HomeMy WebLinkAbout099-23 - KPFF Engineering - Supplement / Change Order 1, WSDOTDocusign Envelope ID: 63E4AA80-D2C4-8CB7-822B-6DB7D256170B Washington State VAf Department of Transportation Supplemental Agreement Organization and Address Number 1 City of Port Orchard 216 Prospect Street Port Orchard, WA 98366 Original Agreement Number C099-23 Phone: 360-876-4991 Project Number Execution Date Completion Date December 31, 2028 Project Title New Maximum Amount Payable SR 166/Bay Street Reconstruction Project $2,886,615.19 Description of Work This supplement adds Construction Phase Services including construction management, daily inspection, federal documentation, design services during construction, WSDOT coordination, archaeological monitoring, real estate support, public outreach, and surveying necessary for the construction phase of the SR 166 project. The Local Agency of Port Orchard Washington desires to supplement the agreement entered in to with KPFF, Inc. and executed on 12/7/2023 and identified as Agreement No. C099-23 All provisions in the basj agreement remain in effect except as expressly modified by this supplement. The changes to the agreement are described as follows: Section 1, SCOPE OF WORK, is hereby changed to read: The Consultant shall provide construction -phase services.Work includes construction management, inspection, and design support. Additional services include coordination, updating bid documents for new bid date, updating design specifications to current WSDOT standards, monitoring, outreach, and surveying. II Section IV, TIME FOR BEGINNING AND COMPLETION, is amended to change the number of calendar days for completion of the work to read: Work shall be completed within 540 calendar days. III Section V, PAYMENT, shall be amended as follows: The maximum payable is increased by $1,579,608.60, for a revised total of $2,886,615.19. as set forth in the attached Exhibit A, and by this reference made a part of this supplement. If you concur with this supplement and agree to the changes as stated above, please sign in the Appropriate spaces below and return to this office for final action. By: John McMillan, PE Consultant Signature By: Robert Putaansuu, Mayor gne y: F6 Pl MJA Stub. r5&4 Approving Authority Signature 7/14/2026 DOT Form 140-063 Revised 09/2005 Docusign Envelope ID: 63E4AA80-D2C4-8CB7-822B-6DB7D256170B Exhibit "A" Summary of Payments Basic Agreement Supplement #1 Total Direct Salary Cost $401,468.00 $489,221.84 $890,689.84 Overhead (Including Payroll Additives) $605,881.50 $749,710.29 $1,355,591.79 Direct Non -Salary Costs $64,270.26 $93,640.25 $157,910.51 Fixed Fee $123,016.43 $147,036.22 $270,052.66 Total $1,194,636.19 $1,479,608.60 $2,674,244.80 This table does not include the management reserve in supplement #1 DOT Form 140-063 Revised 09/2005 Docusign Envelope ID: 63E4AA80-D2C4-8CB7-822B-6DB7D256170B EXHIBIT A PORT ORCHARD SR166 RECONSTRUCTION DESIGN SERVICES DURING CONSTRUCTION AND CONSTRUCTION MANAGEMENT SUPPORT Contents AmendmentDescription......................................................................................................................... 2 Task1: Project Management.................................................................................................................. 2 1.5 2026 Project Management.............................................................................................. 2 1.6 Construction Phase Project Management..................................................................... 3 Task2: Data Collection........................................................................................................................... 3 2.3 2026 Supplemental Pickups............................................................................................ 3 Task4: PS &E............................................................................................................................................. 3 4.7 PSE and WSDOT Design Refinement Services............................................................ 3 Task 10: WSDOT Coordination............................................................................................................. 4 10.3 2026 WSDOT Coordination............................................................................................ 4 Task12: Real Estate Services.................................................................................................................. 