Loading...
058-09 - Resolution - Six-Year Transportation Improvement PlanIntroduced by: Public Works Director Requested by: Public Works Director Drafted by: Public Works Director Introduced: June 23, 2009 Adopted: June 23, 2009 RESOLUTION NO. 058-09 A RESOLUTION OF THE CITY OF PORT WASHINGTON, ADOPTING THE TRANSPORTATION IMPROVEMENT PLAN. ORCHARD, SIX-YEAR WHEREAS, the Council adopts the six-year transportation improvement program annually for the following six-years; now, therefore; THE CITY COUNCIL OF THE CITY OF PORT ORCHARD, WASHINGTON, HEREBYRESOLVESAS FOLLOWS: THAT: The six-year construction portion of the Six-Year Transportation Improvement Program for the years 2010-2015, a copy of which is attached hereto and marked Exhibit "A" and is an integral portion of the Six-Year Comprehensive Street Program for the City of Port Orchard is hereby adopted. PASS ED by the City Council of the City of Port Orchard, SIGNED by the Mayor and attested by the Clerk in authentication of such passage this 23rd day of June 2009. / / ·~.·/' / Lary Washington State Department of Transportation Agency: Co. No.: City No.: ro .z:.Q; <:: "' 'i:: .c .Q (/) t).!l! .QE <=U ~ ::J ::J O..z u. 1 2 16 I 1 17 2 17 3 17 4 Port Orc=h.:::a,_rd=----------- 18 Co. Name: 1000 MPO/RTPO: Project Identification A. PIN/Federal Aid No. c. Project Title Kitsap Co. PSRC B. D. Street/Road Name or Number Bridge No. E. Beginning MP or Road-Ending MP or Road F. Describe Work to be Done ·- 3 STPUS-6610(004) Tremont Street Widening Tremont Street from: Port Orchard Blvd. to: SR16 Widen to four lanes with sidewalks and stormwater STPUS-6601 (001) Bay Street Seawall Bay Street from: 1800 Block Bay Street to: Bay Street Sewall Construct a 150-foot long pedestrian walkway, inprove drainage .. South Kitsap Boulevard South Kitsap Blvd from: Tremont Street to: Pottery Ave Remove and replace existing pavement ------ Arnold Creek Crossing Bay Street from: 1800 Block Bay Street to: Replace wooden span with pipe arch culvert ---·---- Report Date: June 23, 2009 ~ "' ~ ~ 0. Ecn 'C .. <:: 0 ~-= ~ u j;8. ~ ..J a.~ J! ]! ~ "' .§ 0 5 >- _,_ 4 5 6 7 04 s .65 c G 0 p s T w .... 06 s c 0.03 G 0 p s T -T ·I--· 03 p 0.2 c G 0 p s T 06 p 0.01 c G 0 p T s -· Six Year Transportation Improvement Program From 2010 to 2015 Hearing Date: 6/23/2009 Adoption Date: 6/23/2009 Amend Date: Resolution No.: Project Costs in Thousands of Dollars Federally Funded Fund Source Information Expenditure Schedule Projects Only Q) "' ··----(Local Agency) "' Federal Funding R/W "' 0.. -----· ----------Required t> Phase Federal Federal State 4th Envir. Q) Start Fund Cost by Fund State Local Total Thru Date ·e-Funds Funds Funds 1st 2nd 3rd Type 0.. Code Phase Code 6th (MMIYY) ·!---· --14 8 9 10 11 12 13 15 16 I 17 18 19 20 21 RW 111112010 I STP(U) I 12461 I I 1941 1440 I 200 I 1320 1 I CN 311512011 STP(U) 696 624 1320 Yes 612010 . ----------------- Totals 1,942 818 2760 200 1320 ALL 111112010 I STP(U) I 1281 I I 221 1501 421 I I ----------- - ,,_, ___ Totals 128 22 150 42 --------·--· ALL 1311512011 I I I I 3001 3001 I 300 I I I I No --------------------- Totals 300 300 300 ALL 13/i 5120121 I 2501 I I sor 300 I I I .. 300 I ···----- STP(U) No _. . - Totals 250 50 300 300 ·-----·----- Page 1 v. 5.7-Supersedes previous editions Washington State Department of Transportation Agency: Port Orchard Co. No.: 18 Co. Name: Kitsap Co. ~~~~---------- City No.: 1000 MPO/RTPO: PSRC =-=------- - Project Identification ----- ro A. PIN/Federal Aid No. B. Bridge No. 1: .