HomeMy WebLinkAbout054-26 - Granicus - ContractDocusign Envelope ID: C35E874B-4B76-85E0-8113-884B57EA4454
G GRAN ICUS
THIS IS NOT AN INVOICE Order Form
Prepared for
Contract No. 054-26 Port Orchard, WA
Granicus Proposal for Port Orchard, WA
ORDER DETAILS
Prepared By:
Taylor Brodersen
Phone:
(814) 720-4368
Email:
taylor.brodersen@granicus.com
Order #:
Q-466252
Prepared On:
13 Apr 2026
Expires On:
29 May 2026
ORDER TERMS
Currency:
USD
Payment Terms:
Net 30 (Payments for subscriptions are due at the beginning of the period of
performance.)
Current Subscription
End Date:
31 Dec 2026
Order #: Q-466252
Prepared: 13 Apr 2026
Page 1 of 9
Docusign Envelope ID: C35E874B-4B76-85E0-8113-884B57EA4454
GRANICUS Order Form
Port Orchard, WA
PRICING SUMMARY
The pricing and terms within this Proposal are specific to the products and volumes contained within this
Proposal.
One -Time Fees
Solution
Billing
Frequency
Quantity/Unit
One -Time Fee
SmartGov Employee Training
Upon Delivery
18 Each
$2,976.84
Project Management - SmartGov
Upon Delivery
1 Each
$3,832.64
Financial Export Connector Configuration
Upon Delivery
1 Each
$2,756.25
Existing Merchant Connector Configuration
Upon Delivery
1 Each
$1,653.75
BlueBeam Connector Configuration
Upon Delivery
1 Each
$1,653.75
Laserfiche Connector Configuration
Upon Delivery
1 Each
$3,445.31
Consulting hours
Upon Delivery
79 Hours
$13,065.02
SUBTOTAL:
$29,383.56
New Subscription Fees
Solution
Period of
Billing
Quantity/
Annual Fee
Prorated Fee
Performance
Frequency
Unit
SmartGov Connector Financial
30 Apr 2026 -
Annual
1 Each
$1,512.63
$1,016.71
31 Dec 2026
SmartGov Connector
30 Apr 2026 -
Merchant
31 Dec 2026
Annual
1 Each
$1,512.63
$1,016.71
SmartGov Connector
30 Apr 2026 -
BlueBeam
31 Dec 2026
Annual
1 Each
$1,512.63
$1,016.71
SmartGov Connector ECM-
30 Apr 2026 -
Laserfiche
31 Dec 2026
Annual
1 Each
$1,512.63
$1,016.71
SUBTOTAL:
$6,050.52
$4,066.84
• Please note, annual fees for new subscriptions will be prorated to align to Client's then -current billing
term. Exceptions include Recurring Captioning Services, SMS, and Targeted Messages.
Order #: Q-466252
Prepared: 13 Apr 2026
Page 2 of 9
Docusign Envelope ID: C35E874B-4B76-85E0-8113-884B57EA4454
GRANICUS
FUTURE YEAR PRICING
Order Form
Port Orchard, WA
Solution(s)
Period of Performance
Year 2
Year 3
SmartGov Connector Financial
$1,588.26
$1,667.68
SmartGov Connector Merchant
$1,588.26
$1,667.68
SmartGov Connector BlueBeam
$1,588.26
$1,667.68
SmartGov Connector ECM-Laserfiche
$1,588.26
$1,667.68
SUBTOTAL:
$6,353.04
$6,670.72
Order #: Q-466252
Prepared: 13 Apr 2026
Page 3 of 9
Docusign Envelope ID: C35E874B-4B76-85E0-8113-884B57EA4454
GRANICUS
PRODUCT UPDATES
Order Form
Port Orchard, WA
FOR INFORMATION ON RECENT AND UPCOMING PRODUCT ENHANCEMENTS ACROSS THE GRANICUS
PORTFOLIO, PLEASE REFER TO THE SEMIANNUAL UPDATE INFORMATION ON THIS WEBPAGE:
: HTTPS://GRANICUS.COM/SEMIANNUAL-UPDATES/
PRODUCT DESCRIPTIONS
Solution
Description
SmartGov Employee Training
SmartGov User Training:
Permitting - User - 2 Hours
Permitting - Admin 4 Hours
Code Enforcement - User 2 Hours
Code Enforcement - Admin 4 Hours
Plan Review User Training - 2 Hours
Inspector User Training - 2 Hours
Ad Hoc Reports Training - 2 Hours
Total - 18 Hours
Includes one planning meeting to determine the training agenda and
training dates. Training dates must be scheduled within 90 days of initial
planning meeting, based on client and consultant availability.
