Amendment No. 1 to Contract No. C083-25
CITY OF PORT ORCHARD PROFESSIONAL SERVICES AGREEMENT WITH
Consor North America, Inc.
THIS AMENDMENT No.1 to Contract No. C083-25 ("Amendment") is entered into between the City of Port
Orchard, a Washington municipal corporation ("City" or "Port Orchard") and Consor North America, Inc. a
Washington Corporation ("Consultant"). City and Consultant are each a "Party" and together "Parties" to this
Amendment.
RECITALS:
WHEREAS, on the 9th day of September, 2025, the City executed a Professional Services Agreement
for Old Clifton Intertie Design Services with the Consultant ("Underlying Agreement"); and
WHEREAS, additional work is required to advance the Old Clifton Intertie Project from its prior 60%
design stage to full 100% bid -ready design, including preparation of complete final plans, specifications,
updated cost estimates, and design -phase coordination; and
WHEREAS, the Consultant must also perform permitting tasks necessary for the project, including
preparation of City, County, State, and environmental permit applications, as well as develop the Washington
State Department of Health (DOH) Project Report needed for approval; and
WHEREAS, the project scope now includes bid -period support services such as preparing addenda and
responding to bidder questions; and
WHEREAS, the amendment provides budget for unanticipated services that may be necessary to
complete the final design package, including a limited allowance for potential NEPA-related work; and
WHEREAS, the Consultant has submitted a detailed scope (Exhibit A) and fee estimate (Exhibit B)
documenting the expanded tasks —Project Management, Final Design (90% and 100% design), Permitting, DOH
Project Report, Bid -Period Services, and Unanticipated Services —totaling $652,329.
NOW, THEREFORE, in consideration of the mutual benefits accruing, it is agreed by and between
the parties thereto as follows:
Amendment No. 1 to Agreement between City of Port Orchard and Consor North America, Inc
Contract No. C083-25
Page 1
Updated 4/2022 IBDR
Docusign Envelope ID: 8BFCAE5C-F1 B7-87CE-82A8-34E2D3EC3F9F
FIRST AMENDMENT TO AGREEMENT:
1. Amendment. The Agreement is hereby amended to add the following Exhibits, which are attached to
this First Amendment and incorporated herein in full:
i. Exhibit A — Old Clifton Intertie Scope of Services (Final Design & Bidding)
ii. Exhibit B — Old Clifton Intertie Fee Estimate (Final Design)
These Exhibits are in addition to the existing exhibits previously attached to the Agreement.
2. Amendment to Compensation Terms. Section 2 of the Agreement titled "Compensation" is hereby
amended to reflect the updated Scope of Services and Fee Estimate included in Exhibit A and Exhibit B
added by this First Amendment. The parties acknowledge and agree that:
i. The services described in the newly added Exhibits shall remain Time and Materials
Not to Exceed.
ii. The Not to Exceed amount is increased by $652,329.00, resulting in a new total Not
to Exceed amount of $1,651,263.00, unless otherwise authorized in writing.
iii. Compensation for these additional services shall continue to be based on the billing
rates and reimbursable expenses set forth in Exhibit B, as attached to and
incorporated into this Amendment.
Severability. The provisions of this Amendment are declared to be severable. If any provision of this
Amendment is, for any reason, held to be invalid or unconstitutional by a court of competent
jurisdiction, such invalidity or unconstitutionality shall not affect the validity or constitutionality of any
other provision.
4. Entire Agreement. The written provisions and terms of this Amendment shall supersede all prior
verbal statements of any officer or other representative of the parties, and such statements shall
not be effective or be construed as entering into or forming a part of or altering in any manner
whatsoever, this Amendment. The entire agreement between the Parties with respect to the
subject matter hereunder is contained in the Agreement and exhibits thereto, any prior executed
amendments and this Amendment. Should any language in any of the Exhibits to the Agreement or
prior amendments conflict with any language contained in this Amendment, then this Amendment
shall prevail. Except as modified by this Amendment, all other provisions of the original Agreement
and any amendments thereto not inconsistent with this Amendment shall remain in full force and
effect.
