Loading...
035-06 - Resolution - Approving with Conditions Horstmas Heights Prelim. PlatRESOLUTION NO. 035-06 A RESOLUTION OF THE CITY OF PORT ORCHARD, WASHINGTON, APPROVING WITH CONDITIONS HORSTMAN HEIGHTS PRELIMINARY PLAT AND PLANNED RESIDENTIAL DEVELOPMENT APPLICATION FOR PROPERTY LOCATED AT THE INTERSECTION OF TUFTS AVENUE AND HORSTMAN ROAD WHEREAS, the James Corporation, applicant, and David Alan Development, LLC, owner, submitted an application, dated June 17, 2005, (SUBDIV 05-02/PRD) for a preliminary plat and planned residential development to subdivide a 10.92 acre site into 54 residential lots on property located at the intersection of Tufts Avenue and Horstman Road, tax parcel numbers 302402-3-020-2000, 302402-3-021-2009 and 302402-025-2005, as legally described in Exhibit A; and WHEREAS, A Mitigated Determination of Non -Significance was issued on August 16, 2006; and WHEREAS, on August 21, 2006, the Planning Commission held a public meeting on the application; and WHEREAS, the application was processed as described in Planning Commission Resolution 013-06 attached hereto as Exhibit B; and WHEREAS, on September 11, 2006, the City Council held a public hearing on the application; and WHEREAS, being fully advised, the City Council finds and concludes as follows: TESTMONY AND EXHIBITS The Council bases its findings and Conclusions upon the following Exhibits and Testimony that it finds to be relevant, credible, and persuasive. 1. The following documents were admitted into the record: a) Agenda Staff Report dated September 11, 2006 with attachments. 2. Norm Olsen, spoke on behalf of the applicant. He described the major components of the project and made several recommendations and comments concerning sidewalks, right of way, setbacks, and significant trees. 3. Heather Wilson, requested frontage improvements along Horstman Road, Resolution No. 035-06 Page 2 of 3 FINDINGS AND CONCLUSIONS 1. The Findings and Conclusions set forth in Exhibit B are hereby adopted as the Council's Findings and Conclusions, except as modified herein. The provisions set forth in this Resolution shall control over any inconsistent provisions set forth in Exhibit B. 2. Exhibit B, Finding No. 21 is modified as follows: Revise finding to state: "...Horstman Road is a Port Orchard right-of-way..." 3. The applicant has agreed to develop a neighborhood park of at least 1/3 acre in size with pedestrian trail access between the proposed plat of Horstman Heights and the preliminary plat of Overlook and pay $200 per lot towards the cost and installation of play equipment for the park. 4. The applicant has requested to be relieved from the obligation to make frontage improvements to Horstman Road and has agreed to sign a waiver of no -protest to formation of a Local Improvement District (LID) for future Horstman Road improvements to include pavement widening, curb, gutter, sidewalk, street lights, storm water system, and landscaping, as provided in the City's Development Standards. In lieu of improvements to Horstman, applicant has also agreed to make improvements to Orlando Street as originally recommended by the Planning Commission. NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF PORT ORCHARD, WASHINGTON, HEREBY RESOLVES AS FOLLOWS: Section 1. The preliminary plat application and planned residential development is hereby approved, subject to the conditions set forth in Exhibit B, except as modified herein. The conditions of approval set forth in this Resolution shall control over any inconsistent provision set forth in Exhibit B. Revise to delete "final construction plans" and replace with "final plat". Section 3. Exhibit B, Conditions of Approval No. 4 is modified as follows: Revise condition to state: "...landscape areas in common areas, except for frontage yards on the lots, shall have temporary irrigation systems..." Section 4. Exhibit B, Conditions of Approval No. 9 is modified as follows: Revise condition to state: "...the applicant shall be required to develop a neighborhood park of at least 1/3 acre in size between the proposed plat of Horstman Heights and the preliminary plat of Overlook and pay $200 per lot towards the cost and installation of play equipment for the park." Resolution No. 035-06 Page 3 of 3 Section 5. Exhibit B, Conditions of Approval No. 36 is modified as follows: Revise condition to state: `The applicant shall be required to provide lighting at the entrance to the plat and enter into a "No Protest Agreement" for future LID of road improvements on Horstman Road prior to final plat approval. The waiver of protest agreement shall be in a form provided by the City and approved by the City Attorney. Upon acceptance of the "No Protest Agreement" by the City, it shall be recorded with the County Auditor." PASSED by the City Council of the City of Port Orchard, SIGNED by the Mayor and attested by the Clerk in authentication of such passage this 251" day of September, 2006. 