.00 193,900.67 193,900.67 -3,474,561.33 94.71% Revenue Total: 3,668,462.00 3,668,462.00 193,900.67 193,900.67 -3,474,561.33 94.71% Expense 06 - Miscellaneous 650,444.00 4,784,569.00 4,044.34 4,044.34 4,780,524.66 99.92% Expense Total: 650,444.00 4,784,569.00 4,044.34 4,044.34 4,780,524.66 99.92% Fund: 111- Impact Mitigation Fee Surplus (Deficit): 3,018,018.00 -1,116,107.00 189,856.33 189,856.33 1,305,963.33 117.01% Fund: 206 - Bond Redemption Fund Revenue 00 - Revenues 1,245,400.00 1,245,400.00 2,533.25 2,533.25 -1,242,866.75 99.80% Revenue Total: 1,245,400.00 1,245,400.00 2,533.25 2,533.25 -1,242,866.75 99.80% Expense 06 - Miscellaneous 1,000,400.00 1,000,400.00 0.00 0.00 1,000,400.00 100.00% Expense Total: 1,000,400.00 1,000 400.00 0.00 0.00 1,000,400.00 100.00% Fund: 206 - Bond Redemption Fund Surplus (Deficit): 245,000.00 245 000.00 2,533.25 2,533.25 -242,466.75 98.97% Fund: 411 - Water Operating Revenue 00 - Revenues 4,510,815.00 4,510,815.00 317,372.22 317,372.22 -4,193,442.78 92.96% Revenue Total: 4,510,815.00 4,510,815.00 317,372.22 317,372.22 -4,193,442.78 92.96% Expense 05 - Public Works 3,991,158.46 4,401,782.57 197,486.66 197,486.66 4,204,295.91 95.51% 06 - Miscellaneous 731,350.00 615,500.00 3,074.98 3,074.98 612,425.02 99.50% Expense Total: 4,722,508.46 5,017,282.57 200,561.64 200,561.64 4,816,720.93 96.00% Fund: 411- Water Operating Surplus (Deficit): -211,693.46 -506,467.57 116,810.58 116,810.58 623,278.15 123.06% Fund: 412 - Water Stabilization Revenue 00 - Revenues 0.00 0.00 .,. 3,921.16 ..................._ 3,921.16 3,921.16 0.00% Revenue Total: 0.00 0.00 3,921.16 3,921.16 3,921.16 0.00% Fund: 412 - Water Stabilization Total: 0.00 0.00 3,921.16 3,921.16 3,921.16 0.00% Fund: 414 -Water Debt Service Revenue 00 - Revenues 1,366,600.00 1,451,200.00 4,300.80 4,300.80 -1,446,899.20 99.70% Revenue Total: 1,366,600.00 1,451,200.00 4,300.80 4,300.80 -1,446,899.20 99.70% Expense 06 - Miscellaneous 1,366,600.00 1,451,200.00 0.00 0.00 1,451,200.00 100.00% 3; 1'7/2O2 10:251 33 A Pag 1.4 of .; Budget Report For Fiscal: 2026 Period Ending: 01/31/2026 Variance Original Current Period Fiscal Favorable Percent Department Total Budget Total Budget Activity Activity (Unfavorable) Remaining Expense Total: 1,366,600.00 1,451,200.00 0.00 0.00 1,451,200.00 100.00% Fund: 414 - Water Debt Service Surplus (Deficit): 0.00 0.00 4,300.80 4,300.80 4,300.80 0.00% Fund: 421- Storm Drainage Utility Revenue 00 - Revenues 3,195,900.00 3,891,000.00 305,216.06 305,216.06 -3,585,783.94 92.16% Revenue Total: 3,195,900.00 3,891,000.00 305,216.06 305,216.06 -3,585,783.94 92.16% Expense 05 - Public Works 2,441,355.10 2,782,237.50 126,731.41 126,731.41 2,655,506.09 95.44% 06 - Miscellaneous 521,700.00 1,037,442.00 8,545.00 8,545.00 1,028,897.00 99.18% Expense Total: 2,963,055.10 3,819,679.50 135,276.41 135,276.41 3,684,403.09 96.46% Fund: 421- Storm Drainage Utility Surplus (Deficit): 232,844.90 71,320.50 169,939.65 169,939.65 98,619.15 -138.28% Fund: 422 - Storm Drainage Stabilization Revenue 00 - Revenues 0.00 0.00 2,255.50 2,255.50 2,255.50 0.00% Revenue Total: 0.00 0.00 2,255.50 2,255.50 2,255.50 0.00% Fund: 422 - Storm Drainage Stabilization Total: 0.00 0.00 2,255.50 2,255.50 2,255.50 0.00% Fund: 424 - Storm Drainage Debt Service Revenue 00 - Revenues 221,700.00 221,700.00 8,977.11 8,977.11 -212,722.89 95.95% Revenue Total: 221,700.00 221,700.00 8,977.11 8,977.11 -212,722.89 95.95% Expense 06 - Miscellaneous 221,700.00 221,700.00 8,262.66 8,262.66 213,437.34 96.27% Expense Total: 221,700.00 221,700.00 8,262.66 8,262.66 213,437.34 96.27% Fund: 424 - Storm Drainage Debt Service Surplus (Deficit): 0.00 0.00 714.45 714.45 714.45 0.00% Fund: 431- Sewer Operating Revenue 00 - Revenues 6,372,750.00 6,372,750.00 534,060.38 534,060.38 -5,838,689.62 91.62% Revenue Total: 6,372,750.00 6,372,750.00 534,060.38 534,060.38 -5,838,689.62 91.62% Expense 05 - Public Works 6,111,255.10 6,438,082.30 385,822.82 385,822.82 6,052,259.48 94.01% 06 - Miscellaneous 651,475.00 735,944.00 2,592.43 2,592.43 733,351.57 99.65% Expense Total: 6,762,730.10 7,174,026.30 388,415.25 388,415.25 6,785,611.05 94.59% Fund: 431- Sewer Operating Surplus (Deficit): -389,980.10 -801,276.30 145,645.13 145,645.13 946,921.43 118.18% Fund: 432 - Sewer Stabilization Revenue 00 - Revenues 0.00 0.00 5,701.98 5,701.98 5,701.98 0.00% Revenue Total: 0.00 0.00 5,701.98 5,701.98 5,701.98 0.00% Fund: 432 - Sewer Stabilization Total: 0.00 0.00 5,701.98 5,701.98 5,701.98 0.00% Fund: 434 - Sewer Debt Service Revenue 00 - Revenues 1,081,600.00 1,081,600.00 5,110.16 5,110.16 -1,076,489.84 99.53% Revenue Total: 1,081,600.00 1,081,600.00 5,110.16 5,110.16 -1,076,489.84 99.53% Expense 06 - Miscellaneous 1,081,600.00 1,081,600.00 0.00 0.00 1,081,600.00 100.00% Expense Total: 1,081,600.00 1,081,600.00 0.00 0.00 1,081,600.00 100.00% Fund: 434 - Sewer Debt Service Surplus (Deficit): 0.00 0.00 5,110.16 5,110.16 5,110.16 0.00% Fund: 500 - Equipment Rental and Revolving Revenue 00 - Revenues 1,974,100.00 2,515,905.00 117,538.54 117,538.54 -2,398,366.46 95.33% Revenue Total: 1,974,100.00 2,515,905.00 117,538.54 117,538.54 -2,398,366.46 95.33% Expense 10 - ER&R 1,218,500.00 1,780,105.00 116,139.36 116,139.36 1,663,965.64 93.48% 3/1 /2026 10:25:11 A Page 15 rf 11 Budget Report For Fiscal: 2026 Period Ending: 01/31/2026 Variance Original Current Period Fiscal Favorable Percent Department Total Budget Total Budget Activity Activity (Unfavorable) Remaining Expense Total: 1,218,500.00 1,780,105.00 116,139.36 116,139.36 1,663,965.64 93.48% Fund: 500 - Equipment Rental and Revolving Surplus (Deficit): 755,600.00 735,800.00 1,399.18 1,399.18 -734,400.82 99.81% Report Surplus (Deficit): 1,425,599.34 -6,049,131.66 668,218.99 668 218.99 6,717,3506S 111.05% 3/1 /2 26 10:23:33 AM P g! 16 of l i Budget Report CAPITAL BUDGET For Fiscal: 2026 Period Ending: 12/31/2026 Group Summary Variance Original Current Period Fiscal Favorable Percent Account Typ... Total Budget Total Budget Activity Activity (Unfavorable) Remaining Fund: 302 - Capital Construction Revenue 0.00 129,125.00 0.00 60,652.80 -68,472.20 53.03% Expense 0.00 204,125.00 0.00 17,273.50 186,851.50 91.54% Fund: 302 - Capital Construction Surplus (Deficit): 0.00 -75,000.00 0.00 43,379.30 118,379.30 157.84% Fund: 304 - Street Capital