Effective date. This Amendment shall be effective as of 5/26/2026
DATED this 26TH day of May 2026.
Amendment No. 1 to Agreement between City of Port Orchard and Consor North America, Inc
Contract No. C083-25
Page 2
Updated 4/2022 IBDR
Docusign Envelope ID: 8BFCAE5C-F1 B7-87CE-82A8-34E2D3EC3F9F
CITY OF PORT ORCHARD, WASHINGTON
Signed by:
Doti Pt, MJA Shun.
4?
Robert Putaansuu, Mayor
ATTEST/AUTHENTICATED:
Signed by:
Brandy Wallace, MMC, City Clerk
APPROVED AS TO FORM:
Signed by:
za-ao. 5a
Charlotte A. Archer, City Attorney
CONSULTANT
Signature
Lael Alderman, Vice President/Region Director, Water
Printed Name and Title
Amendment No. 1 to Agreement between City of Port Orchard and Consor North America, Inc
Contract No. C083-25
Page 3
Updated 4/2022 IBDR
Docusign Envelope ID: 8BFCAE5C-F1 B7-87CE-82A8-34E2D3EC3F9F
EXHIBIT A
AMENDMENT NO. 1
SCOPE OF SERVICES
OLD CLIFTON INTERTIE PROJECT - FINAL DESIGN
& BIDDING
CITY OF PORT ORCHARD
Introduction
Consor North America, Inc. (Consor) has developed this Amendment No. 1 Scope of Services (Scope) and
accompanying fee estimate to provide engineering services for the Old Clifton Intertie project (Project).
The scope and fee have been developed based on discussions with City of Port Orchard (City) staff and
Consor's understanding of the project.
The consultant team is led by Consor as the prime consultant and includes sub -consultants CG Engineering
(CG) for structural engineering services, Industrial Systems Inc. (IS) for electrical, instrumentation, and
controls, and the Driftmier Architects (Driftmier) for architectural services.
Project Understanding
The Project involves a design of a water system intertie between the City's water system and the
McCormick Woods water system. The project includes design of one (1) new booster pump station (BPS)
and Pressure Reducing Valve (PRV) Facility, and water main to connect the 580 Zone to the 390 Zone. The
BPS and PRV Facility is anticipated to be located along SW Old Clifton Road in a City -owned parcel. The
interconnecting water main is planned to be located within the public right-of-way for SW Old Clifton Road.
The final design phase of the Project includes the preparation of plans, specifications, contract documents
(using the City's standard contract documents), permitting, and engineering opinions of probable
construction costs (OPCC) needed for the bidding, based on the 60% design completed by Consor
anticipated to be complete in July 2026. Permitting for the project will be initiated prior to the 60%
deliverable.
The Project requires Washington State Department of Health (DOH) Project Report approval.
Scope of Services
The Scope of Services includes permitting, final design, and bid period services project phases. Tasks include
the following elements:
■ Objective: Summary of the goals that will be achieved by the task
■ Activities: Project elements and efforts that will be completed by the Consor project team
■ Deliverables: The finished product that will be delivered to the City
■ Assumptions: Assumptions used to develop each task
Consor • March 2026 • Old Clifton Intertie Project • City of Port Orchard
Scope of Services • 1
Docusign Envelope ID: 8BFCAE5C-F1 B7-870E-82A8-34E2D3EC3F9F
City staff will be actively engaged throughout the project, utilizing a series of meetings, workshops, and
presentations to solicit City input and develop consensus at key points in the design process. Tasks in this
Scope of Services include:
■ Task 1—
Project Management
■ Task 2
— Final Design
■ Task 3
— Permitting
■ Task 4
— DOH Project Report
■ Task 5
— Bid Period Services
■ Task 6—
Unanticipated Services
Task 2 has sub -tasks for the BPS and PRV Facility and the water main designs. A detailed breakdown of the
tasks and subtasks that comprise the Scope of Services follows and aligns with the tasks included in the Fee
Estimate included as Exhibit B.
Engineering services during construction, construction observation, and special inspections are not
included in the Scope of Services. Specific scope and budget may be added by Contract Amendment once
the construction phase for the facilities has been approved by the City.