3"U e : I NuLwe] ATTEST: Michelle Merlino, Interim City Clerk • • • 1 1 • Exhibit "A" THAT PORTION OF THE NORTHWEST QUARTER OF THE SOUTHWEST QUARTER OF SECTION 30, TOWNSHIP 24 • NORTH, RANGE 2 EAST, W.M., IN KITSAP COUNTY, WASHINGTON, DESCRIBED AS FOLLOWS: COMMENCING AT THE SOUTHWEST CORNER OF NORTHWEST QUARTER OF THE SOUTHWEST QUARTER OF SAID SECTION 30; THENCE SOUTH 88035'14" EAST ALONG THE SOUTH LINE THEREOF A DISTANCE OF 245.91 FEET; THENCE NORTH 103846" EAST 30.00 FEET TO THE NORTH RIGHT-OF-WAY MARGIN OF ORLANDO STREET AND THE TRUE POINT OF BEGINNING; THENCE CONTINUING NORTH 1°38'46" EAST 425.00 FEET; THENCE SOUTH 88°35'14" EAST 107.60 FEET; THENCE SOUTH 1 °38'46" WEST 35.00 FEET; THENCE SOUTH 88°35'14" EAST 101.00 FEET; THENCE NORTH 1038'46" EAST 194.49 FEET TO THE SOUTHERLY RIGHT-OF-WAY MARGIN OF HORSTMAN ROAD; THENCE NORTH 87043'28" EAST ALONG SAID MARGIN A DISTANCE OF 62.85 FEET TO THE BEGINNING OF A CURVE TO THE RIGHT HAVING A RADIUS OF 1114.98 FEET; THENCE ALONG SAID CURVE AND ALONG SAID MARGIN AN ARC DISTANCE OF 140.63 FEET THROUGH A CENTRAL ANGLE OF 7013'36" TO THE BEGINNING OF A CURVE TO THE LEFT HAVING A RADIUS OF 723.28 FEET; THENCE ALONG SAID CURVE AND ALONG SAID MARGIN AN ARC DISTANCE OF 68.43 FEET THROUGH A CENTRAL ANGLE OF 5°25'15"; THENCE NORTH 89°31'49" EAST ALONG SAID MARGIN A DISTANCE OF 130.60 FEET TO THE BEGINNING OF A CURVE TO THE RIGHT HAVING A RADIUS OF 183.09 FEET; THENCE ALONG SAID CURVE AND ALONG SAID MARGIN AN ARC DISTANCE OF 107.05 FEET THROUGH A CENTRAL ANGLE OF 33029'57"; THENCE SOUTH 56058'14" EAST ALONG SAID MARGIN A DISTANCE OF 259.76 FEET; THENCE SOUTH 13035'14" EAST 274.95 FEET; THENCE NORTH 88035'14" WEST 56.16 FEET; THENCE NORTH 4034'18" WEST 30.00 FEET; THENCE NORTH 74°06'47" WEST 65.64 FEET; THENCE SOUTH 77003'13" WEST 86.33 FEET; THENCE SOUTH 3047'14" EAST 188.80 FEET TO THE NORTH RIGHT-OF-WAY MARGIN OF ORLANDO STREET; THENCE NORTH 88035'14" WEST ALONG SAID MARGIN A DISTANCE OF 818.16 FEET TO THE TRUE POINT OF BEGINNING. A RESOLUTION OF THE CITY OF PORT ORCHARD, WASHINGTON, PLANNING COMMISSION RECOMMENDING APPROVAL WITH CONDITIONS THE HORSTMAN HEIGHTS PRELIMINARY PLAT, PLANNED RESIDENTIAL DEVELOPMENT AND REZONE APPLICATION FOR PROPERTY LOCATED AT THE INTERSECTION OF TUFTS AVENUE AND HORSTMAN ROAD. WHEREAS, the property owner has filed an application with the City (SUBOIV 05-02/PRD) for a preliminary plat and planned residential development to subdivide a 10.92 acre site into 54 residential lots on property located at the intersection of Tufts Avenue and Hortsman Road, parcel numbers 302402-3-020-2000, 302402-3-021-2009, and 302402-3-025- 2005; and WHEREAS, the applicant filed an application with the City (R 1156) for a rezone of two of the parcels; 302402-3-020-2000 from R4.5 to R20 and parcel 302402-3-025-2005 from Commercial to R20. WHEREAS, on August 21, 2006, the Planning Commission held a public meeting on the application; and follows: WHEREAS, being fully advised, the Planning Commission finds and concludes as TESTMONY AND EXHIBITS The Planning Commission bases its findings and Conclusions upon the following Exhibits and Testimony that it finds to be relevant, credible, and persuasive. 1. The following documents were admitted into the record: A. Staff Report dated August 21, 2006 with attachments. B. August 21, 2006 Planning Commission minutes. 2. Norm Olson, of N.L.Olson and Associates, spoke on behalf of the applicant. He described the major components of the project and made several recommendations and comments �oncerning the conditions of approval for sidewalks, right of way, setbacks, and significant tries. 3. Bill Rafferty testified that Hortsman Road was very dangerous and he was concerned about the safety of children walking up from Olney Road. 4. Ron,,}Hempel stated that the City should not alter the significant tree ordinance. 