4 12.1 2026 TCE Easement Services.......................................................................................... 4 Task 13: Construction Management & DSDC.................................................................................... 5 13.1 Construction Management Delivery Support............................................................. 5 13.2 Design Services during Construction........................................................................... 6 Task 14: Construction Daily & Special Inspections.......................................................................... 8 14.1 Daily Construction Inspection Services........................................................................ 8 14.2 Special Construction Inspections / Testing................................................................. 8 Task 15: Archaeological Monitoring.................................................................................................... 9 Task 16: Outreach Support During Construction.............................................................................. 9 Task 17: Aquatic Lease Survey with Utility Easement Figures.....................................................10 PORT ORCHARD SR166 RECONSTRUCTION - SCOPE OF WORK i KPFF CONSULTING ENGINEERS Docusign Envelope ID: 63E4AA80-D2C4-8CB7-822B-6DB7D256170B Amendment Description Provide additional services to support SR166 project delivery, including Design Services During Construction (DSDC) and Construction Management (CM). City Delivery vision is • WSDOT approval for advertisement by September • Project Advertisement in November 2026 • Construction in 2027 Planned Contractor Working Day duration is 150 working days, with the contractor starting work in March 2027 and wrapping up construction activities in the fall of 2027, excluding landscape establishment. The Consultant shall provide field inspector services. Consultant will provide a full- time daily inspector for five months and a half-time daily inspector for four months. Consultant assumes Port Orchard will supply an inspector of their own during the half- time work to fulfill federal requirements. Construction Management services shall be provided to the City during active construction, 1 full month before project construction activities begin and 1 full month after construction activities are completed for project close out. The Consultant team shall be staffed by 2 FTE for the 38 work weeks with team performing work to oversee construction contract including direct coordination with the contractor and federal funding compliance responsibilities. Task 1: Project Management The CONSULTANT shall provide overall project administration and management for the duration of the project. 1.5 2026 Project Management The CONSULTANT shall 1. Administer and manage project scope, schedule and budget for up to 6 months. 2. Submit monthly invoices and progress reports Deliverable(s): 1. Scope, schedule, and budget updates as warranted (electronic PDF). 2. Monthly progress report summary (electronic PDF). 3. Monthly invoices (electronic PDF). PORT ORCHARD SR166 RECONSTRUCTION - SCOPE OF WORK KPFF CONSULTING ENGINEERS AMENDMENT Docusign Envelope ID: 63E4AA80-D2C4-8CB7-822B-6DB7D256170B 1.6 Construction Phase Project Management The CONSULTANT shall 1. Administer and manage project scope, schedule and budget for up to 12 months. 2. Submit monthly invoices and progress reports. Deliverable(s): 1. Scope, schedule, and budget updates as warranted (electronic PDF). 2. Monthly progress report summary (electronic PDF). 3. Monthly invoices (electronic PDF). Task 2: Data Collection 2.3 2026 Supplemental Pickups The CONSULTANT shall collect supplemental as -built data from nearby projects to support SR 166 project delivery, permitting and record collection, including survey pickups and record drawing collection. Deliverable(s): 1. Supplemental Data collection and basemap updates Task 4: PS&E 4.7 PSE and WSDOT Design Refinement Services The CONSULTANT will complete additional design services for the project to accommodate evolving third -party utility and WSDOT requests. This requires design refinement, supplemental quality management, and a new WSDOT Ad -Ready Submittal for 2026 compliance review. Additional services shall address: 1. Utility design revisions due to modified franchise utility relocation preferences. 