HomeMy WebLinkAbout063-25 - Active Construction, Inc. - Contract Amendment 2Docusign Envelope ID: FBA037C1-1961-8DF3-82E2-4E68E00C4B5E
CITY OF PORT ORCHARD
Authorization for Change Order No. 2
Date: 04/17/26 Contractor: Active Construction, Inc.
Sidney Rd. Non -Motorized Imp.
Project: Project 5110 River Rd E.
Contract / Job # C063-25
Tacoma, WA 98443
THIS CHANGE ORDER AUTHORIZES (add description).
ACI's installation of the Sidney Non -Motorized Improvements project's sanitary sewer force main has encountered delays as a direct result of an adjacent trench
for a separately installed sanitary sewerjust prior to the City's project. The adjacent trench backfill was unsuitable native material that was proven to not meet
WSDOT material specifications. Meeting these material specifications was a requirement by that developer/contractor's City of Port Orchard permit conditions.
During the trenching by ACI for the City's project, the adjacent trench wall consistently sloughed and fell into ACI's trench. Additionally, this condition made it
unsafe to plate the roadway during construction due to instability of the roadway related to the adjacent trench. For this reason, ACI had to backfill every evening
and excavate to expose the pipe every morning. This led to a required change to the construction methods and materials required when compared to the original
project scope. instead of being able to weld the pipe directly, ACI had to install fusion couplings every day utilizing a specialized fusing machine. For the above
reasons, ACI experienced delays related to the amount of pipe per day that could be installed. The attachments include information on labor, equipment, and
material costs that are associated with these delays. Additionally, ACI will be granted 7 working days for these delays. An additional 5 working days are being
granted due to the other contractor working on Sidney Road, forcing ACI to reorganize and prioritize other portions of the work along Sidney Ave. in total, 12
additional working days will be granted in association with this change order.
Change Order #2 Totals- 587,406.81 including tax. See attachments for additional details. I
Contract History
Amount Sales Tax Total Date Appvd by
Original Contract
$2,653,782.44
$70,941.56
$2,724,724.00
22 -Jul -25
Council
Change Order 1
$26,492.85
$1,372.11
$27,864.96
29 -Dec -25
PW Director
Change Order 2
$86,674.84
$731.97
$87,406.81
28 -Apr -26
Council
Total Contract $2,766,950.13 $73,045.64 $2,839,995.77
have reviewed the Change Order informa
costs are true and accurate.
nt
Sig
r)
n above and certify that to the best of my knowledge descriptions and
,-DocuSigned by:
Public Works Director
Denis Ryan
Printeill Name & Title
Printed Name
DocuSigned by:
Change Orders that do not exceed 10%, with a maximum of
��� l/' PIM MAA SITU.
$50,000, of either legally authorized budget limit or contract
Approved:
�6AE88650L1E711EF
amount established by City Council can be approved by the Public
Ma g fined by:
Works Director.
Change Orders that do not exceed 10%, with a maximum of
Attest:
$100,000, of either legally authorized budget limit or contract
nnnn^n
City Clerk
amount established by City Council are to be approved by the
Mayor.
April 28, 2026
Change Orders over $100,000 or exceed a total of 10% require
Council Action.
Council Approval Date
Docusign Envelope ID: FBA037C1-1961-8DF3-82E2-4E68EOOC4B5E
I ACTIVE �
AC CONSTRUCTION
INC
4/15/2026
Christian Williams
City of Port Orchard
216 PROSPECT STREET
PORT ORCHARD, WA 98366
Re: Project: SIDNEY ROAD NON -MOTORIZED IMPROVEMENTS
Owner CITY OF PORT ORCHARD
Subject: Delays & additional materials due to existing adjacent trench conditions.
Christian,
As discussed, documented, and witnessed by COPO staff, our utility crews have consistently
encountered road and trenching instability issues as a direct result of the condition of the existing trench
adjacent to ours. These conditions have resulted in the following additional costs.