5. William M. Palmer indicated that in the 1980s, this property was to have a commerc`fal development on it, so a dense residential development was better for neighbors. 6. Jennifer Light had several questions for the applicant concerning traffic, speed, and crime. 7. Pat Waters indicated that he was a builder and local employer, and that it was Resolution No. 013-06 Page 2 of 9 important to have new development so that he could keep his employees working. S. L.E. Cass indicated that he has a stream on his property that was adversely affected by the Kmart development and is concerned about the effects of the Horstman Heights storm system. 9. Dick Brown gave testimony about the drainage in the area, including the Kmart system and Olympic Pointe apartments. General I . The application R-1156 for a zone reclassification for two of the three subject parcels to R20 zoning, was received on June 17, 2005. 2. The application SUBDIV 05-02, a PRD for 50 lots, was received on June 17, 2005. Kitsap County Assessor Information shows that Alan David Development LLC, is the property owner. The James Corporation is the applicant. David Milne, Manager or David Alan Development, LLC, submitted a letter on August 11, 2006, authorizing Jim James to serve as agent for the owner. Subsequent site plans have been revised to show 54 lots. 3. The NOA/Notice of intent to issue the MDNS was issued March 1, 2006. 4. Water is provided by Annapolis Water 5. Sewer is provided by Karcher Creek Sewer District. 6. The Determination of Completeness was issued on December 16, 2005; however, the site plan was recently revised to allow for detached housing in the R20 zone. 7. The minimum total developable lot area required for property proposed for a planned residential development in the R20 zone is one acre. The proposed site complies with and exceeds this provision. Site Conditions 8. Steep slopes, located north and south of the proposed development are landslide hazard areas due to the site classification of intermediate stability slopes, severe erosion potential as classified by the SCS, and slope gradients exceeding 50 percent. 9. A Geotechnical Engineering Report submitted by N.L. Olson and Associates, Inc., written by Wesley R. Johnson, P.E. in August 2005 If all recommendations of the report are followed, the potential for large scale sliding or deep-seated failures on this property resulting from the proposed construction is negligible and the overall slope stability under the present. conditions appears good. 10. The site contains two Category III wetlands. The buffer width standard is 50 feet, however Buffer Averaging is proposed as provided in Chapter 2, Section 5 of the Critical Areas Ordinance. 11. A wetland Mitigation Plan is required to demonstrate that such averaging can clearly provide as great or greater functions and values as would be provided under the standard buffer requirement. 12. The minimum buffer width is 25 feet. 13. The site contains an intermittent stream with an associated ravine that will be untouched as a dedicated open space tract. Resolution No. 013-06 Page 3 of 9 14. The site contains a ridge that extends from the north to the southeast, with 10 to 20 percent slopes at the ridge, and 20 to over 50 percent slopes on the remainder of the property. As such, it is subject to a geologic hazard assessment and a geotechnical engineering evaluation for the proposed development. 15. The Geotechnical analysis finds that the site would be classified as a Geologically Hazardous Area, but if all recommendations are followed, there would be minimal risk of erosion or landslide events. 16. Based on the results of the geologic assessment, the site is suitable for the proposed residential plat development. 17. Grading at the site is expected to be major, with cuts of up to 25 feet. 18. Approximately 800 linear feet of 8 to 10 foot (exposed) retaining wall will be installed on site for stabilization and to create level building sites. 111W7 ff; 19. Primary streets serving the site are a two-lane arterial, a two-lane collector, and a two-lane local access street. 20. Olney Avenue is a north -south arterial with 11-foot travel lanes and 3-foot paved shoulders south of Horstman Road. It connects Jackson Avenue at Mile Hill Drive to the south with Beach Drive/Bay Street to the north at Sinclair Inlet. 