2. Design changes to drainage and utilities are required due to changing WSDOT guidance and permitting requirements. Specifically, the project must ensure that stormwater flow rates and volumes at each outfall within the corridor are maintained to comply with permit guidelines. 3. Responses to WSDOT reviewer comments within the same submittal from new WSDOT reviewers. 4. Design and contract refinement needed due to utility agencies not procuring construction easements for duct banks. PORT ORCHARD SR166 RECONSTRUCTION - SCOPE OF WORK KPFF CONSULTING ENGINEERS AMENDMENT Docusign Envelope ID: 63E4AA80-D2C4-8CB7-822B-6DB7D256170B 5. Design review and refinement to support maintaining overhead utility services during construction activities. 6. Project 2026 WSDOT Standard Specification adoption. 7. Ecology stormwater permitting support Deliverable(s): 1. Additional Plan, Specification, and Estimate (PSE) Design Submittal Work 2. Revised Drainage Report 3. Ecology Stormwater Permitting support materials Task 10: WSDOT Coordination 10.3 2026 WSDOT Coordination The CONSULTANT shall provide additional WSDOT coordination support for a 2027 construction season delivery date and coordinate WSDOT project design update requests, such as detour information, detour coordination and supporting activities. The Consultant shall meet with WSDOT staff virtually for up to five 1 -hour meetings to support this effort. Assumption(s): 1. WSDOT shall require the project to utilize 2026 WSDOT Standard Specifications 2. City staff shall develop, refine and confirm City project manual elements, such as City boilerplate contract, instructions to bidder, and other front end contract documentation typically provided by local agencies. Deliverable(s): 1. Meeting Attendance & Presentation Materials 2. Plan refinements, including Traffic Control Plans, Budget documents, and PS&E checklists Task 12: Real Estate Services 12.1 2026 TCE Easement Services Support shall include execution of an additional option year of the TCE with property owners. Execution of this option will require appraisal re-evaluation. The Consultant shall meet with City staff virtually up to ten 1 hour meetings to support this effort. PORT ORCHARD SR166 RECONSTRUCTION - SCOPE OF WORK KPFF CONSULTING ENGINEERS AMENDMENT Docusign Envelope ID: 63E4AA80-D2C4-8CB7-822B-6DB7D256170B Assumption(s): 1. City shall provide payment to property owners and administrative services. 2. Construction shall be completed within all TCE areas by November 2027. Deliverable(s): 1. Appraisal updates 2. Signed Payment vouchers 3. TCE Coordination meeting notes and materials Task 13: Construction Management & DSDC 13.1 Construction Management Delivery Support The CONSULTANT shall provide construction management services to the City including: Pre -Con Support 1. Review plans/ specifications, prepare agenda, facilitate in person pre -con meeting and distribute meeting minutes. Construction Management Administration Provide Construction Management activities including: 1. Coordinate with contractor, City, and other project stakeholders. 2. Provide document control via the City's VPM system. 3. Track schedule, working days, certified payroll, and wage rate interviews. 4. Facilitate weekly in person meetings; provide agenda and distribute meeting minutes. 5. Prepare contractor pay application packages monthly. 6. Coordinate special inspections, testing, and WSDOT fabrication inspection. 7. Coordinate design/City/WSDOT review of submittals and RFIs, provide BABA reviews, maintain and update ROM and collect required documentation, review monthly CPM schedule updates and provide a report, compile document packages for use during anticipated PMR. 8. Prepare and negotiate construction field directives and change orders. 9. Participate in one in person half day PMR with Local Programs. Closeout: 1. Coordinate punch walk and compile punch list. 2. Facilitate substantial and final completion. PORT ORCHARD SR166 RECONSTRUCTION - SCOPE OF WORK KPFF CONSULTING ENGINEERS AMENDMENT Docusign Envelope ID: 63E4AA80-D2C4-8CB7-822B-6DB7D256170B 3. Collect as -built drawings and closeout documents from contractor. Assumption(s): 1. Construction period from NTP to physical completion shall last 30 weeks. Consultant shall support 4 weeks before and 4 weeks after contractor work has begun and completed. 