Task 1- Project Management
Objective
Provide overall leadership and team strategic guidance aligned with City staff objectives. Coordinate,
monitor, and control the project resources to meet the technical, communication, and contractual
obligations required for implementing the project scope.
Activities
1.1 Invoices/Status Reports
Prepare monthly invoices, including expenditures by task, hours worked by project personnel, and other
direct expenses with the associated backup documentation. Monthly status reports to accompany each
invoice and include comparisons of monthly expenditures and cumulative charges to budget by task,
including cost -to -complete, earned value, cash flow, and sub -consultant participation. Monthly status
reports to include schedule updates if the schedule shifts.
1.2 Coordination with City Staff
Coordinate with City staff by regular status reports, monthly status meetings, weekly telephone
communication, and e-mail during the project. City PM to be copied on all email communications with City
staff.
1.3 Consultant Team Coordination
Coordinate with and manage project team, including subconsultants on specific tasks, scope, and budget
to facilitate execution of the Scope of Services. Internal team coordination to include one -hour, bi-weekly
team conference calls with discipline leads and key team members.
Consor • March 2026 • Old Clifton Intertie Project • City of Port Orchard
Scope of Services • 2
Docusign Envelope ID: 8BFCAE5C-F1 B7-870E-82A8-34E2D3EC3F9F
1.4 Decision Log
Develop, maintain, and monitor a decision log to document major project decisions.
Deliverables
■ Monthly invoice and status report covering:
o Work on the project performed during the previous month
o Meetings attended
o Problems encountered and actions taken for their resolution
o Potential impacts to submittal dates, budget shortfalls or optional services
o Budget Analysis
o Updated monthly schedule, when applicable
o Issues requiring project team action
■ Kickoff meeting agenda and notes
■ Decision log form
Assumptions
■ Notice to Proceed date by May 4, 2026, with a focus on the Permitting task.
■ Project duration is anticipated to be 13 months.
■ Non-bi-weekly meeting agenda will be submitted to City in advance of meetings and workshops for
City review and input.
■ City reviews:
o Review period for deliverables is 10 working days.
o Review comments will be compiled into a single document before submitting them to
Consor.
■ Assume 13 progress payments/status reports.
■ Project workshops and design review meetings are included in later tasks.
■ Project schedule will be developed and maintained using MS Project; includes up to two (2)
updates.
Task 2 — Final Design
Objective
Develop the Project preliminary design to 90% and 100% levels of completion. The project is broken into
two (2) areas based on Project components.
■ BPS and PRV Facility
■ Water Main
Anticipated elements for each Task 2 subtask include:
■ 90% Plans and Technical Specifications: Develop the Project 60% design to approximately 90%
completion. Provide approximately 97 of 97 construction drawings in the 90% Design Submittal
for the General, Civil, Structural, Mechanical, Architectural, P&IDs, E&IC design disciplines. The
90% Design Submittal to include construction drawings, full specifications, 90% Engineer's
OPCC and updated project schedule.
Consor • March 2026 • Old Clifton Intertie Project • City of Port Orchard
Scope of Services • 3
Docusign Envelope ID: 8BFCAE5C-F1 B7-870E-82A8-34E2D3EC3F9F
■ 100% Plans and Technical Specifications: Develop the Project 90% design to 100% completion.
Provide 97 of 97 construction drawings in the 100% Design Submittal for the General, Civil,
Structural, Mechanical, Architectural, P&IDs, E&IC design disciplines. The 100% Design
Submittal to include construction drawings, full specifications, 100% Engineer's OPCC and
updated project schedule.
■ Review Meeting: Conduct review meeting following the 90% deliverable with City staff in a
workshop setting virtually via telephone or Microsoft Teams.
Activities
2.1 BPS and PRV Facility
2.1.1 90% Design
Expand upon the 60% Design Submittal following City review and develop the 90% Design
Submittal to include necessary drawings and specifications for the construction of the BPS and
PRV Facility and associated facilities. 90% Design Submittal to incorporate City Permit review
comments.
2.1.2 100% Design
Finalize the design drawings and full specifications required for bidding.
