027-10 - Resolution - Adopting Six-Year Transportation Improvement Program for 2011-2016Introduced by: Public Works Director
Requested by: Public Works Dir ector
Drafted by: Public Works Director
Intro duce d: July 27, 2010
Adopte d: July 27, 2010
RESOLUTION NO. 027-10
A RESOLUTION OF THE CITY OF PORT ORCHARD,
WASHINGTON, ADOPTING THE SIX-YEAR
TRANSPORTATION IMPROVEMENT PROGRAM FOR
THE YEARS 2011-2016.
WHEREAS, the Council adopts the six-year transportation improveme nt
program annually for the following six-years; now, therefore;
THE CITY COUNCIL OF THE CITY OF PORT ORCHARD,
WASHINGTON, HEREBY RESOLVES AS FOLLOWS:
THAT: The six-year construction p01tion of the Six-Year
Transp01tation Improvement Program fo r the years 2011-
2016, a copy of which is attached hereto and marked Exhibit
"A" and is an integral p01tion of the Six-Year Comprehensive
Street Program for the City of Port Orchard is hereby
adopted.
PASSED by the City Council of the City of P01t Orchard, SIGNED by the Mayo r and
attested by the Clerk in authentication of such passage this 27th day of July 2010.
-... \Vashington State Department of Transportation
Agency: Port Orchard
Co. No.: .1!_ Co. Name: Kitsap Co.
City No.· 1000 MPO/RTPO: PSRC . -··-
Project ldantHication .,. d A. PINIFederal Aid No. B. Bridge No. E i ~ ~ ~~ C. Project Title I• • c • .g E ~~ ~ !l u ~
0. StreatiRoad Name or Number ~ ~ c. §U o.;i ii~ .. al Phase u.. E. Beginning MP or Road • Ending MP or Road E ;; Stert ~ " "[ F: Describe Work to be Done
1 2 3 4 5 6 7 8 9
STPUS-6610(004) s c RWI1f1/2011 I 16 1 04 .65 CN 311512012
Trsmont Stleet Wkifmfng G
Tremont street 0
from: Port Orchard Blvd. to: SR16 p
s Widen to l'our lanes with &lclewalks and stormWater T w Totals
17 2 03 p 02 c ALL 13115120121
South Kitsap BouleVBrd G
South Kitsap Blvd 0
p
from: Tremont Street to: Pottery Ave s Remove Slld replace existing pavement T
Totals
06 p c ALL 13115120131 17 3 0.01
Arnold Creek Crossing G
BaySt...t 0
jtrom: 1 BOO Block Bay Street to:
p
T Replace wooden span With pipe ereh culvert. s
Totals
f--·-PE 111112011 I 17 4 06 s 1.5 c RW 6130Q011
ay Street Pad6strian Path G CN 3/15/2012
aySt...t 0
p
m: Downtown to: City Limits s stall Guan::lrail1111d street Improvements. T
Totals -
Report Date: July 7, 2010
Six Year Transportation Improvement Program
From 2011 to 2016
Hearing Date: 7/27/2010 Adoption Date: 7/27/2010
-- --·-· Amend Oat' Resolution N, -··
Project Coats In Thousands of Dollars Federally Funded
Fund Source lnfonnatton Expenditure Schedule Projects Only
Federal Funding (Local Agency)
R1W
Required Federal Federal State 4th
Fund Cost by Fund Stele Local Total Envir. Date Thru Funds Funds Funds 1st 2nd 3rd Type (MJWYY) Code Phase Code 6th
10 11 12 13 14 15 16 17 18 19 20 21
STP(U)
I
17301 I I
2701 20001
"""I 12500 1 I
STP(U) 10813 1687 12500
Yes '
2/11
12.543 1957 14500 2000 12500
I I I I 3001 3001 I 300! I No
300 300 300
STP(U)
I 2501 I I 501 3001 I I 300 I
No
250 50 300 300
STP(E)
I
3001 I I .:I
300
300 I
I
STP{U) 432 500 500
STP(U) 3114 3600 3600
I
'
3,846 554 4400 800 3600
Page 1 v. 5. 7 • Supersedes previous editions
-•• Washington State Department of Transportation
Agency: Pon Orchard
Co. No.: 18
City No.: 1000
Co. Name: rK"'itsa'"'!P'_'Cv_o<>·~----
. MPO/RTPO: PSRC
Ptoject Identification
" ~" A. PIN/Federal Aid No. B. Bridge No. j .. c. • 0. ·;;: .0 C. Project Title i! '!l.ll! .g E t! D. Street/Road Name or Number Jl ~c..> Q.~ " E. Beginning MP or Road -Ending MP or Road B
F. Describe Work to be Done
1 2 3 4 5
00 5 07 s
Residential Paving Program
from: to:
Repair and replace roadway pavetr'o$1\l In reSidential areas.