2. Construction Management team travel time from Seattle to Port Orchard will be billable to the project, with staff performing project work during commute time. Deliverable(s): 1. Weekly meeting agendas & minutes 2. Weekly statements of working days 3. Certified payroll reviews 4. Monthly pay applications 5. BABA reviews 6. Submittal document packages for PMR 13.2 Design Services during Construction The CONSULTANT shall provide design support during construction (DSDC) services. Activities may include: 1. CONSULTANT (one staff member) shall attend up to Forty (40) construction team meetings of one hour in duration via a virtual meeting platform 2. Responding to up to thirty Requests For Information (RFI) from the CONTRACTOR. 3. Review of up to fifteen (15) CONTRACTOR proposals and submittals. 4. Attending up to five construction challenge resolution meetings at the site. 5. Developing and transmitting up to ten design change orders with approximately four engineered drawings or exhibits per change order. 6. Performing up to five field visits to observe CONTRACTOR operations and construction of key work elements, including 7. Support and coordination of 8. Sanitary Sewer Bypass operation preparation 9. Storm Drainage Interception work 10. Illumination systems and foundations 11. 3rd Party Utility relocation support 12. Review, coordination and approval of Contractor material submittals, including QPL submittals. PORT ORCHARD SR166 RECONSTRUCTION - SCOPE OF WORK 6 KPFF CONSULTING ENGINEERS AMENDMENT Docusign Envelope ID: 63E4AA80-D2C4-8CB7-822B-6DB7D256170B PORT ORCHARD SR166 RECONSTRUCTION - SCOPE OF WORK KPFF CONSULTING ENGINEERS AMENDMENT1 Docusign Envelope ID: 63E4AA80-D2C4-8CB7-822B-6DB7D256170B Assumption(s): 1. Design modifications shall be stamped and sealed by a professional engineer Deliverable(s): 1. Design change orders, submittal responses, support documentation and meeting participation Task 14: Construction Daily & Special Inspections 14.1 Daily Construction Inspection Services The Consultant shall provide a daily inspector. 1. Provide full-time on -site construction observation. 2. Document all material delivered to the job site in accordance with the LAG Manual, Request for Approval of Material and Record of Material RAM/ROM. 3. Prepare daily inspection reports, recording the construction Contractor's operations; includes quantities of work placed that day, equipment and crews, and other pertinent information. All daily inspection reports will adhere to WSDOT Local Agency Guidelines. Assumption(s): 1. Construction working days are assumed to be Monday through Friday between 7am and 5pm. 2. A job trailer or office desk will be provided for Consultant use on site (either through the Contractor or provided by the Port Orchard). 3. ROM will be provided by WSDOT 4. Fabrications inspection will be provided by WSDOT Deliverable(s): 1. Inspector's Daily Reports. 2. Daily project photos 3. Materials field acceptance reports 14.2 Special Construction Inspections 1 Testing The Consultant shall provide geotechnical testing and special inspections/testing. Consultant shall facilitate 3rd party construction testing services for the project including: 1. Wall and subgrade compaction testing for up to 60 hours of field testing. PORT ORCHARD SR166 RECONSTRUCTION - SCOPE OF WORK 8 KPFF CONSULTING ENGINEERS AMENDMENT Docusign Envelope ID: 63E4AA80-D2C4-8CB7-822B-6DB7D256170B 2. HMA paving compaction and HMA material sampling testing for up to 40 hours of field testing. 3. Up to five Concrete placement tests requiring 30 hours of field testing time. 4. Associated laboratory testing for tests listed above. Consultant shall communicate directly with 3rd party special inspectors and coordinate testing and document testing results. Assumption(s): 1. The SR 166 Contractor shall provide all hazardous or contaminated materials testing Deliverable(s): 1. Testing and inspection reports. Task 15: Archaeological Monitoring The Consultant shall provide field archaeological monitoring services to the City in alignment with the approved Cultural Resources Report recommendations. Services shall include: • Providing up to 50 days of Archaeological Monitoring on the site when the contractor is performing ground disturbing activities below the existing estimated historic existing grade as shown in the Cultural Resources Report • 1 training session for contractor and field staff focused on compliance with the Inadvertent Discovery Plan. Deliverable(s): 1. Monitoring Plan and Inadvertent Discovery Plan (MIDP) 2. 