2.2 Water Main
2.2.1 90% Design
Expand upon the 60% Design Submittal following City review and develop the 90% Design
Submittal to include necessary drawings and specifications for the construction of the water main
and associated facilities. 90% Design Submittal to incorporate City Permit review comments.
2.2.2 100% Design
Finalize the design drawings and full specifications required for bidding.
2.3 Opinion of Probable Construction Cost (OPCC)
Prepare OPCCs as part of the 90% (AACE International Class 1) and 100% (AACE International Class 1) design
submittals.
2.4 Quality Management
Perform quality management on all deliverables.
Deliverables
■ Meeting agendas, notes, and supporting materials, draft and final in PDF format
■ The 90% and 100% design submittals include design plans at half size (11x17), technical
specifications, OPCC and construction schedule in PDF format.
Consor • March 2026 • Old Clifton Intertie Project • City of Port Orchard
Scope of Services • 4
Docusign Envelope ID: 8BFCAE5C-F1 B7-870E-82A8-34E2D3EC3F9F
Assumptions
■ Scope of Services does not include structural design of any site walls, detention vaults, or other
site structures.
■ Design of the pre-engineered trusses, if used, will be part of a design -build package by the truss
manufacturer.
■ Incorporate standard front end contract documents, provided by the City, into complete
Contract Documents with approved modifications by Consor.
■ Provide Washington Professional Engineer's Stamp with signature and date on final bid ready
edition of the contract documents.
■ City distributes design review packages and bid documents for the project.
■ The current CSI MasterFormat specifications to be used.
■ No significant changes to the BPS and PRV Facility building post 60% design.
■ City comments on the 90% design submittal will not impact the basis of the design, nor will
they change direction received earlier in the design process.
■ Materials developed for design will be sufficient for use in public engagement.
■ There will be no new comments from the City from the 100% review, only confirmation that
comments were adequately addressed.
■ Quality management is included in this task for review of deliverables.
Task 3 — Permitting
Objective
Provide services to assist the City in obtaining permits and approvals necessary to construct the Project.
Complete the environmental documentation and permit applications for the Project. Prepare a permit
submittal and tracking matrix and provide periodic updates. Meet with stakeholders early to introduce
Project, define design criteria, and critical areas review requirements. Provide timely and thorough
responses to regulatory agencies.
Activities
3.1 Permitting
Prepare the required local, state, and federal permit applications and supporting documents. The following
permit applications are anticipated to be prepared:
■ City Building Permit application, including permit -review ready structural calculations sealed
by a Washington licensed Structural Engineer
■ City and Kitsap County Right -of -Way (ROW) Permit applications
■ City Minor Land Disturbing Permit (LDAP) application
■ Stormwater Drainage Report
■ City Sewer Connection Permit application
■ City Critical Areas Permit application
■ State Environmental Policy Act (SEPA) checklist
■ NPDES Construction Stormwater General Permit
Submit an electronic copy of the draft permit applications for review. Incorporate comments into final
permit applications.
Consor • March 2026 • Old Clifton Intertie Project • City of Port Orchard
Scope of Services • 5
Docusign Envelope ID: 8BFCAE5C-F1 B7-87CE-82A8-34E2D3EC3F9F
Attend one (1) permit meeting with up to two (2) members of the Project team.
3.2 Quality Management
Perform quality management on all deliverables.
Deliverables
■ Draft and final permit applications.
Assumptions
■ Two (2) rounds of revisions from the project team will be required prior to finalization of the
permit applications.
■ A traffic control permit, except one submitted by the contractor during construction, is not
required.
■ SEPA will result in a Declaration of Non -Significance.
■ A Hearing Examiner will not be involved.
■ Permits are submitted electronically.
■ The site is not in a floodplain.
■ Electrical, plumping, mechanical, and over the counter permits will be obtained by the
contractor after award of the construction contract or be deferred submittals.
■ Application of permits does not ensure that permits can be obtained.
■ Effort for this task is an allowance and is limited to the budget established in the level of effort.
Additional effort, if required will be provided through a contract amendment.
■ Quality management is included in this task for review of deliverables.
