HomeMy WebLinkAbout094-25 - Skillings, Inc. - Contract Amendment 10 CITY OF PORT ORCHARD
Authorization for Amendment No. 1
Date: June 11, 2026
Project: Sidney Road Non -Motorized
Improvements Project
Contract / Job # C094-25
Contractor: Skillings, Inc.
5016 Lacev Blvd SE
Lacey, WA 98503-5729
THIS AMENDMENT AUTHORIZES THE FOLLOWING CHANGES TO THE AGREEMENT:
Agreement C094-25 is amended with the additional scope of services as attached to include additional
topographic survey, additional design sheets, specifications, and additional stormwater design including
reporting. The additional work will utilize the Contract's existing Management Reserve Fund, resulting in
no increase to the original project budget.
In all other respects the Underlying agreement between the parties shall remain in full force and effect,
amended as set forth herein, but only as set forth herein.
Contract History
Amount Sales Tax Total Date Appvd by
Original Contract
$665,682.00
$0.00
$665,682.00
28 -Oct -25
Council
Amendment 1
$0.00
$0.00
$0.00
11 -Jun -26
PW Director
Total Contract $665,682.00 $0.00 $665,682.00
I have reviewed the Amendment information above and cert'f that to the best of my knowledge descriptions
and costs are true and accurate.
�y Digitally signed by Patrick Skillings
Date: 2026.06.1108.37: 06-0700
�' 1
Consultant Approval Signature
Patrick Skillings - Exec Vice President
Printed Name & Title
Public Works Contracts Greater than $35,000: Change Orders that do not exceed 10%,
with a maximum of $50,000, of either legally authorized budget limit or contract amount
established by City Council can be approved by the Public Works Director. Total Contract Approved:
Amount shall reset to reflect new Council -approved contract totals authorized prior to the
requested change order. $50,000-$100,000 require Mayoral Approval. $1O0,000 and
over require Council Approval.
Public Works Contracts under $35,000, change orders that individually do not exceed Attest:
$7,500 with an aggregate cap of $10,000.
Public Works Contracts unbudgeted and under $7,500: All Change Orders that do not
exceed an aggregate cap of $7,500 (Excluding underlying value), provided there are
departmental funds available in the budget.
All Departments: Mayor approves any and all Change orders that do not exceed 10% of
either authorized budget limit or contract amount established by City Council. With a
maximum aggregate amount of $100,000. Total Contract Amount shall reset to reflect
new Council -approved contract totals authorized prior to the requested change order.
Any individual Change order that is over $100,000 requires Council approval.
Works Director
)ehis Ryan
Printed Name
Mayor
City Clerk
Council Approval Date
9 SKILLINGS
EXHIBIT A
SCOPE OF WORK SUPPLEMENT
Prepared for:
CITY OF PORT ORCHARD
SUPPLEMENTAL AGREEMENT NO. 1
25164 — RUBY CREEK CULVERT REPLACEMENT
June 2, 2026
Introduction:
The prime Scope of Work assumed that only Minimum Requirements 1- 5 would be triggered due to
the limited proposed impervious surface. Site design has evolved and the proposed new and
replaced impervious surface will exceed 5,000 square feet, requiring all minimum requirements.
Additionally, frontage improvements connecting to existing improvements and extending outside of
the stream buffer were requested by the City.
This supplemental scope is to describe the additional effort associated with expansion of the design
footprint and includes additional topographic survey, additional design sheets, specifications, and
additional stormwater design including reporting. The prime contract included a Management
Reserve Fund of $30,000, which will be utilized as budget for the additional scope.
Project Assumptions:
• Skillings will provide Field and Office Support to provide an updated Topographic Survey
map.
• A full drainage report addressing all Minimal Requirements will be required.
• Treatment and flow control will not be required at the TDA level.
• Stormwater from two identified existing off -site outfalls in the northeastern and southwestern
areas will be rerouted as needed to accommodate the proposed sidewalk and associated
improvements. The northeastern outfall is from a storm sewer system, and the southwestern
outfall is a roadside conveyance ditch. Both are excluded from and will not receive
stormwater treatment under this project.
• Frontage improvements will be limited to the area between existing frontage improvements
on the east side of Sidney RD SE and will be extended outside of the stream buffer on the
west side of Sidney RD SE.
• Frontage improvements shall be comprised of the addition of a 6' bike lane, curb and gutter,
and 8' cement concrete sidewalk.
• Widths of frontage improvements will be tapered to connect to existing improvements where
connected.
Skillings, Inc. Page 1 of 8 Add'I Topo & Frontage Improvements
Project No. 25164 Ruby Creek Culvert Replacement
Supplement No. 1 City of Port Orchard
Task 1 — Office Support
Assumptions:
• Additional Mapping as per the attached exhibit map to the previous mapping work.
• Horizontal and Vertical Datums will be the same utilized on the initial phase of this work.
• Project management and administration includes billing.
Task Description:
• Project Management and Administration.