<: w .2:'-m ~ ~ <I> ~-Cl ., c "' Ew w c "' .Q VI ·c .o c. Project Title = 0 "' _Q E ~G) ~ () u.!l! ~ ..J .c oc. ~ o._ ~::J D. Street/Road Name or Number ~ ~ cu a.z Q.~ "' ~ u Phase :J :E LL E. Beginning MP or Road-Ending MP or Road § <I> Start 1-::J ·e- F. Describe Work to be Done o._ ---··--- 1 2 3 4 5 6 7 8 9 STPE-0166(008) PE 1/1/2010 17 5 06 s 1.5 c RW 6/30/2010 Bay Street Pedestrian Path G CN 3/15/2011 Bay Street 0 from: Downtown to: City Limits p s Install Guardrail and street improvements. T ------ Totals -----I 'At:i.:pn5/2o1 o ~-00 6 07 s c Residential Paving Program G 0 from: to: p s Repair and replace roadway pavement in residential areas __j_T Totals ------- STPUS-6621 (001) I I ALL 11/1/2010 I 17 7 32 s 0.17 c Cedar Heights Sidewalks IIJ G Pottery Avenue 0 from: Lippert Drive to: Jr. High School p s Construct concrete sidewalk, curb, gutter and stormwater system on west T side of street Totals ---·-. I ALL 13/15/2010 I 00 8 32 s c Sidewalk Improvement Project G 0 from: to: p s Repair and replace concrete sidewalks T Totals .. --··· . -· ---·-. - Report Date: June 23, 2009 Six Year Transportation Improvement Program From 2010 to 2015 Hearing Date: 6/23/2009 Adoption Date: 6/23/2009 Amend Date: Resolution No.: Project Costs in Thousands of Dollars Federally Funded -- Fund Source Information Expenditure Schedule Projects Only --(Local Agency) c---· Federal Funding R/W ---. --·· Required Federal Federal State 4th Envir. Fund Cost by Fund State Local Total Thru Date Funds Funds Funds 1st 2nd 3rd Type Code Phase Code 6th (MM/YY) +------------ 10 11 12 13 14 15 16 17 18 19 20 21 STP(E) 300 300 300 STP(U) 432 68 500 500 STP(U) 865 135 1000 1000 ------. ----- 1,597 203 1800 800 1000 . -.. ···---· I I I 9001 9001 150 I 150 I 150 I I 450 i ---------- 900 900 150 150 150 450 -i3ol ---__ i ___ STP(U) I I 201 1501 1291 I I I I No -. 130 20 150 129 ----. io I I I I I 601 601 10 I 1 o I 30 I No ----- 60 60 10 10 10 30 .. -------·---... ---- Page 2 v. 5.7-Supersedes previous editions Washington State Department of Transportation Agency: Port Orchard Co. No.: 18 Co.Name: KitsapCo~·------------­ MPO/RTPO: PSRC City No.: 1000 ro ~ c II) :E~ g!a·oE () ..!!:: 'i:: ::J § u O..z "- Project Identification A. PIN/Federal Aid No. C. Project Title ----- B. Bridge No. D. Street/Road Name or Number E. Beginning MP or Road • Ending MP or Road ~ l "' .r:; 0.. ~ ·e- Phase Start Six Year Transportation Improvement Program From 2010 to 2015 Hearing Date: Amend Date: Project Costs in Thousands of Dollars -~--------:::---c-Fund Source Information Federal Funding - Federal Federal State Fund Cost by Fund Code Phase Code State Funds Local Total Funds Funds 6/23/2009 Adoption Date: 6/23/2009 Resolution No.: Expenditure Schedule (Local Agency) Federally Funded Projects Only -----,--,--~ 4th Envir. Thru Type 3rd 2nd 1st RIW Required Date (MMIYY) F. Describe Work to be Done 3--------o.. i I ---l·---c4-+-c5c-+-~6c-I. i l--c8-+------=g--+------10 11 12 -13-+--14-+-1~5-+ 16 17 6th ---+-~------ 19 20 18 ~-- 16 9 Downtown Improvements Bay Street from: Bank Street to: Harrison Avenue Replace and resurface existing sidewalks, replace curbs, add stormwater culverts, construct traffic calming devices. 03 p c G 0 p s T No ALL [3115/2011 I ! i I I I I 3501 350 -=~c--------.. -------------- 17 10 Bethel Avenue Bethel Ave ... -----:---+-+- 32 I p I 24 05 Totals -g-+c-AL'-:L=il~31=15cct2cco-c12"1-------cs-rF'(U.-:)----,~--3c-4:-c6:o'l -------,----3=-:5c:O,----·c-C3=50 350 I I 540I 4000 1 --., 1 __ c r·---:40-:-oo"l ____ -- No t--- 17 11 from ll~th_!