17 6 STPUS-6621 (001) 32 s
Cedar Heights Sidewalks
Pottery Avenue
rom: Lippert Drive to: Jr. High Scllool
Con&lrud concrete sideWalk, curb, gutter and stonnwater system on west
side Of street.
DO 7 32 I s Sidewalk Improvement Project
om: to:
Repair and replace concrete sidewalks.
16 8 03 p ~-., .....
m: Bank Street to: Harrison Avenue
eplace and teSIJrface existing sidewalks, replace curbs. add alormwal8r
lvarts. construct traffiC calming devices.
Report Date: July 7, 2010
t ~ $ • ~
~ 0. ~ I Phase
~ "' Start
0.
6 7 8 9
c ALL 13/15.120111
G
0
p
s
T
Totals
0.17 c
G
ALL 11/112011 I
0
p
s
T
Totals
c ALLI3/15120111
G
0
p
s
T
Totals
l! ALL 13115120121
Totals
·Six Year Transportation Improvement Program
From 2011 to 2016
Hearing Date: 7/27/2010 Adoption Date: 712712010
Amend Date Resolution N----··
Project Costs In Thousands of Dollars Federally Funded
Fund Source lnfonnatlon Expenditure Schedule l?rojeels Only
(Local Agency} Federal Funding RJW
Federal Federal State 4th Required
Fund Cost by Fund State Local Total Thru Envir. Da1e
Funds Funds Funds 1st 2nd 3rd Type Code Phase Code 6th (MM'YY)
10 11 12 13 14 15 16 17 18 19 20 21
I I I I 9001 900 150 I 150 I 150 I 450
900 900 150 150 150 450
STP(U)
I 4321 I I ••j 5001 500 I I I ! No
432 88 500 500
I I I I 801 ·~ 10 I 101 101 30
No
80 80 10 10 10 30
I I I I 3501 34 I 350 I I No
350 350 350
Page2 v. 5. 7 • Supersedes previous editions
-... washington State Department of Transportation
Agency: Port Orchard
Co. No.: 18
City No.: 1000
co.Name: ~K~i~~a~p~C~o·~----------
MPOIRTPO: PSRC ...
Project Identification
~ ~~ A. PIN/Federal Aid No. B. Bridge No. ~
,g.ij C. Project Title ~ .. .g E ~~ D. Street/Road Name or Number §0 0.~ ~"' ... E. Beginning MP or Road -Ending MP or Road .§
F. Describe Work to be Done
1 2 3 4
17 9 32
Bethel Avenue 05
Bethel Ave
from: §~~.!'J!l".!IJUe to: Uncoln Avenue
Widen to four lanes with sideWalks, lights and stormwater
17 10 32
BfJttl81 Avenue West 05
Bethel Avenue
from: Bay Street to: Bethel Avenue
Widen to lour lanes wlth sidewalks. lightS and storTll'tl8ter.
17 11 04
Sidney Avenue Overlay
Sidney Avenue
rom: Lippert Drive to: SR 16
Overlay road and COII$Iruct ahoulder.
17 12 05
Pottery Avenue Widening
Pottery Avenue
from: Tremont Street to: Melcher street
Widen road to two lanes with sidewalks and stonnwater system.
Report Date: July 7, 2010
1 J ~ ~ = "' i 0. .. ~ il Phase '!l start ·e-
0.