• QA/QC and Sign Topographic Map
Task 2 — Field Mapping and Drafting
Assumptions:
• Redeploy Field Crew to the site
• Additional Mapping as per the Exhibit sketch.
• Assuming that the Survey Control that was previously set is not disturbed.
• Field data and pictures will be uploaded.
Task Description:
1. Field Data Collection
2. Process Field Data, Draft and Final update to topographic map.
Deliverables:
• PDF File of the combined efforts for the Topographic Mapping — provided via Email.
• Civil 3D Cad files — to be provided to the City— via Email.
Task 3 — Survey Control Replacement (as needed)
Assumptions:
• Survey Control Replacement will occur, if needed.
Task Description:
1. Establish new survey control.
2. QA/QC of new survey control.
Skillings, Inc. Page 2 of 8 Add'I Topo & Frontage Improvements
Project No. 25164 Ruby Creek Culvert Replacement
Supplement No. 1 City of Port Orchard
Deliverables:
• New survey control.
• Survey control QA/QC.
Task 4 — Frontage Improvements (60%)
This task consists of additional work needed to address the additional minimum requirements beyond
Minimum Requirements 1-5 in the design, plans, specifications (PSE), and stormwater report in the
60% phase.
Assumptions:
• A full drainage report addressing all Minimal Requirements will be required.
• Stormwater from two identified existing off -site outfalls in the northeastern and southwestern
areas will be rerouted as needed to accommodate the proposed sidewalk and associated
improvements. The northeastern outfall is from a storm sewer system, and the southwestern
outfall is a roadside conveyance ditch. Both are excluded from and will not receive stormwater
treatment under this project.
• Treatment and flow control will not be required at the TDA level.
• Frontage improvements will be limited to the area between existing frontage improvements
on the east side of Sidney RD SE and will be extended outside of the stream buffer on the
west side of Sidney RD SE.
• Frontage improvements shall be comprised of the addition of a 6' bike lane, curb and gutter,
and 8' cement concrete sidewalk.
• Widths of frontage improvements will be tapered to connect to existing improvements where
connected.
Task Description:
1. Additional 60% Stormwater Reporting
2. Additional 60% design
3. Additional 60% specs
Deliverables:
• One (1) set of 60% plans and specifications (PDF)
• Preliminary Stormwater Report
Task 5 — Frontage Improvements (100%)
This task consists of additional work needed to address the additional minimum requirements beyond
Minimum Requirements 1-5 in the design, plans, specifications and stormwater report in the final
design.
Skillings, Inc. Page 3 of 8 Add'I Topo & Frontage Improvements
Project No. 25164 Ruby Creek Culvert Replacement
Supplement No. 1 City of Port Orchard
Assumptions:
• See assumptions in Task 4.
Task Description:
1. Final Stormwater Reporting
2. Final Plans
3. Final Specs
Deliverables:
• One (1) set of 100% plans and specifications (PDF)
• Final Stormwater Report
END SCOPE OF WORK
Prepared by: Alex Tilton
Reviewed by: Annika Fain
Date: June 2, 2026
Date: June 2, 2026
Skillings, Inc. Page 4 of 8 Add'I Topo & Frontage Improvements
Project No. 25164 Ruby Creek Culvert Replacement
Supplement No. 1 City of Port Orchard
EXHIBIT B
MAN-HOUR SUMMARY
RUBY CREEK - ADDED TOPO
SEE MARK UP EXHIBIT MAP
•
H
N
v,
25164 - RUBY CRK
p
I
m
z
m
z
O
H m
= y
0
m
�
70
m
y
Z
v+
C
�°
m
<
cZ—i,
D
I,,
Z
Z
m
Z
[�
< 0
m
< Z
in
;
>
D
-
;a
m
m
m
2
M
Z
D
Z
O I
r
<
m
<
f,
<
[)
z
>
H
Ill
rt
Z
O
m
m
[7
D
H
v
T
Z
D
Z
TASK #
TASK DESCRIPTION
1
Office Support
1.1
Project Management & Administration
4
1
1.2
QA/QC and Sign Topographic Map
2
1
1
2
Field Mapping and Drafting
2.1
Field Data Collection
1
2
1
10
2.2
Process Field Data, Draft and Final
2
1
2
20
1
update to topographic map.
Survey Control Replacement (as
3
needed)
3.1
Establish new survey control.
1
1
1
4
1
3.2
QA/QC of new survey control.
1
1
1
4
4
Frontage Improvements (60%)
4.1
Additional 60% Stormwater Reporting
5
18
6
4.2
Additional 60% design
3
14
5
4.3
Additional 60% specs
3
10
5
5
Frontage Improvements (100%)
5.1
Final Stormwater Reporting
3
8
3
5.2
Final Plans
3
8
3
5.3
Final Specs
3
6
3
HOURS PER DISCIPLINE
20
64
31
9
7
1
14
24
3
Skillings, Inc.