21. Horstman Road is a two-lane east -west collector that connects Olney Avenue with Hillandale Drive in the east. It has 11-foot travel lanes with no shoulders except for a wide shoulder/school bus stop on the north side, east of Tufts Avenue. Horstman Road is a Kitsap County right-of-way. 22. Orlando Street is an east -west local access street that primarily serves the Olympic Pointe Apartments. It has two 12-foot travel lanes with a 5-foot sidewalk. There is unimproved right-of-way uphill east of Olympic Pointe Apartments, and another segment of Orlando accessed from Horstman Road, which has no shoulders or sidewalk. 23. Tufts Avenue is a north -south local access road that provides access to the Sinclair Heights subdivision in unincorporated Kitsap County. Although it connects with other small streets, there is no outlet other than the Horstman access. The proposed main access to Horstman Heights is located directly across Horstman from Tufts Avenue. 24. The nearest transit service line is provided along Olney Avenue. Kitsap Transit routes 6 and 81 provide daily service on Olney Road at Horstman and at Orlando. No trip reductions are used in forecasting future traffic conditions due to provided transit service. 25. The proposed access location has adequate sight distance to the east and west from both proposed access roads, according to the Traffic Impact Analysis prepared by Gibson Traffic Consultants, dated September 30, 2005. 26. Roughly 517 daily trips would be created on a typical weekday of which approximately 55 trips are expected into and out of the site during the PM peak hour (numbers were adjusted by staff from the original report based on the addition of four new lots). No morning peak hour projections were provided in the report. 27. Future traffic due to the proposed project would cause minimal increases in delays to the key intersections. 28. According to the traffic impact analysis, no off -site traffic mitigation is necessary for the project. Resolution No. 013-06 Page 4 of 9 29. The level of service (LOS) at the Horstman/Tufts intersection will remain at LOS A with the addition of the project. 30. The Olney/Horstman intersection will remain at LOS B with the proposed development. 3 L The Olney/Orlando intersection will remain at LOS B with the proposed development. 32. A sidewalk and street trees are to be installed on the north side of Orlando from the project access road for approximately 345 feet to Olney. 33. Sidewalks and street trees will be installed on both sides of internal access streets for Horstman Heights. Land Use/Zoning 34. The purpose of the R20 zone is to allow high density residential development in urban locations where public services and facilities are most available; and to implement comprehensive plan goals and policies for housing quality, diversity, and affordability, and to efficiently use residential land, public services, and energy. Single-family detached housing is allowed in this zone per Ordinance 012-06. 35. The development is being reviewed under the provisions of a PRD as required by the Comprehensive Plan Land Use Element Pg VI-9 (4). 36. The density is determined by net useable acre (total site area less sensitive environmental features and dedications) multiplied by 20. The site is 10.92 acres. Approximately 75% (8.19-acres) of the site is constrained by steep slopes (30% or greater). Right-of-way consists of 2.16-acres. Onsite storm water detention facilities consist of approximately .43- acres. The zoning for this site with density credit would support 55 dwelling units. 37. The minimum total lot area required for property proposed for a planned residential development is one acre. The proposal of 10.92 acres complies with this requirement (Chapter B5, Section 4d). 38. The proposed PRD provides an average lot size of 4000 square feet. The provision of alleys and designs which incorporate parking at the rear is not appropriate on the subject parcel because the presence of steep hillsides. Site Plan/PRD 39. The applicant has addressed Chapter B3, Section 6B (See attached narrative). 