Loading...
095-09 - Resolution - Interlocal Agreement with Department of Ecology for Phase II Stormwater Pass Through GrantIntroduced by: Andrea Archer, P.E. Requested by: Andrea Archer, P.E. Drafted by: Andrea Archer, P.E. Introduced: October 13, 2009 Adopted: October 13, 2009 RESOLUTION NO. 095-09 A RESOLUTION OF THE CITY OF PORT ORCHARD, WASHINGTON, AUTHORIZING THE MAYOR TO EXECUTE AN AGREEMENT WITH THE DEPARTMENT OF ECOLOGY FOR THE FY 2010-2011 PHASE II STORMWATER PASS-THROUGH GRANT WHEREAS, In August the City received notification that a Phase II Storm water Pass-through Grant had been offered to the City; and WHEREAS, the grant is a $so,ooo grant, no City match required, to be used in compliance with the City's Phase II National Pollution Discharge Elimination System (NPDES) Permit; and WHEREAS, the grant will be used in 2010 to fund an Engineering Tech II position to develop a report to plan for monitoring on the next permit cycle, perform mapping or geographic information systems of municipal separate storm sewer systems (MS4s) for the illicit discharge detection and elimination section of the NPDES Permit, and perform public education and outreach activities; now, therefore, THE CITY COUNCIL OF THE CITY OF PORT ORCHARD, WASHINGTON, HEREBY RESOLVES AS FOLLOWS: THAT: The Council authorizes the Mayor to sign the grant agreement for the FY 2010-2011 Phase II Stormwater Pass- Through Grants Program Agreement between the State of Washington Department of Ecology and the City of Port Orchard. PASSED by the City Council of the City of Port Orchard, SIGNED by the Mayor and attested by the Clerk in authentication of such passage this 13th ~YA cto 09.