• Crews have had to install additional couplers every day due to trench instability. ACI' s intent
was to plate the trench at the end of every workday. Due to the instability created by the
existing adjacent trench we were unable to complete our work plan as estimated. Crews had to
install couplers and backfill the trench completely at the end of every workday.
o ACI is requesting full compensation for the cost of these materials, electric fusion
couplers, and fusion machine.
• Additionally, with the added work and loss of production due to the existing adjacent trench,
we are requesting (14 '/2) additional workdays to be added to the schedule.
o ACI estimated 125 LF per day, equaling a total of (32) workdays.
o Due to unforeseen existing conditions, the crews averaged 95 LF per day, equaling a
total of (45 1/2) workdays.
• ACI is requesting full compensation for the delays associated with the existing trench
conditions. These are, but are not limited to, crew time and flagger hours.
ACTIVE CONSTRUCTION, INC.
(Authorized Signature)
Benjamin Kent - Superintendent
(Name & Title)
il 15, 2026
(Dated)
PO BOX 430 PUYALLUP, WA 98371 PHONE (253) 248-1091 FAX (253) 248-1092
www.activeconstmction.com AC-TI-VCI-164-JL
ACI is an "Equal Employment Opportunity Employer"
Docusign Envelope ID: FBA037C1-1961-8DF3-82E2-4E68E00C4B5E
ACIACTIVE
CONSTRUCTION ADDITIONAL WORK SUMMARY
INC.
A.C.I. SIDNEY ROAD NON -MOTORIZED IMPROVEMENT PROJECT A.C.I. PHASE
PROJECT CODE
25-031 DATE WORK PERFORMED:
DESCRIPTION OF WORK
Additonal Labor, equiptment, materials and rentals, to install added HDPE couplers (34). Additional labor,equiptment, (change in
means & methods) backfill daily in lieu of road plates. This is equivillant to (1) Foreman, (2) Laborers, (4) Operators, and (4)
Flaggers. Materials charged, are only for addtional work, other gear shown is contracual. This includes all fusion machines and
couplers.
MANPOWER
HOURS
@ RATE
TOTAL
FOREMAN
40.0
@ $93.15
$3,726.00
LABORER
80.0
@ $76.84
$6,147.20
OPERATOR
160.0
@ $88.78
$14,204.80
FLAGGER
160.0
@ $60.11
$9,617.60
SUBTOTAL LABOR
$33,695.60
EQUIPMENT DESCRIPTION / RATES
EQUIP. NO.
EQUIPMENT DESCRIPTION
HOURS
@ RATE
TOTAL
273
Onsite truck
32.0
@ $31.87
$1,019.84
279
650J Dozer
20.0
@ $64.50
$1,290.00
535
JD 644 Loader
52.0
@ $82.47
$4,288.44
576
225D Excavator
44.0
@ $102.92
$4,528.48
610
Dynapac Roller
12.0
@ $34.61
$415.32
SUBTOTAL EQUIPMENT
$11,542.08
MATERIAL COSTS
DESCRIPTION
UNIT
@ RATE
TOTAL
Couplers & Fusion Machine
1.00
@ $23,609.66
$23,609.66
SUBTOTAL MATERIALS
$23,609.66
SERVICE COSTS
DESCRIPTION
UNIT
@ RATE
TOTAL
SUB CONTRACTOR
DESCRIPTION
UNIT
@ RATE
TOTAL
MARK-UP ON LABOR 31%
$10,445.64
SUBTOTAL LABOR
$44,141.24
MARK-UP ON EQUIPMENT 21%
$2,423.84
SUBTOTAL EQUIPMENT
$13,965.92
TAX ON MATERIALS (N/A ON WATER
& SEWER) 9.30%
$731.97
MARK-UP ON MATERIALS
21%
$4,958.03
SUBTOTAL MATERIALS
$29,299.66
GRAND TOTAL
$87,406.81
Note:
Docusign Envelope ID: FBA037C1-1961-8DF3-82E2-4E68E00C4B5E
Corporate Office
3633 136th PI SE. Ste 100, Bellevue, WA 98006
H. D. FQIrULER P0 Box 160, Bellevue, WA 98009-0160
Phone 425-654-8800 - Fax 425-6411-8888 85
COMPANY Service Warehou Branch
REMIT. PO Box 84368. Seattle. WA 98124
invoice
Number 17236463 KRWH Bellevue, WA 98005 Fax (none)
# 011500
To:
Ship to: 500 SIDNEY AVE
1/1
T-0 ACTIVE CONSTRUCTION CO
PO BOX 430
PORT ORCHARD WA
Order# Ins Date: Order Writer:
983679999
PUYALLUP WA
983710162
08768464
02/12/26
Ethan Smith
Terms: NET 10TH PROX
FOB: H. D. FOWLER COMPANY
Due: 03/10/26
Ship Via: SALESPERSON DELI
P0/JOB: 25-031
F-RY031 SIDNEY ROAD SEWER MAI
Qty Qty
Line Ship'd BO'd
2 8 0
Part # Unit
Price
UoM Description
EA MSFM412 DAILY RATE OF 412 FUSION MACHINE 1200-000
Extended T
Price X
9600.00 Y
(4"-12") FUSION MACHINE" WEEKLY RATE OF 412
3 8 0
FUSION MACHINE "
EA MSFMBEADSML DAILY RENTAL SMALL DIAMETER 600.000
4800.00 Y
DE-BEADER 3"-12" DE -BEADING HEADS, INCLUDES
1 1 0
POLES" 10" DEBEADER WI POLE KIT "
EA MSOUT CHECKOUT OF RENTAL ITEM " 12-9-25 0.000
0.00
BEGIN RENTAL OF 412-001 W1 1-" IPS INSERTS "
RECEIVED
Eg ,3 2026
ACI
Sub total 14,400.00
Freight 0.00
Tax 1,339.20
Serving the Pacific Northwest since 1911 Grand Total 15,739.20
MIKE ANS vww.hdfowier corn
Terms & Conditions: hdfowier.com/tcs
Docusign Envelope ID: FBA037C1-1961-8DF3-82E2-4E68E00C4B5E
�ro INVOICE
1830 Craig Park Court
St. L, No 63146
Invoice #
Invoice Date
Account #
Sales Rep
Phone #
Branch #302
Total Amount Due
Remit To:
CORE 6 MAIN LP
PO BOX 2S33O
ST. LOUIS, MO
X827407
12/03/25
114482
JOHNNY SPENCER
253-840-8558
Puyallup, WA
$18,149.46
63146
Shipped To:
ACTIVE CONSTRUCTION, INC. 000/0000 SIDNEY RD SW & SW HOVDE RD
ACCOUNTS PAYABLE 00000 PORT ORCHARD, WA
PO BOX 430
PUYALLUP WA 98371 0162
CUSTOMER JOB- 25-031 SIDNEY NMI SIDNEY RD NMI
+ r Thank you for the opportunity to aerve your We appreciate your prompt payment.
Date Ordered Date Shipped Customer PO # Job Name ,lob # Bill of Lading Shipped Via Invoice#
9/28/25 12/02/25 SEE BELOW SIDNEY NMI 25-031 CORE & MAIN LP X827407
Product Code
0941P1011
0941F101122
398
091O0SEFIPS
0941M1011FA
0941BUR1011DI
Description
uantit
Ordered Shipped B/❑
CUSTOMER PO#- 25-O31 HOPE MAT'L
10 IPS DR11 } PE PIPE
200 PSI
10" 4100 SDR11 IPS PE 22-1/2
#8 COPPER SPLIT BOLT CONNECTOR
10 IPS ELECTROFUSE CPLG ELK
10 4100 SDR11 IPS PE FLG ADP
10" SDR11 DI IPS BACKING RING
RECEIVED
DEC 4
ACI
344O 10OO 244O
Price UM Extended Price
15.54000 FT 15,540.00
10
1O
105.73000 EA
1,057.30
9
9
3.03000 EA
27.27
1
1
231.49000 EA
231.49
4
4
44.19000 EA
176.76
4
4
29.16000 EA
116.64
Freight Delivery Handling Restock Misc Subtotal: 17,149.46
Other: 1,000.00
Tax:
$1,000.00
Terms: NET 3O
ordered By: MIKE B - HDPE MAT Invoice Total; $18,149.46
This trap.action i■ governed by and subject to core a Xain'e standard term. and conditions. which are incorporated by reference and accepted.