1) Benefit the community more than if the project complied with the established standards, guidelines, and policies .. , Staff response. The property is located within the comprehensive plan designation for high density residential uses. One of the large pieces of property was recently changed from commercial zoning to high density residential. The location of the property, with medium -density residential to the north (Sinclair Heights), and multi -family (Olympic Terrace Apartments) to the south, is appropriate as a transition zone between single-family and multi -family. Without the PRD, the project would be limited to a multi -family development, per Ordinance 012-06 and would not provide the density transition that this development provides. The PRD will also provide a pedestrian corridor from Horstman to the commercial developments on Mile Hill, and may encourage more pedestrian activity from residents of Horstman Heights and Sinclair Heights. 2) Clearly specify residential and other land uses through detailed site plans, lot layouts, and building elevations ... Resolution No. 013-06 Page 5 of 9 Staff response: Lot layouts are provided on detailed site plans illustrating setbacks, vehicular circulation, visitor parking, pedestrian amenities, and landscaping. Updated building elevations have been provided that show a typical single-family detached home. Staff understands that the lots may be sold and different designs may be submitted at a later date. 3) Preserve unique or sensitive physical features such as steep slopes and views, and retain natural vegetation ... Staffresponse: Tract D, on the northeastern portion of the site, will be preserved, although there will be some buffer encroachment in lots 1-11. The applicant proposes to use buffer averaging to mitigate the encroachment. Aside from Tract D and Tract E, the proposed park, the entire site will be subject to some dramatic regrading, with cuts of up to 25 feet. No native vegetation will be preserved, except in Tract D. 101 trees over 18- inches in diameter are to be removed. 4) Provide more open space and recreational amenities than would be available under conventional land development practices ... Staff response. Although 3.56 acres of the site are set aside as open space, only 7,664 square feet are available for recreation. Tract E shows some replacement trees and picnic tables on the site plan, but it is not clear how frequently this will be used by residents due to its proximity to the main entrance of the plat and its small size. Tracts A, C, and D are shown on the site plan as open space, but do not preserve vegetation or slopes, or provide for recreational opportunities due to the steep topography and large retaining planned for the site. No access to these areas are depicted on the site plan. Planning Commission Recommendation: The applicant was proposing to create a regional park at the bottom of the slope, adjacent to the apartments. However, the land is -not -owned by theapplicantand no planhasbeen submitted. The Planning Commission liked the idea of the park, but wanted a condition of approval added that would require either the creation of a regional park, or providing for the cost and installation of a park in the neighborhood. 5) Utilize creative design techniques to promote an uncluttered appearance such as a variety of lot sizes, parking at the rear of sites and the pro vision of alleys, .. . Staff response: There are no plans for rear parking or the provision of alleys, due to the steep topography of the site. While the lot sizes are not uniform, there is not a great deal of difference in lot width at the street. 6) Specifically demonstrate its benefit to the surrounding neighborhood and community at large ... Staff response., The project will benefit the community by providing affordable single- family housing. It will also provide pedestrian connectivity for the plat, and some neighboring properties, to bus stops and commercial/shopping areas. Planning Commission Recommendation: Although the revised site plan shows some pedestrian circulation within the plat, there is limited connectivity to the adjacent streets, such as Orlando and Horstman. Also, if the applicant does end up building a park, there needs to be additional pedestrian access added to access the proposed park facility. Resolution No, 013-06 Page 6 of 9 7) Specify the phasing of the development of a site ... Staff response: As of the most current site plan submittal, there is not phasing involved in the development of the plat. 8) Provide public facility sites or improvements, such as road improvements, utilities, parks, or open space ... Staff response: The proposed plat will provide pedestrian improvements and street trees along Orlando Street. There will also be sidewalks and street trees installed along the internal plat streets. A retention pond will be installed onsite. All appropriate utilities will be installed to serve the future homesites. There will be a small area with no amenities aside from three to four picnic tables, and some designated open space as part of the plat. Staff is requesting pedestrian paths from the ends of the cul-de-sacs to Orlando Street and stairs or a path to the upper part of Orlando Street. 