Loading...
061-08 - Resolution - Change Order 2 to Contract with Northern Con-Agg for Bethel Sinkhole ProjectRESOLUTION NO. 061-08 A RESOLUTION OF THE CTIY OF PORT ORCHARD, WASHINGTON, APPROVING AND AUTHORIZING THE MAYOR TO EXECUTE CHANGE ORDER NO. 2 WITH NORTHERN CON-AGG, INC. WHEREAS, Northern Con-Agg, Inc. was selected to complete construction for the Bethel Avenue Sinkhole Project; and WHEREAS, the contract requires a second change order to revise the contract total. now, therefore; THE CITY COUNCIL OF THE CITY OF PORT ORCHARD, WASHINGTON, HEREBY RESOLVES AS FOLLOWS: THAT: The City Council approves and authorizes the Mayor to sign Change Order No. 2 with Northern Con-Agg, Inc., reducing the total contract amount by $7,901.23 for a revised contract total amount of $318,591.05 for the Bethel Avenue Sinkhole Project, a copy of which is attached as Exhibit A and incorporated by this reference. PASSED by the City Council of the City of Port Orchard, SIGNED by the Mayor and attested by the Clerk in authentication of such passage this 9th day of December 2008. ~ Change Order -Minor Change (Not To Be Used For Structural Changes) -~:~tract Number __ . ----l Co~;;Jr~:enll~-~i~l~hole -----------------------+~ F;:-e-:d-e-ra--1 ~::~~=b~--- Change Order Number ! Change Description lDate 2 __ I Fiel~b<:trrg_e/CI<>.s.~Q.tl!________________ _____ __ __ Nov 18, 2008 Region 1 Project Engineer i Phone Number t-0 lym pic Re_g_i()l_l_ _ __ ___l__M_,r_k_I)orsey, P.E~·:__ ________________ --~~ ____ Q§O.l§_76-49~l_ ___ _ Prime Contractor I Design~Builder Northern Con Agg_ Inc. Brief Description of Problem I Reason for Entitlement The original contract was awarded without the consideration of Bid Alternate Number L through this change order. This is being revised Quantities ran over on the HMA and the Roadway Excavation due to the discovery of the underground fuel tank during construction and an unplanned repair to the water main. ------·--·------------------------------------------------·--·----------- Justification of Cost: Bid Alternate Number 1 will save the contract $8,730.00. However, the addition of the HMA and Roadway Excavation will add $828.77 back to the contract. The total change from Change Order I is a cost savings of $7,901.23. Date Approvals Required by C~eck(s!q ar 1)' n ----- ATTEST: rh'fllu.. ~ '-' C1 ty Clle'rk' 1 n Calculated By ! Date }Checked By /.;,if II' Date AnsJreaArcher __________ J_N_ov 18, 200§4_i'ft\jl Szretter, NCA !J:1 _ Nov 18,2008 _ Inspector's Signature ! Date ---rvvork Started ' ! Work Completed DOTForm42i-005A EF Revised 2/08 I ~--i Distribution: Copy w/Attachments-Mark Dorsey, P.E. Copy of page 1 only w/o Attachments~ PrimeContractor I Design-Builder Copy w/o Attachments-OR Construction Office Original w/o Attachments-State Construction Office Page 2 "·. Washington State Department of Transportation Change Order -Minor Change Contract Number l Contract Title I Federal Aid Number ·----~------·----·----L-Bethe!Aven~,e__Sinkhole ~ Change Order Number i Change Description ·-··-···--Date ··--···-- 2 I Field Change/Close__Q.\1!:.________ Nov 18, 2008 R;gio,-,--·.o -I Project Engineer ----------·-···--··-----~Phone Number . ··-- _QI)'f!lpi_~ Region _j __ l0_ark Dorsey, P.cc.··=E:..... ----~---··----··-··----~~--~"'(360)_8]_6-499 I __ _ Prime Contractor I Design-Builder Northem Con Agg, Inc. [8J Ordered by Engineer under the terms of Section 1-04.4 of the Standard Specifications or the RFP [8J Change proposed by Contractor I Design-Builder Change Description Adjustment for bid alternative #I and an increase in the quantities for Hot Mix Asphalt and Roadway Excavation Including Haul. -""' \p c \'\] 'C- """'r v ~o. d'"l '\"" '-" '\\lu '<""..... \\ ~ 1.." \)X..c, 0~ j~~\) • yo?-"(, d< x~ .....; O'r \'G \j\1 c,\ \ ' '?\)'?;, -· All work, materials and measurements to be in accordance with the provisions of the Contract for the type of construction involved unless stated otherwise in this document. Original Contract Amount Current Contract Amount $ 296,737.00 $ Prime Contractor I DesignRBuilder Signature or Method of Concurrence: Project Engineer's Signature for Execution: Est. Net Change This C.O. -7,901.23 Distribution: Copy w/Attachments-Mark Dorsey, P. Est. Revised Contract Amount $ 318,591.05 Copy of page 1 only w/o Attachments -Pri Co tractor f Design-Builder Page 1 DOT Form 421-005A EF Revised 2/0B Copy w/o Attachments-OR Construction Offi Original w/o Attachments-State Construction ffice