064-09 - Resolution - Change Order 1 to Contract with Pacific Air Control for HVAC MaintenanceIntroduced by: Public Works Director Requested by: Public Works Director Drafted by: Public Works Director Introduced: June 23, 2009 Adopted: June 23, 2009 RESOLUTION NO. 064-09 A RESOLUTION OF THE CITY OF PORT ORCHARD, WASHINGTON, AUTHORIZING THE MAYOR TO EXECUTE CHANGE ORDER NO. 1 WITH PACIFIC AIR CONTROL, INC. WHEREAS, on December 30, 2008, the City of Port Orchard entered into a Contract with Pacific Air Control, Inc. regarding the 2009 HVAC Maintenance Program; WHEREAS, during routine maintenance it was discovered that numerous HVAC system components were either missing or inoperative, at both City Hall and the Library; WHEREAS, on May 12, 2009, the City Council adopted Resolution No. 012-09, thereby amending the 2009 Budget, which included additional HVAC Maintenance funding; and WHEREAS, the total contract amount needs to be amended from $7,600 to $17,057.80 for associated cost necessary to make HVAC system repairs; now, therefore; THE CITY COUNCIL OF THE CITY OF PORT ORCHARD, WASHINGTON, HEREBY RESOLVES AS FOLLOWS: THAT: The City Council agrees to amend the contract between the City of Port Orchard and Pacific Air Control, Inc, by increasing the contract amount from $7,600 to $17,057.80; and FURTHER THAT: The Mayor is authorized to execute Change Order No. 1 (Exhibit A) with Pacific Air Control, Inc. for the 2009 HVAC Maintenance Program. PASS ED by the City Council of the City of Port Orchard, SIGNED by the Mayor and attested by the Clerk in authentication of such passage this 23rd day of J e 2009. 6/5/2009 ll :45 AM Authorization for Change Order #1 Date: June 23, 2009 Contractor: ____ _,_Pa,_c~i"'-fic~A,ir_,C,o~n~t~ro~l,'-'1'-!nc~. Project: 2009 HVAC Maintenance Contract I Job # ______ ___,C"'0""07,_-_,_09'- Brief Description of Change Order work (Documentation to be attached): Additional cost associated with the repair of missing and/or inoperative system components and the addition of (3) Library units previously omitted from the maintenance contract. I have reviewed the Change Order information above and certify that to the best of my knowledge descriptions and costs are true and accurate. Submitted by: --l-f-C"""'...._=__...-"""';;;:----~T-- Title: P~blic Works Director/City Change Orders over $1,000 up to $15,000 are to be approved by the Mayor. Approved: Attest: Change Orders over $15,000 (per project) require Council action. Common/CITY OF PORT ORCHARD change order _....-:; Pagel of l pacific air control, inc. Air Conditioning, Heating, Controls, Sales, Service, Installation February 3, 2009 City of Port Orchard Attn: Jay Cookson 216 Prospect Street Port Orchard, WA 98366 Re: City of Port Orchard Library Dear Jay, While performing the first inspection, out technician noted the following: CU1 s/n 5A5F serving the West side of the building The·pipe insulation on this condensing unit is gone. This insulation is critical for proper cooling operations and in maintaining the proper temperature splits at the indoor coil. We highly recommend installing the pipe insulation and supporting the piping properly. Cost of the above: $400.00 plus tax CU2 sfn JP5F serving the West side of the building The pipe insulation on this condensing unit is gone. This insulation is critical for proper cooling operations and in maintaining the proper temperature splits at the indoor coil. We highly re.commend. installing the pipe insulation and supporting the piping properly. Cosfof the above: $400.00 plus tax Once the above work has. been completed, the units will be tested for proper operation. If further repairs are necessary, we will contact you. Thank you for the opportunity to work With you on . this project. If you l'!av~ at'lY questions regardin this report,.)M if you would like to schedule the abovecmenti6ried work, please fe ee ·.tf sa call. · · .. ·.·· ... '' -,_.,,-'- Catliy Jfansen ~~~~~~~~~oq Customer Service RepresentatiVe · Pat ric i a J . K i r k patrick , C i ty C l e r k Cc: Ben Clladwick, Se ·ce Manager Z...O"icn:rz._. PriCe quoted is valid for 30 days. · In this proposal we are assuming that this is not a prevailing wage job pursuantto RCW39.12. . •. · · Pi'o@al # 209002 . COiitraclors Lieense #PACIFAC230P8 · · · · 1\S!)s\Shared files\Proposals\Servici> Proposals\City of Port Orchard Library\209002\CU1, CU2 pipe insulation. doc ll8!2N<>rlh CreekParkwayN., Suite 104, Botl1ell, WA 9801 l Ph: (206) 682-6393 Fnx: (206) 340-2270 l pacific air control, inc. 11812 Northereek Parkway North, Suite 104 Dothell, W A 980 II (206) 682-6393, (425) 883-3348 fax: (206) 340-2270 City of Port Orchard 216 Prospect Street Port Orchard, W A 98366 Attention: Mark Dorsey Subject: Maintenance Service and Repair Agreement Dear Mark: June l, 2009 Please include the following HV AC addenda to the cw-rent contract for the City of Port Orchard. Buildings include City Hall and the Library: Current HV AC Maintenance and Service Agreement Addendum for City of Port Orchard Library Add (3) units to HVAC Quarterly Maintenance See Addendum #2009-I attached HVAC Repairs for Library & City Hall See Repair Proposals attached Total Revised Agreement with the City of Port Orchard Approved by: C i Fy C 1 e rk $6,998.00 $ 426.00 $8,283.00 $15,707.00 plus tax Accou e Kelly Chase Enclosures MAINTENANCE AND SERVICE AGREEMENT Contract# A-1920 Site 2 ADDENDUM # 2009-1 Addendum -for MAINTENANCE AND SERVICE AGREEMENT: EQUIPMENT LOCATION BILLING ADDRESS City of Port Orchard 216 Prospect St City of Port Orchard Library 87 Sidney Ave Port Orchard, Wa 98366 Port Orchard, Wa 98366 This addendum to the original maintenance agreement is to add service to the following equipment as described below. UNIT MAKE MODEL# GP Trane YCC048F1HOBE EF Greenheck CBE104 EF Greenheck CBE104 TYPE SERIAL# GasEiectric J42160636 EF EF LOCATION Roof Roof Roof FILTE;RS 3-10x25x1 (1) belt (1) belt This addendum is to add these units to the quarterly maintenance and filter change. Total Addendum price per year: $426.00 + tax Payable at: $106.50 +tax, per quarter Revised total annual agreement price: $7.424.00+ tax Payable at: $1.856.00+ tax, per quarter ATTEST:. Clerk