To review these tern. and conditions. please visit: httpa:llcoreandmaia.coalterms•of-aalel
Page: 1
00000
Docusign Envelope ID: FBA037C1-1961-8DF3-82E2-4E68E00C4B5E
invoice #
Invoice Date
EjFINVOICE Account #
Sales Rep
Phone #
Branch #302
1830 Craigg Park Court
Total Amount Due
St. Louie, MO 63146
Remit To:
CORE & MAIN LP
PO Box 28330
ST. LOUIS, MO
Shipped To:
ACTIVE CONSTRUCTION, INC. 000/0000 CUSTOMER PICK-UP
ACCOUNTS PAYABLE 00000
PU BOX 430
PUYALLUP WA 98371 0162
Y264813
12/22/25
114482
JOHNNY SPENCER
253-840-8558
Puyallup, WA
$2,314.90
63146
CUSTOMER JOB- 25-031 SIDNEY NMI SIDNEY RD NMI
r r Thank you for the opportunity to serve your We appreciate your prompt ywent.
Date Ion # Bill of Lading Shipped Via Invoice#
Ordered Date Shipped Customer P❑ # Job Name WILL CALL Y26481-312/12/25 12/16/25 SEE BELOW SIDNEY NMI 25-031
Product Code
09100SEFIPS
Description
CUSTOMER PO#- 25-031 FUSION COCIPLG
10 IPS ELECTROFUSE CPLG ELK
REGE1VEv
DEC 237025
ACt
Quantity
Ordered Shipped B/O
1C
Price UM Extended Price
231.49000 BA 2,314.90
Subtotal: 2,314.90
Freight Delivery Handling Restock iliac Other: .00
Tax: 0
Tarms: NET 30 Invoice Total: $2,314.90
ordered By: MIRE EVANS
This transaction is governed by and subject to Core & Mein'. ■tendard tern and conditions, which are incorporated by reference and accepted.
To review these tern.e and conditions, please visit: bttpsI//careandmain. Cora/terms-of-sale/
Page:
0000C
Docusign Envelope ID: FBA037C1-1961-8DF3-82E2-4E68E00C4B5E
cv� r INVOICE
1830 Craig Park Court
St. Louis, Ha 63146
ACTIVE CONSTRUCTION, INC. 000/0000
ACCOUNTS PAYABLE 00000
PO BOX 430
PUYALLUP WA 98371 0162
Invoice #
Invoice Date
Account #
Sales Rep
Phone #
Branch #302
Total Amount Due
y329333
1/06/26
114482
JOHNNY SPENCER
253-840-8558
Puyallup, WA
$2,314.90
Remit To:
CORE & MAIN LP
PO BOX 28330
ST. LOUIS, NO 63146
Shipped To:
SIDNEY RD SW & SW HOVDE RD
PORT ORCHARD, WA
CUSTOMER JOB- 25-031 SIDNEY NMI SIDNEY RD NMI
-- ___--�----_---_---_- -Thank you for the opportunity' to serve you! We appreciate your promptpayent. a Date Ordered Date Shipped Customer PO # Job Name Job # Bill of Lading Shipped MAIN LP X329333#
12/31/25 1/05/26 SEE BELOW SIDNEY NMI 25-O31
Product Code
09100SEFIP5
Description
CUSTOMER PO#- 25-031- 10 HDPE CPLG
10 IPS ELECTROFUSE CPLG BLK
RECEIVED
JAN 7 2026
0i
Quantity
Ordered Shipped 8/0
10
Price UN Extended Price
231.49000 EA 2,314.90
Subtotal: 2,314.90
Freight Delivery Handling Restock Misc Other: .0D
.O0
Tax:
Terms: NET 30 Invoice Total: $2,314.90
Ordered By: MIRE B - 10 SOPS CPLGS
This transaction is governed by ands ub ect to
ohcotarma
r iand conditionse pleas via itd tihttpe hlcoreendmain aml t0raiaYr gserC nre and ecc epted. rPage: 1.