Task 4 —DOH Project Report
Objective
Develop draft and final Project Report for submission to DOH per Water System Design Manual (Revised
June 2020) requirements.
Activities
4.1 DOH Project Report
Develop the draft Project Report and submit for City review. Incorporate City comments and submit to DOH
for review. Incorporate DOH review comments and submit Final Project Report for DOH approval.
4.2 Quality Management
Perform quality management on all deliverables.
Deliverables
■ Draft and final Project Report in PDF format.
Consor • March 2026 • Old Clifton Intertie Project • City of Port Orchard
Scope of Services • 6
Docusign Envelope ID: 8BFCAE5C-F1 B7-870E-82A8-34E2D3EC3F9F
Assumptions
■ The Preliminary Design Report will be the basis of the DOH Project Report.
■ Only one (1) round of revisions from the City will be required prior to finalization of the draft
Project Report. City to provide review comments within 10 calendar days of receiving draft
Project Report.
■ Only one (1) round of revisions from DOH will be required prior to finalization of the final
Project Report.
■ DOH review will take no longer than 30 calendar days.
■ Quality management is included in this task for review of deliverables.
Task 5 — Bid Period Services
Objective
Provide support to City staff during bidding with Addendum preparation.
Activities
5.1 Bid Period Services
Addenda
Prepare addenda for the City's review and distribution to respond to Bidder questions and inquiries and
provide clarification of Contract Documents.
5.2 Quality Management
Perform quality management on all deliverables
Deliverables
■ One (1) electronic (PDF) copy of each addendum
Assumptions
■ The bidding process will be led by the City with support from Consor for preparing addenda.
■ For budgetary purposes, three (3) addenda are estimated.
■ Quality management is included in this task for review of deliverables.
Task 6— Unanticipated Services
Objective
Unanticipated services authorized under this task are at the City's discretion. Consor will provide scope and
fee estimate for additional services when requested by the City and will commence work only when written
authorization is provided by the City. $20,000 of the Unanticipated Services budget is reserved for the
possible NEPA process; should NEPA occur and more budget is required, an amendment will be prepared.
Consor • March 2026 • Old Clifton Intertie Project • City of Port Orchard
Scope of Services • 7
Docusign Envelope ID: 8BFCAE5C-F1 B7-87CE-82A8-34E2D3EC3F9F
Estimated Schedule
The estimated schedule provided in the following table is based on the City's desires for design to be begin
as soon as possible. The schedule is dependent on regulatory review durations that are assumed to take
120 working days. A more detailed project schedule will be developed after Notice to Proceed is provided
by the City.
Task Name
Notice to Proceed
Pre -Application Meeting with City
Update Permit Application Items
Permit Regulatory Review
90% Design
City Review
Draft DOH Project Report
DOH Project Report Review
100% Design
Final DOH Project Report
Bid Period
Budget
Duration
0 days
0 days
5 days
120 days
50 days
10 days
25 days
20 days
40 days
5 days
30 days
Start
May 2026
May 2026
June 2026
June 2026
July 2026
September 2026
December 2026
February 2027
January 2027
March 2027
April 2027
Finish
May 2026
May 2026
June 2026
December 2026
August 2026
September 2026
February 2027
March 2027
March 2027
March 2027
May/June 2027
The fee estimate is included as Exhibit B. Payment will be made at the billing rates for personnel working
directly on the project, which will be made at Consor's Hourly Rates, plus Direct Expenses incurred. Billing
rates are included as Exhibit C. Subconsultants, when required by Consor, will be charged at actual costs
plus a 10 percent fee to cover administration and overhead costs. Direct expenses will be paid at the rates
shown in Exhibit C.
Consor • March 2026 • Old Clifton Intertie Project • City of Port Orchard
Scope of Services • 8
Docusign Envelope ID: 8BFCAE5C-F1 B7-87CE-82A8-34E2D3EC3F9F
EXHIBIT C
n cu)nsor
2026 SCHEDULE OF CHARGES
Per.onnel:
Labor s+ill be oe.ed tq o1art classhcalon at the follann•p horly reo. sfnch re valid horn January 1, 2026 tlsough Decenster
31, 2026. Atter the period, the rates are 5uotect to adptstrrrrnt.
