Loading...
015-13 - Resolution - Adopting the Six-Year Transportation Improvement Program for 2014-2019Introduced by: Public Works Director Requested by: Public Works Director Drafted by: Asst. City Engineer Introduced: June 25, 2013 Public Hearing: June 25, 2013 Adopted: June 25,2013 RESOLUTION NO.015-13 A RESOLUTION OF THE CITY OF PORT ORCHARD, WASHINGTON, ADOPTING THE SIX -YEAR TRANSPORTATION IMPROVEMENT PROGRAM FOR THE YEARS 2014-2019. WHEREAS, the Council adopts the six -year transportation improvement program annually for the following six -years; now, therefore, THE CITY COUNCIL OF THE CITY OF PORT ORCHARD, WASHINGTON, HEREBY RESOLVES AS FOLLOWS: THAT: The six -year construction portion of the Six -Year Transportation Improvement Program for the years 2014-2019, a copy of which is attached hereto and marked Exhibit "A" and is an integral portion of the Six -Year Comprehensive Street Program for the City of Port Orchard is hereby adopted. PASSED by the City Council of the City of Port Orchard, SIGNED by the Mayor and attested by the City Clerk in authentication of such passage this 25th day of June 2013. Timothy C. MAthes, Mayor ATTEST: Brand nearson, CMC, City Clerk aty of Port urcnara bix-rear i ransportation improvement vrogram 1 i irj For 2014-2019 TIER 1 Resolution No. 015-13 Exhibit A Road Name Total Phase Federal State Priority Begin Termini Project Total Est. Start Funding Fund Federal Fund Number Project Title/Project Description End Termini Length Cost 2014 2015 2016 2017 2018 2019 Year Status Phase Code Funds Code State Funds Local Funds 1.1 Tremont St Widening/SR16 to Port Orchard Blvd. Widen Tremont from two travel lanes to four Tremont Street 0.65 20,800,000 0 10,000,000 5,000,000 0 0 0 2015 P CN PWTF 15,000,000 2,500,000 travel lanes with sidewalks and stormwater Port Orchard Blvd. improvements. Prior: $3,604,640 SR 16 1.2 Arnold Creek Crossing Replace wooden span under Bay Street for Arnold Bay Street 0.01 Creek with culvert. 1800 Block Bay Street Arnold Avenue 300,000 0 0 0 0 0 .300,000 2019 P CN 300,000 1.3 Bay Street Pedestrian Path Install guardrail, street improvements and sidewalks from Downtown Port Orchard to the Annapolis Foot Ferry Terminal which links to the Washington State Ferry System. Prior: $839,534 Bay Street 1.5 4,775,950 Frederick Street Eastern City Limits 1,000,000 1,000,000 1,000,000 2015 P CN STP(US) 3,000,000 468,208 1.4 Annual Residential Paving Program May include repairing or replacing the existing paving in residential areas. 450,000 0 150,000 0 150,000 0 150,000 2015 P CN 450,000 1.5 Sidewalk Improvement Project Repair and replace concrete sidewalks as needed. 60,000 10,000 10,000 10,000 10,000 10,000 10,000 2014 P CN 60,000 1.6 Anderson Hill/Old Clifton Rd Intersection Improvements Intersection Improvements Old Clifton/Anderson Hill 0 400,000 100,000 0 0 0 0 2014 P PE 100,000 0 300,000 0 0 0 2015 P CN 300,000 Page Iof3 City of Port Orchard Six -Year Transportation Improvement Program (TIP) For 2014-2019 TIER 2 Road Name Total Phase Priority Begin Termini Project Total Est. Start Funding Federal State Number Project Title/Project Description End Termini Length Cost 2014 2015 2016 2017 2018 2019 Year Status Phase Fund Code Federal Funds Fund Code . State Funds Local Funds 2.1 Bethel Avenue Widen Bethel Avenue from two travel lanes to Bethel Avenue 2.4 4,000,000 0 0 0 400,000 0 0 2017 P PE STP(US) 346,000 54,000 four travel lanes and add sidewalks, street lighting Bethel Roundabout 0 0 0 0 600,000 0 2018 P RW STP(US) 519,000 81,000 and stormwater improvements. Lincoln Ave. 0 0 0 0 0 3,000,000 2019 P CN STP(US) 2,595,000 405,000 2.2 Bethel Avenue West Bethel Road is currently two lanes wide it needs Bethel Avenue 0.4 5,000,000 0 0 0 0 0 5,000,000 2019 P ALL STP(US) 4,325,000 675,000 to be widened to four lanes with street lights, Bay Street sidewalks, and stormwater system upgrades to Bethel Avenue 2.3 Sidney Avenue (North of SR 16) Overlay Overlay Sidney Avenue and construct a shoulder. Sidney Avenue 0.5 500,000 0 0 0 500,000 0 0 2017 