Loading...
HomeMy WebLinkAbout02/24/2026 - Regular - Additional Doc-Donlin2 (PDF)Use this document 2nd Additional Construction Costs generated by the City of Port Orchard Foundation Pinning* (includes labor, materials, geotech & structural engineer, GC fee, and sales tax) $125,000. Additional last minute foundation engineering —additional concrete 25,000. Geotech engineering fees 15,410. Structural engineering fees 13,080. House Design (Pacific Home Source) twice converting plans to `as built' 3,800. Basement vents first demanded installing, then demanded sealing up 3,735. Sewer connection road paving (removal and repaving) 12,911. (Inv #3032 & 3035) Construction loan monthly interest charges (9.2025 — 2.2026 -7 months to date) 44,884. (City forced inactivity) $243,820. *Not yet billed as of 2.2026