10 weekly monitoring summary reports 3. Final report with monitoring results Task 16: Outreach Support During Construction The CONSULTANT will support City staff in public engagement during construction. This may include: • Virtual open house to discuss the project and upcoming roadway closures and communication plans. PORT ORCHARD SR166 RECONSTRUCTION - SCOPE OF WORK KPFF CONSULTING ENGINEERS AMENDMENT Docusign Envelope ID: 63E4AA80-D2C4-8CB7-822B-6DB7D256170B • Development of project communication materials to share on social media and via email listservs. • Up to five virtual meetings with stakeholders • Preparation of a fact sheet about the project that will serve as an attachment for email communications and will be posted on the City's website. The CONSULTANT will write up to two press releases to be shared with various media in Port Orchard and distributed using City social media and website communication methods. Services shall align with 88 total hours of Consultant effort. Assumption(s): 1. City will maintain and host the project website. 2. City staff will lead social media outreach and distribute notice via its contact email distribution list and other established notification channels. 3. Port Orchard communications staff will share the press release with appropriate media outlets. Deliverable(s): 1. Public outreach graphics and press releases. 2. Meeting notes and attendance Task 17: Aquatic Lease Survey with Utility Easement Figures The CONSULTANT will support City lease efforts with the Dept of natural resources for a long term easement on DNR property currently leased by the City of Port Orchard. Work may include: • Preform a topographic survey of the as -built conditions for the required site plan, and supplement any additional items needed. • Draft and write descriptions for three (3) new utility easements to be shown on survey. • Prepare survey and submit to DNR for review and comments. • Address DNR comments and submit for final approval. • Record the record of survey with the Kitsap County Auditor. Assumption(s): In addition to any assumptions previously made in this proposal, the following assumptions have been made in preparation of this scope of work: 1. Any scope of work requested or required that is not specifically identified in one of the tasks above may be considered an additional service. Prior to completing PORT ORCHARD SR166 RECONSTRUCTION - SCOPE OF WORK 10 KPFF CONSULTING ENGINEERS AMENDMENT Docusign Envelope ID: 63E4AA80-D2C4-8CB7-822B-6DB7D256170B any such work, KPFF will discuss with you the need and impact on the scope and fee. 2. All recording and application fees will be the responsibility of the client and are not included in the fee schedule given below. 3. KPFF will be allowed unrestricted access to site during course of project. 4. Reimbursement fee given does not include any DNR fees or payments for lease holds, fee given includes title reports and recording of the Record of Survey. Deliverable(s): 1. Deliverables will be a Record of Survey for Aquatic Land Lease recorded with the Kitsap County Auditor and digital files provided to DNR to satisfy survey requirements. 2. Up to three utility easements PORT ORCHARD SR166 RECONSTRUCTION - SCOPE OF WORK KPFF CONSULTING ENGINEERS AMENDMENT Docusign Envelope ID: 63E4AA80-D2C4-8CB7-822B-6DB7D256170B City of Port Orchard SR 166 Project September 2023 KPFF Fee Calulation Weighted Guidelines Factor Rate Weight Value Degree of Risk 25 0.31 7.775 Relative Difficulty of Work 20 0.31 6.160 Size of Job 15 0.311 4.664 Period of Performance 15 0.350 5.250 Assistance by the State 15 0.33 5.010 Sub -consulting 10 0.299 2.990 Total Profit Fix Fee 31.85 Total Agreement Cost: $1,194,636.19 Subconsultant Costs: $342,424.34 Percent Sub -consultant: 28.66% Agreement Duration (Months): 24 Calculated Risk Factors Size of Job: 0.311 Period of Performance: 0.350 Sub -Consulting: 0.299 DIRECTIONS: The engineer needs to fill in only the fields that are highlighted. The three highlighted fields in the table are judgment calls. The other three are defined by formulae. These are calculated using project information that the engineer fills in using the highlighted cells below the table. Docusign Envelope ID: 63E4AA80-D2C4-8CB7-822B-6DB7D256170B City of Port Orchard SR 166 