Pnrri,rl CrID—, vi
$384
lCnit' ,i. rr,r VarsaBer A
$340
Prnrip,sl Erpreer V
$362
Cartlstrviceron r,ee A
$316
Prnopal frplrxer IV
$347
Corutrvction Mxr*er VIII
$299
Principal kr(prcr III
$322
Construetran Manager Vii
$281
Prnnpal Erb riser II
$304
Constructten Mier VI
$267
Prniptl FrOrv.r I
$288
Construction Managrr V
$746
Profossonaf (rgnmor I%
$218
Construction Marsdgor IV
$234
Fnglnoenng 0coVner tit
$273
Comlrucoon Marra IN
$713
Proteisior.v Frlgneer Val
$709
Construction Mirtayv. II
$197
EnginemngDesfpserVl■
$261
CenslructionUanr>atoi
$161
Protessl0rial Erlpneer Va
$257
Construction Copdnator V
$228
Engineerrrr((0espser Vll
$248
Construction Coadrelor IV
$206
Profenional Ers veer Vi
5245
Construction Coordruitot al
$191
LnCineeenng Demeter Vi
$236
Corotruction Coordrsatot■
$169
Prefes:ro-rd Ertgnrer V
$232
Construction Coordnaton 1
$153
fnxlneenryt Desyser V
$274
Construction Aomtn Spec alu IV
$201
Profesvos.Y krgnaer IV
$218
Concoction Aemrn Spec a1- III
$183
Lnglneenr9 Cem r.r IV
$212
Construction Aemtn Spec alit II
$159
Prat.sutxrY fn8rre.r III
$211
Construction Aemin Spec all. I
$140
( nelnecog 0008,101111
$209
nspcaa VII
$746
Engln.arng0as8fn.r II
$197
Nippcton VI
$228
Enginpeeing Des8,wr I
$1103
vispector Y
$706
Principal III
$390
mopector IV
$191
Prncrpal II
$349
msliecter 111
$169
PnKipil I
$310
vrspectce II
$153
Project Maruter V
$303
Nspector 1
$132
ProjectVanvgt IV
$299
redimicianlV
$211
Project Man.6er 1s
$280
Technician in
$192
Prasect Manger II
$249
Ttdnroan II
$167
Proect Manger 1
$218
lechrtean 1
$143
Cost Estlmator ■.
$332
Project Coaanxor IV
$204
Cost fstlmator ■
$269
Pro1.ct CoixXnxor III
$185
Cost Estlmator 1
$204
Props Cooran4or 11
$161
tbuaatyConrd Coftvwce 50cciat6:
$210
Project Cooranxor 1
$153
clinnit. Srrentlt.t VI
$307
AhnititUra:N, II
$153
cllnsate Scientist V
$270
Admwstra:Ne 1
$141
Climate Scientist IV
$244
AMliristra:Ne
$126
Climate Scientist 111
$217
Climate Scientist II
5700
01mate Scientist 1
$169
ProJ.ct Expenses:
Eraen9cas incurred that vie dit ectty atbtbutable to the protect will be Invoiced at actual cost. These e■pensds include tare toll"irr.
CADD Haste avedSotheare
$18 00/haur
Modetr ig and OIS HaedrsgrcJSot weee
$10 00nccxtr
Moods
Cu'rent IRS Rate
Posts and OHr esy Senses.
Al Cost
Pining and Reproduction
At Cost
Travel. Lodging, and Subsistence
At Cost
Outside Services:
Outsirin tochnK.41, profassional. asp otbnr :.maces wu be nvacod
a: actual costptus 10 percent to cover admmistraeon and
a riinad.