>1/\Y.!'",ue to: Lincoln Avenue Widen to four lanes with sidewalks, lights and stormwater. Bethel Avenue West Bethel Avenue --------- from: Bay Street to: Bethel Avenue 0 p I ~ Totals --------t---+-_j_ . --t---+-:cc:'-T==-:-:--,-- 1 c ALLII3115120141 I 32 p .4 05 G 0 p ___ U~i~en to four lanes with sidewalks, lights and stor~w-at-er_. ---------+~ ------ PI s T w 1~----­ Totals 17 12 Sidney Avenue Overlay Sidney Avenue from: Lippert Drive to: SR 16 Overlay road and construct shoulder. 04 .5 c G 0 p s T -------------------------. - No 540 4000 4000 6751 5ooo j 1 -,~--'-'-c,j-5ooo -+----3,460 STP(-U) ____ I43251' -·· 4,325 675 5000 ~--===,-~--,--~ --,--~ _,5oo"l-----=5oo:o~--~ 500 I 5000 ~I --==+-----+----- -------------.. -------------- ---L _________ ----------Totals _,_,_ __ _L____L __ _j__ ... ---'--'--=----------------.. 500 500 500 ___ -=-:_::_______:c:_::_ __ . _____ :_:_::_ ---'-------' Report Date: June 23, 2009 Page3 v. 5.7-Supersedes previous editions Washington State Department of Transportation Agency: Port Or_..c .. ha.,.r_..dc_ ____ _ Co. No.: 18 Co. Name: K~tsap-=C-=o'--______ _ City No.: 1000 MPO/RTPO: PSRC ---------- Project Identification ro A. PIN/Federal Aid No. B. Bridge No. ;: a, VI _z:-(i; .. c "' ~li) VI " 'i:: .0 c. Project Title c 0 .Q (/) ~T = .. () U.S! _Q E ~ ...J c(_) ~::J D. Street/Road Name or Number oc. .13 Jj ~ o._z c.~ Ul ::J ~ u. E. Beginning MP or Road-Ending MP or Road .5 0 1-::::> F. Describe Work to be Done ------- 1 2 3 4 5 6 7 I 17 13 05 p _3 c Pottery Avenue Widening G Pottery Avenue 0 J from: Tremont Street to: Melcher Street p s Widen road to two lanes with sidewalks and stormwater system. T ----' 17 14 05 p _4 Melcher Street Widening Pottery Avenue from: Pottery Ave to: Sherman Ave Reconstruct two-lane road. ----- 17 15 05 p _25 c Fireweed Road Widening G Fireweed Road 0 from: Sidney Ave to: South Flower Ave p s Widen two-lane road to include shoulders and add stormwater system. T - I 19 16 05 p _35 c Sherman Avenue Widening G ,. .... "'~ I I 0 from: Fireweed Rd to: Terminus p s Widen two--lane road to include shoulders and stormwater syst: -T -- Report Date: June 23, 2009 Six Year Transportation Improvement Program From 2010 to 2015 Hearing Date: 6/23/2009 Adoption Date: 6/23/2009 Amend Date: Resolution No.: Project Costs in Thousands of Dollars Federally Funded Fund Source Information Expenditure Schedule Projects Only "' "' -----(Local Agency) -- "' Federal Funding RIW -"' (l_ -----Required t> Phase Federal Federal State 4th State Local Total Envir_ "' Start Fund Cost by Fund Thru Date ·e-Funds Funds Funds 1sl 2nd 3rd Type (l_ Code Phase Code 6th (MMIYY) ------- 8 9 10 11 12 13 14 15 16 17 18 19 20 21 ALL 13/15/2011 I I I I I 16001 1600 I 1600 I I No I ---------- Totals 1600 1600 1600 ----------- ALL 13/15i20131 I I OTHER I 2001 2001 4001 I I I 400 I I ! No --·--- Totals 200 200 400 400 ALLI3/15/20131 I 1- I I 5ool 5001 I I I 500 1-- I No I - ----- Totals 500 500 500 ALL 13/15/20121 I I I I ---- 7501 l501 I I 7501 I I No ----- Totals 750 750 750 ------·----- Page4 v. 5.7-Supersedes previous editions Washington State Department of Transportation Agency: Port Or"c"'ha=r-=d ___ _ Co. No.: 18 Co. Name: Kitsap Co. ~~~----------- City No.: 1 000 MPO/RTPO: PSRC -:___ __ _ ------- Project Identification A. PIN/Federal Aid No. B. Bridge No. ~ ro ~ " c: U) -"='" E0 ·c .o c. Project Title " .Q (f> .,-.a QE J: ID ~ Q) C> ., U) " 0 "' " -' u .<:: Six Year Transportation Improvement Program From 2010 to 2015 Hearing Date: 6/23/2009 Adoption Date: 6/23/2009 Amend Date: Resolution No.: - Project Costs in Thousands of Dollars ------Federally Funded Fund Source Information Expenditure Schedule Projects Only -·-·-· (Local Agency) ------- Federal Funding R/W t5~ ~::J D. StreeURoad Name or Number ~~ J!l ~ 0.. -----· -----Required c:u n.z a.