Project No. 25164
Supplement No. 1
Page 5 of 8
Add'I Topo & Frontage Improvements
Ruby Creek Culvert Replacement
City of Port Orchard
EXHIBIT B-1
COST SUMMARY
Classification
Man Hours
X
Rate =
Cost
PROJECT ENGINEER
20
X
$227.00 =
$4,540.00
ENGINEER
64
x
$156.00 =
$9,984.00
TECHNICIAN
31
X
$179.00 =
$5,549.00
PROFESSIONAL LAND SURVEYOR
9
X
$206.00 =
$1,854.00
PROJECT SURVEYOR
7
X
$148.00 =
$1,036.00
FIELD SURVEYOR
1
X
$130.00 =
$130.00
2 MAN SURVEY CREW
14
X
$224.00 =
$3,136.00
SURVEY TECHNICIAN
24
X
$126.00 =
$3,024.00
ADMINISTRATIVE ASSISTANT
3
X
$147.00 =
$441.00
Total Hours =
173
Total NHR =
$29,694.00
REIMBURSABLES:
Mileage
147
X
$0.725 =
$106.58
Miscellaneous Expenses
$100.00
X
0% _
$100.00
Total Expenses=
$206.58
SUBCONSULTANT COST (See Exhibit E):
Total Subconsultants
_
$0.00
SUB -TOTAL (NHR + REIMBURSABLES + SUBCONSULTANTS):
Sub Total =
$29,900.58
MANAGEMENT RESERVE FUND:
SUB TOTAL =
$29,900.58
x
0% =
MRF =
$0.00
GRAND TOTAL
GRAND
$29,900.58
TOTAL =
PREPARED BY:
Annika Fain
DATE:
6/2/2026
REVIEWED BY:
Patrick Skillings
DATE:
6/2/2026
Skillings, Inc.
Project No. 25164
Supplement No. 1
Page 6 of 8
Add'I Topo & Frontage Improvements
Ruby Creek Culvert Replacement
City of Port Orchard
EXHIBIT B-2
EXPENSE SUMMARY
Item
Description
Basis
Quantity
Rate
Total
1
Telephone
Month
$0.00
2
Auto Rental
Each
$0.00
3
Lodging
Day
$0.00
4
Per Diem -Meal
Day
$0.00
5
Photocopies - Blk & White
Each
$0.10
$0.00
6
Photocopies - Color
Each
$0.35
$0.00
7
Half Sized Prints
Each
$0.50
$0.00
8
Full Sized Prints
Each
$6.00
$0.00
9
Postage
Month
$0.00
10
Shipping
Month
$0.00
11
FAXs
Each
$0.00
12
Miscellaneous Project Costs
Month
0
$100.00
$0.00
13
Miscellaneous Survey Costs
Estimated
1
$100.00
$100.00
14
InRoads Software
Month -No of years
$950.00
$0.00
15
Traffic Control
Estimated
$0.00
Total Miscellaneous Expenses
$100.00
Mileage
Per Mile
147
0.725
$106.58
Total Expenses
$206.58
Skillings, Inc.
Project No. 25164
Supplement No. 1
Page 7 of 8
Add'I Topo & Frontage Improvements
Ruby Creek Culvert Replacement
City of Port Orchard
SEC. 10 AND 11, T23N, R1 E
PARKINS
102301-
20 20'"0' 40
SCALE IN FEET
LEGEND
® EXISTING SURVEYED AREA
® NEW SURVEYAREA
----- 150 STREAM BUFFER
O \\ wI. 4 •�t
1 a \\
\� I, - HAVEN ON SIDNEY LLC \
\ 11z301-2-009-2002 \
- KITSAP COUNTY TRANSPORTAPON BENEFIT AREA
\ '-
112301-2-052-2008
\\
\\\ / O HAVEN ON SIDNEY LLC \
\ / 112301-2-053-2007 \\
DATE REVISIONS
DESIGNED BY: ALEXANDER TILTON 4/21/26 NO. DATE DESCRIPTION SRUBY CREEK CULVERT 425164
CHECKED BY: ALEXANDER TILTON 4 21 26 K I L L ING PRELIM
CHECKED .: ANNIKA FAIN 4/21/26 REPLACEMENT
PROJ. ENGR.: ANNIKA FAIN 4/21/26 ORCHARD �E
Platted By. Alexanax 511 m 4/21/26 16]6 AAI 5 611 Sored By Ale.a0 Tloo m 4/21/26 III II Au 5016 Lacey Boulevard SE, Lavey, Washington 98503 ADDITIONAL SURVEY AREA
Ems sklI, .- w-61 ale.awaer time aes1266z 251643P3vaw (360) 491-3399 Fax (3660)) 491-381-38 57 PORT ORCHARD WA
Skillings, Inc. Page 8 of 8 Add'I Topo & Frontage Improvements
Project No. 25164 Ruby Creek Culvert Replacement
Supplement No. 1 City of Port Orchard