Project September 2023 Concord Weighted Guidelines Factor Rate Weight Value Degree of Risk 25 0.33 8.250 Relative Difficulty of Work 20 0.30 6.000 Size of Job 15 0.350 5.250 Period of Performance 15 0.350 5.250 Assistance by the State 15 0.35 5.250 Sub -consulting 10 0.000 0.000 Total Profit Fix Fee 30.00 Subconsultant Costs: $81,865.64 Agreement Duration (Months): 24 Calculated Risk Factors Size of Job: 0.350 Period of Performance: 0.350 DIRECTIONS: The engineer needs to fill in only the fields that are highlighted. The three highlighted fields in the table are judgment calls. The other three are defined by formulae. These are calculated using project information that the engineer fills in using the highlighted cells below the table. Docusign Envelope ID: 63E4AA80-D2C4-8CB7-822B-6DB7D256170B City of Port Orchard SR 166 Project September 2023 ESA Weighted Guidelines Factor Rate Weight Value Degree of Risk 25 0.250 6.250 Relative Difficulty of Work 20 0.250 5.000 Size of Job 15 0.350 5.250 Period of Performance 15 0.350 5.250 Assistance by the State 15 0.350 5.250 Sub -consulting 10 0.000 0.000 Total Profit Fix Fee 27.00 Subconsultant Costs: $79,184.07 Agreement Duration (Months): 24 Calculated Risk Factors Size of Job: 0.350 Period of Performance: 0.350 DIRECTIONS: The engineer needs to fill in only the fields that are highlighted. The three highlighted fields in the table are judgment calls. The other three are defined by formulae. These are calculated using project information that the engineer fills in using the highlighted cells below the table. Docusign Envelope ID: 63E4AA80-D2C4-8CB7-822B-6DB7D256170B City of Port Orchard SR 166 Project September 2023 Equinox Weighted Guidelines Factor Rate Weight Value Degree of Risk 25 0.230 5.750 Relative Difficulty of Work 20 0.235 4.700 Size of Job 15 0.350 5.250 Period of Performance 15 0.203 3.048 Assistance by the State 15 0.350 5.250 Sub -consulting 10 0.000 0.000 Total Profit Fix Fee 24.00 Subconsultant Costs: $21,334.00 Agreement Duration (Months): 6 Calculated Risk Factors Size of Job: 0.350 Period of Performance: 0.203 DIRECTIONS: The engineer needs to fill in only the fields that are highlighted. The three highlighted fields in the table are judgment calls. The other three are defined by formulae. These are calculated using project information that the engineer fills in using the highlighted cells below the table. Docusign Envelope ID: 63E4AA80-D2C4-8CB7-822B-6DB7D256170B City of Port Orchard SR 166 Project September 2023 HWA Weighted Guidelines Factor Rate Weight Value Degree of Risk 25 0.280 7.000 Relative Difficulty of Work 20 0.290 5.800 Size of Job 15 0.350 5.250 Period of Performance 15 0.350 5.250 Assistance by the State 15 0.31 4.704 Sub -consulting 10 0.000 0.000 Total Profit Fix Fee 28.00 Subconsultant Costs: $95,300.00 Agreement Duration (Months): 24 Calculated Risk Factors Size of Job: 0.350 Period of Performance: 0.350 DIRECTIONS: The engineer needs to fill in only the fields that are highlighted. The three highlighted fields in the table are judgment calls. The other three are defined by formulae. These are calculated using project information that the engineer fills in using the highlighted cells below the table. Docusign Envelope ID: 63E4AA80-D2C4-8CB7-822B-6DB7D256170B This firm was purchased by City of Port Orchard SR 166 Project September 2023 Psomas and is now KPG doing business as Psomas Weighted Guidelines Factor Rate Weight Value Degree of Risk 25 0.33 8.250 Relative Difficulty of Work 20 0.30 6.000 Size of Job 15 0.350 5.250 Period of Performance 15 0.350 5.250 Assistance by the State 15 0.35 5.250 Sub -consulting 10 0.000 0.000 Total Profit Fix Fee 30.00 Subconsultant Costs: $84,276.94 Agreement Duration (Months): 24 Calculated Risk Factors Size of Job: 0.350 Period of Performance: 0.350 DIRECTIONS: The engineer needs to fill in only the fields that are highlighted. The three highlighted fields in the table are judgment calls. The other three are defined by formulae. These are calculated using project information that the engineer fills in using the highlighted cells below the table. Docusign Envelope ID: 63E4AA80-D2C4-8CB7-822B-6DB7D256170B City of Port Orchard SR 166 Project September 2023 RES Weighted Guidelines Factor Rate Weight Value Degree of Risk 25 0.280 7.000 Relative Difficulty of Work 20 0.290 5.800 Size of Job 15 0.350 5.250 Period of Performance 15 0.350 5.250 