Maximum of 15 Subscriber trainees per session. Service will be delivered
virtually.
Project Management -
Project Management: Company Project Manager will act as an extension
SmartGov
of the Subscriber's team and manage the implementation from start to
finish. The Subscriber will have access to a personalized timeline which will
be reviewed on a regular cadence. The Project Manager will partner with
the Subscriber to coordinate all services, management of the project
timeline, and help identify risks and/or issues.
Project Management Services include:
• Project planning and kickoff meetings.
• Project schedule developed and maintained according to the
SOW tasks, deliverables, dependencies, and resource assignments.
• Status reporting and coordination of status meetings, bi-weekly, or
as required.
• Schedule monitoring and scope management.
• Risk Management planning to identify, analyze, and mitigate risks.
• Action Item and decision tracking, as well as resolving and
escalating issues.
• Change control management and issue tracking.
Order #: Q-466252
Prepared: 13 Apr 2026
Page 4 of 9
Docusign Envelope ID: C35E874B-4B76-85E0-8113-884B57EA4454
GRANICUS
Order Form
Port Orchard, WA
Solution
Description
• Company project resource management.
• Verify product and deliverable acceptance with Subscriber.
• Facilitating transition to Support.
• Company's Project Manager will serve as the single point of
contact for the project related to this SOW.
SmartGov Connector Financial
The SmartGov Financial Connector outputs a financial extract with a pre-
determined format which may be written to the customer's FTP site, if
desired, to facilitate automated external processing of the file. The
customer may request the use of an alternate delimiter if a comma is not
acceptable. The financial extract job may be run on demand or
scheduled to run on a consistent basis (e.g., daily, weekly, monthly, etc.).
Companion reports designed for reconciliation and extract verification are
also available.
SmartGov Connector Merchant
Connection to one merchant in the back office and/or portal from a list of
available options. Subscriber remains responsible for the relationship with
the provider.
Financial Export Connector
Configure financial export according to subscribers FMS (financial
Configuration
management system) as provided by Subscriber.
Train Subscriber on how to export and set scheduler.
Company will customize the configuration of the export to match
Subscriber financial system input needs as documented. Available
customizations include:
Additional data fields
Altered order of column information
Alternate delimiter or fixed width formatting
A header line is not part of the export.
Financial Connector does not connect directly with any Financial
Management System.
If Subscriber provides a local (FTP) File Transfer Protocol, the Financial
Connector can automatically upload to the defined FTP destination.
By default, financial extract jobs are pre -configured and the included
configuration of the Receipt Extract job will produce a comma -delimited
file with the following data points:
Receipt Number
Receipt Date
FMS/GL Code
Fund
GL Account
Fee Amount Paid
Order #: Q-466252
Prepared: 13 Apr 2026
Page 5 of 9
Docusign Envelope ID: C35E874B-4B76-85E0-8113-884B57EA4454
GRANICUS
Order Form
Port Orchard, WA
Solution
Description
Fee Code Name
Permit/License/Case Number
Payer Name
The included configuration of the Receipt Extract - FMS/GL Summary job
will produce a comma -delimited file with the following data points:
FMS/GL Code
Fund
GL Account
Fee Amount Paid
The file output of the financial extract may be written to the customer's FTP
site, if desired, to facilitate automated external processing of the file. The
customer may request the use of an alternate delimiter if a comma is not
acceptable.
The financial extract job may be run on demand or scheduled to run on a
consistent basis (e.g., daily, weekly, monthly, etc.). Companion reports
designed for reconciliation and extract verification are also available.
Existing Merchant Connector
Configure merchant connection.
Configuration
Test and troubleshoot connection during test process.