5 6 7 B 9
p 2.4 c ALLI3/15J20131
G
0
p
s
T
Totals
p c ALL 131.15120151
.4 G
0
p
s
T
. w Totals
p .5 c ALLI3115120121
G
0
p
s
T
Totals
p .3 c ALL 13115120121
G
0
p
s
T
Totals
Six Year Transportation Improvement Program
From 2011 to 2016
Hearing Date: 7/27/2010 Adoption Date: 7/2712010
I'UIIt;niU LliiU:; ~tntUIUUOn 1'110,;
Project Coats In Thousands of Dollars Federally Funded
Fund Source Information Expenditure Schedule Projects Only
Federal Funding (Local Agency)
RlW
Federal Federal Slate
2nd I 3rd
4th Required
Fund Cost by Fund State Local Total Thru Envlr. Date
Funds Funds FL11ds 1st Typa Code Phase Code 6th (MMIYY)
10 11 12 13 14 15 16 11 1 18 19 20 21
STP(U)
I 34601 I I ""I
4000
I I 4000 I
No
M60 s.o 4000 4000
STP(U)
I 43251 I I 6751 50001 I I I
5000
No
4,325 675 5000 5000
I I I I 5001 5001 I sao I I
500 500 500
I I I I 16001 16001 I 1600 I I
I .
1600 1500 1600 -··----·----·---
Page 3 v. 5. 7 • Supersedes previous editions
-... Washington State Department of Transportation
Agency; Port Orchard
Co. No.: 18
City No.: 1000
Co. Name: ~Kl~ts"'a'~'p"C-'o'-. _____ _
MPO/RTPO: PSRC
Project Identification
li d A PIN/Federal Aid No. B. Bridge No. ~ Is: ~~ .g E C. Project Title ~! D. Street/Road Name or Number ~(.) Q.~
E. Beginning MP or Road -Ending MP or Road .E
F. Describe Work to be Done
1 2 3 4
171 13 05
Melcher Street Widening
Pottery Avenue
I )from: Pottery Ave to: Sherman Ave
Reconetruct two-lane road.
17 14 05
FireW96d Rotld Widening
Fireweed Road
from: Sidney Ave to: South Flower Ave
Widen two-lane road to include shoulders and add 11tonnwater system.
19 15 05
Shsrman Avenue Widening
Sherman Ave
~~: Fireweed Rd to: Terminus
Widen two-lane road to Include shoulders and stormwater system
"f. ~-' 32 16
Port Otchard B/vri SidewsJk
Port Orchard Blvd
m: Bay Street to: Tremont St
Conslruct concrete sidewalk on one sllie of road.
Report Date: July 7, 2010
~ ~ • t ~ il ~ il ~ c. ~ 1l Phase !l Start -~
c.
5 6 7 8 9
p .4 ALL 13115120141
To1als
p c ALL 13115/20141
.25 G
0
p
s
T
Totals
p .35 c ALL 13115/20131
G
0 p
s
T
Totals
s c ALL! 3115120161
1.1
G
0
p
s
T
Totals
Six Year Transportation Improvement Program
From 2011 to 2016
Hearing Date: 7/2712010 Adoption Date: 7/27/2010
Amend Date Resolution N,~ --··
Project Costa In Thousands of Dollars Federally Funded
Fund Source Information Expenditure Schedule Projeds Only
Federal Funding (Local Agency)
R1W
Federal Federal State 4th Required
Fund Cost by Fund State Local Total Envir. Date
Funds Funds Funds 1st 2nd 3<d Thru Type IMM'¥>1 Code Phase Code 6th
10 11 12 13 14 15 16 17 18 19 20 21
I I OTHER! 2001 2001 400 I I I 400
No
200 200 400 400
I I I I 5001 '"'f I I I
500
No
500 500 500
I I I I 7501 7501 I I 750 I
I No
750 750 750
STP(U) I 871 I I "I 1001 I I I
100
No
87 13 100 100 ---
Page4 v. 5.7-Supersedes previous editions
-... washington State Department of Transportation
Agency: Port Orchard
Co. No.: 16
City No.: 1000
Co. Name: "Ki"'ts"a"'p"C"o'-. _____ _
MPOJRTPO: PSRC
ProJect Identification
~$ d A. PINfFederal Aid No. B. Bridge No. ~
!" C. Project Title 'BJ!! .g E ~~ D. Street/Road Name or Number §" a.,E ii.o"
~ E. Beginning MP or Road -Ending MP or Road §
F. Describe Work to be Done
1 2 3 4
17 17 32
Old Clifton Road
Old Clifton Road
itmm: SR 16 kl: West City Umi~
Widen to four lanes with sidewalk, lights, and stormwater.
