HomeMy WebLinkAbout02/24/2026 - Regular - Additional Doc-Donlin2 (PDF)Use this document 2nd
Additional Construction Costs
generated by the
City of Port Orchard
Foundation Pinning*
(includes labor, materials, geotech & structural engineer, GC fee, and sales tax) $125,000.
Additional last minute foundation engineering —additional concrete 25,000.
Geotech engineering fees 15,410.
Structural engineering fees 13,080.
House Design (Pacific Home Source) twice converting plans to `as built' 3,800.
Basement vents first demanded installing, then demanded sealing up 3,735.
Sewer connection road paving (removal and repaving) 12,911.
(Inv #3032 & 3035)
Construction loan monthly interest charges (9.2025 — 2.2026 -7 months to date) 44,884.
(City forced inactivity)
$243,820.
*Not yet billed as of 2.2026