Subscriber to provide the required linking information for Company to
complete the setup. These will often include connection URLs, Login IDs,
and Transaction Keys. Requirements vary slightly depending on the
selected Merchant.
SmartGov will not test in Production environments.
Laserfiche Connector
This connector allows file attachments in SmartGov to be stored within an
Configuration
ECM (Enterprise Content Management) system. The Laserfiche integration
was built in compliance with CMIS (Content Management Interoperability
Services) standards.
Subscriber must have the Laserfiche CMIS Gateway, version 10 or higher,
installed and configured for the desired repository and be able to provide
a browser binding URL that SmartGov can reach.
The service and subscription for this connector does NOT include a
subscription to Laserfiche or training on how to install or use the Laserfiche
software.
There are three Secured Functions that control access to the Laserfiche
configuration options:
Admin.JurisdictionBlobProvider - Allow user to all ECM settings and
mappings
Admin.JurisdictionBlobProvider.ConfigureCMlSConnection - Allow user to
Order #: Q-466252
Prepared: 13 Apr 2026
Page 6 of 9
Docusign Envelope ID: C35E874B-4B76-85E0-8113-884B57EA4454
GRANICUS
Order Form
Port Orchard, WA
Solution
Description
configure CMIS connection settings
Admin.JurisdictionBlobProvider.ConfigureECMTemplates - Allow user to
configure metadata template mappings
Configure Subscriber's credentials and mapping in SmartGov.
Meet with Subscriber and guide them through SmartGov to test the
connection.
Consulting hours
Configuration of 175 existing inspection types and 154 existing permit types
within the SmartGov Public Portal. This estimate includes BPA and workflow
configuration as well as creating 3 new reports.
Order #: Q-466252
Prepared: 13 Apr 2026
Page 7 of 9
Docusign Envelope ID: C35E874B-4B76-85E0-8113-884B57EA4454
G GRANICUS
Order Form
Port Orchard, WA
TERMS & CONDITIONS
• This quote, and all products and services delivered hereunder are governed by the terms located at
https://granicus.com/legal/licensing, including any product -specific terms included therein (the "License
Agreement"). If your organization and Granicus has entered into a separate agreement or is utilizing a
contract vehicle for this transaction, the terms of the License Agreement are incorporated into such separate
agreement or contract vehicle by reference, with any directly conflicting terms and conditions being resolved
in favor of the separate agreement or contract vehicle to the extent applicable.
• If submitting a Purchase Order, please include the following language: The pricing, terms and conditions of
quote Q-466252 dated 13 Apr 2026 are incorporated into this Purchase Order by reference and shall take
precedence over any terms and conditions included in this Purchase Order.
• This quote is exclusive of applicable state, local, and federal taxes, which, if any, will be included in the invoice.
It is the responsibility of Port Orchard, WA to provide applicable exemption certificate(s).
• Any lapse in payment may result in suspension of service and will require the payment of a setup fee to
reinstate the subscription.
Order #: Q-466252
Prepared: 13 Apr 2026
Page 8 of 9
Docusign Envelope ID: C35E874B-4B76-85E0-8113-884B57EA4454
GRANICUS
BILLING INFORMATION
Billing Contact: ap@portorchardwa.gov
Billing Address: 216 Prospect St Port Orchard WA 9836
Billing Email: ap@portorchardwa.gov
Order Form
Port Orchard, WA
Purchase Order [ ] - No
Required? [ ] -Yes
6 PO Number:
If PO required
Billing Phone: 360.876.4407
If submitting a Purchase Order, please include the following language:
The pricing, terms, and conditions of quote O-466252 dated 13 Apr 2026 are incorporated into this Purchase
Order by reference and shall take precedence over any terms and conditions included in this Purchase Order.
AGREEMENT AND ACCEPTANCE
By signing this document, the undersigned certifies they have authority to enter the agreement. The
undersigned also understands the services and terms.
Port Orchard, WA
Signature: signed by:
Er3B96492E3F5847D
Name: I Rob Putaansuu
Title: Mayor
Date:I 4/15/2026
Order #: Q-466252
Prepared: 13 Apr 2026
Page 9 of 9