17 18 32
Pottery Avenue Widooina Starting on Ttemant 05
Pottery Avenue
rom: Tremont St to: SR 16 Olverpass
Widen to four-lanes with Sidewalks, stonnwatersyatem, and tralficcatmlng.
171 19 32
Sidney Avenue Widening 05
Sidney Ave
rom: SR 16 OVerpass to: Sedgwick Rd
Wiclen road to four-lanes with sidewalks, stormwa:ler system, and tremc
calming.
17
"f.
06
Bay Stand RockweD Ave lnte~rsection
Baystret
m: Rockwell Ave to:
Improve driver safey and visibility at thllllntarsucllon.
Report Date: July 7, 2010
~ ~ $ • < .a • " m ... ~ ll !i a. ~ "!! Phase ~ Start => ·e-a.
5 6 7 8 9
c ALL 13115120151 p .5 G
0
p
s
T
Totals
c PE ~~5~0141 p .95 RW 12/1512014 G CN 511512015 0
p
s
T
Totals
c ALL 13/15120161 p .95 G
0 s
p
T
Totals
p 0
ALL 16115/20131
Totals
Six Year Transportation Improvement Program
From 2011 to 2016
Hearing Date: 712712010 Adoption Date: 7/27/2010
. ····-·--.. Amend Date Resolution N·
Project Coste: in Thousands of Dollars Federally Funded
Fund Source lnfonnatlon Expenditure Schedule Projects Only
(Local Agency) Federal Funding RfW
Federal Federal State 4th Required
Fund Cost by Fund State Local Total Envir. Date
Funds 1sl 2nd 3rd Thru Type c-Phase Code Funds Funds 6th IMMI¥>1
10 11 12 13 14 15 16 17 18 19 20 21
STP(U)
I 15001 I I 2341 1734
I I I
1734
No
1,500 234 1734 1734
STP(U)
I
7001
AlP I 16001
1101
810
I I I
810
STP(U) 1000 156 1156 1156
STP(U) 1500 634 3734 3734 Yes
12/15113
3,200 1600 900 5700 5700
STP(U)
I 32001 AlP I 16001 9001 57001 I I I
5700
Yes
3,200 1600 900 5700 5700
I I I I 1001 1001 I I 100 I
100 100 100 -L_
PageS v. 5.7-Supersedes previous editions
-.... Washington State Department of Transportation
Agency: Port Orchard
Co. No.: 18
City No.: 1000
Co. Name: ~K~it,.,sa,.p'-C"o".'------
MPOIRTPO: PSRC ...
Project Identification l~t ):; A. PINIFedaral Aid No. B. Bridge No. ~~ C. Pro ,teet Title .g E '~~ ~(.) a.::i! D. Street/Road Name or Number ~,_
E. Beginning MP or Road -Ending MP or Road .!
F. Ducribe Work to be Done
1 2 3 4
19 21 I o3
Cline Aven/J6 Rehabilltabon
Cline Avenue
~m: Kitsap Drive to:· Dwight Street
Replace sidewalk on we!ll. side of street and pavement tn ro~dWI!)'.
I
Report Date: July 7, 2010
fi. •
• 5i j ~ j ~ ~ .. .. ~ ~ Phase l 5 Start ..
5 6 7 6 9
p 0.13
ALL 16/15120131
Totals
Grand Totals for Port Orchard
Six Year Transportation Improvement Program
From 2011 to 2016
Hearing Date: 7/27/2010 Adoption Date: 7127/2010
1"\JIJVDU D R, . --------------
Project Coats In Thousand& ot Dollars FederaUy Funded
Fund Source Information Expenditure Schodule Projects Only
Federal Funding I (Local Agency)
R1W
Federal Federal State Required 4th Envir. Fund Cost by Fund Slate Local Total Thru Dale
Funds Funds lsi 2nd 3rd Type Code Phose Code Funds 6th (MINYY}
10 11 12 13 14 15 16 17 t6 19 20 21
I I I
I
100! 100
I I
100 I
I No
100 100 100
32,843 3,400 11,151 47,394 3,460 19010 5,310 19,614
Page6 v. 5.7 ·Supersedes previous editions