0000
Docusign Envelope ID: FBA037C1-1961-8DF3-82E2-4E68E00C4B5E
MAIN ■
1830 Craig Park Court
St. Louis, WO 63146
Backordered from:
12/03/25 X827401
ACTIVE CONSTRUCTION, INC. 000/0000
ACCOUNTS PAYABLE 00000
PO BOX 430
PIJYALLUP WA 98371 0162
Invoice #
Invoice Date
Account #
Sales Rep
Phone #
Branch #302
Total Amount Due
Y441419
1/30/26
114482
JOHNNY SPENCER
253-840-8558
Puyallup, WA
$23,535.05
Remit To:
CORE & MAIN LP
PO BOX 28330
ST. LOUIS, MO 63146
Shipped TO:
SIDNEY RD SW & SW HOVDE RD
PORT ORCHARD, WA
CUSTOMER JOB- 25-031 SIDNEY NMI SIDNEY RD NMI
_ __ ------------------------------------------
-----------------------------------
Thanknk you for the opportunity to serve yowl We appreciate your prompt payment.
Date Ordered Date Shipped Customer PO # Job Mamie Job # Bill of Lading Shipped Via Invoice*
9/28/25 1/29/26 SEE BELOW SIDNEY NMI 25-031 CORE & MAIN LP Y441419
Product Code Description
CUSTOMER PO#- 25-031 HDPE MAT'L
0941P1011 10 IFS DR11 HDPE PIPE
200 PSI
09100SEFIPS 10 IFS ELECTROFUSE CPLG BLK
Quantity
Ordered Shipped B/0
1440 1440
5 5
Price UM Extended Price
15.54000 FT 22,377.66
231.49000 EA 1,157.45
Subtotal: 23,535.05
Freight Delivery Handling Restock Misc Other: .00
Tax; 0
Terms. NET 30
Ordered By: MIKE E - KDPE MAT Invoice Total: $23,535.05
Thin treoCactian i■ governed by and eubject to Core & rtain'e standard terra and conditions. which are incorporated by reference end accepted -
To review these terms and conditions, plea.. visit= http s:Ilcoresadmaia.com/term.f-tale/
Page: 1
01001
Docusign Envelope ID: FBA037C1-1961-8DF3-82E2-4E68E00C4B5E
■- ■ - Bic MAIM
1830 Craig Park Court
St. Louis, MO 63146
Invoice #
Invoice Date
Account #
Sales Rep
Phone #
Branch #3O2
Total Amount Due
Y561415
2/24/26
114482
JOHNNY SPENCER
253-840-8558
Puyallup, WA
$694.47
Remit To:
CORE & MAIN LP
PO BOX 28330
ST. LOUIS, MO 63146
Shipped To:
ACTIVE CONSTRUCTION, INC. 000/0000 SIDNEY RD SW & SW HOVDE RD
ACCOUNTS PAYABLE 00000 PORT ORCHARD, WA
PO BOX 430
PUYALLUP WA 98371 O162
CUSTOMER JOB- 25-031 SIDNEY NMI SIDNEY RD NMI
-- ----------------------------------------------------------------------
Y Thank you for the opportunity to nerve you: We apprn.iate your prompt payment.
