Loading...
HomeMy WebLinkAbout06/10/2025 - Regular - Additional Doc-TIFTransportation Impact Fees Preferred Alternative Nicholas Bond, AICP 6/10/25 • Consultant Alternatives: • Alternative A: $7,044 per trip • Alternative B: $8,998 per trip • Alternative C: $10,181 per trip • Council requested the we split the difference between Alternatives A and B. • Adjusting the fee requires adding or subtracting projects. ' • Alternative B includes all projects from Alternative A plus 12 additional projects. • Growth's Share Alternative A: $60,431,579 • Growth's Share Alternative B: $77,195,221 • Council asked to split the difference between Alternatives A and B. • This means adding $8,381,821 in projects. • Council was asked to rank 12 projects from highest to lowest priority. r 1. Project 2.20 Bay Street Ped. Pathway West Ph. 1 (Tremont to Foot ferry) $1,000,000 2. Project 2.23 Bay St Complete Street (PO Blvd to Mile Hill Dr) $2,500,000 3. Project 2.34 Bay St Reconstruction Ph. 2 (PO Blvd to Robert Geiger St) $1,250,000 4. Project 2.27 Sidney Ave (Downtown) Impr. (Prospect to Waterfront) $375,000 5. Project 2.32 Bay St Ped. Pathway West Ph. 2 (Kitsap Transit to PO Blvd) $250,000 6. Project 2.02A Sedgwick Rd West Design/ROW (SR1 6 to Sidney Rd SW) $231,000 7. Project 2.35 Bay St Reconstruction Ph. 3 (Frederick to Harrison) $1,000,000 Total Cost for projects ranked #1-7: $6,606,000 8. Project 2.04B Bethel/Sedgwick Corridor Ph. 2 (SR 16 to Bethel) $3,944,000 9. Project 2.17 Salmonberry Rd Widening (Ramsey to Bethel) $2,250,000 10. Project 2.24 Bay St & Port Orchard Blvd Roundabout $750,000 11. Project 2.02B Sedgwick Rd West Construction (SR 16 to Sidney Rd SW) $693,642 12. Project 2.19 Old Clifton Rd/Feigley Rd Roundabout $2,520,000 4 I Growth's Share Target: $8,381,821 1. Alternative A plus projects 1-7: $6,606,000 2. Alternative A plus projects 1-7, 10-11: $8,049,642 3. Alternative A plus projects 1-7, 9: $81856�000 4. Alternative A plus projects 1-8: $10,550,000