Loading...
026-09 - Resolution - Amendment to Contract with BHC Consultants for 2008 Sewer Comp PlanIntroduced by: Requested by: Drafted by: Introduced: Adopted: RESOLUTION NO. 026-09 Public Works Director Public Works Director Public Works Director March 24, 2009 March 24, 2009 A RESOLUTION OF THE CITY OF PORT ORCHARD, WASHINGTON, AUTHORIZING THE MAYOR TO EXECUTE AN AMENDMENT TO THE BHC CONSULTANTS CONTRACT FOR ADDITIONAL WORK REQUESTED TO THE 2008 SEWER COMPREHENSIVE PLAN, BEING CHANGE ORDER NO.2. WHEREAS, the City of P01t Orchard approved authorized the Mayor to sign a contract with BHC Consultants on November 13, 2007 in the amount not to exceed $40,000.00 for the preparation of a Technical Memorandum; and WHEREAS, the City of P01t Orchard issued a second contract to BHC Consultants on February 12, 2008 in the amount not to exceed $so,ooo.oo for the preparation of a Sanitary Sewer Comprehensive Plan; and WHEREAS, the City of P01t Orchard directed Staff to prepare the South Kitsap Industrial Area (SKIA) Infrastructure Assessment & Technical Memorandum with this work added to the second contract with BHC Consultants on December 23, 2008, being Change Order No.1; WHEREAS, the Utility Committee has determined that additional work associated with the 6-year CIP, odor control improvements at McCormick PS#2 and a Sewer Report for the Tremont Street Widening project (including sewer basin analysis at Sidney/Sedgwick) must be provided to complete the 2008 Sewer Comprehensive Plan, being Change Order No. 2; now, therefore THE CITY COUNCIL OF THE CITY OF PORT ORCHARD, WASHINGTON, HEREBY RESOLVES AS FOLLOWS: THAT: The City Council authorizes the Mayor to execute Change Order No. 2 (Exhibit A) for the additional work requested to complete the 2008 Sewer Comprehensive Plan. PASSED by the City Council ofthe City ofP01t Orchard, SIGNED by the Mayor and attested by the Clerk in authentication of such passage this 24th day of ·ch 20 9. / II Authorization for Change Order #2 Date: March 24 , 2009 Contractor: BHC Consultants, LLC --------~~~~~==~~=- Project: Sewer Comprehensive Plan 1601 Fifth Avenue, Suite 500 Contract I Job # --------------------Seattle, WA 98101 Brief Description of Change Order work (Documentation to be attached): f-or work necessary to complete the 2008 Comprehensive Sewer Pla n; excluding the South Kitsap Industrial ~rea (SKIA) as it relates to the proposed 6-year CIP and sewe r rates, addition of a program to improve pdor control at the McCormick Woods PS#2 and the add ition of a Sewer Report as needed for the T remont ~treet Widening project (includes a sewer basin analysis for Sedgwick/Sidney) . " . ., ... :;!: '-' Contract History . ,<J'.. I •.. I> • $ · .. Date ., ,/Appvd b~ Original Contract $50,000.00 12-Feb-08 Counci l Change Order 1 $5,000.00 23-Dec-08 Council Change Order 2 $43,000.00 24-Mar-09 Council Change Order 3 Change Order 4 Change Order 5 Change Order 6 I Change Order 7 Total Contract $98,000 .00 I have re vi ew e d the C hange Order info rmati o n abov e and c ertify that t o t he best o f m y kn o w le dge d esc ription s and costs are tru e and a ccurate . Submitte d by: Titl e : C hange O rd e rs o ver $1,000 up t o $1 5,000 are t o be app roved by the Mayo r. A ppro v e d: Attest : C hange O rders over S 15,000 (per p roj ect) re quire Counc il acti o n . Com m o n/CITY OF PO RT O RC HARD c h a n g e o rd e r Counc il Approval Dat e Pa ge 1 o f 1