Projects Revenue 750,000.00 4,755,000.00 0.00 82,121.33 -4,672,878.67 98.27% Expense 750,000.00 4,755,000.00 0.00 97,287.56 4,657,712.44 97.95% Fund: 304 - Street Capital Projects Surplus (Deficit): 0.00 0.00 0.00 -15,166.23 -15,166.23 0.00% Fund: 413 - Water Capital Revenue 2,379,000.00 2,763,464.00 0.00 123,924.35 -2,639,539.65 95.52% Expense 635,250.00 1,220,164.00 0.00 10,701.69 1,209,462.31 99.12% Fund: 413 - Water Capital Surplus (Deficit): 1,743,750.00 1,543,300.00 0.00 113,222.66 -1,430,077.34 92.66% Fund: 423 - Storm Drainage Capital Facil Revenue 1,164,000.00 2,163,344.00 0.00 59,779.19 -2,103,564.81 97.24% Expense 0.00 1,290,742.00 0.00 972.38 1,289,769.62 99.92% Fund: 423 - Storm Drainage Capital Facil Surplus (Deficit): 1,164,000.00 872,602.00 0.00 58,806.81 -813,795.19 93.26% Fund: 433 - Sewer Capital Revenue 2,616,000.00 2,700,469.00 0.00 235,759.15 -2,464,709.85 91.27% Expense 430,125.00 514,594.00 0.00 6,279.70 508,314.30 98.78% Fund: 433 - Sewer Capital Surplus (Deficit): 2,185,875.00 2,185,875.00 0.00 229,479.45 -1,956,395.55 89.50% Report Surplus (Deficit): 5,093,625.00 4,526,777.00 0.00 429,721.99 -4,097,055.01 90.51% 3/7/2026 11:40:08 AM Page 3 of 4 CASH & INVESTMENTS Detail Report Date Range: 01/01/2026 - 01/31/2026 Fund Summary Fund Beginning Balance Total Activity Ending Balance 001 Current Expense 18,037,245.80 -93,548.01 17,943,697.79 002 - City Street Fund 6,195,371.30 -11,308.72 6,184,062.58 003 Stabilization Fund 3,506,220.11 11,163.44 3,517,383.55 103 - Criminal Justice 544,393.82 30,302.56 574,696.38 104 - Special Investigative Unit 109,530.14 364.04 109,894.18 107 - Community Events 600,243.05 13,989.10 614,232.15 108 - Paths & Trails 20,112.05 207.43 20,319.48 109 - Real Estate Excise Tax 6,743,034.36 68,860.98 6,811,895.34 111- Impact Mitigation Fee 14,444,086.97 189,856.33 14,633,943.30 206 - Bond Redemption Fund 790,088.64 2,533.25 792,621.89 302 - Capital Construction 346,808.11 4,354.41 351,162.52 304 - Street Capital Projects 813,015.15 76,147.27 889,162.42 401- Water -Sewer Utilities 0.00 0.00 0.00 403 - Water -Sewer Cumulative Reserve 0.00 0.00 0.00 411- Water Operating 3,586,597.80 116,810.58 3,703,408.38 412 - Water Stabilization 1,222,960.33 3,921.16 1,226,881.49 413 - Water Capital 13,861,133.46 43,258.33 13,904,391.79 414 - Water Debt Service 1,341,363.93 4,300.80 1,345,664.73 421- Storm Drainage Utility 3,363,420.93 169,939.65 3,533,360.58 422 - Storm Drainage Stabilization 703,461.30 2,255.50 705,716.80 423 - Storm Drainage Capital Facil 1,938,624.65 20,909.35 1,959,534.00 424 - Storm Drainage Debt Service 222,823.64 714.45 223,538.09 431- Sewer Operating 9,241,888.68 145,645.13 9,387,533.81 432 - Sewer Stabilization 1,778,375.71 5,701.98 1,784,077.69 433 - Sewer Capital 14,226,060.53 99,505.57 14,325,566.10 434 -Sewer Debt Service 1,593,794.03 5,110.16 1,598,904.19 500 - Equipment Rental and Revolving 5,174,731.28 1,399.18 5,176,130.46 631- Trust and Agency 63.00 10,068.65 10,131.65 632 - Wastewater Treatment Facil Fee 10,069,084.03 56,037.40 10,125,121.43 Grand Total: 120,474,532.80 978,499.97 121,453,032.77 3/17/2026 10: 00 7 AM Page 5 o€ 5