Prospectus Level Estimate BethelBethel and Lincoln Intersection Improvement Project Subset of TIP tier 2 Bethel Corridor Phase 5 Project 3/6/2020 Design Phase: Consultant - Civil Consultant - Survey Consultant - Environmental NEPA City Staff Permit Fees - LDAP, SEPA Advertising Printing and Misc. Subtotal Contengency 25% Tota I Construction Phase: Construction Contract Consultant - Constr Admin & Insp Consultant - Materials testing City Staff State Staff Sub Total Contengency 25% Total Grand Total Budget C, W 300,000 35,000 15,000 15,000 2,000 1,000 1,000 369,000 92,250 461,250 1,554,000 120,000 5,000 30,000 5,000 1,714,000 428,500 2,142,500 2,603,750 Fraction 17% Obligation Q42020 73% See Bethel Corridor Study 6% 80% Obligation Q12022 Construction Cost Breakdown from Bethel Corridor Study Round -a -bout $ 1,300,000 Stormwater Pond A $ 254,000 16% $ 1,554,000 Funding Breakdown Grant $ 1,500,000 58% Remainder City $ 1,103,750 42% City - Streets + TI F $ 765,930.00 City - Storm $ 337,820.00