~ "' ~ 13 Phase Federal Federal State 4th ::J ~ State Local Total Envir. u.. E. Beginning MP or Road-Ending MP or Road § Q) Start Fund Cost by Fund Thru Date ... ::> ·e Funds Funds 1st 2nd 3rd Type Code Phase Code Funds 6th (MM/YYJ F. Describe Work to be Done 0.. ----.. ---20------ 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 21 STPUS-6615(002) ALL 13/15/20151 STP(U) I 871 I I 131 100 I I I 100 16 17 32 s 1.1 c I I Pori Orchard Blvd Sidewalk G No Port Orchard Blvd 0 ·from: Bay Street to: Tremont St p s Construct concrete sidewalk on one side of road T I _j I --- Totals 87 13 100 1Q!l_ '----... I I 0/d Cliflon Road I ALL 13/15/20141 STP(U) I 15001 I I 2341 17341 ! I I 1734 17 18 32 p .5 c I I G I No , I Old Clifton Road 0 from: SR 16 to: West City Limits p Widen to four lanes with sidewalk, lights. and stormwater. L_U~---Totals - 1,500 234 1734 1734 ----810 1--------- I I p[ I PE 3/15/20131 STP(U) I 700 I 110 810 I I I I 17 19 32 .95 c RW 12/15/2013 STP(U) 1000 16001 156 1156 1156 Pottery Avenue Widening Starting on Tremont 05 G CN 5/15/2014 i STP(U) 1500 AlP 634 3734 I ' 3734 Yes Pottery Avenue 0 I I p !from: Tremont St to: SR 16 Olverpass s 12/15/13 I Widen to four-lanes with sidewalks, stormwater system, and traffic calming I T Totals 3,200 1600 900 5700 5700 - I I Sidney Avenue Widening .. I 6~ I P I ALL 13/15/20151 I 32001 AI PI 16001 9001 57001 I I I c STP(U) 5700 17 20 .95 G I Yes I~"•'" ···-I "" I 0 s from: SR 16 Overpass to: Sedgwick Rd p Widen road to four·lanes with sidewalks, stormwater system, and traffic T calming - L Totals 3,200 1600 900 5700 5700 -------------------. Report Date: June 23, 2009 Page 5 v. 5.7-Supersedes previous editions Washington State Department of Transportation Agency: Port Orchard _____ _ Co. Name: Kitsae Co. ------ Co. No.: 18 City No.: 1000 MPO/RTPO: PSRC --------- Project Identification A. PIN/Federal Aid No. B. Bridge No. 1: ro z.Q; ~-c: "' E"' .Q (/) ·c ..c c. Project Title ~G) ti.l!l .2 E L;:> D. Street!Road Name or Number oc. c:u O..z _,., ::> c. .. LL E. Beginning MP or Road-Ending MP or Road § I F. Describe Work to be Done - 1 2 3 4 17 21 1 06 Bay Stand Rockwell Ave Intersection ·Bay Street 11m: Rockwell Ave to: --prove driver safey and visibility at this interseciton. I i I I 19 22 03 Cline Avenue Rehabilitation : Cline Avenue : [from: Kitsap Drive to: Dwight Street I _l , Replace sidewalk on west side of street and pavement in roadway _ L_ I --· -- Report Date: June 23, 2009 -- ~ "' ~ ., ., "' c: 0 "' ~ ~ u "' ~ ..J J:: Six Year Transportation Improvement Program From 2010 to 2015 Hearing Date: 6/23/2009 Adoption Date: 6/23/2009 Amend Date: Resolution No.: Project Costs in Thousands of Dollars -Federally Funded Fund Source Information Expenditure Schedule Projects Only ---(Local Agency) -·---. -- Federal Funding RIW ---Jl ~ 0.. ----" Required "' ~ Phase Federal Federal State 4th 5 ti Envir. ., Start Fund Cost by Fund State Local Total Thru Date .. ·e-Funds Funds Funds 1st 2nd 3rd Type 0.. i Code Phase Code 6th (MMIYY) -~ ------ 5 6 7 8 9 10 11 12 13 14 16 17 18 19 20 21 p 0 ALL 16/15/2011 I I I I I 1001 100 100 I I I ----------_I Totals 100 100 100 ---- I ALL 16/15/2011 !I I I I I 1001 1001 1001 I I I p 0.13 I I ' No ------- Totals 100 100 100 I ____ ------ Grand Totals for Port Orchard 19,819 3,400 9,635 32,854 1,431 5230 5,210 19,6141 Page6 v. 5.7-Supersedes previous editions