40. The site plan has been revised from the original application to include 54 detached single- family homes. The previous plan included attached housing, and a reserve tract for multi- family. 41. Although there are no pending building plans, the submitted building elevations show either one or two car garages. With a 15-foot building setback, and no on -street parking, parking for guests and extra cars may become an issue in the future. No extra parking space are provided at this time. CONCLUSIONS 1. The proposed subdivision is consistent with the Comprehensive Plan. 2. The proposed site plan is consistent with the PRD provisions of the Zoning Ordinance. 3. The significant tree replacement plan is not in compliance with a ratio of 3:1 as required in the landscaping section of the Zoning Ordinance and will have to be revised and approved prior to the issuance of clearing, grading, and or any construction. 4. The proposed development meets most of the minimum requirements of the City's Stormwater Manual, 5. The proposed Preliminary Plat does not adequately address parks and recreation requirements of the City's Subdivision code. 6. The tree replacement plan will need to be revised to meet minimum standards as outlined in the zoning Ordinance. SEPA 1. All SEPA conditions shall be met. ZONING 2. All conditions identified by City Departments and other agencies must be met prior to the approval of final construction plans. 3. Prior to Final site development approval, the Landscape Plan must be revised and submitted for approval, meeting the provisions of Chapter C4. 4. Except for areas of undisturbed existing vegetation or low areas with existing high soil moisture conditions, landscape areas shall have temporary irrigation systems. Such Resolution No. 013-06 Page 7 of 9 systems may be removed after 24 months or 2 growing seasons, whichever occurs first, provided that the plantings are established. 5. Prior to Final Plat approval, the landscaping must be bonded according to provisions of Chapter C4, Section 22. The landscape bond is subject to approval by the City Attorney, 6. A separate sign permit is required for any signage proposals. 7. Address numbers shall be visible from the street, and installed prior to Certificate of Occupancy. 8. As part of Final Plat approval, a notice to title shall be filed for lots 1 — 11 stating that the lots contain portions of critical wetland buffers, and no development can occur in the buffers. Buffers must be marked with a split -rail fence and wetland signs. 9. The applicant has not provided adequate onsite recreational facilities, nor has he offered to pay toward the development of a regional park. Therefore, the applicant shauld shall be required to develop a neighborhood park between the proposed plat of Horstman Heights and the preliminary plat of Overlook; or pay a per lot amount to cover the cost of a park plus equipment and installation. 10. Covenants, Conditions and Restrictions (CC & R's) providing for maintenance of the common open space and stormwater pond must be submitted with the final plat application and recorded on the face of the plat, prior to final plat approval. 11. The proponent shall prove, prior to site development, that the proposed retaining walls and grading will not adversely affect neighboring properties. 12. All recommendations from the geotechnical report prepared by Wesley Johnson, P.E., of N.L. Olson and Associates, dated August 2005, shall be followed. FIRE PREVENTION CODE 13. Buildings shall be constructed in accordance with the provisions of the International Fire Code, and the International Building Code, as adopted and enforced by the City of Port Orchard. All construction shall be in accordance with Chapter 14, Fire Safety During Construction, Alteration or Demolition of a Building. 