Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
02/24/2026 - Regular - Additional Doc-Donlin2
Additional Construction Costs generated by the City of Port Orchard Foundation Pinning * (includes labor, materials, geotech & structural engineer, GC fee, and sales tax) $125,000. Additional last minute foundation engineering – additional concrete 25,000. Geotech engineering fees 15,410. Structural engineering fees 13,080. House Design (Pacific Home Source) twice converting plans to ‘as built’ 3,800. Basement vents first demanded installing, then demanded sealing up 3,735. Sewer connection road paving (removal and repaving) 12,911. (Inv #3032 & 3035) Construction loan monthly interest charges (9.2025 – 2.2026 -7 months to date) 44,884. (City forced inactivity) _________ $243,820. *Not yet billed as of 2.2026