Date Ordered Date Shipped Customer PO # Job Name Job # Bill of Lading Shipped Via Invoice#
2/18/26 2/23/26 SEE BELOW SIDNEY NMI 25-031 CORE :t MAIN LP Y561415
Product Code Description
CUSTOMER PO#- 25-031- HOPE MAT'L
0910OSEFIPS 1O IPS ELECTROFUSE CPLG BLK
RECEIVED
EB 25 2026
AC!
Ordered Shipped B/O
Price UM Extended Price
231.49000 SA 694.47
Freight Delivery Handling Restock Mist Subtotal: 694.47
Other: .O0
Tax: OO
Terms: NET 30 _ �'+pics Total: - --- $694.47
Ordered By. MIKE S - SPY i(7►T'L - -
Ii1
This transaction is governed by and-ubj•ct to Coro 4 Main's standard terms and conditions, which are incorporated by reference and accepted.
To review these terms and conditions, p.eaae visit: httpa:llcoreandwa in.co/term-of-salel
Page: 1
00000
Docusign Envelope ID: FBA037C1-1961-8DF3-82E2-4E68E00C4B5E
C INVOICE
1630 Craig Park Court
St. Louie, *W) 63146
Invoice #
Invoice Date
Account #
Sales Rep
Phone #
Branch #302
Total Amount Due
Y511014
2/16/26
114482
JOHNNY SPENCER
253-840-8558
Puyallup, WA
$1,157.45
Remit To=
CORE & MAIN LP
PO BOX 28330
ST. LOUIS. MO 63146
Shipped To:
ACTIVE CONSTRUCTION, INC. ❑00/0000 SIDNEY RD SW & SW HOVDE RD
ACCOUNTS PAYABLE 0000O PORT ORCHARD, WA
P❑ BOX 430
PUYALLUP WA 98371 0162
CUSTOMER JOB- 25-031 SIDNEY NMI SIDNEY RD NMI
------ --------------------------------------------------------------
Thank you tar the opportunity t❑ serve you! we appreciate your prompt payment.
Date Ordered Date Shipped Customer P❑ # Job Name Job # Bill of Lading Shipped Via Invoice#
- 25-03 a -ter 'i N0 25-031 CORD r MAIN LP Y11014
Quantity
Product Code Description Ordered Shipped B/❑ Price UM Extended Price
09100SEPIPS 10 IPS ELECTROFUSE CPLG ELK 5 5 231.490O❑ EA 1,157.45
RECEIVED
FEB 17 2026
ACI
Freight Delivery Handling Restock Misc Subtotal: 1,157.45
Other: .00
Tax: .00
Terms: ,iET 30
Ordered By: DAN X. Invoice Total; $1,157.45
This transaction is governed by and subject to Core i ■sin's standard term and conditions, which are incorporated by reference and accepted.
To review these terms and conditions, please visit: Attpa:Ilcoraandsaie.comlterma-of -aalel
_ -. Page: 1
Docusign Envelope ID: FBA037C1-1961-8DF3-82E2-4E68E00C4B5E
Docusign Envelope ID: FBA037C1-1961-8DF3-82E2-4E68E00C4B5E
Docusign Envelope ID: FBA037C1-1961-8DF3-82E2-4E68E00C4B5E
Date
Length Completed (LF)
Location
Total Length of FM (LF) Total Working Days to Complete Average Length/Day (LF/Day) Assumed Length/Day (LF/Day) w/o Trench
2/18
119
South of NW Cascade Trench
3257 33 98.70 123.0
2/19
140
South of NW Cascade Trench
2/23
120
South of NW Cascade Trench
# Working Days Req'd w/o Trench
2/24
120
South of NW Cascade Trench
26.48
2/25
120
South of NW Cascade Trench
2/26
120
South of NW Cascade Trench
Total Working Days Lost Due to Trench
3/4
122
South of NW Cascade Trench
6.5
Average
123.0
Note: Above lengths completed south of the NW Cascade Trench area were used to find an average length per day when unaffected by NWC trench
Note: Sewer force main installed during course of 33 working days between 12/22 and 3/5.