HomeMy WebLinkAbout10/21/2025 - Work Study - Additional Doc-Critical Areas OrdinanceD25 Critical Areas Ordinance Update
Port Orchard Municipal Code 20.162
Department of Community Development
October 2025
Align with 2024
Comprehensive
Plan Periodic
Update
Ensure
compliance with
the Growth
Management Act
(GMA)
Integrate Best
Available Science
(BAS)
Protect critical
areas and
Critical Areas Defined
(RCW 36.70A.030(5))
• Wetlands
• Aquifer recharge areas
• Fish and wildlife habitat conservation
areas
• Frequently flooded areas
• Geologically hazardous areas
Planning Commission Review Timeline
January, February, July 2025: Staff
presentations
ec
Significant edits based on Planning
Commission input
Public hearing and recommendation
Initial comment matrix introduced Matrix updated, largely unchanged
7 Oct. 2025
Comment Matrix Overview
Tracks public input and staff
responses
Color -coded: Green =
Incorporated; Yellow = Under
discussion; Red = Not incorporated
Included in all Planning
Commission packet and Work
Study packet
• New Verification Process (POMC 20.162.021)
• Enables critical areas review outside of development applications; supports feasibility studies and site planning consensus
between applicants and the City.
• Provides a City review service to property owners and developers; does not authorize the City to prepare reports on behalf of
property owners.
• Ensures recommendations are based on existing site conditions rather than speculative future mitigation measures.
• Code Reorganization
• Restructures sections to streamline review and improve usability.
• Wetland Buffers and Mitigation
• Updates buffer standards to align with Department of Ecology guidance.
• Reflects current wetland mitigation hierarchy with emphasis on mitigation banking and programmatic solutions; onsite
mitigation remains an option when programmatic approaches are infeasible.
• Riparian Management Zones (RMZs)
• Replaces "stream buffer" terminology with RMZ to align with WDFW BAS.
• RMZ standards revised to meet or exceed WDFW minimums, improving habitat protection.
Buffer width (in feet) based on habitat score
Wetland Category
Score 3-4 Score 5
Score 6-7
Score 8-9
Category l:
100 140
220
300
Based on total score
Category I:
250
300
Bogs and wetlands of high conservation value
Category l:
200
220
300
Coastal Lagoons
Category I:
300
Interdunal
Categoryl:
100 140
220
300
Forested
Category I:
200 (buffer width not based on habitat scores)
Estuarine
Category II:
100 140
220
300
Based on score
Category II:
150
220
300
Interdunal wetlands
Category II:
150 (buffer width not based on habitat scores)
Estuarine
Category III (all)
80 140
220
300
Category IV (all)
50
Buffer width (in feet) based on habitat score
Wetland Category
Score 3-5 Score 6-7 Score 8-9
Buffer width based on special characteristics
Category l:
100
150 300
N/A
Based on total score
Category I:
N/A 300
250
Bogs and wetlands of high conservation value
Category I:
N/A
200
Estuarine and wetlands in coastal lagoons
Category I:
N/A 300
N/A
Interdunal
Category l:
100
150 300
N/A
Forested
Category II:
100
150 300
N/A
Based on score
Category II:
N/A
150
Interdunal wetlands
Category II:
N/A
150
Estuarine and wetlands in coastal lagoons
Category III (all)
80
150 300
N/A
Category IV (all)
50
N/A
BUFFER WIDTH STANDARD
MINIMUM BUILDING SETBACK OTHER DEVELOPMENT STANDARDS
For minor new development the department may reduce the buffer width by
up to 25 percent through an administrative buffer reduction process when
150 feet 15 feet beyond buffer review with the Washington State Department of Fish and Wildlife determines
that conditions are sufficient to protect the affected habitat. The buffer shall
50 feet 15 feet beyond buffer
not be less than 25 feet. Where applicable, refer to the development
50 feet 15 feet beyond buffer standards in this chapter. Where such features occur on a site, the more
restrictive buffer or building setback will apply.
Where applicable, refer to the development standards in this chapter. Where
None
50 feet such features occur on a site, the more restrictive buffer or building setback
None
50 feet will apply.
None
50 feet
None
35 feet
Buffer widths and setbacks will be determined through mandatory habitat plan.
ite-specific conditions will determine the need for the preparation of a habitat plan for buffer widths and setbacks.
Proposed Riparian Management
Zone Buffers
Streams
r Type
CATEGORY
F
Np
Ns
RIPARIAN MANAGEMENT ZONE WIDTH STANDARD
Lakes - Less Than 20 Acres (Non -Type 1 Waters of the State)
ning Designation
Community Facilities
Commercial, Mixed Use
Employment
Greenbelt, Residential
CONSISTENT WITH THE GOALS
AND POLICIES IN THE CITY OF
PORT ORCHARD 2024
COMPREHENSIVE PLAN
PRESERVES ECOLOGICAL
FUNCTIONS AND MITIGATES RISKS
SUCH AS LANDSLIDES AND
FLOODING
INCLUDES SPECIAL MEASURES TO
PROTECT ANADROMOUS
FISHERIES, INCLUDING
SALMONIDS
ENSURES CONSISTENCY WITH
GMA REQUIREMENTSAND
INTEGRATES BAS
• SEPA Determination of Non -Significance (DNS) issued September 12, 2025
• One DNS comment from DNR; definition of "geologist" added to draft
• DNS was not appealed
• Proposed amendments transmitted to WA Dept. of Commerce on September 12,
2025 for 60 -day review (review period ends November 11, 2025)
• Adoption by Council may occur after Commerce review period concludes
• Planning Commission forwarded recommendation of approval following October 7
public hearing
• Legal blackline version included in packet and incorporated into adopting ordinance
• Tentative City Council action: November 18, 2025 pending Commerce review
completion