14. Fire hydrant placement shall be revised to meet the maximum separation distance of 400 feet. Where possible, the spacing intervals for hydrants shall commence at street intersections. 15. Water service must meet a minimum requirement of 1000 gallons per, minutes to provide fire flow. 16. The applicant must consult with the South Kitsap School District about an appropriate bus stop location and safety issues. STORMWATER / UTILITIES 17. Stormwater quantity control, water quality treatment, and erosion and sedimentation control shall be designed in accordance with the City of Port Orchard Municipal Code, Chapter 15.32 Stormwater Management or as amended at the time of Excavation/Stormwater Permit Application. 18. Construction plans and profiles of all roads, stormwater drainage facilities and appurtenances, prepared by the developer's engineer shall be submitted to the City for review and acceptance as part of the application for an Excavation/Stormwater Permit. 19. The design of the stormwater quality control facility will be in accordance to Chapter 6 of the City of Port Orchard Stormwater Design Manual, 20. All stormwater system improvements will be completed prior to final plat approval. Resolution No. 013-06 Page 8 of 9 21. The Engineer of Record shall certify that the as -built live and dead storage detention pond volumes meet the design criteria. The Engineer of Record shall verify that soils are compatible with the detention pond. 22. The Engineer of Record shall certify that the as -built water quality treatment facility meet the design criteria. 23. Contractor is responsible for permanent stabilization and restoration of the project site, including vegetation of open space areas. 24. Submit the Operation and Maintenance Manual for review and acceptance by the Department of Public Works prior to Final Inspection. The Manual shall be prepared by a Professional Engineer and meet the requirements of Public Works. 25. All Best Management Practices for erosion and sedimentation control shall be followed during site development and during construction. A detailed Temporary Erosion and Sedimentation Control plan shall be submitted and approved by the City Engineer prior to issuance of a site development permit. 26. The applicant shall submit a letter from Annapolis Water District indicating adequate water and fire flow requirements prior to issuance of a site development permit. 27. The applicant shall submit a letter from Karcher Creek Sewer District indicating adequate sewer capacity prior to the issuance of a site development permit. 28. Water and sewer as-builts shall be provided to the City prior to final plat approval. ROADS 29. Prior to final plan approval, Construction City Engineer for all road improvements. Plans shall be submitted and approved by the 30. Project proponents must ensure that adequate sight distance is provided at the site access. 31. Pedestrian easements, 10 feet in width, shall be provided at the ends of the cul-de-sacs at roads B and C. Five-foot asphalt or concrete paths or stairs shall be installed that provide access to the sidewalks on Orlando Street. 32. Pedestrian access and lighting shall be provided on the unimproved right-of-way portion of Orlando Street from the pedestrian access at Road C west. 33. As indicated on the preliminary plat drawings, half street improvements must be installed on Orlando Street to the intersection with Olney Road. 34. Any retaining wall over four feet in height must be designed by a licensed structural engineer and submitted for review by the City prior to site development. Internal roads should be wide enough to allow from on -street parking on one side of the street, except on Road D. 35. Locations of handicapped access, curb cuts, and driveway approaches shall be provided on plans prior to Final Plat approval. 36. Kitsap County will make the final determination about requirements for frontage improvements on Horstman Road (see Staff Report). NOW, THEREFORE, BE IT RESOLVED that the Planning Commission of the City of Port Orchard hereby recommends that the City Council approve the Horstman Heights Preliminary Plat/PRD and Rezone of tax parcels 302402-3-020-2000 and 302402-3-025-2005. PASSED by the Planning Commission of the City of Port Orchard, this 21' day of August, 2006. Resolution No. 013-06 Page 9 of 9 Gil Michael, Chair ATTEST: Joanne Long -Woods Planning Director