Loading...
021-20 - GeoEngineers, Inc. - Supplement / Change Order 1Supplemental Agreement Number 0rganization and Address GeoEngineers, Inc. 17425 NE Union Hill Rd Ste 250 Redmond, Washington 98052 Phone: 253.383.4940 Original Agreement Number LA 616s Project Number srP(E) - 0166(008) Execution Date February 13,2020 Completion Date March202l Project Title Bay Street Pedestrian Pathway - NEPA Update New Maximum Amount Payable $25,355.01 Description of Work The consultant will prepare a public outreach summary report and an updated Environmental Justice Matrix and report as part of the NEPA updated at the request of WSDOT. ^-.w Washington State Department of Tlansportation The Local Agency of Citv of Port Orchard desires to supplement the agreement entered in to with GeoEngineers,Inc. and executed on February 13, 2020 and identified as Agreement No.c.o)1-)o All provisions in the basic agreement remain in effect except as expressly modified by this supplement. The changes to the agreement are described as follows: I Section 1, SCOPE OF WORK, is hereby changed to read: As part of the NEPA update, we are proposing to provide a response letter to comments that WSDOT received regarding the NEPA update and we will provide an updated corridor-level environmental site assessment to be in compliance with current WSDOT guidelines forhazardous materials discipline reports. il Section lV TIME FOR BEGINNING AND COMPLETION, is amended to change the number of calendar days for completion of the work to read: Not applicable ill Section V PAYMENT, shall be amended as follows: Additional 1 3,680.65 required. as set forth in the attached Exhibit A, and by this reference made a part of this supplement. lf you concur with this supplement and agree to the changes as stated above, please sign in the Appropriate spaces below and return to this office for final action. By: ?=to DOT Form 140-063 Revised 09/2005 By Approving Authority Signature Exhibit "A" Summary of Payments Basic Agreement Supplement #1 Total Direct Salary Cost 3,409.00 3,880.42 7,289.42 Overhead (lncluding Payroll Additives) 7,203.56 8,199.72 15,403.28 Direct Non-Salary Costs 39.10 436.38 475.48 Fixed Fee r,022.70 1 1 64.1 J)2,186.83 Total 11,674.36 13,680.65 25,355.01 DOT Form 140-063 Revised 09/2005 Exhibit A Scope of Services Gity of Port Orchard Bay Street Pedestrian Pathway NEPA Update Services April 2020 Prepared by: GeoEngineers, lnc 17425 NE Union Hill Rd Suite 250, Redmond, WA 98052 GeoEnan eznsiQ 1101 Fawcett Avenue, Suite 200 Tacoma, Washington 98402 253.383.4940 April t6,2O2O City of Port Orchard 216 Prospect Street Port Orchard, Washington Attention: Mark Dorsey Subject: Change Orderfor BayStreet Pathway NEPA Update Bay Street Pedestrian Pathway Project Port Orchard, Washington File No. 12309-009-03 GeoEngineers, lnc. (GeoEngineers) is pleased to present this scope and budget for providing additional National Environmental Policy Act (NEPA) and Hazardous Materials update support to the City of Port Orchard (City). GeoEngineers has previously completed NEPA development and support for the Bay Street Pedestrian Pathway Project. GeoEngineers is currently scoped to prepare a communications memorandum and prepare an updated environmentaljustice letter to support the NEPA update. However, we understand that the City received a letter from the Washington State Department of Transportation (WSDOT) that identified specific comments related to the NEPA updated for the project and WSDOT has requested a response letter. We additionally understand that an update is needed to the May 2Q1"L Corridor-Level Environmental Site Assessment in compliance with current WSDOT guidelines for Hazardous Materials Discipline Reports. This change order is to address the preparation of the response letter. SCOPE OFSERVICES This scope and budget is a change order for additional work for the project. Tasks 1 and 2 are described within the signed proposal dated December 20, 2019. Tasks 3 through 5 describe the additional work requested. Task 3 - Critical Areas Evaluation and Research r GeoEngineers will research existing mapped data sources for updated information in response to some of the comments. For example, GeoEngineers will review mapped information regarding well protection areas and floodplain base flood elevations. r GeoEngineers will coordinate with Washington Department of Fish and Wildlife (WDFW) for updated information on bald eagle nests in the vicinity of the site. City al PartArchad Aptit L6,2A2O Page 2 r GeoEngineers will conduct a brief survey for wetland and stream habitats within the project area. It is anticipated that habitat conditions have not changed since the 2011 original NEPA site investigation. Task 4 - Right-Sized Hazardous Materials Report GeoEngineers will