Consor • March 2026 • Old Clifton Intertie Project • City of Port Orchard
Scope of Services • 9
Docusign Envelope ID: 8BFCAE5C-F1 B7-870E-82A8-34E2D3EC3F9F
OLD CLIFTON INTERTIE FINAL DESIGN & BIDDING
CITY OF PORT ORCHARD
PROPOSED FEE ESTIMATE
Principal Engineer
VI
Principal Engineer
IV
Pro
E
LABOR
CLASSIFICATION
or III
(HOURS)
Engineering
Desl ner III
Engineering
Desl ner I
Engineering
Desi ner IX
Proj
Subconsultants
Architect-
-CO E&IC- IS Driftmler
Multiplier
% Marku
SubconsultantT
Marku
r
Task 1- Project Management
Task 1.1- Invoices/Status Reports
13
13
26
$ 6,848
1.10
$ -
$ -
$ -
$ -
$ 6,848
Task 1.2 - Coordination with City Staff
80
80
$ 27,357
1.10
$ -
$ -
$ -
$ -
$ 27,357
Task 1.3- Consultant Team Coordination
80
80
$ 27,357
1.10
$ -
$ -
$ -
$ -
$ 27,357
Task 1.4- Decision Log
Task I Subtotal
12
0
0
0
0
0
0
12
$ 4,104
65,665
$
1.10
$ -
$ -
$ -
$ -
$ 4,104
5,665
Task 2 - Final Design
Task 2.1- BPS and PRV Facility
41
45
154
7
230
43
292
10
822
$ 209,793
$ 15,845
$ 33,488
$ 22,300
1.10
$ 78,796
$ -
$ 5,256
$ -
$ 293,845
Task 2.2- Water Main
13
56
136
103
6
314
$ 72,778
1.10
$ -
$ -
$ 1,854
$ -
$ 74,632
Task 2.3- Opinion of Probable Construction Co,t(OPCC)
4
2
10
10
20
30
20
96
$ 23,878
1.10
$ -
$
$
$
$ 23,878
Task 2.4- Quality Management
120
20
10
150
$ 52,113
1.10
$ -
$
$
$
$ 52,113
Task2 Subtotal
58
120
47
1
73
20
280
209
0
16
1382
$ 358,562
$ 15,845
$ 33,488
$ 22,300
$ 78,796
$
$ 7,110
$
$ 444,468
Task3- Permitting
Task 3.1- Permitting
24
4
40
12
38
38
8
164
$ 40,494
$ 6,000
1.10
$ 6,600
$ -
$ 144
$ -
$ 47,238
Task 3.2- Quality Management
2
2
2
6
$ 1,552
1.10
$ -
$
$ -
$ -
$ 1,552
Task3 Subtotal
24
2
4
40
12
0
40
40
8
0
0
170
$ 42,046
$ -
$
6,000
$ 6,600
$ -
$ 144
$ -
$ 48,790
Task 4- DOH Project Report
Task 4.1- DOH Project Report
4
6
16
8
16
16
4
8
78
$ 18,369
1.10
$ -
$
$ 72
$ -
$ 18,441
Task4.2- Quality Management
4
4
4
12
$ 3,105
1.10
$ -
$ -
$ -
$ -
$ 3,105
Task4Subtotal
4
4
6
0
20
20
4
0
8
90
$ 21,474
$ -
$
$ 72
$ -
$ 21,546
Task 5 - Bid Period Services
Task 5.1- Bid Period Services
8
4
12
12
8
8
8
60
0 15,736
$ 1,700
$ 5,772
$ 6,000
1.10
$ 14,819
$ -
$ 144
$ -
$ 30,699
Task 5.2- Quality Management
2
1
1
4
$ 1,160
1.10
$ -
$
$ -
$ -
$ 1,160
Task5 Subtotal
8
2
4
2
0
9
9
8
0
0
64
$ 16,897
$ 1,700
$ 5,772
$ 6,000
$ 14,819
$ -
$ 144
$ -
$ 31,860
Task 6 - Unanticipated Services
Task 6.1- Unanticipated Services
0
$
1.10
$ -
$ 40,000
$
$
$ 40,000
Task 65ubtotal
0
279
0
128
0
61
0
232
0
105
0
20
0
349
0
278
0
415
0
13
0
24
0
1904
$ -
$
$ -
$ -
$
$ -
800,216
$ 40,000
$ 40,000
$
$
$ 40,000
City of Port Orchard Old Clifton Intertie Final Design
March 2026 Connor Page 1