Assistance by the State 15 0.31 4.704 Sub -consulting 10 0.000 0.000 Total Profit Fix Fee 28.00 Subconsultant Costs: $70,704.00 Agreement Duration (Months): 24 Calculated Risk Factors Size of Job: 0.350 Period of Performance: 0.350 DIRECTIONS: The engineer needs to fill in only the fields that are highlighted. The three highlighted fields in the table are judgment calls. The other three are defined by formulae. These are calculated using project information that the engineer fills in using the highlighted cells below the table. Docusign Envelope ID: 63E4AA80-D2C4-8CB7-822B-6DB7D256170B City of Port Orchard SR 166 Project September 2023 Stepherson Weighted Guidelines Factor Rate Weight Value Degree of Risk 25 0.250 6.250 Relative Difficulty of Work 20 0.250 5.000 Size of Job 15 0.350 5.250 Period of Performance 15 0.350 5.250 Assistance by the State 15 0.350 5.250 Sub -consulting 10 0.000 0.000 Total Profit Fix Fee 27.00 Subconsultant Costs: $84,276.94 Agreement Duration (Months): 24 Calculated Risk Factors Size of Job: 0.350 Period of Performance: 0.350 DIRECTIONS: The engineer needs to fill in only the fields that are highlighted. The three highlighted fields in the table are judgment calls. The other three are defined by formulae. These are calculated using project information that the engineer fills in using the highlighted cells below the table. Docusign Envelope ID: 63E4AA80-D2C4-8CB7-822B-6DB7D256170B City of Port Orchard SR 166 Using LAG Manual Fee Calculation sheet at1 June 2026 WSP WSP 2026 -June Calculator Rate Weight Value WSDOT Fee Calculations Degree of Risk 25 0.25 6.25 Relative Difficulty of Job 20 0.25 5 Size of Job 15 0.3 4.5 Period of Performance 15 0.225 3.375 Assistance by Agency 15 0.3 4.5 Sub -Consulting 10 0.15 1.5 25.125 Docusign Envelope ID: 63E4AA80-D2C4-8CB7-822B-6DB7D256170B Fee Proposal Port Orchard SR166 Reconstruction KPFF Consulting Engineers and Subconsultants b7jR9'iirJen Description KPFF WSP RES Group Equinox HWA KPG Psomas Stepherson Concord Total Cost Task 1 Project Management $ 99,288.77 $ 16,624.40 $ - $ - $ - $ 2,578.34 $ - $ 1,877.69 $ 120,369.20 1.5 2026 Project Management $ 38,187.99 $ - $ - $ - $ - $ 483.66 $ - $ 1,877.69 $ 40,549.35 1.6 Construction Phase Management $ 61,100.78 $ 16,624.40 $ - $ - $ - $ 2,094.67 $ - $ - $ 79,819.86 Task 2 Data Collection $ 4,873.84 $ 4,873.84 2.5 2026 Pickup $ 4,873.84 $ 1,658.87 $ 6,532.71 Task 4 PS&E Design $ 196,303.72 $ $ - $ - $ - $ - $ - $ 196,303.72 4.7 "SE and WSDOT Design Refinement Services $ 196,303.72 $ $ - $ - $ - $ - $ - $ 196,303.72 Task 10 WSDOT Coordination $ 29,849.26 $ $ - $ - $ - $ - $ - $ 29,849.26 10.3 2026 WSDOT Coordination $ 29,849.26 $ $ - $ - $ - $ - $ - $ 29,849.26 Task 12 Ri ht of Way $ 4,284.21 $ - $ 6,386.11 $ - $ - $ - $ - $ - $ 10,670.32 12.4 2026 TCE Easement Services $ 4,284.21 $ - $ 6,386.11 $ - $ - $ - $ - $ - $ 10,670.32 Task 13 Construction Management and DSDC $ 648,665.55 $ - $ - $ - $ - $ 10,585.66 $ - $ 9,327.29 $ 668,578.50 13.1 Construction Management Delivery Support $ 554,201.33 $ - $ - $ - $ - $ . $ - $ . $ 554,201.33 13.2 Design Services During Construction $ 94,464.22 $ - $ - $ - $ - $ 10,585.66 $ - $ 9,327.29 $ 114,377.17 Task 14 Construction Daily & Special Inspections $ - $ 236,805.13 $ - $ - $ 20,994.98 $ - $ - $ - $ 257,800.12 14.1 Daily Construcfion Inspection Services $ - $ 236,805.13 $ - $ - $ - $ - $ - $ 236,805.13 14.2 Special Construction Inspections7Testing $ - $ $ - $ 20,994.98 $ - $ - $ - $ 20,994.98 Task 15 Archaeological Monitoring $ - $ - $ - $ 53,133.53 $ - $ - $ - $ - $ 53,133.53 15.1 Daily Monitoring Summary Report $ - $ - $ - $ 53,133.53 $ - $ - $ - $ - $ 53,133.53 Task 16 Outreach Support Daring Construction $ 3,265.87 $ - $ - $ - $ - $ - $ 12,731.08 $ - $ 15,996.94 16.1 Public Outreach Graphics and Press Release $ 3,265.87 $ - $ - $ - $ - $ - $ 12,731.08 $ - $ 15,996.94 0 0 0 0 0 0$ 0$ Task 17 Aquatic Lease Services $ 28,392.91 $ - $ - $ - $ - $ - $ - $ - $ 28,392.91 17.1 Aquatic Lease Services $ 28,392.91 $ - $ - $ - $ - $ - $ - $ 28,392.91 Total Labor Cost by Firm $ 1,014,924.13 $ 253,429.54 $ 6,386.11 $ 53,133.53 $ 20,994.98 $ 13,163.99 $ 12.731.08 $ 11,204.99 $ 1,385,968.35 Reimbursable Costs by Firm I $ 36,820.00 I $ 250.00 I $ 6,217.50 I $ 12,474.00 I $ 36,820.00 I $ 150.00 $ 800.00 I $ 108.75 $ 93,640.25 Management Reserve Project Budget with Reserve $ 100,000.00 $ 1,579,608.60 Page 1 of 1