prepare a Right-Sized Hazardous Materials (HazMat) Discipline Report, complete with maps/figures, applicable data and photos, per the report guidance available on the HazMat website htto://wwwwsdotwa.govlenvironmenVtechnical/disciplines/hazardous+naterials/investigation- samplingdocument. At this time, we anticipate that a letter report will be the appropriate level of report consistent with the 2OtlreporL We will utilize the information from the previous 2OIl,reportto the extent practicable. The2O2O effort will include: l Review the results of a federal, state and local environmental database search provided by an outside environmental data service for listing of information on confirmed and suspected contaminated sites or nearby structures specified by ASTM lnternational (ASTM). The evaluation will focus on sites that are within 7+ mile from the alignment. Local geologl and hydrogeolos/ will be considered. The database search will also be evaluated to identify Washington State Department of Ecology (Ecology) files that may need to be reviewed for updated information. r Review Ecologl files regarding listed properties of potential environmental concern relative to the alignment. r Conduct a visual reconnaissance from public access areas and from the public right-of-way along the project corridor. r Prepare a letter report summarizingthe findings. One round of review and comment of the draft report is assumed. Task 5 Response Letter GeoEngineers will prepare a response letter to the February 3,2O2O comment letter from SHERS Law Firm. As part of this task we will include information from Task 3 (described above) and include responses to comments on aesthetic and visual impacts, environmental site assessment, wetland and stream data, bald eagle nests and working in floodplains. Assumptions For the purposes of this scope, the following assumptions have been made: r The site visit will be completed in one day and the City will provide us with access to the site. l The City will address stormwater and parking comments. : There will be one round of revisions of the draft documents before the document is finalized. r GeoEngineers will not submit permits and permitting fees are not included within this scope and budget. i :t.' .1 ':2 1.:. ')(..i i'' GeoErucrn EERO City at ParlOrcnarC Apttt t6.2O2O Page 3 TERMS, FEE EiTIilIAIE ATTD SCHEDULE The estimated total cost for Tasks 3 through 5, described above, is $13,680.65. The estimated budgets for the tasks are described in the attached spreadsheet. We propose to conduct our services on a time- and-expense basis in accordance with the terms in the Local Agency Guidelines agreement and our approved WSDOT overhead rate. There are no intended third-par$ beneficiaries arising from the services described in this proposal and no party other than the party executing this proposal shall have the right to legally rely on the product of our services without prior written permission of GeoEngineers. This proposal is valid for a period of 60 days commencing from the first date listed above and subject to renegotiation by GeoEngineers, lnc., after the expiration date. We appreciate the opportunity to submit our proposed scope of services and look forward to working with you on this project. We will not proceed with any modification to our scope or fee estimate without first contacting you and receiving your prior authorization. lf you have any questions regarding the scope of services, please do not hesitate to call us at 253.383.4940. Sincerely, GeoEngineers, lnc. , /:.../ .' 1r-t ... Jennifer L. Dadisman, PWS Biologist JLDJ0C:tlm Attachments: Exhibit G-1. Subconsultant Fee Determination - Summary Sheet J Callaghan, MS, PWS Principal Fisheries Biologist i :.: ' !; 1'1 1t,2 !:i tJ'. GeoErue n EERse Exhtffi,6,t Subgonsultant FeE Dst.|rnlftitlrM .summary glie€* Fatnlrray Pojes{Fr.ojeet:Na111e elieilNailit Bqy Stneq Pedettien CirydPortOirlid Stait&te. End- Dsts PrgJ€€I#'1.2€09-009.03 Tqsk Ueslripilqn; ,5tlbi!6irduft ant,F,Sd Dritatminetlon '9ubonss&.ntr Glaeslflc*ionr rs&t DgE Elglhlglfon:for''fr "E3iiitkted T{d{el. man:lloura ,% lrtcrsssg 0 RstB % of'l,Ih,flt x sa.Q80.4? x S3,880,42 Eollar,r $€4$.SA $3,8r0.4U $!.00 So.oo l&i$i?2 0{r{1613..lt S-3Fi38 rSAO0,0o: $.r:rgta ${3so$5 7 2 76 6 0 0g x x Xx 1r. d x. $90:s0r Sgi@2.8'8 M49;68' rgu,0O :1$0;00 $0-00 0 OverheadtOH Frxsil Fos(FFI Cost - including Salary Additives) on Rare x DSC oi @ FF RalerDse.of E0.00rt RalitiDulsnucis Retmbur-cahl.esT-atdl rand To{al units oauh @€adl @ eqpilgg @€{cfr @Ec{ @E€I @e€& @ $0.0o $0.00 $0:0! EO,So $0i00 l::li, it ii ii:r!r:ll li; r i.tr I 1iiti.rcr' 1i1i.1,l1r ; r1 11i | 1.1ii1 lii'lrt otiLrcttirt r,t I ir'lr1 llrrtlrrili'rri i l)li (lil ll (l (l I li (l li;/t (ril llll lri{) 1,..i,i l, Il) (.r() l|il i il M6WI