P ALL 500,000 Lippert Drive SR 16 2.4 Pottery Avenue Widening Widen road to two travel lanes with sidewalks on Pottery Avenue 0.3 1,600,000 0 0 0 0 0 1,600,000 2019 P ALL 1,600,000 both sides and stormwater system improvements. Tremont Street Melcher Street 2.5 Melcher Street Widening Melcher Street West is currently a narrow two- Melcher Street West 0.4 400,000 0 0 0 0 0 400,000 2019 P ALL OTHER 200,000 200,000 lane road, the reconstruction would widen the Pottery Avenue road to allow two safe travel lanes. Sherman Avenue 2.6 Fireweed Road Widening Fireweed is a two lane road currently, it needs to Fireweed Road 0.25 500,000 0 0 0 0 0 500,000 2019 P ALL 500,000 be widened to include shoulders and a Sidney Avenue stormwater system needs to be installed. South Flower Avenue 2.7 Sherman Avenue Widening Sherman Avenue is currently two travel lanes Sherman Avenue 0.35 750,000 0 0 0 0 750,000 0 2018 P ALL 750,000 wide, but needs shoulders and a stormwater Fireweed Road system. Terminus at SR 16 2.8 Port Orchard Gateway Entry Phase II Port Orchard Boulevard is currently three lanes Port Orchard Blvd. 1.1 16,000,000 0 0 0 0 0 16,000,000 2019 P ALL STP(US) 13,840,000 2,160,000 wide with narrow shoulders, as a continuation of Bay Street the Tremont Widening Project it will need to be Tremont Street widened to include sidewalks, traffic calming and traffic control at the intersection with Bay Street. 2.9 Old Clifton Road Widening Old Clifton Road is currently a two lane road Old Clifton Road 2.11 1,734,000 0 0 0 0 1,734,000 0 2018 P ALL STP(US) 1,500,000 234,000 without sidewalks, this project would widen the SR 16 Overpass road to four lanes and add street lighting, West City Limits sidewalks, and storm drainage. 2.10 Pottery Avenue Widening Tremont to SR16 Pottery is currently a two-lane road, it needs to be Pottery Avenue 0.95 5,700,000 0 0 0 500,000 0 0 2017 P PE STP(US) 432,500 67,500 widened to a four -lane road, with sidewalks, Tremont Street 0 0 0 0 750,000 0 2018 P RW STP(US) 648,750 101,250 traffic calming and upgrades to the stormwater SR 16 Overpass 0 0 0 0 0 4,450,000 2019 P CN STP(US) 2,292,250 TIB 1,500,000 657,750 2.11 Sidney Avenue (South of SR 16) Widening Sidney Avenue is currently two lanes wide, it Sidney Avenue 0.95 5,700,000 0 0 0 0 0 5,700,000 2019 P ALL STP(US) 3,200,000 TIB 1,600,000 900,000 needs to be widened to four lanes including the SR 16 Overpass addition of sidewalks, traffic calming, and Sedgwick Road stormwater system improvements. 2.12 Bay Street and Rockwell Avenue Intersection Improvements are needed at the intersection for Bay Street 0 100,000 0 0 0 0 0 100,000 2019 P ALL 100,000 driver safety and visibility. Bay Street Rockwell Avenue 2.13 Cline Avenue Rehabilitation Replace sidewalk and parking strip on the west Cline Avenue 0.13 250,000 0 0 0 0 50,000 0 2018 P PE 50,000 side of the road, the east side has already been Kitsap Drive 0 0 0 0 0 200,000 2019 P CN 200,000 replaced. Dwight Street Page 2 of 3 a V%y we VWNL vN"Iulu-JIA-1c01 I I ON 140PLIULdIlLl1 I -191FIvvC11ICI 1 L r l Wr,101 t 1, l i rI For 2014-2019 TIER 2 Road Name Total Phase Priority Begin Termini Project Total Est. Start Funding Federal State Number Project Title/Project Description End Termini Length Cost 2014 2015 2016 2017 2018 2019 Year Status Phase Fund Code Federal Funds Fund Code State Funds Local Funds 2.14 Bethel Corridor Improvements Widen roadway Bethel Rd. 1.7 40,750,000 0 750,000 0 0 0 0 2015 P PE 750,000 Ives Mill Road 0 0 1,000,000 4,000,000 0 0 2016 P RW STP(US) 4,325,000 675,000 Lincoln Avenue 0 0 0 0 0 35,000,000 2018 P CN STP(US) 30,275,000 4,725,000 2.15 Old Clifton Rd & McCormick Woods Drive Intersection Signal Improvements Old Clifton Rd 0 270,000 0 0 0 100,000 0 0 2017 P PE 100,000 McCormick Woods Dr. 0 0 0 0 300,000 0 2018 P CN 300,000 Old Clifton Rd. 2.16 Old Clifton Rd & Campus Parkway Intersection Roundabout McCormick Woods 0 400,000 0 100,000 0 0 0 0 2015 P PE 100,000 North - Old Clifton Rd. & 0 0 300,000 0 0 0 2016 P CN 300,000 Campus Parkway Page 3 of 3